Project Shield

configuration Document

SHIELD
Configuration Document

MATERIALS
MANAGEMENT

SEPTEMBER to NOVEMBER 2007

Page 1 of 182
Project Shield
configuration Document
TABLE OF CONTENTS: Page No

1. Enterprise Structure – Definition: --------------------------------------------------------------------------07-27


1.1 Logistics – General
1.1.1 Define valuation level
1.1.2 Define, copy, delete, check plant
1.2 Materials Management
1.2.1 Maintain storage location
1.2.2 Maintain purchasing organization
2. Enterprise Structure – Assignment :-------------------------------------------------------------------------27-32
2.1 Logistics - General
2.1.1 Assign plant to company code
2.2 Materials Management
2.2.1 Assign purchasing organization to company code
2.2.2 Assign purchasing organization to plant
3. Logistics – General:-----------------------------------------------------------------------------------------------33-42
3.1 Material Master
3.1.1 Assign Screen Sequences to User/Material Type/Transaction/Industry Sector
3.2 Material Types
3.2.1 Define Attributes of Material Types
3.2.2 Define Number Ranges for Each Material Type
3.3 Settings for Key Fields
3.3.1 Define Material Groups
3.3.2 Define Divisions
3.4 Business Partner
3.4.1 Vendors - Define Account Groups and Field Selection (Vendor)
3.4.2 Vendors- Define Number Ranges for Vendor Master Records
4. Materials Management:
4.1 Purchasing----------------------------------------------------------------------------------------------------43-117
4.1.1 Environment Data
4.1.1.1 - Define Attributes of System Messages
4.1.1.2 Define Default Values for Buyers
4.1.2 Material Master
4.1.2.1 Define Shipping Instructions
4.1.2.2 Define Purchasing Value Keys
4.1.3 Vendor Master
4.1.3.1 Define Terms of Payment
4.1.3.2 Check Incoterms
4.1.4 Create Purchasing Groups
4.1.5 Purchasing Info Record

Page 2 of 182
Project Shield
configuration Document
4.1.5.1 Define Number Ranges
4.1.6 Quota Arrangement
4.1.6.1 Define Number Ranges
4.1.6.2 Define Quota Arrangement Usage
4.1.7 RFQ/Quotation
4.1.7.1 Define Document Types
4.1.7.2 Define Number Ranges
4.1.7.3 Release Procedure
4.1.8 Purchase Requisition
4.1.8.1 Define Document Types
4.1.8.2 Define Number Ranges
4.1.9 Purchase Order
4.1.9.1 Define Document Types
4.1.9.2 Define Number Ranges
4.1.9.3 Release Procedure
4.1.9.4 Set Tolerance Limits for Price Variance
4.1.9.5 Texts for Purchase Orders
4.1.9.6 Set up Stock Transport Order
4.1.9.7 Returns Order
4.1.10 Contract
4.1.10.1 Define Document Types
4.1.10.2 Define Number Ranges
4.1.10.3 Release Procedure
4.1.11 Scheduling Agreement
4.1.11.1 Define Document Types
4.1.11.2 Define Number Ranges
4.1.12 Conditions
4.1.12.1 Define Price Determination Process
4.1.12.1.1 Define Access Sequences
4.1.12.1.2 Define Condition Types
4.1.12.1.3 Define Calculation Schema
4.1.12.1.4 Define Schema Group
4.1.12.1.5 Define Schema Determination
4.1.12.1.6 Define Transaction/Event Keys
4.1.13 Account Assignment
4.1.13.1 Maintain Account Assignment Categories
4.1.14 Define Default Values for Document Type
4.1.15 Version Management
4.1.15.1 Set Up Version Management for Purchase Requisitions
4.1.15.2 Set Up Version Management for External Purchasing Documents
4.1.15.3 Define Reasons for Change

Page 3 of 182
Project Shield
configuration Document
4.1.16 Vendor Evaluation
4.1.16.1 Define Weighting Keys
4.1.16.2 Define Criteria
4.1.16.3 Define Scope of List
4.1.16.4 Maintain Purchasing Organization Data
4.2 External Services Management -----------------------------------------------------------------------108-111
4.2.1 Service Master
4.2.1.1 Define Service Category
4.2.1.2 Define Number Ranges
4.2.2 Number Ranges
4.2.2.1.1 Define Number Ranges for Service Entry Sheet
4.2.2.1.2 Define Internal Number Range for Service Specifications
4.2.2.1.3 Assign Number Ranges
4.2.3 Define Attributes of System Messages
4.3 Inventory Management and Physical Inventory--------------------------------------------------112-124
4.3.1 Goods Issue / Transfer Postings
4.3.1.1 Create Storage Location Automatically
4.3.1.2 Set Up Dynamic Availability Check
4.3.2 Goods Receipt
4.3.2.1 Set Tolerance Limits
4.3.2.2 Create Purchase Order Automatically
4.3.2.3 Set "Delivery Completed" Indicator
4.3.3 Reservation
4.3.3.1 Define Default Values
4.3.4 Physical Inventory
4.3.4.1 Cycle Counting
4.3.5 Movement Types
4.3.5.1 Record Reason for Goods Movements
4.3.6 Output Determination
4.3.6.1 Maintain Condition Tables
4.3.6.2 Maintain Access Sequences
4.3.6.3 Maintain Output Types
4.3.6.4 Maintain Output Determination Procedures
4.3.6.5 Maintain Conditions
4.4 Valuation and Account Assignment------------------------------------------------------------------125-139
4.4.1 Define Price Control for Material Types
4.4.2 Split Valuation
4.4.2.1 Activate Split Valuation
4.4.2.2 Configure Split Valuation
4.4.3 Account Determination
4.4.3.1 Account Determination Without Wizard

Page 4 of 182
Project Shield
configuration Document
4.4.3.1.1 Define Valuation Control
4.4.3.1.2 Define Valuation Classes
4.4.3.1.3 Configure Automatic Postings
4.5 Logistics Invoice Verification--------------------------------------------------------------------------140-145
4.5.1 Define Attributes of System Messages
4.5.2 Incoming Invoice
4.5.2.1 Number Assignment
4.5.2.1.1 Maintain Number Assignments for Accounting Documents
4.5.2.1.2 Maintain Number Assignment for Logistics Documents
4.5.2.1.2.1 Transaction - Assign Number Range
4.5.2.1.2.2 Maintain Number Range Intervals for Invoice Documents
4.5.3 Maintain Default Values for Tax Codes
4.5.4 Invoice Block
4.5.4.1 Determine Payment Block
4.5.4.2 Set Tolerance Limits
4.6 Consumption-Based Planning ------------------------------------------------------------------------146-146
4.6.1 Master Data
4.6.1.1 Define MRP Controllers
5. Financial Accounting (New) [ TAXINN-Condition based Procedure]-------------------------147-157
5.1 Tax on Sales/Purchases
5.1.1 Basic Settings
5.1.1.1 Check Calculation Procedure
a) Access Sequences
b) Define Condition Types
c) Define Procedures
5.1.1.2 Assign Country to Calculation Procedure
5.1.1.3 Check and Change Settings for Tax Processing
5.2 Calculation
5.2.1 Define Tax Codes for Sales and Purchases
5.3 Posting
5.3.1 Define Tax Accounts
6. Logistics – General [Country India Version-CIN Settings] :-----------------------------157-182
6.1 Tax on Goods Movements [India]
6.1.1 Basic Settings
6.1.1.1 Maintain Excise Registrations
6.1.1.2 Maintain Company Code Settings
6.1.1.3 Maintain Plant Settings
6.1.1.4 Maintain Excise Groups
6.1.1.5 Maintain Series Groups
6.1.2 Determination of Excise Duty
6.1.2.1 Select Tax Calculation Procedure

Page 5 of 182
Project Shield
configuration Document
6.1.2.2 Maintain Excise Defaults
6.1.3 Condition-Based Excise Determination
6.1.3.1 Define Tax Code for Purchasing Documents
6.1.3.2 Assign Tax Code to Company Codes
6.1.3.3 Classify Condition Types
6.1.4 Master Data
6.1.4.1 Assign Users to Material Master Screen Sequence for Excise Duty
6.1.4.2 Maintain Chapter IDs
6.1.5 Account Determination
6.1.5.1 Define G/L Accounts for Taxes
6.1.5.2 Specify Excise Accounts per Excise Transaction
6.1.5.3 Specify G/L Accounts per Excise Transaction
6.1.6 Business Transactions
6.1.6.1 Incoming Excise Invoices
6.1.6.1.1 Maintain Rejection Codes
6.1.6.1.2 Specify Which Movement Types Involve Excise Invoices
6.1.7 Outgoing Excise Invoices
6.1.7.1 Assign Billing Types to Delivery Types
6.1.7.2 Maintain Default Excise Groups and Series Groups
6.1.8 Subcontracting
6.1.8.1 Maintain Movement Type Groups
6.1.8.2 Subcontracting Attributes
6.1.9 Tools
6.1.9.1 Number Ranges
6.1.9.2 Message Control

---------------------------------------------------------------------------------------------------------------------------------------

Page 6 of 182
Project Shield
configuration Document

Enterprise structure Related to Materials Management


Definition
Define valuation level
Enterprise Structure
SPRO Definition Logistic General
Definition Define Valuation Level

For GMR – Valuation level is defined at Plant Level.

Define, copy, delete, check plant


SPRO / IMG ->
> Enterprise Structure -> Definition -> Logistics General ->
> Define copy delete
check plant

Page 7 of 182
Project Shield
configuration Document

Following plants are defined for GMR.

2000 GMR Energy Limited

2001 Kamalanga Thermal Power Projec

2002 Talong

2003 Bajoli Holi

2004 GMR Energy Limited(Corp Off)

2005 GMR Enegry Ltd (Delhi Off )

2100 GMR Power Corporation Pvt Ltd

2101 HYUNDAI HEAVY IND. CO.LTD. C/O. GMR POWER CORP.

2150 Vemagiri Power Generation Ltd

2151 Korea Plant Service & Eng Co L

2200 GMR Hydro Power Gen Pvt Ltd

3110 GMR T.T EXPRESSWAYS PVT LTD

3120 GMR Tuni Anakapali Exp Pvt Ltd

3130 GMR Pochanpalli Exp Pvt Ltd

3210 GMR Ambala-Chand Exp Pvt Ltd

3220 GMR Jadcherla Exp.ways Pvt Ltd

3230 GMR Ulundurpet Exp Pvt Ltd

3310 GMR PROJECTS PVT.LTD.

4001 GMR Ind.Ltd,Sugar Div,Sankili Sugar Division- SANKILI

4002 GMR Ind.Ltd,Co-gen Div,Sankili Co-Gen Division - SANKILI

4003 GMR Ind.Ltd,Dist Div,Sankili Distillery Division-SANKILI

4011 GMR Ind.Ltd,Sugar Div,Haliyal Sugar Division - HALIYAL

Page 8 of 182
Project Shield
configuration Document
4012 GMR Ind.Ltd,Co-gen Div,Haliyal Co-Gen Division - HALIYAL

4013 GMR Ind.Ltd,Dist Div,Haliyal Distillery Division-HALIYAL

4098 GMR Industries Limited Aviation

4099 GMR Industries Ltd,Corp.Office GMR Corporate Office

5010 GMR Properties Pvt Ltd

5020 Delhi Acropolis Private Ltd.,

6600 GMR Corporate Centre Limit

8000 RAXA Security Services Ltd.

8100 GMR Aviation Private Limited GMR Aviation Private

8601 GMRVF- Estates & Hostels GMRVF- Estates & Hostels

8602 GMRVF-GMRIT-ENGG. & PG GMRVF-GMRIT-ENGG. & PG

8603 GMRVF-GMRIT-P.G.DIPLOMA GMRVF-GMRIT-P.G.DIPLOM

8604 GMRVF-SGCSRC-UG&PG GMRVF-SGCSRC-UG&PG

8605 GMRVF-SGCSRC-B.Ed GMRVF-SGCSRC-B.Ed

8606 GMRVF-CSW-RAJAM GMRVF-CSW-RAJAM

8607 GMRVF-CORPORATE GMRVF-CORPORATE

A001 GMR Industries Ltd., Sugar Division- SANKILI

A002 GMR Industries Ltd., Co-Gen Division - SANKILI

A003 GMR Industries Ltd., Distillery Division-SANKILI

Maintain Storage Location


A storage location is the place where stock is physically kept within a plant. Storage location
has the following attributes:
SPRO / IMG -> Enterprise Structure -> Definition -> Materials Management-> Maintain storage
location

Page 9 of 182
Project Shield
configuration Document
Following storage location are defined for GMR.

