REBAR SCHEDULE

Bar Grade/ Total Shape Length a* b* c* d* e* kg kg


Mark Size No. Code (each) (each) (all) REINFORCEMENT DRAWING NO MOC-03-EV-H-908
15 N16 112 LL 1430 700 110 700 2.31 260.8 M5N-AJV-DWG-125-600-BD-4500
16 N16 74 LL 1460 700 150 700 2.36 176.1
57 N16 26 C 6290 0 10.18 264.8 THICKNESS [mm] 230
61 N16 110 C 2300 0 3.72 409.6 40 LENGTH [mm] 6370
253 N16 4 C 2070 0 3.35 13.4
322 N16 48 C 2320 0 3.76 180.3 40 COVER HEIGHT [mm] 2380
40

COVER
392 N16 4 C 2170 0 3.51 14.1
Total: 1319.0
COVER WEIGHT [t] 17.24

40
COVER 40
16 VOLUME [m³] 6.10

57

57
COVER
16 AREA [m²] 15.16

COVER
392 15

40
61 61 61 GRADE S50

15 15 15 LIFT STR'TH [MPa]


61 61
322

ELEVATION C
ELEVATION B
B T
57 322

57

57
322 MIN. COVER [mm]
16 40 40

15

15
EDGE CHAMFER [mm] 12mm

61

61
16 57 CLASS 2
322 FORM FACE FINISH
SMOOTH
61 61 61
UNFORMED >5mm

57

57
SURFACE
FACE FINISH ROUGHNESS

COVER
15

15

15
40
ELEVATION A
16 16 SECTION A - A
TOP REINFORCEMENT
1:50 1:50

13 - N 16 - 16 - 200 U BARS

13 - N 16 - 57 - 200 EF
1 - N 16 - 392 - EF
A 1 - N 16 - 392 - EF 1 - N 16 - 253 - EF 1 - N 16 - 253 - EF
11 - N 16 - 61 - 200 EF
33 - N 16 - 61 - 200 EF 11 - N 16 - 15 - 200 U BARS
11 - N 16 - 15 - 200 U BARS
33 - N 16 - 15 - 200 U BARS 11 - N 16 - 61 - 200 EF

PE111 - 19-01-19 - IFA


13 - N 16 - 16 - 200 U BARS
11 - N 16 - 16 - 200 U BARS
13 - N 16 - 16 - 200 U BARS

13 - N 16 - 16 - 200 U BARS

11 - N 16 - 16 - 200 U BARS
12 - N 16 - 322 - 200 EF
12 - N 16 - 15 - 200 U BARS

12 - N 16 - 322 - 200 EF
33 - N 16 - 15 - 200 U BARS 12 - N 16 - 15 - 200 U BARS

A
ELEVATION A ELEVATION B ELEVATION C
1:50 1:50 1:50

GENERAL NOTES REV NAME DATE DESCRIPTION PAN GULF TECHNOLOGIES PVT. LTD.
6th Floor,A Wing,Lodha I-Think Techno Campus,
R0 AY 19/01/2019 ISSUED FOR APPROVAL
EF - EACH FACE Pokharan Road No:2,Behind TCS,Off Eastern
Express Highway,Thane(West),Maharsthra,India.
TEL:022-61566256
CIVMEC CONSTRUCTION AND ENGINEERING
SITE:XXXXXXXXXXXXXX DRAWING TITLE: Precast Element Reinforcement Details DRAWN BY: RN
HEAD OFFICE : 16 Nautical Driver,Henderson,WA 6166 CONTRACT: West Connex New M5 CHECKED BY: AS
doc.control@civmec.com.au
ISSUE DATE : 19.01.2019 APPROVED BY: JP
www.civmec.com.au
SCALE: PROJECT No. DRAWING NO: SHEET No. REV.
1:50 12063-B M5N-CIV-SHP-125-601-BD-4360 2/2 R0