Sei sulla pagina 1di 8

End user : TRANSNOA S.A.

Bid Title : 132kV EETT TUCUMAN NORTE y TUCUMAN OESTE de CIUDAD DE SAN MIGUEL DE TUCUMAN
Doc. No. : ARG-1312-MP-127
Date: : 21-Jan.-2014

MANUFACTURING PROCESS
End user : TRANSNOA S.A.
Bid Title : 132kV EETT TUCUMAN NORTE y TUCUMAN OESTE de CIUDAD DE SAN MIGUEL DE TUCUMAN
Doc. No. : ARG-1312-MP-127
Date: : 21-Jan.-2014

FACTORY CAPACITY
cable manufacturing facilities

Year of
No Name of Machine Unit Capacity Manufacturer
Manufacturing

1 Drawing Cu 11Dies 1 24MT/day LG Machinery 1995


2 Drawing Cu 13Dies 1 25MT/day Niehoff 1996
3 Drawing Cu 17Dies 1 4.8MT/day Pioneer 1991
4 Drawing Cu 17Dies 1 9.0Km/day Pioneer 2004
5 Drawing AL 11Dies 1 9.6Km/day LG Machinery 1995
6 96 Bo, Stranding M/C 1 7.5Km/day HeNing 2007
7 72 Bo, Stranding M/C 1 7.0Km/day LG Machinery 1990
8 60 Bo, Stranding M/C 1 15Km/day LG Machinery 1995
9 54 Bo, Stranding M/C 1 15Km/day LS VINA Cable 2005
10 30 Bo, Stranding M/C 1 15Km/day LS VINA Cable 1999
11 Stranding 7 Bo, Skip 1 16Km/day LG Machinery 1990
12 Stranding 7 Bo, Tube 1 15Km/day LG Machinery 1990
13 Stranding 630 Buncher 1 45Mm/day Pioneer 1991
14 R/T Strander 1 3.6Km/day LG Machinery 1990
15 1600 Buncher 1 9.0Km/day LG Machinery 1991
16 Laying-up 4 Bobin 1 3.5Km/day LG Machinery 1995
17 5 Bobbin Drum Twist 1 3.5Km/day Smater 2008
18 Taping Metallic Screen 1 3.2Km/day LG Machinery 1995
19 Φ115 CCV Line No. 1 1 6.0Km/day LG Machinery 1995
20 Φ115 CCV Line No. 2 1 6.0Km/day SOLUTECH 1985
21 Φ200 CCV Line No. 3 1 8.0Km/day SIMEC 2005
22 Φ200 CCV Line No. 4 1 2.9Km/day SIMEC 2008
23 Lead sheath 1 1 2.5Km/day LG Machinery 1990
3
24 New Dry room 1 300m /day LS VINA Cable 2008
25 Properzi Line 1 100MT/day Properzi 1994
26 Welded Aluminum 1 2.5Km/day Anhui Herrman Impex Co. 2010
27 Φ150 Extruding-1 1 4.4Km/day LG Machinery 1995
28 Φ150 Extruding-2 1 4.4Km/day Wai Tak Lung 2008
29 Φ115 Extruding 1 15.0Km/day LG Machinery 2003
30 Φ90 Extruding 1 15.0Km/day Wai Tak Lung 2008
31 Φ80 Extruding 1 15.0Km/day LG Machinery 1982
32 Φ70 Extruding 1 60.0Km/day Pioneer 1991
End user : TRANSNOA S.A.
Bid Title : 132kV EETT TUCUMAN NORTE y TUCUMAN OESTE de CIUDAD DE SAN MIGUEL DE TUCUMAN
Doc. No. : ARG-1312-MP-127
Date: : 21-Jan.-2014

RAW MATERIAL CONTROL


Quality Control Process
For
132kV CU/XLPE/AL/HDPE

Date: 20 Jan, 2014


QA Department
Quality control process

Process Items Method Frequence Form type Verdict

CU Rod Surface Visual Check 100% Daily working Statistics,


Diameter Measurements sheet Verdict
Tensile strength Mechanical property
1 [Check materials] Resistivity Electric property

2 Drawing Surface Visual One sample Daily work Statistics,


Diameter Measurements per each sheet Verdict
Production
[Check on
3 batch
process]
Surface Visual Three times Daily working Statistics,
4 Strand No. of wires Visual Per each sheet Verdict
Outer diameter Measurements stranding
Direction of the outer layers Visual Batch
5 [Check on Stranding Pitch Measurements
process]
XLPE

6 Hot set test Measurements One samples Incoming Statistics,


[Check materials] T/S & E/L Before and after aging Mechanical property /Lot Test sheet Verdict
Electric property

7 Insulation Surface Visual Check Daily work Statistics,


Thickness and diameter Measurements 100% sheet Verdict
[Check on Hot set test Mechanical property
8
process] Concentricity Measurements
Quality control process

Process Item Methods Frequence From type Verdict

Al Sheath Surface Visual 03 samples Incoming Statistics,


Dimension Measurements /Lot Test sheet Verdict

9 [Check materials]

Al Sheath Surface Visual Check Daily work Statistics,


10
Thickness Measurement 100% sheet Verdict
[Check on
11
process]
Surface Visual 05 samples Incoming Statistics,
HDPE

T/S & E/L before and after ageing Mechanical property /Lot Test sheet Verdict
12 Hot pressure test
[Check material]

Surface & Marking contents Visual Check Daily work Statistics,


13 Thickness Measurements 100% sheet Verdict
Outer Sheath
Electrical test on non- Electrical
metallic sheath (Spark test)
14 [Check on
process]

Finish product checking process


Test on cable
Routine test Sample test (10% of drum)

No. Test item Method No. Test item Method

Measure by micrometer
1 Appearance 1 Conductor examination
and caliper
A.C High voltage at 190kV/30 2 Check of dimensions
2 A.C tester
min..
2.1 Thickness of Insulation Measured by projector
3 P.D test at 114kV P.D tester
2.2 Thickness of metallic sheath. Measured by Micrometer
DC voltage test on oversheath 2.3 Thickness of outersheath Measured by Microscope
4
at 25kV/1 min.
2.4 Outer diameter of cable Measured by caliper
3 Hot set test for XLPE Physical in Oven
4 Water penetration
Measured by DC
5 D.C resistance of cond. at 20oC.
resistance tester
6 Capacitance

Potrebbero piacerti anche