PLANT SLOC DESCRIPTION

2000 ACST A/C Stores

2000 ADST Admin Stores

2000 ASTA Bulk Acid ST- A

2000 ASTB Bulk Acid ST- B

2000 CHTR Chlor tonner Rm

2000 COCR CO2 Cyl(Cntrl Rm

2000 COGT CO2 Cyl(GTG)

2000 CSTA Bulk Castic ST-A

2000 CSTB Bulk Castic ST-B

2000 ELST Elec Maint Store

2000 FST1 Fuel Stor Tank

2000 INST Instr Maint Stor

2000 LOSC Lube Oil Scrap

2000 MESC Metal Scrap Yard

2000 MEST Mech Maint Stor

2000 NEWH New Warehouse

2000 NMSC Non-Metalic Scrp

2000 NTFL Nitrogen Cyl(FH)

2000 NTST Nitrogen Cyl(STG

2000 OLWH Old Warehouse

2000 OPST Operation Stores

2000 OPYD Open Yard

Page 10 of 182
Project Shield
configuration Document
2000 RHST Raw HSD Tank

2000 RNT1 Raw Naphta Tank1

2000 RNT2 Raw Naphta Tank2

2000 SAST Safety Stores

2000 THST HSD Trt Stor Tan

2001 PK1

2002 PT1

2003 PBH1

2004 PB1

2005 PD1

2100 101A Tank 101-A

2100 101B Tank 101-B

2100 102A Tank 102-A

2100 102B Tank 102-B

2100 201A Cyl Lube oil - A

2100 201B Cyl Lube oil - B

2100 ACST Sul Acid ST

2100 ADST Admin Store

2100 CHTR Chl tonner SA

2100 CLST Service Tank

2100 CTCH Cooling Tower SA

2100 FLT8 Fuel tank - 8

2100 FLT9 Fuel tank - 9

2100 HYST Hyd Lime St Area

Page 11 of 182
Project Shield
configuration Document
2100 MAST Main Store

2100 MLST Tank 200

2100 OMST O&M Store

2100 SCYD Scrap Yard

2100 STCH STP Chem Store

2100 T104 LDO Tank

2100 T108 HSD Tank

2100 T200 System Oil

2100 T205 Talusia

2100 T600 Oil sludge ST

2100 T601 Sep Oil Sludg ST

2100 ULOS Used Lube Oil

2101 ENGE Engine Room

2101 OMST O&M Store

2150 ACST A/C Stores

2150 ACWA BAST-A(CW PLANT)

2150 ACWB BAST-B(CW PLANT)

2150 ADST GMR Admn Store

2150 ARSH Argonite Shed

2150 ASTA BAST-A(DM PLANT)

2150 ASTB BAST-B(DM PLANT)

2150 CHEM Chemical Lab

2150 CHTR Chl Stor Yard

2150 CMHS Chemical House

Page 12 of 182
Project Shield
configuration Document
2150 CNTR Containers (8 no

2150 COGT CO2 Tank for GTG

2150 COSH CO2 Cyl Shed GTG

2150 CSTA BCST Tank - A

2150 CSTB BCST Tank - B

2150 ELEC Electrical Lab

2150 HKST House Keep Store

2150 HYSH Hydrogen Shed

2150 INST Instrumentation

2150 LOTR Tran.oil yard

2150 MESC Metal Scrap Yard

2150 NTBL Nit Cyl HRSG

2150 NTFL Nit Cyl Fuel Han

2150 OPYD Open Yard

2150 SAST Safety Stores

2150 WHSE Ware House

2151 OMST O&M Store

2200 PA1

3100 RS01 TAMBARAM-TINDIVA

3120 RS02 Tuni-Anakapalli

3130 RS03 Pochanpalli

3210 RS04 Ambala-Chandigar

3220 RS05 Jadcherla

Page 13 of 182
Project Shield
configuration Document
3230 RS06 Ulundurpet

3310 RS07 GMR Projects

4001 FR10 FERT- PALAKONDA

4001 FR11 R.A.VALASA - 1

4001 FR12 R.A.VALASA - 2

4001 FRT1 FERT-MAIN STORE

4001 FRT2 FERT-KOTTURU

4001 FRT3 FERT-VEERAGATAM

4001 FRT4 FERT-VANGARA

4001 FRT5 FERT - RAJAM

4001 FRT6 FERT - CHEEPURUP

4001 FRT7 FERT - DEVADI

4001 FRT8 FERT - RANASTHAL

4001 FRT9 FERT - GARA

4001 SC01 Com Mat - Mech

4001 SC02 Com Mat - Elec

4001 SC03 Com Mat - Proces

4001 SC31 Torr Steels

4001 SC32 Structural Mat

4001 SC33 Metal Steels

4001 SC35 Pipes 1

4001 SC36 Pipes 2

4001 SC37 Pipes 3

4001 SC39 Oil & Fuel Stor

Page 14 of 182
Project Shield
configuration Document
4001 SC40 Diesel Bunk

4001 SC41 Gas1-Oxygen

4001 SC42 Gas2-D.A Others

4001 SC43 Gas3 - Empty

4001 SC45 Chemicals

4001 SC90 Rejected Mat

4001 SC95 Scrap Material

4001 SC99 Statry/EDP Mat

4001 SCRP SCRAP MATERIAL

4001 SCRT CUSTOMER RETURNS

4001 SFG1 SUGAR FG 1A & 1B

4001 SFG2 SUGAR FG 2A & 2B

4001 SFUL SUGAR FUELS

4001 SML1 MOLASSES TANK 1

4001 SML2 MOLASSES TANK 2

4001 SML3 MOLASSES TANK 3

4001 SRMS SUGAR RAW MAT

4001 SS01 Sugar Mat - Mech

4001 SS02 Sugar Mat - Elec

4001 SS03 Sugar Mat - Proc

4001 SS71 FG Storage 1

4001 SS72 FG Storage 2

4001 SS73 FG Storage 3

4001 SS74 FG Storage 4

Page 15 of 182
Project Shield
configuration Document
4001 SS77 Molasses Tank 1

4001 SS78 Molasses Tank 2

4001 SS79 Molasses Tank 3

4001 SS82 Raw Mat (Cane)

4001 SS84 Bagasse Storage

4001 SS85 Fert -Main Store

4001 SS86 Fert -Kotturu

4001 SS87 Fert -Veeragatam

4001 SS88 Fert -Vangara

4001 SS89 Fert -Rajam

4001 SS90 Fert-Chepurupali

4001 SS91 Fert-Devadi

4001 SS92 Fert-Ranasthalam

4001 SS93 Fert-Gara

4001 SS95 Sulphur

4001 SS97 Lime

4001 SS98 Prod Storage

4001 STOL TOOLS

4001 SWIP SUGAR-WIP

4002 CFUL CO-GEN FUELS

4002 CRMS CO-GEN RAW MATER

4002 CTOL CO-GEN TOOLS

4002 CWIP CO-GEN WIP

4002 SP01 Co-gen.Mat- Mech

Page 16 of 182
Project Shield
configuration Document
4002 SP02 Co-gen.Mat- Elec

4002 SP03 Co-gen.Mat- Proc

4002 SP78 Caustic Lye

4002 SP79 HCL

4002 SP80 Sulphuric Acid

4002 SP81 Clarified Water

4002 SP83 DM Water

4002 SP85 Bagasse Storage

4002 SP86 Bagasse Storage

4002 SP87 Bagasse Storage

4002 SP88 Bagasse Storage

4002 SP89 Bagasse Storage

4002 SP92 Bio-Mass Fuels

4002 SP93 Coal Yard

4002 SP94 Ash Yard

4002 SP95 Scrap Yard

4002 SP98 Prod Storage

4003 DEP1 DIST - ETP1

4003 DEP2 DIST - ETP2

4003 DFG1 DIST - FG 1

4003 DFG2 DIST - FG 2

4003 DFG3 DIST - VAT

4003 DML1 Molasses Tank -I

4003 DML2 Molasses Tank -2

Page 17 of 182
Project Shield
configuration Document
4003 DRMS DIST - RAW MAT

4003 DTOL DIST - TOOLS

4003 DWIP DIST - WIP

4003 SD01 DIist.Mat - Mech

4003 SD02 DIist.Mat - Elec

4003 SD03 DIist.Mat - Proc

4003 SD31 Molasses Tank- I

4003 SD32 Molasses Tank-II

4003 SD33 Molases Day Tank

4003 SD36 RS/ENA Rec - 1

4003 SD37 RS/ENA Rec - 2

4003 SD38 RS/ENA Rec - 3

4003 SD39 RS/ENA Rec - 4

4003 SD42 Ethaonal Rec - 1

4003 SD43 Ethaonal Rec - 2

4003 SD44 Ethaonal Rec - 3

4003 SD45 Ethaonal Rec - 4

4003 SD48 Impure Spirit -1

4003 SD49 Impure Spirit -2

4003 SD51 Fusel oil Rec -1

4003 SD52 Fusel oil Rec -2

4003 SD55 RS/ENA Vat -1

4003 SD56 RS/ENA Vat -2

4003 SD57 RS/ENA Vat -3

Page 18 of 182
Project Shield
configuration Document
4003 SD58 RS/ENA Vat -4

4003 SD61 Imp Spirit Vat-1

4003 SD63 Fusel Oil Vat -1

4003 SD65 DS Vat - 1

4003 SD67 Ethanol Vat -1

4003 SD68 Ethanol Vat -2

4003 SD71 DS Issue Vat -1

4003 SD72 DS Issue Vat -1

4003 SD75 Issue Vat - 1

4003 SD76 Issue Vat - 1

4003 SD77 Issue Vat - 1

4003 SD79 Clar Wat Reservr

4003 SD80 DM Water Tank

4003 SD81 Coal Yard

4003 SD82 Husk Yard

4003 SD83 Bagrasse Yard

4003 SD84 Ash Storage

4003 SD87 Buffer Tank - 1

4003 SD88 Buffer Tank - 2

4003 SD89 Lagoon - 1

4003 SD90 Lagoon - 2

4003 SD92 Sump

4003 SD93 Leachate Pit

4003 SD94 Bio-Compost Yard

Page 19 of 182
Project Shield
configuration Document
4003 SD95 Scrap Material

4003 SD96 Bio-Fert Storage

4003 SD98 Prod Storage

4011 HC01 Com Mat - Mech

4011 HC02 Com Mat - Elec

4011 HC03 Com Mat - Proces

4011 HC31 Torr Steels

4011 HC32 Structural Mat

4011 HC33 Metal Steels

4011 HC35 Pipes 1

4011 HC36 Pipes 2

4011 HC37 Pipes 3

4011 HC39 Oil & Fuel Stor

4011 HC40 Diesel Bunk

4011 HC41 Gas1-Oxygen

4011 HC42 Gas2-D.A Others

4011 HC43 Gas3 - Empty

4011 HC45 Chemicals

4011 HC90 Rejected Mat

4011 HC95 Scrap Material

4011 HC99 Statry/EDP Mat

4011 HS01 Sugar Mat - Mech

4011 HS02 Sugar Mat - Elec

4011 HS03 Sugar Mat - Proc

Page 20 of 182
Project Shield
configuration Document
4011 HS71 FG Storage 1

4011 HS72 FG Storage 2

4011 HS73 FG Storage 3

4011 HS74 FG Storage 4

4011 HS77 Molasses Tanks1

4011 HS78 Molasses Tanks2

4011 HS79 Molasses Tanks3

4011 HS82 Raw Mat(Cane)

4011 HS84 Bagasse Storage

4011 HS85 Fertlizer 1

4011 HS86 Fertlizer 2

4011 HS87 Fertlizer 3

4011 HS88 Fertlizer 4

4011 HS89 Fertlizer 5

4011 HS90 Fertlizer 6

4011 HS91 Fertlizer 7

4011 HS92 Fertlizer 8

4011 HS93 Fertlizer 9

4011 HS95 Sulphur

4011 HS97 Lime

4011 HS98 Prod Storage

4011 SCRP SCRAP MATERIAL

4011 SCRT CUSTOMER RETURNS

4011 SFG1 SUGAR FG 1A & 1B

Page 21 of 182
Project Shield
configuration Document
4011 SFG2 SUGAR FG 2A & 2B

4011 SFUL SUGAR FUELS

4011 SML1 MOLASSES TANK 1

4011 SML2 MOLASSES TANK 2

4011 SML3 MOLASSES TANK 3

4011 SRMS SUGAR RAW MAT

4011 STOL TOOLS

4011 SWIP SUGAR-WIP

4012 CFUL CO-GEN FUELS

4012 CRMS CO-GEN RAW MATER

4012 CTOL CO-GEN TOOLS

4012 CWIP CO-GEN WIP

4012 HP01 Co-gen.Mat- Mech

4012 HP02 Co-gen.Mat- Elec

4012 HP03 Co-gen.Mat- Proc

4012 HP78 Caustic Lye

4012 HP79 HCL

4012 HP80 Sulphuric Acid

4012 HP81 Clarified Water

4012 HP83 DM Water

4012 HP85 Bagasse Storage

4012 HP86 Bagasse Storage

4012 HP87 Bagasse Storage

4012 4012 Bagasse Storage

Page 22 of 182
Project Shield
configuration Document
4012 HP89 Bagasse Storage

4012 HP92 Bio-Mass Fuels

4012 HP93 Coal Yard

4012 HP94 Ash Yard

4012 HP95 Scrap Yard

4012 HP98 Prod Storage

4013 DFG1 DIST - FG 1

4013 DFG2 DIST - FG 2

4013 DFG3 DIST - VAT

4013 DML1 Molasses Tank -I

4013 DML2 Molasses Tank -2

4013 DRMS DIST - RAW MAT

4013 DTOL DIST - TOOLS

4013 DWIP DIST - WIP

4013 HD01 DIist.Mat - Mech

4013 HD02 DIist.Mat - Elec

4013 HD03 DIist.Mat - Proc

4013 HD31 Molasses Tank- I

4013 HD32 Molasses Tank-II

4013 HD33 Molases Day Tank

4013 HD36 RS/ENA Rec - 1

4013 HD37 RS/ENA Rec - 2

4013 HD38 RS/ENA Rec - 3

4013 HD39 RS/ENA Rec - 4

Page 23 of 182
Project Shield
configuration Document
4013 HD42 Ethaonal Rec - 1

4013 HD43 Ethaonal Rec - 2

4013 HD44 Ethaonal Rec - 3

4013 HD45 Ethaonal Rec - 4

4013 HD48 Impure Spirit -1

4013 HD49 Impure Spirit -2

4013 HD51 Fusel oil Rec -1

4013 HD52 Fusel oil Rec -2

4013 HD55 RS/ENA Vat -1

4013 HD56 RS/ENA Vat -2

4013 HD57 RS/ENA Vat -3

4013 HD58 RS/ENA Vat -4

4013 HD61 Imp Spirit Vat-1

4013 HD63 Fusel Oil Vat -1

4013 HD65 DS Vat - 1

4013 HD67 Ethanol Vat -1

4013 HD68 Ethanol Vat -2

4013 HD71 DS Issue Vat -1

4013 HD72 DS Issue Vat -1

4013 HD75 Issue Vat - 1

4013 HD76 Issue Vat - 2

4013 HD77 Issue Vat - 3

4013 HD79 Clar Wat Reservr

4013 HD80 DM Water Tank

Page 24 of 182
Project Shield
configuration Document
4013 HD81 Coal Yard

4013 HD82 Husk Yard

4013 HD83 Bagrasse Yard

4013 HD84 Ash Storage

4013 HD87 Buffer Tank - 1

4013 HD88 Buffer Tank - 2

4013 HD89 Lagoon - 1

4013 HD90 Lagoon - 2

4013 HD92 Sump

4013 HD93 Leachate Pit

4013 HD94 Bio-Compost Yard

4013 HD95 Scrap Material

4013 HD96 Bio-Fert Storage

4013 HD98 Prod Storage

4098 AVST Aviation St Loc

4099 CR01 Stainary/EDP Mat

5010 PR01 GMRPPL

5010 PR02 DAPL

6600 FMS1 Skip House

6600 FMS2 King Street 1

6600 FMS3 King Street 2

6600 FMS4 MTB

6600 FMS5 SBM

6600 FMS6 HMG

Page 25 of 182
Project Shield
configuration Document
6600 FMS7 IBCKP-10/11Floor

8000 RX01 Uniforms

8000 RX02 Arms & Weapons

8100 1 Location 0001

8100 88 Lager 0088 (WM)

8100 100 Lagerort WM&HU

8100 200 SCM-EWM

8601 VF01 Estates & Hostel

8602 VF02 GMRVF-GMRIT-ENGG

8603 1 Location 0001

8603 VF03 GMRIT-P.G.DIPLOM

8604 VF04 SGCSRC-UG&PG

8605 VF05 SGCSRC-B.Ed

8606 VF06 CSW-RAJAM

8607 VF07 CORPORATE

Maintain purchasing organization


In this step, you set up your purchasing organizations. From the Materials Management and
purchasing view, the purchasing organization is responsible for the complete processing of
purchasing activities (such as requests for quotations, purchase orders & Scheduling
Agreements).
Path: SPRO / IMG -> Enterprise Structure -> Definition -> Materials Management-> Maintain
purchasing organization

Page 26 of 182
Project Shield
configuration Document

ASSIGNMENT
Assign plant to company code
In the step "Assign plant to company code"; you assign each plant to a company code. A Plant
can only belong to one company code.
SPRO / IMG -> Assignment -> Logistics – General-> Assign plant to company code

Co code Plant Name of the plant Company name

2000 2000 GMR Energy Limited GMR Energy Limited

2000 2001 Kamalanga Thermal Power Projec GMR Energy Limited

2000 2002 Talong GMR Energy Limited

2000 2003 Bajoli Holi GMR Energy Limited

2000 2004 GMR Energy Limited(Corp Off) GMR Energy Limited

2000 2005 GMR Enegry Ltd (Delhi Off ) GMR Energy Limited

2100 2100 GMR Power Corporation Pvt Ltd GMR Power Corporation

2100 2101 HYUNDAI HEAVY IND. CO.LTD. GMR Power Corporation

2150 2150 Vemagiri Power Generation Ltd Vemagiri Power Generation

Page 27 of 182
Project Shield
configuration Document
2150 2151 Korea Plant Service & Eng Co L Vemagiri Power Generation

