Sei sulla pagina 1di 2
IR — INSPECTION REQUEST WEST QUANA I= SECTION-1 ay | Contractor No.: AWQ0109 ExxonMobil jcarze Ec Produced Water Treatment M109 LOCATION: DS-7 | IR NO:IR Mo CE-C0030 | IRISSUE DATE: 05 February 2017 DISCIPUNE: Civil SUBJECT: Inspection INSPECTION REQUIRED DATE:06 February 2017 | TIME:10:00 REF. SPECIFICATION: 1QWA-FT-NSPDS-00-040901 REV.1 EARTHWORK REF. DRAWINGS: !QW@-CE1091-LDPLT-D7-0001 REV. D DS7 PLOT PLAN, RFF. ITP: 1QWA-CE1092-CPCQAC-00-ODICIVIL REV. C INSPECTION AND TEST PLAN (OTHERS REF.: ATTACHMENT /CHECK UST IF ANY: NAME OF CONTRACTOR/SUBCONTRACTOR: (CPECC/AL MADAR ‘Our request the inspection of the following works for certficate/witness that al tems has been properly executed in accordance with approved procedures, specifications, drawings and all items has been coordinated with future works. DISCRIPTION OF WORK TO BE INSPECTED: ‘We complete the compaction of second layer in DS7. Request inspection for surveying work for this layer ‘COMMENTS: Olaccepted ClaccepTep with COMMENTS Oresecteo work is not ready Qnacceptable inspection result Tisee comments | CI TICK THIS BOX IF “NO” EMIL/ SOC and itis a "WITNESS" as per TP, [by ticking this box means CPECC needs to produce all the related documents and. sign / close this IR) ‘SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT SUBCONTRACTOR crece COMPANY omnes PINT WANE: NTT NAME: PrN WAM nT aN Uhalicl wateed| ‘SIGNATURE: CE : ‘SIGNATURE: “ae DATE: - LPATE: 5/21 2017 MFCO pen epee al Tracing & Contracting www.mfcoig.com ‘8M, BS=141M ,Hl=3.21 Req, FS=3.106M No. FS (M) Elev. (WM) 1 3.12 0.09 2 3.07) 0.14 3 3.02 0.19 4 3.15 0.06 5 an 0.14 6 3.13 0.08 7 3.4 0.11 8 34 O11 @ 3.09 0.12 70 3.09 0.12 4 34 O11 12 3.07 0.14 13 34 O11 14 3.08 0.13 15 3.09 0.12 16 34 O11 7 3.12 0.09 18 34 on 19 3.41 4 20 3.13 0.08 24 3.47 on 22 3.09 0.12 23 3.15 0.08 24 3.14 0.07 25 3.15: 0.06 26 3.12 0.09 27 3.12 0.09 28 3.4 O11 29 3.12 0.09 30 3.16 0.05) 34 3.412 0.09 32 3.09 0.42 33 3.11 4 34 3.12 0.09 35 3.14 0.07 36. 3.15 0.06 37, 3.14 0.07 38 3.41 0.4 ft MFCO SURVEYOR CPECC SURVEYOR ExxonMobil LP Moha: hmed Ma Gang 5 Ce salam aly ward 6Eh NE (Q, BASRA, AL JAZAEER ST, website: www.mfcoia.com, email: mfco@mfcoig.com , Phone: 009647800006008

Potrebbero piacerti anche