GROUND FLOOR
1. Electrical trench closing thermal lab
2. CAM lab front tiles and wall finish
3. Handicap toilet to be finished
FIRST FLOOR
1. Staff room toilet- full work
2. Grill work
SECOND FLOOR
1. T&P cell bath room and tiles polishing and finishing work
2. Inner and outer – wall finishing in toilet
3. Seminar hall –full work
4. Grill work
THIRD FLOOR
1. Seminar hall – full work
2.307 to 309 AC duct closing
3. Full work pending in toilet
4. Grill work
MECHANICAL BUILDING ELECTRICAL WORK
2. AC work in Third floor computer lab , mini conference hall , Seminar hall second and third
floor
4. Partition finishing
2. Toilet door finishing, lock inside and outside (third, fourth and fifth floor)