2200 2200 GMR Hydro Power Gen Pvt Ltd GMR Badirinath HPG Pvt Ld

3110 3110 GMR T.T EXPRESSWAYS PVT LTD GMR TTE Pvt Ltd

3120 3120 GMR Tuni Anakapali Exp Pvt Ltd GMR TAE Pvt Ltd

3130 3130 GMR Pochanpalli Exp Pvt Ltd GMR Pochanpalli Exp P Ltd

3210 3210 GMR Ambala-Chand Exp Pvt Ltd GMR ACE Ptd Ltd

3220 3220 GMR Jadcherla Exp.ways Pvt Ltd GMR Jadcherla Exp Pvt Lt

3230 3230 GMR Ulundurpet Exp Pvt Ltd GMR Ulundurpet Exp Pvt Ld

3310 3310 GMR PROJECTS PVT.LTD. GMR Projects Pvt Ltd

4000 4001 GMR Ind.Ltd,Sugar Div,Sankili GMR Industries Limited

4000 4002 GMR Ind.Ltd,Co-gen Div,Sankili GMR Industries Limited

4000 4003 GMR Ind.Ltd,Dist Div,Sankili GMR Industries Limited

4000 4011 GMR Ind.Ltd,Sugar Div,Haliyal GMR Industries Limited

4000 4012 GMR Ind.Ltd,Co-gen Div,Haliyal GMR Industries Limited

4000 4013 GMR Ind.Ltd,Dist Div,Haliyal GMR Industries Limited

4000 4098 GMR Industries Limited GMR Industries Limited

4000 4099 GMR Industries Ltd,Corp.Office GMR Industries Limited

5010 5010 GMR Properties Pvt Ltd GMR Properties Pvt Ltd

5020 5020 Delhi Acropolis Private Ltd., Delhi Aerotropolis Pvt Ld

6600 6600 GMR Corporate Centre Limit GMR Corporate Center Ltd

8000 8000 RAXA Security Services Ltd. Raxa Security Services

8100 8100 GMR Aviation Private Limited GMR Aviation Private Ltd

8100 8100 GMR Aviation Private Limited GMR Aviation Private Ltd

8600 8601 GMRVF- Estates & Hostels GMR Varalakshmi Foundtn

8600 8602 GMRVF-GMRIT-ENGG. & PG GMR Varalakshmi Foundtn

Page 28 of 182
Project Shield
configuration Document
8600 8603 GMRVF-GMRIT-P.G.DIPLOMA GMR Varalakshmi Foundtn

8600 8604 GMRVF-SGCSRC-UG&PG GMR Varalakshmi Foundtn

8600 8605 GMRVF-SGCSRC-B.Ed GMR Varalakshmi Foundtn

8600 8606 GMRVF-CSW-RAJAM GMR Varalakshmi Foundtn

Assign purchasing organization to company code


In this Implementation Guide (IMG) activity, you assign purchasing organizations to company codes

SPRO / IMG -> Assignment -> Materials Management-->Assign purchasing organization to


company code

Assign purchasing organization to plant :


SPRO  Assignment  Materials ManagementAssign purchasing organization to plant

In this IMG activity, you assign purchasing organizations to the plants for which they
are responsible.
Porg Description Plant Name1

2000 Energy Pur Org 2000 GMR Energy Limited

2000 Energy Pur Org 2001 Kamalanga Thermal Power Projec

2000 Energy Pur Org 2002 Talong

2000 Energy Pur Org 2003 Bajoli Holi

2000 Energy Pur Org 2004 GMR Energy Limited(Corp Off)

2000 Energy Pur Org 2005 GMR Enegry Ltd (Delhi Off )

2000 Energy Pur Org 2006

2000 Energy Pur Org 2100 GMR Power Corporation Pvt Ltd

2000 Energy Pur Org 2150 Vemagiri Power Generation Ltd

2000 Energy Pur Org 2200 GMR Hydro Power Gen Pvt Ltd

2101 Pur Org for HHI 2101 HYUNDAI HEAVY IND. CO.LTD.

2151 Pur org for KPS 2151 Korea Plant Service

3000 Roads Pur Org 3110 GMR T.T EXPRESSWAYS PVT LTD

3000 Roads Pur Org 3120 GMR Tuni Anakapali Exp Pvt Ltd

Page 29 of 182
Project Shield
configuration Document
3000 Roads Pur Org 3130 GMR Pochanpalli Exp Pvt Ltd

3000 Roads Pur Org 3210 GMR Ambala-Chand Exp Pvt Ltd

3000 Roads Pur Org 3220 GMR Jadcherla Exp.ways Pvt Ltd

3000 Roads Pur Org 3230 GMR Ulundurpet Exp Pvt Ltd

3000 Roads Pur Org 3310 GMR PROJECTS PVT.LTD.

4000 Agro Pur org 4001 GMR Ind.Ltd,Sugar Div,Sankili

4000 Agro Pur org 4002 GMR Ind.Ltd,Co-gen Div,Sankili

4000 Agro Pur org 4003 GMR Ind.Ltd,Dist Div,Sankili

4000 Agro Pur org 4011 GMR Ind.Ltd,Sugar Div,Haliyal

4000 Agro Pur org 4012 GMR Ind.Ltd,Co-gen Div,Haliyal

4000 Agro Pur org 4013 GMR Ind.Ltd,Dist Div,Haliyal

4000 Agro Pur org 4098 GMR Industries Limited

4000 Agro Pur org 4099 GMR Industries Ltd,Corp.Office

5000 Property Pur Org 5010 GMR Properties Pvt Ltd

5000 Property Pur Org 5020 Delhi Acropolis Private Ltd.,

6600 GCCL Pur Org 6600 GMR Corporate Centre Limit

8000 Raxa Pur Org 8000 RAXA Security Services Ltd.

8100 Aviation Pur org 8100 GMR Aviation Private Limited

8600 Foundation Pur Org 8601 GMRVF- Estates & Hostels

8600 Foundation Pur Org 8602 GMRVF-GMRIT-ENGG. & PG

8600 Foundation Pur Org 8603 GMRVF-GMRIT-P.G.DIPLOMA

8600 Foundation Pur Org 8604 GMRVF-SGCSRC-UG&PG

8600 Foundation Pur Org 8605 GMRVF-SGCSRC-B.Ed

8600 Foundation Pur Org 8606 GMRVF-CSW-RAJAM

8600 Foundation Pur Org 8607 GMRVF-CORPORATE

Page 30 of 182
Project Shield
configuration Document
Porg Description Plant Name1

9000 Cent Pur Org 2000 GMR Energy Limited

9000 Cent Pur Org 2001 Kamalanga Thermal Power Projec

9000 Cent Pur Org 2002 Talong

9000 Cent Pur Org 2003 Bajoli Holi

9000 Cent Pur Org 2004 GMR Energy Limited(Corp Off)

9000 Cent Pur Org 2005 GMR Enegry Ltd (Delhi Off )

9000 Cent Pur Org 2100 GMR Power Corporation Pvt Ltd

9000 Cent Pur Org 2101 HYUNDAI HEAVY IND. CO.LTD.

9000 Cent Pur Org 2150 Vemagiri Power Generation Ltd

9000 Cent Pur Org 2151 Korea Plant Service & Eng Co L

9000 Cent Pur Org 2200 GMR Hydro Power Gen Pvt Ltd

9000 Cent Pur Org 3110 GMR T.T EXPRESSWAYS PVT LTD

9000 Cent Pur Org 3120 GMR Tuni Anakapali Exp Pvt Ltd

9000 Cent Pur Org 3130 GMR Pochanpalli Exp Pvt Ltd

9000 Cent Pur Org 3210 GMR Ambala-Chand Exp Pvt Ltd

9000 Cent Pur Org 3220 GMR Jadcherla Exp.ways Pvt Ltd

9000 Cent Pur Org 3230 GMR Ulundurpet Exp Pvt Ltd

9000 Cent Pur Org 3310 GMR PROJECTS PVT.LTD.

9000 Cent Pur Org 4001 GMR Ind.Ltd,Sugar Div,Sankili

9000 Cent Pur Org 4002 GMR Ind.Ltd,Co-gen Div,Sankili

9000 Cent Pur Org 4003 GMR Ind.Ltd,Dist Div,Sankili

9000 Cent Pur Org 4011 GMR Ind.Ltd,Sugar Div,Haliyal

9000 Cent Pur Org 4012 GMR Ind.Ltd,Co-gen Div,Haliyal

9000 Cent Pur Org 4013 GMR Ind.Ltd,Dist Div,Haliyal

Page 31 of 182
Project Shield
configuration Document
9000 Cent Pur Org 4098 GMR Industries Limited

9000 Cent Pur Org 4099 GMR Industries Ltd,Corp.Office

9000 Cent Pur Org 5010 GMR Properties Pvt Ltd

9000 Cent Pur Org 5020 Delhi Acropolis Private Ltd.,

9000 Cent Pur Org 6600 GMR Corporate Centre Limit

9000 Cent Pur Org 8000 RAXA Security Services Ltd.

9000 Cent Pur Org 8100 GMR Aviation Private Limited

9000 Cent Pur Org 8601 GMRVF- Estates & Hostels

9000 Cent Pur Org 8602 GMRVF-GMRIT-ENGG. & PG

9000 Cent Pur Org 8603 GMRVF-GMRIT-P.G.DIPLOMA

9000 Cent Pur Org 8604 GMRVF-SGCSRC-UG&PG

9000 Cent Pur Org 8605 GMRVF-SGCSRC-B.Ed

9000 Cent Pur Org 8606 GMRVF-CSW-RAJAM

9000 Cent Pur Org 8607 GMRVF-CORPORATE

Page 32 of 182
Project Shield
configuration Document

Logistic General : Material Master


Materials Management---Logistics – General

SPRO Logistics - General Configuring the Material Master Assign Screen Sequences to
User/Material Type/Transaction/Industry Sector

Page 33 of 182
Project Shield
configuration Document

Material Type
Refer following chart for various material type defined for GMR
Basic Settings-> Material Types
SPRO / IMG -> Logistics - General -> Material Master Define
Attributes of Material Types
Mtyp Material Type Description

ZAWA Trading Goods

ZBYP By Product

ZCAP Capital Goods

ZDIN Service

ZERS Spare Parts

ZFRT Finished Product

ZHER Manufacturer Part

ZHIB Operating supplies

ZHLB Semifinished Product

ZHMI Production Resource/Tool

ZNBW Nonvaluated materials

ZPIP Pipeline materials

ZRBY Semifinished Product

ZROH Raw materials

ZSCM Scrap Materials

Page 34 of 182
Project Shield
configuration Document
ZVRP Packaging

Page 35 of 182
Project Shield
configuration Document

SPRO Logistics - General -> Material Master Basic settingmaterial typeDefine Number
Ranges for Each Material Type

External Number ranges Used

Page 36 of 182
Project Shield
configuration Document

Setting for key field

Material Group
In this IMG activity, you define material groups to group together materials with the same
attribute or purpose.
Define
SPRO / IMG -> Logistics - General -> Material Master-> Settings for Key Fields
Material Groups
Various material groups have been defined as per GMR requirement.
Matl Group Matl Group Description

AUTOMOBL Automobiles

BULKMAT Bulk material

BYPRODUCT By - Products

CAPITEMS Capital Items

CEMENT Cement

CHEMICALS Chemicals

CIVSANIRR Civil, Santory & Irr

COMPRESSR Compressor

CONSTMAT Construction Materia

CONSULTCY Consultancy

CONTRLSYS Control system

ELECEQUIP Electrical Equipment

ELECSPARE Electrical Spares

ENGINE Engine

FERRUSMAT Ferrous materials

FINSHDGDS Finished Goods

FIRNSAFTY Fire and safety

FUELS Fuels

Page 37 of 182
Project Shield
configuration Document
GENCONSM General Consumables

GENEQUIP General Equipment

GENERATOR Generator

GENRLADMN General Administrati

INSCNTRSP Instrument & Control

INSTNELEC Instruments & Electr

INTRNFURN Interiors/Furnishing

ITHARDWRE IT Hardware

LABORATRY Laboratory

MECHEQUIP Mechanical Equipment

MECHSPARE Mechanical Spares

MOTORS Motors

NONFERMAT Non-Ferrous material

OFFSUPPLS Office supplies

PACKNGMAT Packing Materials

PROCSSMAT Process Materials

PROTSYS Protection system

PUMPS Pumps

RAWMATRLS Raw materials

REFAIRCON Refrig & Airconditon

RUBMATERL Rubber Materials

SCRAP Scrap Material

SECTYEQPT Security Equipment

SECTYUNFM Security Uniforms

Page 38 of 182
Project Shield
configuration Document
SEMIFDGDS Semi-finished goods

SERVICES Services

SOFTWARE Software

STEEL Steel

TOOLNTACK Tools & tackles

TURBINE Turbine

VESSELS Vessels

VLVPIPFIT Valves, Pipes and Fi

Divisions
 Define Divisions
SPRO / IMG -> Logistics - General -> Material Master-> Settings for Key Fields

Business Patner
SPRO / IMG -> Logistics - General -> Business Partner VendorscontrolDefine Account Groups and
Field Selection (Vendor)

Page 39 of 182
Project Shield
configuration Document
Vendor - Define Vendor Account Group
Following vendor vendor groups are defined for GMR
Group Description

GDMV Domestic Vendor

GEMV Employee Vendor

GFEV Founder Employee Vendor

GGRO Grower Vendor

GHAR Harvesting Vendors

GIMV Import Vendor

GINT GMR Internal Group Companies

GONV One-time Vendor

GRPC Treasury Group Companies

GRXP One-time Vendor-Recruit Expens

GSRV Service Vendor

GSTV Stock Transfer Vendor

SPRO / IMG -> Logistics - General -> Business Partner VendorscontrolsDefine Number Ranges for
Vendor Master Records

Page 40 of 182
Project Shield
configuration Document

Page 41 of 182
Project Shield
configuration Document

Page 42 of 182
Project Shield
configuration Document

Materials Management--Purchasing
Path: SPRO/IMGMaterials ManagementPurchasingEnvironment DataDefine Attributes of
System MessagesSystem messages

Path: SPRO/IMGMaterials ManagementPurchasingEnvironment Data Define Default Values


for Buyers

Page 43 of 182
Project Shield
configuration Document
SPRO/IMGMaterials ManagementPurchasing Material Master Define Shipping Instructions

SPRO/IMGMaterials ManagementPurchasing Material Master Define Purchasing Value Keys

Vendor Master
SPROMaterialsManagementPurchasingVendor MasterDefine Terms of Payment

In this step, you make the system settings that are relevant to the vendor master record from the Purchasing point of view.
Define Terms of Payment : Payment terms created as per GMR team requirement as follows.

payment Terms Description

G001 10% Advance against Bank Guarantee

G002 20% Advance against Bank Guarantee

G003 30% Advance against Bank Guarantee

G004 70% Payment Against Proforma Invoice

G005 70% Payment Against Proforma Invoice

G006 50% Payment against Proforma Invoice

G007 50% Agst Pro Inv before Des & After Inspection

G008 30% Agst Pro Inv before Des & After Inspection

Page 44 of 182
Project Shield
configuration Document
G009 20% Agst Pro Inv before Des & After Inspection

G010 10% Agst Pro Inv before Des & After Inspection

G011 10% on submission of Performenc Bank Guarantee

G012 20% on submission of Performenc Bank Guarantee

G013 30% on submission of Performenc Bank Guarantee

G014 20% Advance on Acceptence of PO

G015 10% Advance on Acceptence of PO

G016 30% Advance on Acceptence of PO

G017 40% Advance on Acceptence of PO

G018 50% Advance on Acceptence of PO

G019 100% Advance on Acceptence of PO

G020 10% Against Release of Documents

G021 20% Against Release of Documents

G022 30% Against Release of Documents

G023 10% Against Approval Drawings

G024 Perf BG Valid for 12 months from date of Com/18mon

G025 Perf BG Valid for 12 months from date of Erection

G026 40% After Receipt of Materials at our site

G027 50% After Receipt of Materials at our site

G028 60% After Receipt of Materials at our site

G029 70% After Receipt of Materials at our site

G030 80% After Receipt of Materials at our site

G031 90% After Receipt of Materials at our site

G032 100% After Receipt of Materials at our site

G033 100% Cash on Delivery Basis

G034 75% Payment Through Bank

G035 100% Payment Through Bank

Page 45 of 182
Project Shield
configuration Document
G036 100% Payment Through DD

