SUB-CONTRACTOR DOCUMENT TRANSMITTAL

TO: WINTECO CORPORATION DATE: 22-Oct-18


Baeksang Star Tower #301 PROJECT: Salalah LPG Project, Oman
60-17, Gasan-Dong COMPANY Contract No: SLPG/08/2015
Geumcheon-Gu, Seoul CONTRACTOR Project No: JI-2033
Korea, 153-801

TRANSMITTAL NO:
ATTN: Y.K.Moon
JI-2033-PECOL-WINT-T-0444
TRANSMITTING OF:

Procedure Documents- S/C Winteco

DOC.
SL: DOCUMENT NUMBER REV: TITLE APPROVAL
CODE

1 SLPG-Q-0000-04001-051-001-4 0 Welder Pre-qualification Record for Dhofar structure 2

2 SLPG-Q-0000-04001-021-001-4 A RT Procedure for Tanks & Piping 3

3 SLPG-Q-0000-04001-023-001-4 A MT procedure for Tank & Piping 3

4 SLPG-Q-0000-04001-024-001-4 A PT procedure for Tanks & Piping 3

5 SLPG-Q-0000-04001-025-001-4 A RT Procedure for Structure 3

6 SLPG-Q-0000-04001-026-001-4 A UT Procedure for Structure 3

7 SLPG-Q-0000-04001-027-001-4 B MT procedure for Structure 1

8 SLPG-Q-0000-04001-028-001-4 B PT procedure for Structure 1

9 SLPG-Q-0000-04001-034-001-4 A RT Procedure for Tanks & Piping - by Sub-Contractor 2

10 SLPG-Q-0000-04001-035-001-4 A MT Procedure for Tanks & Piping - by Sub-Contractor 2

11 SLPG-Q-0000-04001-036-001-4 A PT Procedure for Tanks & Piping - by Sub-Contractor 2

12 SLPG-Q-0000-04001-037-001-4 A UT Procedure for Structure - by Sub-Contractor 2

13 SLPG-Q-0000-04001-008-001-4 B Pickling & Passivation Procedure 1

14 SLPG-Q-0000-04001-003-001-4 C Weld Consumable Control/Handling Procedure 1

15 SLPG-Q-0000-04001-004-001-4 C Welder & Welding Operator Qualification Procedure 1

16 SLPG-Q-0000-04001-013-001-4 D WPS & PQR for Anchor strap 2

17 SLPG-Q-0000-04001-020-001-4 A WPS & PQR for Piping 2

18 SLPG-Q-0000-04001-040-001-4 A WPS / PQR (No. FC-P1.1-793I-1) for Double Wall Tank 2

19 SLPG-Q-0000-04001-041-001-4 A WPS / PQR (No. FS-P1.1-791I & FS-P1.1-792I) for Double Wall Tank 2

20 SLPG-Q-0000-04001-042-001-4 A WPS & PQR (No. GT-P1.1-811I & GT-P1.1-812I) for Double Wall Tank 2

21 SLPG-Q-0000-04001-043-001-4 A WPS & PQR (No. SM-P1.1-115I) for Double Wall Tank 2

22 SLPG-Q-0000-04001-044-001-4 A WPS & PQR (No. GM-P25-811) for Double Wall Tank 2
WPS / PQR (No. GS-P1.1-811I, GS-P1.1-812I, GS-P1.1-801I, GS-P1.1-802I, GS-P1.1-113SI)
23 SLPG-Q-0000-04001-045-001-4 A 2
for Double Wall Tank
24 SLPG-Q-0000-04001-046-001-4 A WPS / PQR (No. SM-P1.8-791) for Double Wall Tank 2

25 SLPG-Q-0000-04001-047-001-4 A WPS / PQR (No. GT-P8.8-101) for Double Wall Tank 2

26 SLPG-Q-0000-04001-039-001-4 B WPS / PQR (No. FC-P1.1-801) for Double Wall Tank 2

27 SLPG-Q-0000-04001-048-001-4 B WPS / PQR (No. FC-P1.1-800 and FC-P1.1-804) for Double Wall Tank 2

28 SLPG-Q-0000-04001-049-001-4 B WPS / PQR (No. FC-S355ML-802) for Double Wall Tank 2

29 SLPG-Q-0000-04001-052-001-4 B Proposal of Preliminary Welding Procedure Specification (P-FC-P1.S355ML-803) 2

30 SLPG-Q-0000-04001-055-001-4 A WPS / PQR (No. FC-P1.S355ML-803) for Double Wall Tank 2

31 SLPG-Q-0000-04001-218-001-4 B Inspection And Test Plan At Shop 1

32 SLPG-Q-0000-04001-219-001-4 B Inspection And Test Plan At Field 1

TOTAL NUMBER OF RECORDS: 32

REMARKS:

COPIES TO:
ISSUE REASON:
APPROVAL CODE LEGEND: Code 1 Final. Document accepted without comment. Do not resubmit except TRANSMITTED BY:
modified.
Code 2 Revise & Reissue. Incorporate comments & re-submit. Work may
proceed subject to incorporation of comments indicated.
Code 3 Rejected. Incorporate comments & Re-submit. Work may NOT proceed.
Code 4 Information only. Incorporate comments if any. Work may proceed. PARTHA DE
Code 5 Void/Cancelled. Document has been cancelled/deleted. PROJECT DIRECTOR

Acknowledge receipt by signing and returning a copy of this transmittal to Contractor; Received By
Attention: Document Controller, JI-2033, Petrofac International Ltd., Petrofac House Name:
PO. Box. 23467, Sharjah, UAE Signature:
Tel: +97165740999, Fax: +97165740099, Email: sdc.2033@petrofac.com Date: