IR — INSPECTION REQUEST
WEST QURNA I= SECTION
Contractor No.: AWQ0109
ExonMobil 5 cara ee
Produced Water Treatment M109
WOERTONDSS Tae woan no CE-CO195 | MISUEDATE 092017 psorine: Ga
susiecr: | wanes INsPECHON REQUIRED DATED Ap20i7” | TINEO3<0
REF.SPECIFICATION: 1QWQ-FT-NSPDS-00-040901 REV.1 EARTHWORK 7
'QWO-CE1091-CDFND-D8-0005 REV.0 FOUNDATION FOR PLATFORM NEAR TANK
1a06-481681050
REF. DRAWINGS: !QWA-CE1091-CDFND-D8-0001 REV.OPLAN SECTION & DETAILS OF SLEEPERS
| 1QW.CE1091-CDFND-D6-0006 REV.0 FOUNDATION FOR SHELTER IQD8-PBE681052
‘A/B & PAX681051 A/B PLAN &SECTION
RFF. IT 1QWO-CE1092-CPGAC-00-0001 REV.1 CIVIL INSPECTION AND TEST PLAN
| OTHERS REF.
[ATTACHMENT /CHECK LIST IF ANY:
[NAME OF CONTRACTOR/SUBCONTRACTOR: (CPECC/MECO
‘Our request the inspection of the following works for certificate/witness that all items has been properly executed in
accordance with approved procedures, specifications, drawings and all tems has been coordinated with future works.
DISCRIPTION OF WORK TO BE WITNESS:
‘Sampling the sub-grade layer for SHELTERS, PLATFORM AND SLEEPERS foundations for compaction degree
test in DS8 has been completed, Witness conducting the test
‘COMMENTS:
Z points Paded.
Daccerreo Glaccepten wit COMMENTS COresecreD
Workis not ready
Unacceptable inspection result
Osee comments
D1 Tick THIs 80x IF “NO” EMIL / SOC and if itis a “WITNESS” as per ITP,
(by ticking this box means CPECC needs to produce all the related documents and sign / close this IR)
SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT
‘SUBCONTRACTOR cPECC COMPANY. OTHERS
PRINT NAME: PRINT NAME: PRINT NAME, PRINT NAME.
thatsdodend Mohannad tbvahr Hessers Shani
SIGNATURE:
m
[onli pol [wares awd—2ev A [oate: 1G] 4] 27] oar; a
ExonMobil Ecc
West Quma | Form No. F70102Q
Contract:AWQ0109 Rev. 0
Project Location: Basra, Ira Serial No.
QUALITY CHECKSHEET - FIELD COMPACTION TEST RECORD
Tag Desorption PRODUCED WATER Tea No DsoMi109
Contato AWQ0109 System No
Contactor rece Sib Stem No
raving Reference a Ds6
1QWQ-FT-NSPDS-00-
. 1QW0-cEI091-CDFND-. 040901 REV. lot
Drawing No, tots Specification No, EARTHWORK Test Date _2017
Type Fill NA Lif Thickness _NA Min, Compaction Require: 95%
Laboratory Standard
0-4
Type Date 2017 Max, Density _1:829 Optimum Moisture _18%
Field Test Equip:
Type six Correction Factor
; Tor | Beam | Nome | Dy] Comasion | Bao
Loonilon Skatoh Now| Depth | se | penaiy | Sen | Rs
1 19 |isos_|s7 ww
2 4/1629 [99 ed
3 7 |i6ss_[o2
Comments: jon Cad
Re Contractor/Quality Rep. ‘Company Rep.
Toe bide ed vane “ahammed| brah (>be Hussein Sha te7
Dee) AL pee (O-polh pac 1674 | AE
*PL/t*AL FAO COMPANY.
FOR ENGINEERING TESTING
‘Yo\China Petroleum Engineering & Construction Corporation
Sub\ Test Report (Compaction of Soil)
Information requested test :
No. @ Date of test request | dees Executing company
CE-C 0195@ 09 -04-2017 | DS8-M109/ subgrade layer CPECC/MFCO,
Test date : 10-04-2017
Result:
“Moisture content Dry Densit
No. oe ei me ‘Compaction Degree (%)
1 1» 1.595 87
2 4 1.629 89
Oy
‘Max dry density (gm /em’) 1.829
Optimum moisture content _(%) 18
Notes: The test for M.D.D done according to(ASTM D 1557-002), and for soil test according to (1D2937-07),
~ The result represents sample tested only.
~The Sample brought and received by Mr. ( ).
Ahlam Almansor
ie Reece
FP13-04
heeam
Ea)
eee
eS gE PES
Pogelai(2