G037 100% Payment Through at per Cheque

G038 100% Payment Against Proof of Despatch

G039 Other Charges as meniotned in Notes

G040 100% Payment Within 15 Days of Recpt of Material

G041 100% Payment Within 21 Days of Recpt of Material

G042 100% Payment Within 7 Days of Recpt of Material

G043 100% Payment Within 30 Days of Recpt of Material

G044 100% Payment on Completion of Services

G045 100% Pmt on Completion of Service & Submision bill

G046 100% Payment on Successful Commissioning

G047 5% After Succesful Erection,Testing & Commitioning

G048 10%After Sucesful Erection,Testing & Commitioning

G049 20%After Sucesful Erection,Testing & Commitioning

G050 30%After Sucesful Erection,Testing & Commitioning

G051 50%After Sucesful Erection,Testing & Commitioning

G052 75%After Sucesful Erection,Testing & Commitioning

G053 100%After Sucesful Erection,Testing & Commitioning

G054 5% Advance Payment on Release of Service Order

G055 10% Advance Payment on Release of Service Order

G056 20% Advance Payment on Release of Service Order

G057 30% Advance Payment on Release of Service Order

G058 50% Advance Payment on Release of Service Order

G059 40% Advance Payment on Release of Service Order

G060 5% Payment on Receipt of Materials at Site

G061 10% Payment on Receipt of Materials at Site

G062 20% Payment on Receipt of Materials at Site

Page 46 of 182
Project Shield
configuration Document
G063 30% Payment on Receipt of Materials at Site

G064 40% Payment on Receipt of Materials at Site

G065 50% Payment on Receipt of Materials at Site

G066 75% Payment on Receipt of Materials at Site

G067 90% Payment on Receipt of Materials at Site

G068 90% Payment on Receipt of Materials at Site

G069 90% Payment on Submission of Invoice

G070 100% Payment on Submission of Invoice

G071 30% Pmnt on Completion of Progresive Work as in SO

G072 40% Pmnt on Completion of Progresive Work as in SO

G073 50% Pmnt on Completion of Progresive Work as in SO

G074 75% Pmnt on Completion of Progresive Work as in SO

G075 100% Pmnt on Completon of Progresive Work as in SO

G076 10% Payment on Mobilization of Labour at site

G077 20% Payment on Mobilization of Labour at site

G078 25% Payment on Mobilization of Labour at site

G079 30% Payment on Mobilization of Labour at site

G080 10% Against First Part Payment

G081 20% Against First Part Payment

G082 25% Against First Part Payment

G083 30% Against First Part Payment

G084 10% Against Subsequent Part Payment

G085 20% Against Subsequent Part Payment

G086 25% Against Subsequent Part Payment

G087 30% Against Subsequent Part Payment

G088 5% Advance along with confirmation of Contract

G089 10% Advance along with confirmation of Contract

Page 47 of 182
Project Shield
configuration Document
G090 20% Advance along with confirmation of Contract

G091 5% toward preparation of Statuatory Dwg for Approv

G092 10% toward preparation of Statuatry Dwg for Approv

G093 20% toward preparation of Statuatry Dwg for Approv

G094 25% toward preparation of Statuatry Dwg for Approv

G095 5% on Acceptence of Dwg for Fabrication/Manufactin

G096 10% on Acceptene of Dwg for Fabrication/Manufactin

G097 15% on Acceptene of Dwg for Fabrication/Manufactin

G098 20% on Acceptene of Dwg for Fabrication/Manufactin

G099 10% after Submission of Dwg,O&M Manual & Comp Cert

G100 20% after Submission of Dwg,O&M Manual & Comp Cert

G101 10% as First Instmt after comp.of First Milestone1

G102 10% as First Instmt after comp.of First Milestone3

G103 10% as First Instmt after comp.of First Milestone3

G104 10% Mobilization Advance

G105 20% Mobilization Advance

G106 25% Mobilization Advance

G107 10% After Submission of Soil Investigation Report

G108 20% After Submission of Soil Investigation Report

G109 50% Pmt within 7 days from the date of Final Bill

G110 60% Pmt within 7 days from the date of Final Bill

G111 75% Pmt within 7 days from the date of Final Bill

G112 80% Pmt within 7 days from the date of Final Bill

G113 100% Pmt within 7 days from the date of Final Bill

G114 50% Pmt within 15 days from the date of Final Bill

G115 50% Pmt within 15 days from the date of Final Bill

G116 75% Pmt within 15 days from the date of Final Bill

Page 48 of 182
Project Shield
configuration Document

Check Incoterms
SPROMaterialsManagementPurchasingVendor MasterCheck Incoterms

Following Incoterms are maintained for GMR.

Inco terms Description

CFR Costs and freight

CIF Costs, insurance & freight

CIP Carriage and insurance paid to

CPT Carriage paid to

DAF Delivered at frontier

DDP Delivered Duty Paid

DDU Delivered Duty Unpaid

DEQ Delivered ex quay (duty paid)

DES Delivered ex ship

EXW Ex Works

FAS Free Alongside Ship

FCA Free Carrier

FH Free house

FOB Free on board

FOR Free On Railway

UN Not Free

Create Purchasing Groups ;Purchasing groups have been created as buyers in GMR. Following logic has been
defined for numbering purchasing group.

MaterialsManagement
SPRO Purchasing
Create Purchasing Groups

Purchase group Description of pur group

BH1 Badrinath PG 1

Page 49 of 182
Project Shield
configuration Document
BH2 Badrinath PG 2

C10 CORPORATE - PURCHA

C11 CORPORATE - FIN &

C12 CORPORATE - HR & A

C13 CORPORATE - FMS

C20 CEO

C30 CFO

C40 JMD

C50 MD

C60 SECTOR HEAD

CH1 Chennai PG 1

CH2 Chennai PG 2

CP1 GIDL Corporate

F01 CS- Deptt Head

F02 IT- Deptt Head

F03 Civil- Deptt Head

F04 Mech- Deptt Head

F05 Elec- Deptt Head

F06 E&C- Deptt Head

F07 Chem- Deptt Head

F08 F&A- Deptt Head

F09 Est - Deptt Head

F10 Hostel- Deptt Head

F11 Rajam-Deptt Head

Page 50 of 182
Project Shield
configuration Document
F12 BNG- Deptt Head

F13 Delhi- Deptt Head

F14 HYD- Deptt Head

F15 UTT- Deptt Head

F16 MNG- Deptt Head

F17 Locn 7- Deptt Head

F18 Locn 8- Deptt Head

F19 Locn 9- Deptt Head

F20 Locn 10- Deptt Hea

F21 Locn 11- Deptt Hea

F22 Locn 12- Deptt Hea

F23 Principal

F24 CAO

F25 Director-CSW

F26 Sector Head

FMS GCCL Purchasing Gr

FN1 Found Purch Grp 1

FN2 Found Purch Grp 2

G01 User-FMS-BNG

G02 User-FMS-Hyd

G03 User-FMS-Chn

G04 User-FMS-MUM

G05 User-FMS-DEL

G06 Deptt Head- BNG

Page 51 of 182
Project Shield
configuration Document
G07 Deptt Head- CHN

G08 Deptt Head- HYD

G09 Deptt Head- MUM

G10 Deptt Head- DEL

G11 FMS Head-Corporate

G12 Sector Head/CEO

GA1 GIDL Aviation

GAC GACEPL

GAP GMR Aviation Pvt.

GJE GJEPL

GPE GPEPL

GPL GPPL

GTA GTAEPL

GTT GTTEPL

GUE GUEPL

H01 SUGAR-MECHANICAL

H02 SUGAR-ELECTRICAL

H03 SUGAR-INSTRUMENTAT

H04 SUGAR-CIVIL

H05 SUGAR-PROCESS

H06 COGEN-MECHANICAL

H07 COGEN-ELECTRICAL

H08 COGEN-INSTRUMENTAT

H09 COGEN-CIVIL

Page 52 of 182
Project Shield
configuration Document
H10 COGEN-PROCESS

H11 DISTILLERY-MECHANI

H12 DISTILLERY-ELECTRI

H13 DISTLERY-INSTRUMEN

H14 DISTILLERY-CIVIL

H15 DISTILLERY-PROCESS

H16 CANE

H17 COMMON-HR & ADMN

H18 COMMON-FINANCE &AC

H19 COMMON-IT

H20 COMMON-STORES

H21 COMMON-MATERIALS

H22 SPECIAL PROJECTS-

H23 EXPANSION WORKS-SU

H24 SPECIAL PROJECTS-P

H25 EXPANSION WORKS-PR

H26 SPECIAL PROJECTS-C

H27 EXPANSION WORKS-CO

H28 SPECIAL PROJECTS-D

H29 EXPANSION WORKS-DI

H30 SUGAR

H31 POWER

H32 DISTILLERY

H33 CANE

Page 53 of 182
Project Shield
configuration Document
H34 PROCESS

H35 FIN & ACCT

H36 IT DEPT

H37 HR & ADMN

H38 MATERIALS

H39 STORES

H40 UNIT HEAD

HL1 HYL-Sugar PG

HL2 HYL-Cogen PG

HL3 HYL-Distillery PG

KM1 Kamalanga PG 1

KM2 Kamalanga PG 2

KM3 Kamalanga PG 3

M01 Mech Deptt Head

M02 Elec Deptt Head

M03 C&I Deptt Head

M04 Civil Deptt Head

M05 IT Deptt Head

M06 Stores Head

M07 Mtls Deptt Head

M08 F&A Deptt Head

M09 HR & Admn-Head

M10 Oprn Deptt Head

M11 Tech Ser. Dett Hea

Page 54 of 182
Project Shield
configuration Document
M12 Trg Deptt Head

M13 Env Deptt Head

M14 Chem/Lab Deptt Hea

M15 EHS Deptt Head

M16 Maintt-Head

M17 Admn Head

M18 Operations Deptt H

M19 EHS Head

M20 Plant Mgr

MN1 MNG PG 1

MN2 Mangalore PG 2

PG1 Engineer at site

PG2 Project manager

PG3 GMP

PG4 GMC

PG5 Contracts Departme

PY1 Property Purchase

PY2 Property Purchase

R01 CPM-1

R02 CPM-2

R03 CPM-3

R04 SECT. HEAD-1

R05 SECT. HEAD-2

R06 SECT. HEAD-3

Page 55 of 182
Project Shield
configuration Document
R07 SECT. HEAD-4

R08 SECT. HEAD-5

R09 SECT. HEAD-6

R10 SECT. HEAD-7

R11 SECT. HEAD-8

R12 SECT. HEAD-9

R13 SECT. HEAD-10

R14 CEO

RX1 RAXA General

RX2 RAXA Technical

RX3 RAXA Training

S01 SUGAR-MECHANICAL

S02 SUGAR-ELECTRICAL

S03 SUGAR-INSTRUMENTAT

S04 SUGAR-CIVIL

S05 SUGAR-PROCESS

S06 COGEN-MECHANICAL

S07 COGEN-ELECTRICAL

S08 COGEN-INSTRUMENTAT

S09 COGEN-CIVIL

S10 COGEN-PROCESS

S11 DISTILLERY-MECHANI

S12 DISTILLERY-ELECTRI

S13 DISTLERY-INSTRUMEN

Page 56 of 182
Project Shield
configuration Document
S14 DISTILLERY-CIVIL

S15 DISTILLERY-PROCESS

S16 CANE

S17 COMMON-HR & ADMN

S18 COMMON-FINANCE &AC

S19 COMMON-IT

S20 COMMON-STORES

S21 COMMON-MATERIALS

S22 SPECIAL PROJECTS-

S23 EXPANSION WORKS-SU

S24 SPECIAL PROJ-PROCE

S25 EXP. WORKS-PROCESS

S26 SPECIAL PROJ-COGEN

S27 EXP. WORKS-COGEN

S28 SPECIAL PRO-DISTIL

S29 EXP. WORKS-DISTIL

S30 SUGAR

S31 POWER

S32 DISTILLERY

S33 CANE

S34 PROCESS

S35 FIN & ACCT

S36 IT DEPT

S37 HR & ADMN

Page 57 of 182
Project Shield
configuration Document
S38 MATERIALS

S39 STORES

S40 UNIT HEAD

SK1 SKL-SGR PG

SK2 SKL-Cogen PG

SK3 SKL-Distillery PG

T01 Mechanical

T02 Electrical

T03 C&I

T04 Civil

T05 IT

T06 Materials

T07 F&A

T08 HR & Admn

T09 Operations

T10 Maintt-Head

T11 Admn Head-GMR

T12 Operations-GMR

T13 Plant Mgr-GMR

T30 Mechanical

T31 Electrical

T32 C&I

T33 Planning

T34 Materials

Page 58 of 182
Project Shield
configuration Document
T35 F&A - O&M

T36 Operations- O&M

T37 Maintt-Head-O&M

T38 Admn-Head- O&M

T39 Oprns-Head-O&M

T40 Plant Mgr-O&M

V01 Mechanical Head

V02 Electrical Head

V03 C&I Head

V04 Civil Head

V05 IT Head

V06 Materials Head

V07 F&A Head

V08 HR & Admn Head

V09 Stores Head

V10 Maintt-Head

V11 Admn Head-GMR

V12 Operations-GMR

V13 Plant Mgr-GMR

V30 Mechanical

V31 Electrical

V32 C&I

V33 Civil

V34 F&A - O&M

Page 59 of 182
Project Shield
configuration Document
V35 Operations- O&M

V36 Maintt-Head-O&M

V37 Admn-Head- O&M

V38 Oprns-Head-O&M

V39 Plant Mgr-O&M

VM1 Vemagiri PG 1

VM2 Vemagiri PG 2

X01 Asset Head

X02 Department Heads

X03 Users

Y01 Technical-VP

Y02 General-CSO

Purchase Info Record


MaterialsManagement
SPRO Purchasing
Purchasing Info Record
 Define Number Ranges

Quota Arrangement
MaterialsManagement
SPRO Purchasing
 Quota Arrangement
 Define Number Ranges

0000000001 8999999999 0
MaterialsManagement
SPRO Purchasing
 Quota Arrangement

Define Quota Arrangement Usage

Page 60 of 182
Project Shield
configuration Document

RFQ/Quotation
MaterialsManagement
SPRO Purchasing RFQ/Quotation
Define Document Types

MaterialsManagement
SPRO Purchasing RFQ/Quotation
number ranges

Page 61 of 182
Project Shield
configuration Document

Purchase Requisition:
MaterialsManagement
SPRO PurchasingPurchase Requisition
Define Document Types

Define Document Types


Following document types defined for GMR
Type Description No int Int no Range

PIMP Import Pur.Req 10 5

PIND Domestic Pur.Req 10 3

PMMS Maint of Mat & Servi 10 7

PSER Service Pur.Req 10 4

PSTO STO Pur.Req 10 6

SPROMaterialsManagement
Purchasing
Purchase Requisition
Define Document
TypesDefine Number Ranges.

01 0010000000 0019999999

02 0090000000 0099999999

03 1000000000 1999999999

04 2000000000 2999999999

05 3000000000 3999999999

06 4000000000 4999999999

07 5000000000 5999999999

Release Procedure for Purchasing Requisition


Path: SPROMaterialsManagement Purchasing
Purchase Requisition Release
Procedure with Classification
Procedure Edit Characteristics , class ,

Page 62 of 182
Project Shield
configuration Document
Edit Characteristic:In this step, you create characteristics for a release procedure for purchase
Requisition(PR)
Following characteristic are created for a PR- release

PR_DOCTYPE - Purchase Requisition Document 00.00.0000 CHAR

PR_PLANT - Plant 00.00.0000 CHAR

PR_TOTALVALUE - Total value of requisition for 00.00.0000 CURR

Edit Class: In this step, you create classes for a release procedure for purchase orders (POs).
Following class are created for PR- release

PR_REL_CLASS EN 032 REL_CLASSS

Release group
Create a release group for your release procedure and assign it to a class. In the process, you assign release
conditions to the release procedure.Following are setting for GMR Group

REL.GRP REL.OBJ CLASS DESCRIPTION

N1 1 REL_CLASS PR_REL_CLASS

N2 1 REL_CLASS PR_REL_CLASS

Release Code
Group Code Description

N1 1 USER DEPARTMENT

N1 2 USER DEPT HEAD

N1 3 UNIT HEAD

Page 63 of 182
Project Shield
configuration Document
N2 1 USER

N2 2 USER DEPT HEAD

N2 3 PLANT HEAD

N2 4 ASSET HEAD

Release indicators : A release indicator shows the release status of a PR


Release id Description

2 RFQ/purchase order

Release strategies: Create a release strategy for your release group and assign your release codes accordingly.
Group Code Value

N1 P1 1.00 - 100000.00 INR

N2 P2 >= 100001.00 INR

Purchase Order:
Define Document Types:

SPRO
Materials Management
Purchasing
Purchase order Define Document Types

Following Documents Defined for the Pos.

Type Description ItInt IntNR ExtNR FldSl

GCAP Budgeted Cap Pur.Ord 10 50 NBF

GDOM Domestic Pur.Order 10 45 NBF

GEME Emergency pur.order 10 49 NBF

GIMP Import Pur.Order 10 46 NBF

GSER Service Pur.Order 10 48 NBF

GSTO Stock Transfer PO 10 47 UBF

Page 64 of 182
Project Shield
configuration Document
ZCAP Non Budg.Cap.Pur.ord 10 51 NBF

Release Procedure for Purchase Orders

SPROMaterialsManagementPurchasingPurchase orderRelease Procedure for Purchase


OrdersEdit Characteristics

In this section, you set up a release procedure for purchase orders(POs).To set up the release procedure, you must
make a series of settings in Customizing. This section provides you with an overview of the necessary activities.You
must perform the following steps:

1. Create characteristics :
PO_DOCTYPE Order Type (Purchasing) 00.00.0000 CHAR
PO_PLANT PO_Plant 00.00.0000 CHAR
PO_PURORG Purchasing Organization 00.00.0000 CHAR
PO_VALUE Total net order value 00.00.0000 CURR

SPROMaterialsManagementPurchasingPurchase orderRelease Procedure for Purchase


Ordersclasses

PO_REL_CLASS EN 032 PO_REL_CLASS

SPROMaterialsManagementPurchasingPurchase orderRelease Procedure for Purchase Orders


Release Strategies

2. Set up release procedure


Release Groups
Release Codes
Release indicator
Release Strategies
Workflow

a) Create release group

A1 2 PO_REL_CLASS Release Agro

B1 2 PO_REL_CLASS Release Energy

C1 2 PO_REL_CLASS Release Raxa

D1 2 PO_REL_CLASS Release Fms

Page 65 of 182
Project Shield
configuration Document
E1 2 PO_REL_CLASS Release Property

F1 2 PO_REL_CLASS Release Agro Corp.

H1 2 PO_REL_CLASS Release Roads

b) Release Code
Here you create the release codes you need for your release strategy and assign the codes to your release group.
Following are setting for GMR Group

Agro Release code

A1 01 Procurement Head

A1 02 Department Head

A1 03 Unit Head

A1 04 Chief Executive Off.

A1 05 Joint Managing Dir.

A1 06 Managing Dir.

A1 07 Sector Head

A1 S1 Shared Services

Energy Release code

B1 11 Procurement Head

B1 12 Department Head

B1 13 Shared ser/Finance

B1 14 Plant Manager

B1 15 Head Asset Mgmt

B1 16 Chief Executive Off.

B1 17 Sector Head

B1 H1 Hpe/Hbm/Abm

Raxa Release code

Page 66 of 182
Project Shield
configuration Document
C1 21 Procurement Head

C1 22 Na

C1 23 Shared ser/Finance

C1 24 Chief Security Off.

C1 25 Executive Director

C1 26 Managing Dir.

C1 27 Sector Head

C1 V1 Vice President

FMS Release Code

D1 31 Procurement Head

D1 32 Department Head

D1 33 Shared ser/Finance

D1 34 Location Head

D1 35 Head Fms

D1 36 Sector Head

Property Release Code

E1 41 Gen Manager Projects

E1 42 Gen Manager Contr

E1 43 Assistant Vice Pres.

E1 44 Chief Financial Off.

E1 45 Chief Operation Off.

E1 46 Sector Head

E1 47 Chief Executive Off.

Agro Corporation Release code

Page 67 of 182
Project Shield
configuration Document
F1 51 Department Head

F1 52 Chief Financial Off.

F1 53 Chief Executive Off.

F1 54 Joint Managing Dir.

F1 55 Managing Dir.

F1 56 Sector Head

Roads Release code

H1 61 Procurement Head

H1 62 Sectional Head

H1 63 Chief Executive Off.

H1 64 Sector Head

H1 P1 Project Manager Site

C) Create release indicator :-- A release indicator shows the release status of a PO.

R 6 0.0 Released

X 0.0 Blocked

D) Release strategies
Create a release strategy for your release group and assign your release codes accordingly.

Agro Release Strategy

A1 01 AGRO PO GCAP 1-10L GCAP 1 – 1000000

A1 02 AGRO PO GCAP 10L-1CR GCAP 1000000-000000

A1 03 AGRO PO GCAP >1CR GCAP >10000000

A1 04 AGRO PO ZCAP 1 - 10L ZCAP 1-1000000

A1 05 AGRO PO ZCAP >10L ZCAP >1000000

Page 68 of 182
Project Shield
configuration Document
A1 A1 AGRO PO 1 - 1K GDOM 1-1000

A1 A2 AGRO PO 1K - 10L GDOM 1000-1000000

A1 A3 AGRO PO 10L - 15L GDOM 1000000-1500000

A1 A4 AGRO PO 15L - 25L GDOM 1500000-2500000

A1 A5 AGRO PO >25L GDOM >2500000

A1 A6 AGRO PO GEME 1K-20K GEME 1000-20000

A1 A7 AGRO PO GEME 20K-1L GEME 20000 - 100000

A1 A8 AGRO PO GEME 1L-3L GEME 100000-300000

A1 A9 AGRO PO GEME >3L GEME >300000

Release Stratergy for Energy

B1 11 ENGY GCAP 1 - 25L GCAP 1 - 2500000

B1 12 ENGY GCAP 25L -1CR GCAP 2500000 - 10000000

B1 13 ENGY GCAP 1CR - 5CR GCAP 1000000 - 50000000

B1 14 ENGY GCAP > 5CR GCAP >50000000

B1 15 ENGY ZCAP 1 - 50K ZCAP 1 - 50000

B1 16 ENGY ZCAP 50K - 10L ZCAP 50000 - 1000000

B1 17 ENGY ZCAP > 10 L ZCAP >1000000

B1 B1 ENGY PO 1 - 2L GDOM 1 - 200000

B1 B2 ENGY PO 2L - 25 L GDOM 200000 - 2500000

B1 B3 ENGY PO > 25L GDOM >2500000

B1 B4 ENGY PO GEME 1- 50K GEME 1 - 50000

B1 B5 ENGY PO GEME 50K-5L GEME 50000 - 500000

B1 B6 ENGY PO GEME >5L GEME >5000000

C1 21 RAXA GCAP 1 - 20 L GCAP 1 - 2000000

Page 69 of 182
Project Shield
configuration Document
C1 22 RAXA GCAP 20L - 25L GCAP 2000000 - 2500000

C1 23 RAXA GCAP >25 L GCAP >2500000

C1 24 RAXA ZCAP 1 - 6L ZCAP 1 - 600000

C1 25 RAXA ZCAP 6L -25 L ZCAP 600000 -2500000

C1 26 RAXA ZCAP > 25L ZCAP >2500000

C1 27 RAXA PO GEME >=1 GEME >=1

C1 C1 RAXA PO GD GI 1- 5K GDOM 1 - 5000

C1 C2 RAXA PO G DGI 5K-20L GDOM 5000 -2000000

C1 C3 RAXA PO GD GI20L-25L GDOM 200000 - 2500000

C1 C4 RAXA PO GD GI >25L GDOM >25000000

C1 C5 RAXA PO GSER >=1 GSER >=1

Release Procedure for FMS

D1 31 FMS GCAP 1 - 2L GCAP 1 - 200000

D1 32 FMS GCAP >2L GCAP >200000

D1 33 FMS ZCAP 1 - 50K ZCAP 1 - 50000

D1 34 FMS ZCAP 50K - 10L ZCAP 50000 - 1000000

D1 35 FMS ZCAP >10L ZCAP >1000000

D1 D1 FMS PO 1 - 10 L GDOM 1 - 1000000

D1 D2 FMS PO > 10 L GDOM >1000000

D1 D3 FMS GEME 1- 5K GEME 1 - 5000

D1 D4 FMS GEME 1 - 25K GEME 5000 - 25000

D1 D5 FMS GEME >25K GEME >25000

Release Procedure for Properties

Page 70 of 182
Project Shield
configuration Document
E1 41 PROP GCAP 1 - 2L GCAP 1 - 200000

E1 42 PROP GCAP 2L - 25L GCAP 200000 - 2500000

E1 43 PROP GCAP 25L - 1CR GCAP 2500000 - 10000000

E1 44 PROP GCAP >1 CR GCAP >10000000

E1 45 PROP ZCAP 1 - 10L ZCAP 1 - 1000000

E1 46 PROP ZCAP 10L-25L ZCAP 100000 - 2500000

E1 47 PROP ZCAP 25L - 1CR ZCAP 2500000 - 10000000

E1 48 PROP ZCAP >1CR ZCAP >10000000

E1 E1 PROP PO 1 - 1L GDOM 1 - 100000

E1 E2 PROP PO 1L - 10L GDOM 100000 -1000000

E1 E3 PROP PO 10 L - 25L GDOM 1000000 - 2500000

E1 E4 PROP PO 25L - 50 L GDOM 2500000 - 5000000

E1 E5 PROP PO > 50L GDOM >5000000

E1 E6 PROP GEME 1 - 50K GEME 1 - 50000

E1 E7 PROP GEME 50K-5L GEME 50000 - 500000

E1 E8 PROP GEME > 5L GEME >500000

Release Stratergy for Agro Corporation

F1 F1 AG CORP GCAP 1 -1L GCAP 1 - 100000

F1 F2 AG CORP GCAP 1L-25L GCAP 100000 – 2500000

F1 F3 AG CORP GCAP 25L -CR GCAP 2500000 - 10000000

F1 F4 AG CORP GCAP >1CR GCAP >10000000

F1 F5 AG CORP ZCAP 1- 10L ZCAP 1 - 1000000

F1 F6 AG CORP ZCAP >25L ZCAP >25000000

F1 F7 AG CORP PO 1 -10K GDOM 1 - 10000

Page 71 of 182
Project Shield
configuration Document
F1 F8 AG CORP PO 10K-10L GDOM 10000 - 1000000

F1 F9 AG CORP PO 10L-15L GDOM 100000 – 1500000

F1 FA AG CORP PO 15L-25L GDOM 1500000 – 2500000

F1 FB AG CORP PO >25L GDOM >2500000

F1 FC AG CORP GEME 1 - 1L GEME 1 - 100000

F1 FD AG CORP GEME >1L GEME >100000

Release Stratergy for Road Corporation;

H1 H1 ROADS PO 1- 25L GDOM 1 – 2500000

H1 H2 ROADS PO 25L - 100L GDOM 2500000 – 1000000000

H1 H3 ROADS PO >100L GDOM >1000000000

H1 H4 ROADS PO GEME 1-10L GEME 1 - 1000000

H1 H5 ROADS PO GEME>10L GEME >1000000

H1 H6 ROADS GCAP 1 - 25L GCAP 1 - 2500000

H1 H7 ROADS GCAP 25L -1CR GCAP 2500000 - 10000000

H1 H8 ROADS GCAP >1CR GCAP >10000000

H1 H9 ROADS ZCAP 1 - 10L ZCAP 1 - 1000000

H1 HA ROADS ZCAP >10L ZCAP >1000000

SPROMaterials Management
Purchasing
Purchase order
 Set Tolerance Limits for Price
Variance

Page 72 of 182
Project Shield
configuration Document

SPRO Materials Management Purchasing


Purchase order Texts for Purchase Orders
Define Text Types for Header Texts

Stock Transport Setup


SPRO Materials Management Purchasing
Purchase order Set up Stock Transport Order

Define Shipping Data for Plants
With this data, the system determines the shipping data for the material to be transferred (e.g. the shipping point).

Select the required Plant and Press F8

Page 73 of 182
Project Shield
configuration Document

Create Checking Rule:


Materials Management
SPRO Purchasing
Purchase order Set up Stock Transport Order

Create Checking Rule

In this step, you create rules for the availability check in the case of stock transport orders.

This check enables you to find out whether the quantity requested is available in
the supplying plant, for example, in the case of materials that are to be
transferred over longer distances from one site to another.

SPRO
Materials Management
Purchasing
Purchase order Set up Stock Transport Order
Define Checking Rule.

Page 74 of 182
Project Shield
configuration Document

SPRO
Materials Management Purchasing
Purchase order Set up Stock Transport Order
Assign Delivery Type and Checking Rule

Returns to Vendor
SPROMaterials Management
Purchasing
Purchase order Set up Stock Transport Order Returns
Order Returns to Vendor

Page 75 of 182
Project Shield
configuration Document

Returns Order;- In this step, you define shipping-specific data for the returns
order. You make settings for the required return delivery type for

• purchasing document category F (purchase order),


• purchasing document type

o NB - standard purchase order


o UB - stock transport order

• the supplying plant

Contract
Path: SPRO Materials Management Purchasing Contract Number range

41 4100000000 4199999999

44 4400000000 4499999999

45 4500000000 4599999999

46 4600000000 4699999999

47 4700000000 4799999999

48 4800000000 4899999999

49 4900000000 4999999999

50 5000000000 5099999999

51 5100000000 5199999999

52 5200000000 5299999999

Page 76 of 182
Project Shield
configuration Document

Materials Management
SPRO Purchasing
Contract
 Define Document Types


Type Description Itm int No range int Updategrp Fieldsel

GAGH Acc& guesth contract 10 54 SAP WKK

GCLK Con.& lgl contract 10 55 SAP WKK

GCMK GMR Qty Contract 10 56 SAP MKK

GCWK GMR Value Contract 10 57 SAP WKK

GITK IT.Related contract 10 58 SAP WKK

GLTC Long term contracts 10 59 SAP WKK

GOMK Office main.Contract 10 60 SAP WKK

GPMK Hiring of Plnt & m/c 10 61 SAP WKK

GPRK Project Related Cont 10 62 SAP WKK

Release Procedure for Contract:

Path: SPRO Materials Management Purchasing Contract Release Procedure for Contracts

Edit Characteristic: In this step, you create characteristics for a release procedure for Contract
Following characteristic are created for a contract release

PO_DOCTYPE

PO_PLANT

PO_VALUE

PO_PURORG

Edit Class :In this step, you create classes for a release procedure for Contract
Following class are created for Contract release

REL_CLASS

Page 77 of 182
Project Shield
configuration Document
Release strategies
Create a release strategy for your release group and assign your release codes accordingly.

Contract Release Stratergy Agro

.A1 AA AG CONT GCMK,WK 1-1K GCMK 1 -1000

A1 AB AGRO CONT 1K - 10L GCMK 1000-1000000

A1 AC AGRO CONT 10L - 15L GCMK 1000000-1500000

A1 AD AGRO CONT 15L - 25L GCMK 1500000-2500000

A1 AE AGRO CONT >25L GCMK >2500000

AF AGRO CONT GITK 1- 1


A1 GITK 1-1000000

A1 AG AGROCONT GITK10L-15L GITK 100000-1500000

A1 AH AGROCONT GITK15L-25L GITK 1500000-2500000

A1 AI AGRO CONT GITK >25L GITK >2500000

A1 AJ AGRO CONT GCLK 1-1L GCLK 1 - 100000

A1 AK AGRO CONT GCLK 1L-5L GCLK 100000 - 500000

A1 AL AGRO CONT GCLK >5L GCLK >500000

A1 AM AGRO CONT GLTC 1 -1K GLTC 1 - 1000

A1 AN AGRO CONT GLTC1K-10L GLTC 1000 - 1000000

A1 AO AGROCONTGLTC10L-15L GLTC 1000000 - 1500000

A1 AP AGROCONTGLTC15L-25L GLTC 1500000 - 2500000

A1 AQ AGRO CONT GLTC >25L GLTC >2500000

A1 AR AGRO CONT GAGH 1-5K GAGH 1-5000

A1 AS AGROCONT GAGH5K-25K GAGH 5000-25000

A1 AT AGRO CONT GAGH >25K GAGH >25000

Contract Release Stratergy Energy

B1 B8 ENGY CONT 1 - 2L GCMK 1 - 200000

Page 78 of 182
Project Shield
configuration Document
B1 B9 ENGY CONT >2L GCMK >200000

B1 BA ENGY CONT GITK 1-1L GITK 1 - 100000

B1 BB ENGY CONT GITK >1L GITK >100000

B1 BC ENGY CONT GCLK 1-50K GCLK 1 - 50000

B1 BD ENGY CONT GCLK50K-1L GCLK 50000 - 100000

B1 BE ENGY CONT GCLK >1L GCLK >100000

B1 BF ENGY CONT GLTC >1 GLTC >1

B1 BG ENGY CONT GAGH >1 GAGH >1

B1 BH ENGY CONT GOMK 1 -2L GOMK 1 - 200000

B1 BI ENGY CONT GOMK 2L-5L GOMK 200000 - 500000

B1 BJ ENGY CONT GOMK >5L GOMK >500000

Contract Release Stratergy Raxa

C1 C6 RAXA CONT 1 - 5K GCMK 1 - 5000

C1 C7 RAXA CONT >5K GCMK >5000

Contract Release stratergy FMS

1 D6 FMS CONT 1 - 2L GCMK 1 - 200000

D1 D7 FMS CONT > 2L GCMK >200000

D1 D8 FMS CONT GITK 1 - 1L GITK 1 - 100000

D1 D9 FMS CONT GITK >1L GITK >100000

D1 DA FMS CONT GOMK 1 - 2L GOMK 1 - 200000

D1 DB FMS CONT GOMK 2L-10L GOMK 200000 - 1000000

D1 DC FMS CONT GOMK >10L GOMK >1000000

D1 DD FMS CONT GCLK 1-50K GCLK 1 - 50000

Page 79 of 182
Project Shield
configuration Document
D1 DE FMS CONT GCLK 50K-1L GCLK 50000 - 100000

D1 DF FMS CONT GCLK 1L-25L GCLK 100000 - 2500000

D1 DG FMS CONT GLTC >=1 GLTC >=1

D1 DH FMS CONT GAGH 1- 12L GAGH 1 - 1200000

Contract Release Procedure for Properties

E1 E9 PROP CONT 1 - 1L GCMK 1 - 100000

E1 EA PROP CONT 1L - 10L GCMK 100000 - 1000000

E1 EB PROP CONT 10L - 25L GCMK 1000000 - 2500000

E1 EC PROP CONT 25L-50L GCMK 2500000 - 5000000

E1 ED PROP CONT >50L GCMK >5000000

E1 EE PROP CONT GLTC 1-1L GLTC 1 - 100000

E1 EF PROP CONT GLTC1L-10L GLTC 10000 - 1000000

E1 EG PROPCON GLTC10L-25L GLTC 1000000 - 2500000

E1 EH PROPCON GLTC25L-50L GLTC 2500000 - 5000000

E1 EI PROPCONT GLTC >50L GLTC >5000000

E1 EJ PROPCONT GAGH >=1 GAGH >=1

Contract Release Procedure for Agro Corp

F1 FE AG CORP CONT 1-10K GCMK 1 - 10000

F1 FF AG CORP CONT 10K-10L GCMK 10000 - 1000000

F1 FG AG CORP CONT 10L-15L GCMK 1000000 - 1500000

F1 FH AG CORP CONT15 L-25L GCMK 1500000 - 2500000

F1 FI AG CORP GITK 1 - 1L GITK 1 – 100000

F1 FJ AG CORP GITK 1L - 3L GITK 100000 – 3000000

F1 FK AG CORP GITK 3L - 5L GITK 3000000 – 5000000

Page 80 of 182
Project Shield
configuration Document
F1 FL AG CORP GITK >5L GITK >500000

F1 FM AG CORP GCLK 1 -1L GCLK 1 – 100000

F1 FN AG CORP GCLK 1L-2L GCLK 100000 – 200000

F1 FO AG CORP GCLK 2L-5L GCLK 200000 – 5000000

F1 FP AG CORP GCLK >5L GCLK >500000

F1 FS AG CORP GLTC 1 -10K GLTC 1 - 10000

F1 FT AG CORP GLTC 10K-10L GLTC 10000 - 1000000

F1 FU AG CORP GLTC 10L-15L GLTC 1000000 - 1500000

F1 FV AG CORP GLTC 15L-25L GLTC 1500000 - 2500000

F1 FW AG CORP GLTC >25L GLTC >2500000

F1 FX AG CORP GAGH 1 - 5K GAGH 1 - 5000

F1 FY AG CORP GAGH >5K GAGH >50000

Contract Release Roads

H1 HB ROADS CONT 1 - 25L GCMK 1 – 2500000

H1 HC ROADS CONT 25L-1CR GCMK 2500000 – 1000000

H1 HD ROADS CONT >1CR GCMK >10000000

H1 HE ROADS GOMK 1- 10K GOMK 1 - 10000

H1 HF ROADS GOMK 10K -50K GOMK 10000 - 50000

H1 HG ROADS GOMK 50K-5L GOMK 50000 - 500000

H1 HH ROADS GOMK >5L GOMK >500000

H1 HI ROADS GCLK 1 - 20K GCLK 1 - 20000

H1 HJ ROADS GCLK 20K - 2L GCLK 20000 - 200000

H1 HK ROADS GCLK 2L - 15L GCLK 200000 - 1500000

Page 81 of 182
Project Shield
configuration Document
H1 HL ROADS GCLK >15L GCLK >1500000

H1 HM ROADS GITK 1 -5L GITK 1 – 500000

H1 HN ROADS GITK 5L - 1CR GITK 500000 – 10000000

H1 HO ROADS GITK >1CR GITK >10000000

H1 HP ROADS GPRK 1 - 25L GPRK 1 – 2500000

H1 HQ ROADS GPRK 25 L -1CR GPRK 2500000 – 10000000

H1 HR ROADS GPRK >1CR GPRK >10000000

SCHEDULING AGREEMENT

SPRO
Materials Management  Scheduling Agreement Define Document Types
Purchasing 

SPRO
Materials Management  Scheduling Agreement Define Number Ranges
Purchasing

Page 82 of 182
Project Shield
configuration Document

CONDITIONS
Define Price Determination Process

Path: SPRO Materials Management PurchasingConditions Define Price Determination


Process Define Access Sequences

Define Access Sequences


In this step you define access sequences. An access sequence is a search strategy with the aid of which the SAP System searches for valid
condition records for a condition type.

AS Description Description

0002 Gross Price Access sequence relevant for pricing

WBTC Trading Contract (WBTC) Access sequence relevant for pricing

WB2B Trading Contract (WB2B) Access sequence relevant for pricing

WBTC Trading Contract (WBTC) Access sequence relevant for pricing

WTC1 Trading Contract (WBC1) Access sequence relevant for pricing

Define Condition Types


Path: SPRO Materials Management PurchasingConditions Define Price Determination
Process Define Condition Types.

Page 83 of 182
Project Shield
configuration Document
The condition types are used to represent pricing elements such as prices, discounts, surcharges, taxes, or delivery
costs in the SAP System. These are stored in the system in condition records. Following condition types are define
for GMR which can subsequently be used in GMR Pricing Procedure.

Page 84 of 182
Project Shield
configuration Document

Page 85 of 182
Project Shield
configuration Document

Define Calculation Schema


In the MM area, a calculation schema - a framework of steps used to calculate or determine something - is used among other things to
calculate costs, prices, period-end rebates, and taxes.

Path: SPRO Materials Management PurchasingConditions Define Price Determination


ProcessDefine Calculation Schema.

Procedure Description

GMRDOM GMR Domestic Pricing Procedure

GMRIMP GMR Import Pricing Procedure

GMR Local pricing procedure as follows.

Ste Cnt Fro Man Req Prin SubT Sta AltCT AltCB ActK Accrl
p r CTyp Description m To . t t o t y V y s

1 1 PB00 Gross Price X 9

1 2 PBXX Gross Price 5 X 9

5 GDC1 Discount(Perct) 1

7 GDC2 Discount/Quantity 1

9 GDC3 Discount (Value) 1

11 GPK1 Pack & Forwa(Perct) 1 9 GP1 GP1

13 GPK2 Pack & Forwa(Value) 1 9 GP1 GP1

Page 86 of 182
Project Shield
configuration Document
15 GCH1 Other Charges(Perct) 1 GO1 GO1

17 GCH2 Other Charge (Value) 1 GO1 GO1

19 GCH3 Other Charge/Qty 1 GO1 GO1

20 GCH4 Surcharge% 1

21 GCH5 Surcharge value 1

Sub Tot 1(Price - Dis +


25 P&F ) 1 21 X X

28 JEXC IN Manual Excise 5 X

30 ZADC ADC in pricing 2 X

37 Sub Tot 2(Net Price + ED) 25 36 X

45 JEXS Taxes on the PO X X

Sub Tot 3 (Net Price


50 +ED+Tax) 37 45 X

53 GENT Entry Tax (Perct) 50 X

56 JOCM IN Octroi 50 X

58 GIN1 Insurence (Perct) 1 X GN1 GN1

60 GIN2 Insurence (Value) 1 X GN1 GN1

62 GDOC Document Charg(Perct 1 X GC1 GC1

64 GDO1 Document Char(Value) 1 X GC1 GC1

66 GLD1 Loding & Unlod Ch(Pe 1 X GL1 GL1

68 GLD2 Loding & Unlod Ch(Va 1 X GL1 GL1

70 GLD3 Loding & Unlod Ch(Qt 1 X GL1 GL1

72 GHD1 Hand Charges(Perct) 1 X GH1 GH1

74 GHD2 Hand Char(Value) 1 X GH1 GH1

76 GHD3 Hand Char(Qty) 1 X GH1 GH1

78 GFR1 Freight Charg(Perct) 1 X FR1 FR1

80 GFR2 Freight Charg(Value) 1 X FR1 FR1

82 GFR3 Freight Charg(Qty) 1 X FR1 FR1

84 GDR1 Demurrage Cha(Perct) 78 82 X GD1 GD1

86 GDR2 Demurrage Cha Value 78 82 X GD1 GD1

Page 87 of 182
Project Shield
configuration Document
88 GDR3 Demurrage Char Qty 78 82 X GD1 GD1

90 GIC1 Insp.Charges(Perct) 1 X GI1 GI1

91 GIC2 Insp.Charges(Value) 1 X GI1 GI1

93 GBC1 Brokerage Cha(Perct) 1 X GB1 GB1

95 GBC2 Brokerage Cha(Value) 1 X GB1 GB1

97 GBC3 Brokerage Char(Qty) 1 X GB1 GB1

99 Sub Tot 4(Other Charges) 53 97 X

100 Copy of Sub Tot 3 50 X

10
101 Total PO Cost 99 0 S X

103 NAVS Non-Deductible Tax 37 X

104 SKTO Cash Discount 37 17 X

GRW
110 R Statistical Value 8 C X

GMR Import Pricing procedure as Follows.

Step Cou Cond Type Description From To Print SubTot Reqmt Calc Bas ty Acck Accrls

1 1 PB00 Gross Price 0 0 X 9 0 0 0

1 2 PBXX Gross Price 0 0 X 9 5 0 0

5 0 GDC1 Discount(Perct) 1 0 0 0 0

7 0 GDC2 Discount/Quantity 1 0 0 0 0

9 0 GDC3 Discount (Value) 1 0 0 0 0

11 0 GPK1 Pack & Forwa(Perct) 1 9 0 0 0 GP1 GP1

13 0 GPK2 Pack & Forwa(Value) 1 9 0 0 0 GP1 GP1

15 0 GCH1 Other Charges(Perct) 1 0 0 0 0 GO1 GO1

17 0 GCH2 Other Charge (Value) 1 0 0 0 0 GO1 GO1

19 0 GCH3 Other Charge/Qty 1 0 0 0 0 GO1 GO1

Page 88 of 182
Project Shield
configuration Document
25 0 Sub Tot1(After Discount) 1 19 0 0 0

30 0 GSC1 Shipment Charges % 25 0 X 0 0 0 GS1 GS1

32 0 GSC2 Shipment Chg (Value) 25 0 X 0 0 0 GS1 GS1

34 0 GSC3 Shipment Chg (Qty) 25 0 X 0 0 0 GS1 GS1

40 0 GIN1 Insurence (Perct) 25 0 X 0 0 0 GN1 GN1

42 0 GIN2 Insurence (Value) 25 0 X 0 0 0 GN1 GN1

43 0 GHC1 Handling Charges % 25 0 0 0 0 GH1 GH1

45 0 Sub-Tot 2 (Ship + Insurence) 25 43 0 0 0

50 0 JBCD Basic Custom Duty % 45 0 0 0 0 FR3 FR3

52 0 JSCD Special Custom Duty 45 50 0 0 0 FR3 FR3

58 0 JCV1 IN CVD 45 52 0 0 0 FR3 FR3

61 0 JECV ECess on CVD 58 0 0 0 0 FR3 FR3

64 0 J1CV SHECess on CVD 58 0 0 0 0 FR3 FR3

73 0 JECD ECess on all Duties% 50 64 0 0 0 FR3 FR3

76 0 JEC1 SECess on all Duty% 50 64 0 0 0 FR3 FR3

80 0 Sub Tot3(As.Value+Custom Duty) 45 76 0 0 0

84 0 JADC Add Duty Cust(ADC)% 80 0 0 0 0 FR3 FR3

86 0 SubTot 4(Asse Val+Duties) 80 84 0 0 0

88 0 GENT Entry Tax (Perct) 86 0 0 0 0

91 0 GDOC Document Charg(Perct 1 0 0 0 0 GC1 GC1

92 0 GDO1 Document Char(Value) 1 0 0 0 0 GC1 GC1

94 0 GLD1 Loding & Unlod Ch(Pe 1 0 0 0 0 GL1 GL1

96 0 GLD2 Loding & Unlod Ch(Va 1 0 0 0 0 GL1 GL1

98 0 GLD3 Loding & Unlod Ch(Qt 1 0 0 0 0 GL1 GL1

Page 89 of 182
Project Shield
configuration Document
100 0 GHD1 Hand Charges(Perct) 1 0 0 0 0 GH1 GH1

102 0 GHD2 Hand Char(Value) 1 0 0 0 0 GH1 GH1

104 0 GHD3 Hand Char(Qty) 1 0 0 0 0 GH1 GH1

106 0 GFR1 Freight Charg(Perct) 1 0 0 0 0 FR1 FR1

108 0 GFR2 Freight Charg(Value) 1 0 0 0 0 FR1 FR1

110 0 GFR3 Freight Charg(Qty) 1 0 0 0 0 FR1 FR1

112 0 GDR1 Demurrage Cha(Perct) 106 110 0 0 0 GD1 GD1

114 0 GDR2 Demurrage Cha Value 106 110 0 0 0 GD1 GD1

116 0 GDR3 Demurrage Char Qty 106 110 0 0 0 GD1 GD1

118 0 GIC1 Insp.Charges(Perct) 1 0 0 0 0 GI1 GI1

120 0 GIC2 Insp.Charges(Value) 1 0 0 0 0 GI1 GI1

122 0 GBC1 Brokerage Cha(Perct) 1 0 0 0 0 GB1 GB1

124 0 GBC2 Brokerage Cha(Value) 1 0 0 0 0 GB1 GB1

126 0 GBC3 Brokerage Char(Qty) 1 0 0 0 0 GB1 GB1

129 0 Sub-Tot 5(Other Charges) 88 126 0 0 0

132 0 Copy of Sub-Tot 4 86 0 0 0 0

135 0 Total Landing Cost 129 132 0 0 0

160 0 SKTO Cash Discount 0 0 17 0 0

165 0 Actual price 0 0 S 0 0 0

170 0 GRWR Statistical Value 0 0 X C 8 0 0

Define Schema Group :These allow you to group together certain purchasing organizations that use the
same calculation schema. You can also use them to group together vendors for whom the same calculation schema
is valid.

Path: SPRO Materials Management PurchasingConditions Define Price Determination


Process Define Schema Group

Schema Groups: Vendor

Page 90 of 182
Project Shield
configuration Document
Schema Groups for Purchasing Organizations

Assignment of Schema Group to Purchasing Organization

Schema Groups: Vendor

Sch.grp.vendor Desciption

DS Domestic Schema Vendor

IS Import Schema Vendor

Schema Groups for Purchasing Organizations

GMR Schema Group for Purchasing Organization


PurGr Sc Description

G001 GMR Schema Pur Org

Assign Schema Group to Purchasing Organisation

POrg Description Pur Sch Gr

2000 Energy Pur Org G001

2101 Pur Org for HHI G001

4000 Agro Pur org G001

G001

5000 Property Pur Org

6600 GCCL Pur Org G001

8000 Raxa Pur Org G001

8100 Aviation Pur org G001

8600 Foundation Pur Org G001

Define Schema Determination: In this step we define for various combination of Purchasing Schema Group and
Vendor Schema Group which pricing procedure is applicable. Following is GMR settings for various combinations.

Path: SPRO Materials Management PurchasingConditions Define Price Determination


Process Define Schema Determination

Determine Calculation Schema for Standard Purchase Orders

Page 91 of 182
Project Shield
configuration Document
Pur Sch Grp Vend Sch Grp Price rocedure Description

G001 DS GMRDOM GMR Domestic Pricing Procedure

G001 IS GMRIMP GMR Import Pricing Procedure

Determine Schema for Stock Transport Orders

G001 GSTO GSTPP1 GMR Stock Transfer Pricing

Path: SPRO
 Materials Management  Purchasing
Conditions
 Define Price Determination
Process
 Define Transaction/Event Keys

Trans./Event Key; - To enable the system to find the relevant account for provisions (for accrued delivery costs or
miscellaneous provisions, for example), you must assign a transaction/event (internal processing) key to each
condition type that is relevant to provisions in the step Define Calculation Schema.

Page 92 of 182
Project Shield
configuration Document
Path: SPRO Materials Management PurchasingAccount Assignment Maintain Account
Assignment Categories

Page 93 of 182
Project Shield
configuration Document

Path: SPRO Materials Management PurchasingDefine Default Values for Document Type

Page 94 of 182
Project Shield
configuration Document

Version Management;;-
Set Up Version Management for External Purchasing Documents: In this step, you set up the version management
facility for external purchasing documents.For a combination of purchasing organization, document category, and document type,
you can:

• Activate version management


If version management is active, changes to a purchasing document are managed in versions.

• Define field selection for versions


You can specify the attributes certain fields of the version are to have: mandatory entry, optional entry, display only, field
suppressed.

Path: SPRO
 Materials Management  Purchasing
Version Management
 Set Up Version
Management for External Purchasing Documents

Page 95 of 182
Project Shield
configuration Document

Path: SPRO Materials Management PurchasingVersion Management Define Reasons for


Change

Vendor Evaluation :
In this section, you make the settings for vendor evaluation that apply to all purchasing organizations:

• Define weighting keys

• Define criteria

• Define scope of list

In the step Define Purchasing Organization Data for Vendor Evaluation, you define individual values for each
purchasing organization.

SPROMaterials ManagementVendor EvaluationDefine Weighting Keys

Page 96 of 182
Project Shield
configuration Document
Define Criteria.

Sub criteria.

Page 97 of 182
Project Shield
configuration Document

Page 98 of 182
Project Shield
configuration Document

SPROMaterials ManagementVendor EvaluationDefine Scope of List

Maintain Purchasing Organization Data

Page 99 of 182
Project Shield
configuration Document

Page 100 of 182


Project Shield
configuration Document

Sub criteria for main criteria

Page 101 of 182


Project Shield
configuration Document

Page 102 of 182


Project Shield
configuration Document

Similarly we need to maintain Main and Sub criteria’s for all required Purchase organizations

Weighting for Purchase org

Page 103 of 182


Project Shield
configuration Document

Similarly we need to maintain for all Purchase organization

Page 104 of 182


Project Shield
configuration Document

Page 105 of 182


Project Shield
configuration Document

Similarly we need to maintain for all required Purchase organization

Page 106 of 182


Project Shield
configuration Document

Page 107 of 182


Project Shield
configuration Document

Page 108 of 182


Project Shield
configuration Document

External Services Management

External Services Management:

Use this menu to make the special system settings that are necessary to carry
out procurement transactions involving external services.You should not
process procurement transactions in the SAP System until you have worked
through this chapter. All settings of general relevance to the procurement of
both services and materials are made via the "Purchasing" menu.
Service Master:

SPROMaterials ManagementExternal Services ManagementService MasterDefine Service


Category

SPROMaterials ManagementExternal Services ManagementService MasterDefine Number


Ranges

Page 109 of 182


Project Shield
configuration Document

Page 110 of 182


Project Shield
configuration Document

SPROMaterials ManagementExternal Services Management Number Ranges Define Number


Ranges for Service Entry Sheet

SPROMaterials ManagementExternal Services Management Number Ranges Define Internal


Number Range for Service Specifications

SPROMaterials ManagementExternal Services Management Number Ranges Assign Number


Ranges.

SPROMaterials ManagementExternal Services Management Define Attributes of System


Messages

Page 111 of 182


Project Shield
configuration Document

Material Management- Inventory Management and Physical Inventory

In this section, you complete the system settings required for the following:

goods movements, including:

goods issues

transfer postings.

goods receipts.

reservations

physical inventory

reporting /evaluations

transfer of data from external DP systems.

SPROMaterials ManagementInventory Management and Physical Inventory Goods Issue / Transfer


Postings Create Storage Location Automatically

Page 112 of 182


Project Shield
configuration Document

Page 113 of 182


Project Shield
configuration Document

Set Up Dynamic Availability Check: In this step, you configure the dynamic availability check.

In Inventory Management, two types of availability check are carried out.

• availability check during the entry of reservations


• availability check during the entry of goods movements

The system checks whether the material to be withdrawn is available and issues a message, if necessary.

SPROMaterials ManagementInventory Management and Physical Inventory Issue / Transfer


Postings Set Up Dynamic Availability Check

Page 114 of 182


Project Shield
configuration Document

Page 115 of 182


Project Shield
configuration Document

SPROMaterials ManagementInventory Management and Physical Inventory Goods Receipt Set


Tolerance Limits

SPROMaterials ManagementInventory Management and Physical Inventory Goods Receipt Create


Purchase Order Automatically

Page 116 of 182


Project Shield
configuration Document

SPROMaterials ManagementInventory Management and Physical Inventory Goods Receipt Set


"Delivery Completed" Indicator

Page 117 of 182


Project Shield
configuration Document
Reservation

SPROMaterials ManagementInventory Management and Physical Inventory Reservation Define Default


Values

Plant-

Page 118 of 182


Project Shield
configuration Document

Physical Inventory

SPROMaterials ManagementInventory Management and Physical Inventory Cycle Counting

Page 119 of 182


Project Shield
configuration Document

Movement Types

SPROMaterials ManagementInventory Management and Physical Inventory movement type Record


Reason for Goods Movements

Page 120 of 182


Project Shield
configuration Document

Output Determination :

In Inventory Management, output is text that is created at the time of goods movements. There are output documents
such as:-

goods receipt/issue slips ( example, GR/GI slips, pallet slips) /Labels/ kanban cards/ MAIL messages which
Inventory Management uses to communicate with other departments (purchasing or materials planning, for example)

Depending on the type, an output document can be printed or sent to a recipient (for example, via MAIL). An output
control mechanism that depends on different criteria allows to process and send the output documents with defined
restrictions and under certain conditions.

Goods accompanying slips such as goods receipt or goods issue slips can be printed for every movement. The
goods accompanying slip (also referred to in the system as goods receipt/issue slip) can be printed in three versions:

Version 1: individual slip : -In this version, one goods receipt/issue slip is printed per item.

Version 2: individual slip with inspection text: -This version is also used to print individual slips. The printout also
contains the quality inspection text, provided it exists in the material master record.

Version 3: collective slip:-In this version, a collective slip is printed for all items of the material document.

When entering a goods movement, the user can define through an indicator whether an output document is created,
that is, whether a goods receipt/issue slip is printed or not. Printing a goods receipt/ issue slip in a separate step after
entering the goods movement is also possible.

An output type (also referred to as condition type) is defined for every type of goods receipt/issue slip and for every
version. That is, the following output types are available in the standard system:

GR slip, version 1 / GR slip, version 2/ GR slip, version 3/ GI slip, version 1/ GI slip, version 2.

For particular cases, such as subcontract order processing, separate output types are defined. Return delivery slips
use the same output types as GR slips.

All information relevant for printing the corresponding goods receipt/issue slip is stored for every output type, for
example:

SAPscript layout set / print parameters (for example, immediate print)

When a goods movement is entered, the system checks whether the conditions for an output type are met. For
example, if an output type is defined for the respective transaction type, movement type, and version, an output
document is generated automatically.

In this section, you define which output type is created for a goods movement and how the output document is
processed.

You have to check or maintain the following objects so that the system creates an output document when a goods
movement is entered: -

condition table / access sequence/ output types /output determination procedure / condition records / SAPscript
layout set for the output type / Printer determination

Requirements :

Page 121 of 182


Project Shield
configuration Document
1. In the Print control section, you must have: a) defined print indicators b) allocated print indicators to movement
types c) allocated versions to transactions

2. Before you set up the output determination, you have to run the program RM07NCUS for each client in which you
want to use the output determination function.

This program copies the basic settings from the SAP standard client (000).

Note:In the case of a goods receipt for a purchase order, MAIL messages are sent to purchasing in two cases:

if Purchasing has set the indicator "GR output" in the purchase order /

if an order price quantity has been entered at the time of a goods receipt which lies outside the tolerances (for a
warning message).

In the case of a goods receipt of missing parts, a mail message is sent to the MRP controller if the missing parts
check is active for the plant.

The standard system contains all settings for this output. You only have to maintain the mail texts for the following
output types:

MLGR (GR message) / MLMD (GR quantity variance )/ MLFH (goods receipt of missing part)

SPROMaterials ManagementInventory Management and Physical Inventory Output Determination


Maintain Condition Tables

SPROMaterials ManagementInventory Management and Physical Inventory Output Determination


Maintain Access Sequences

Page 122 of 182


Project Shield
configuration Document

SPROMaterials ManagementInventory Management and Physical Inventory Output Determination


Maintain Output Types

Page 123 of 182


Project Shield
configuration Document
SPROMaterials ManagementInventory Management and Physical Inventory Output Determination
Maintain Output Determination Procedures

SPROMaterials ManagementInventory Management and Physical Inventory Output Determination


Maintain Conditions Create Condition: Inventory Mgmt / Change Condition: Inventory Mgmt/Display
Condition: Inventory Mgmt

Page 124 of 182


Project Shield
configuration Document

Material Management:-Valuation and Account Assignment


In this section, you make the system settings required for the following areas:

-Material valuation

-Link between Materials Management and Financial Accounting

Requirements;

You must have processed the defaults for the material types before you can make your configurations for "Valuation
and Account Determination."

SPROMaterials Management Valuation and Account Assignment  Define Price Control for
Material Types

Page 125 of 182


Project Shield
configuration Document

Page 126 of 182


Project Shield
configuration Document

SPLIT VALUATION:
Split valuation enables you to valuate substocks of a material in different ways (for example, according to external
procurement or in-house production or by batches).

Under the menu option "Split valuation", you can determine whether and how you want to use split valuation at your
company.

SPROMaterials Management Valuation and Account Assignment split valuation Activate Split
Valuation

SPROMaterials Management Valuation and Account Assignment split valuation Configure Split
Valuation

Page 127 of 182


Project Shield
configuration Document

Page 128 of 182


Project Shield
configuration Document

Page 129 of 182


Project Shield
configuration Document

Page 130 of 182


Project Shield
configuration Document

Similarly we need to maintain for all required plants

Page 131 of 182


Project Shield
configuration Document

Account Determination:
In this step, you can make the settings for account determination in Inventory Management and Invoice
Verification. Account determination without the wizard enables you to make a more complex configuration than
account determination with the wizard, but requires that you are already familiar with the principle of automatic
account determination in the ERP System. /You can configure account determination with the wizard in the first
instance, for example. Then, if the wizard does not meet your company's account determination requirements, you
can work without it.

Detailed documentation on account determination is contained in the step Configure automatic postings.

Further notes

You have to work without the wizard if you use the material ledger.

SPROMaterials Management Valuation and Account Assignment  Account Determination


Without Wizard Define Valuation Control

SPROMaterials Management Valuation and Account Assignment  Account Determination


Without Wizard Define Valuation Classes

Page 132 of 182


Project Shield
configuration Document

Page 133 of 182


Project Shield
configuration Document

Page 134 of 182


Project Shield
configuration Document

Page 135 of 182


Project Shield
configuration Document

Page 136 of 182


Project Shield
configuration Document

Configure Automatic Postings : In this step, you enter the system settings for Inventory Management and Invoice
Verification transactions for automatic postings to G/L accounts.You can then check your settings using a simulation function.

What are automatic postings?

Postings are made to G/L accounts automatically in the case of Invoice Verification and Inventory Management transactions relevant to Financial and
Cost Accounting.

Example:
Posting lines are created in the following accounts in the case of a goods issue for a cost center:

Stock account / Consumption account

How does the system find the relevant accounts?

When entering the goods movement, the user does not have to enter a G/L account, since the ERP system automatically finds the accounts to which
postings are to be made using the following data:

-Chart of accounts of the company code:

If the user enters a company code or a plant when entering a transaction, the ERP system determines the chart of accounts which is valid for the
company code.

hou must define the automatic account determination individually for each chart of accounts.

aluation grouping code of the valuation area : If the automatic account determination within a chart of accounts is to run differently for certain
company codes or plants (valuation areas), assign different valuation grouping codes to these valuation areas.

You must define the automatic account determination individually for every valuation grouping code within a chart of accounts. It applies to all valuation
areas which are assigned to this valuation grouping code.

If the user enters a company code or a plant when entering a transaction, the system determines the valuation area and the valuation grouping code.

Transaction/event key (internal processing key):

Posting transactions are predefined for those inventory management and invoice verification transactions relevant to accounting. Posting records,
which are generalized in the value string, are assigned to each relevant movement type in inventory management and each transaction in invoice
verification. These contain keys for the relevant posting transaction (for example, inventory posting and consumption posting) instead of actual G/L
account numbers.

You do not have to define these transaction keys, they are determined automatically from the transaction (invoice verification) or the movement type
(inventory management). All you have to do is assign the relevant G/L account to each posting transaction.

Account grouping (only for offsetting entries, consignment liabilities, and price differences)

Since the posting transaction "Offsetting entry for inventory posting" is used for different transactions (for example, goods issue, scrapping, physical
inventory), which are assigned to different accounts (for example, consumption account, scrapping, expense/income from inventory differences), it is
necessary to divide the posting transaction according to a further key: account grouping code.

An account grouping is assigned to each movement type in inventory management which uses the posting transaction "Offsetting entry for inventory
posting".

Under the posting transaction "Offsetting entry for inventory posting", you must assign G/L accounts for every account grouping, that is, assign G/L
accounts.

If you wish to post price differences to different price difference accounts in the case of goods receipts for purchase orders, goods receipts for orders,
or other movements, you can define different account grouping codes for the transaction key.

Using the account grouping, you can also have different accounts for consignment liabilities and pipeline liabilities.

Page 137 of 182


Project Shield
configuration Document
Valuation class of material or (in case of split valuation) the valuation type

The valuation class allows you to define automatic account determination that is dependent on the material. for example: you post a goods receipt of a
raw material to a different stock account than if the goods receipt were for trading goods, even though the user enters the same transaction for both
materials.

You can achieve this by assigning different valuation classes to the materials and by assigning different G/L accounts to the posting transaction for
every valuation class.

If you do not want to differentiate according to valuation classes you do not have to maintain a valuation class for a transaction.

SPROMaterials Management Valuation and Account Assignment  Account Determination


Without Wizard Configure Automatic Postings

Page 138 of 182


Project Shield
configuration Document

Similarly maintain for Transactions

Page 139 of 182


Project Shield
configuration Document

Logistics Invoice Verification:


In the Implementation Guide for Logistics Invoice Verification, you make the system settings that are required for the following areas:

Processing invoice receipts

Connection to Financial Accounting

Note : You must process the sections for document types and number ranges in the Incoming Invoice unit.

SPRO Materials Management Logistics Invoice Verification Define Attributes of System Messages

SPRO Materials Management Logistics Invoice Verification Incoming Invoice Number


Assignment

Page 140 of 182


Project Shield
configuration Document

Page 141 of 182


Project Shield
configuration Document

Page 142 of 182


Project Shield
configuration Document

SPRO Materials Management Logistics Invoice Verification Maintain Number Assignment for
Logistics Documents Transaction - Assign Number Range

SPRO Materials Management Logistics Invoice Verification Maintain Number Assignment for
Logistics Documents Maintain Number Range Intervals for Invoice Documents

Page 143 of 182


Project Shield
configuration Document

SPRO Materials Management Logistics Invoice Verification incoming invoiceTax Treatment in


Invoice Reduction

SPRO Materials Management Logistics Invoice Verification incoming invoice Maintain Default
Values for Tax Codes

Page 144 of 182


Project Shield
configuration Document
SPRO Materials Management Logistics Invoice Verification Invoice BlockDetermine Payment
Block

SPRO Materials Management Logistics Invoice Verification  Invoice BlockSet Tolerance Limits

Page 145 of 182


Project Shield
configuration Document

Materials Management-Consumption-Based Planning

SPRO Materials Management Consumption-Based Planning Master Data Define MRP


Controllers

Page 146 of 182


Project Shield
configuration Document

Financial Accounting (New)


TAXES ON SALES/PURCHASE

The taxes on sales/purchases include input tax, output tax, acquisition tax and additional taxes.

In addition to tax codes, percentage rates and tax accounts, you have to specify whether the cash discount amount reduces the tax
base amount, depending on the company code. This reduction is, for example, possible in Belgium but not in Germany.

The following sections describe the specifications you must make for calculating taxes on sales/purchases.

SPRO Financial Accounting (New)


 Tax on Sales/Purchases
 Basic Settings
 Check Calculation
Procedure

Check Calculation Procedure

In this activity, you can check and, if necessary, change existing procedures for tax calculation.

Standard settings

Calculation procedures containing the necessary specifications for the calculation and posting of taxes on sales/purchases have
already been defined in the standard SAP system for certain countries. Every calculation procedure groups several tax types
together into a condition type (for example, output tax or input tax) in the calculation procedure, and determines calculation rules
for it.

The calculation procedure determines for which amount the individual condition types are to be calculated. This can be the base
amount (total of the expense items and the revenue items) or a subtotal. The entry in column FrmLvl, determines for which amount
tax is calculated.

Note:- In this activity, the condition types for the check and the possible change provided in the standard system are also displayed.
Here, for example, the condition calculation rule, or for which base amount the tax is calculated is determined (= condition type).

Recommendation:-If possible, do not change the condition types and calculation procedures provided in the standard system. Only
check the standard condition types and calculation procedures regarding whether you can use them for your requirements. If
necessary, make changes.

Activities :If you cannot use the standard settings, change the condition types and calculation procedures delivered to meet your
requirements.

Page 147 of 182


Project Shield
configuration Document

Page 148 of 182


Project Shield
configuration Document

Page 149 of 182


Project Shield
configuration Document

Following types of Coditions defined and used for –Tax procedure at GMR

Page 150 of 182


Project Shield
configuration Document

Similarly we need to defined all required conditions as per the requirement of the GMR.

Page 151 of 182


Project Shield
configuration Document

Page 152 of 182


Project Shield
configuration Document
SPRO Financial Accounting (New)
 Tax on Sales/Purchases
 Basic Settings
 Assign Country to
Calculation Procedure

SPRO  Financial Accounting (New)


 Tax on Sales/Purchases
 Basic Settings
 Check and Change
Settings for Tax Processing

Check &Change Settings for Tax processing:-

In this activity you make the necessary specifications for posting taxes. In doing this you specify under a process key
the following indicators:

• Tax type :- Output tax, input tax, additional taxes, or "not tax-relevant" can be specified as the tax type.

• Nondeductibility of tax amounts:- For this, tax amounts are marked as not deductible.

• Posting indicator: - Here you specify whether the tax amount is posted separately or distributed to expense
or revenue items.

• Tax not relevant to cash discount (Not discount relevant) :-This indicator is set only for Canada. If you
select it, the system does not take into account the corresponding tax amount when determining the tax
base.

[For a every new conditions defined we need to create one Accounting Key w.r.t The business
requirement. Example- In Ta x procedure we have defined new condition For Ecess on Service=ZESS
Condition and for this we have created new Accounting Key as –ZES-ECS on Service Tax in this session ]

Page 153 of 182


Project Shield
configuration Document

Similarly we need to create all required Accounting Key

Calculation : In the following activities you make the settings for calculating the taxes on sales/purchases

SPRO  Financial Accounting (New) Tax on Sales/Purchases


 Calculation Define Tax Codes for
Sales and Purchases [T-code –FTXP]

Use : You have to define a separate tax on sales/purchases code for each country in which one of your company
codes is located.
Each code contains one or more tax rates for the different tax types.

If you have to report tax-exempt or non-taxable sales to the tax authorities, you need to define a tax rate with the
value 0.Note : Do not delete or change any taxes on sales/purchases codes and their definitions as long as items
with these codes exist in the system.
Otherwise, the SAP system displays the tax amounts with incorrect tax rates in the corresponding reports and
determines incorrect amounts during a tax adjustment for payment transactions.

Standard settings : SAP supplies a tax calculation procedure for each country. The procedure comprises a list of all
common tax types with rules for tax calculation. In addition, example tax codes are defined for some countries.

Page 154 of 182


Project Shield
configuration Document
Activities: 1. Check the standard tax codes for your country. Add further tax codes, if necessary./ / 2.
Ensure that tax accounts are defined for the automatic posting of taxes.

similarly we need to create required Taxcodes.

Page 155 of 182


Project Shield
configuration Document

Posting : In the following activities, you set the requirements for posting taxes on sales/purchases

SPRO Financial Accounting (New)


 Tax on Sales/Purchases
 Posting Define Tax Accounts [T-
code –OB40]

In this activity, you specify the accounts to which the different tax types are to be posted. The system determines
these accounts for automatic postings.

G/L Accounts to be Assigned in this


step

Page 156 of 182


Project Shield
configuration Document

Logistics – General
Tax on Goods Movements [CIN]

SPROLogistic General Tax on Goods Movements India Basic Settings

Page 157 of 182


Project Shield
configuration Document
SPROLogistic General Tax on Goods Movements India Basic Settings Maintain Excise Registrations

An entity in India that is entitled by law to produce any goods liable to excise., Each entity is assigned its own excise
registration number. Every factory that manufactures excisable goods is required to register separately, so that a
business with seven factories requires seven registrations.

Page 158 of 182


Project Shield
configuration Document
SPROLogistic General Tax on Goods Movements India Basic SettingsMaintain Company Code Settings

Page 159 of 182


Project Shield
configuration Document

SPROLogistic General Tax on Goods Movements India Basic SettingsMaintain Plant Settings

Page 160 of 182


Project Shield
configuration Document
SPROLogistic General Tax on Goods Movements India Basic Settings Maintain Excise Groups

A unit within an excise registration, in India, which keeps its own set of excise records.

Whereas the excise registration reports to the excise authorities, the excise group is a purely internal organizational
unit. Each excise group keeps records of all transactions that have to be reported to the excise authorities. When the
time comes to present these records to the authorities, the excise registration compiles the information from all of its
excise groups.

Page 161 of 182


Project Shield
configuration Document

Similarly we need to create required Excise Group

SPROLogistic General Tax on Goods Movements India Basic Settings Maintain Series Groups

Use : In this IMG activity, you define the different excise series groups within your company. Series groups allow you
to maintain multiple number ranges for the outgoing excise documents.

Based on excise regulations and exemptions from the authorities you can maintain multiple number series for
outgoing documents. But each of these series has to be declared to the excise authorities.

Activities: Define excise series groups based on type of outgoing document / Assign series group to excise
/registration ID / If no financial postings are required for an Excise invoice in this seris group then you tick the 'No
utilization' indicator. /If the CENVAT has to be paid immediately and you need not wait for the Fort nightly payment
then mark the 'Immediate Utilization' indicator.

Page 162 of 182


Project Shield
configuration Document

SPROLogistic General Tax on Goods Movements India Basic Settings Maintain Excise Duty Indicators

Page 163 of 182


Project Shield
configuration Document
SPROLogistic General Tax on Goods Movements India Basic Settings Determination of Excise
DutyMaintain Excise Defaults

In this IMG activity, you define which tax procedure and pricing condition types are used in calculating excise taxes
using formula-based excise determination.

SPROLogistic General Tax on Goods Movements India Basic Settings Condition-Based Excise
Determination [T-code : FTXP]

Only carry out this activity if you use condition-based excise determination -TAXINN

Need to maintain required Tax code. FTXP [ Example: Give tax code number-Select as V-INPUT TAX then don’t give
any values just save it.

Page 164 of 182


Project Shield
configuration Document

SPROLogistic General Tax on Goods Movements India Basic Settings Assign Tax Code to Company
Codes

Only carry out this activity if you use condition-based excise determination-TAXINN

Similarly we need to maintain all Tax codes for the required Company Codes.

Page 165 of 182


Project Shield
configuration Document

SPRO
Logistic General
 Tax on Goods Movements
 India
 Basic Settings Classify Condition Types

In this IMG activity, you specify which condition types you use for which sort of tax. Note that this only applies to
condition types that you use with the new excise determination method.

The system uses this information when you create a document from another one. For example, when you enter an
incoming excise invoice from a purchase order, or when you create an outgoing excise invoice from a sales order, the
system determines the various excise duties in the excise invoice using the information that you have entered here.

In addition, when you create a purchasing document, the system only uses the condition types that you enter here.

• For taxes on purchases, use the condition types contained in the tax procedure.
• For taxes on sales, use the condition types contained in the pricing procedures.

Page 166 of 182


Project Shield
configuration Document

SPRO Logistic General


 Tax on Goods Movements
 India Account Determination
 Define G/L Accounts
for Taxes

this IMG activity, you specify which G/L accounts you will use to record which taxes

You have set up G/L accounts for each of the processing keys listed below;

Page 167 of 182


Project Shield
configuration Document

Page 168 of 182


Project Shield
configuration Document

G/L Accounts to be Assigned in this


step

Page 169 of 182


Project Shield
configuration Document

SPRO
Logistic General  Tax on Goods Movements
 India  Account Determination Specify Excise
Accounts per Excise Transaction

Use:- In this IMG activity, you specify which excise accounts (for excise duty and CENVAT) are to be posted to for
the various transaction types. Enter all the accounts that are affected by each transaction type.

If you use subtransaction types, enter the accounts for each subtransaction type as well.

Example :-
DC ind Account name
Excise TT
GRPO CR CENVAT clearing account
GRPO CR RG 23 BED account
GRPO DR CENVAT on hold account

Page 170 of 182


Project Shield
configuration Document

Page 171 of 182


Project Shield
configuration Document

Page 172 of 182


Project Shield
configuration Document

SPROLogistic General  Tax on Goods Movements


 India  Account Determination Specify G/L Accounts
per Excise Transaction.

Use : In this IMG activity, you assign the excise and CENVAT accounts to G/L accounts.

When you come to execute the various transactions, the system determines which G/L accounts to post to by looking
at the: Excise group / Company code / Chart of accounts

Furthermore, if you want separate account determination settings within an excise group, you can also use sub
transaction types.

Requirements:- You have already :-Defined the G/L accounts / Defined the excise groups/ Maintained the
transaction accounts.

Activities: For each excise group, assign the excise and CENVAT accounts to G/L accounts. For most businesses,
one set of accounts will suffice for all transactions.

Note: You need not remit the CENVAT to the excise department immediately, so maintain the credit account for
transaction type DLFC as an excise duty interim account. This will be set off when you remit the duty.

Page 173 of 182


Project Shield
configuration Document

Page 174 of 182


Project Shield
configuration Document

Page 175 of 182


Project Shield
configuration Document

Similarly for all Excise Group we need to specify G/L account for various ETT

Page 176 of 182


Project Shield
configuration Document

SPROLogistic General
 Tax on Goods Movements  India Business Transactions
 Incoming Excise
Invoices
 Specify Which Movement Types Involve Excise Invoices

In this IMG activity, you specify which movement types relating to goods receipts involve excise invoices.

The system uses this information during the goods receipt procedure. When you post a goods receipt using one of
the movement types that you have specified here, the system prompts you to enter the excise invoice number.

Page 177 of 182


Project Shield
configuration Document

SPRO Logistic General


 Tax on Goods Movements  Outgoing Excise
 India Business Transactions
InvoicesAssign Billing Types to Delivery Types

SPROLogistic General
 Tax on Goods Movements
 India Business Transactions
 Outgoing Excise
Invoices
 Outgoing Excise Invoices

Page 178 of 182


Project Shield
configuration Document

Subcontracting :
SPRO
Logistic General
 Tax on Goods Movements
 India Business Transactions
 Subcontracting

Maintain Movement Type Groups.

SPRO
Logistic General  Tax on Goods Movements
 India Business Transactions
 Subcontracting
Subcontracting Attributes

The subcontracting attributes help determine conditions for a combination of an excise group, a transaction type, and
a subtransaction type.

The conditions such as the number of excise items per subcontracting challan, if the nonexciseable materials have to
be filtered or not when the subcontracting challan is created, the movement type groups for issues and receipts and
the hierarchy of determining the excise base value are mentioned here.

Page 179 of 182


Project Shield
configuration Document

SPRO
Logistic General
 Tax on Goods Movements
 India Tools--> Number Ranges

You can maintain the number ranges for all CIN Number range objects using this transaction

Activities

Please maintain the number ranges for the folllowing objects The no nr has to be '01' for all

1. j_1iintnum

At an Excise group:

1. j_1irg23a1 /

2. j_1irg23a2

3. j_1iRG1

4. j_1irg23c1

5. j_1irg23c2

6. j_1ipla2

7. j_1iintpr2

8. j_1irg23d

9. j_1irg1_t ( material level)

10. j_1iconpla ( if Consolidated PLA is used )

At Series group

1. j_1iexcloc

2. j_1iexcexp

3. j_1idepinv

4. j_1i57Fc ( 57F Challans

Page 180 of 182


Project Shield
configuration Document

Page 181 of 182


Project Shield
configuration Document

SPRO
Logistic General
 Tax on Goods Movements
 India Tools--> Message Control

In this activity, you can specify whether a given message should appear as a warning message or an error message.

Activities : Enter each message that you want, specifying whether it should apply to one user or all users.

Page 182 of 182