Sei sulla pagina 1di 3
IR — INSPECTION REQUEST WEST QURNA I= SECTION Contractor No.: AWQ0109 ExonMobil 5 cara ee Produced Water Treatment M109 WOERTONDSS Tae woan no CE-CO195 | MISUEDATE 092017 psorine: Ga susiecr: | wanes INsPECHON REQUIRED DATED Ap20i7” | TINEO3<0 REF.SPECIFICATION: 1QWQ-FT-NSPDS-00-040901 REV.1 EARTHWORK 7 'QWO-CE1091-CDFND-D8-0005 REV.0 FOUNDATION FOR PLATFORM NEAR TANK 1a06-481681050 REF. DRAWINGS: !QWA-CE1091-CDFND-D8-0001 REV.OPLAN SECTION & DETAILS OF SLEEPERS | 1QW.CE1091-CDFND-D6-0006 REV.0 FOUNDATION FOR SHELTER IQD8-PBE681052 ‘A/B & PAX681051 A/B PLAN &SECTION RFF. IT 1QWO-CE1092-CPGAC-00-0001 REV.1 CIVIL INSPECTION AND TEST PLAN | OTHERS REF. [ATTACHMENT /CHECK LIST IF ANY: [NAME OF CONTRACTOR/SUBCONTRACTOR: (CPECC/MECO ‘Our request the inspection of the following works for certificate/witness that all items has been properly executed in accordance with approved procedures, specifications, drawings and all tems has been coordinated with future works. DISCRIPTION OF WORK TO BE WITNESS: ‘Sampling the sub-grade layer for SHELTERS, PLATFORM AND SLEEPERS foundations for compaction degree test in DS8 has been completed, Witness conducting the test ‘COMMENTS: Z points Paded. Daccerreo Glaccepten wit COMMENTS COresecreD Workis not ready Unacceptable inspection result Osee comments D1 Tick THIs 80x IF “NO” EMIL / SOC and if itis a “WITNESS” as per ITP, (by ticking this box means CPECC needs to produce all the related documents and sign / close this IR) SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT ‘SUBCONTRACTOR cPECC COMPANY. OTHERS PRINT NAME: PRINT NAME: PRINT NAME, PRINT NAME. thatsdodend Mohannad tbvahr Hessers Shani SIGNATURE: m [onli pol [wares awd—2ev A [oate: 1G] 4] 27] oar ; a ExonMobil Ecc West Quma | Form No. F70102Q Contract:AWQ0109 Rev. 0 Project Location: Basra, Ira Serial No. QUALITY CHECKSHEET - FIELD COMPACTION TEST RECORD Tag Desorption PRODUCED WATER Tea No DsoMi109 Contato AWQ0109 System No Contactor rece Sib Stem No raving Reference a Ds6 1QWQ-FT-NSPDS-00- . 1QW0-cEI091-CDFND-. 040901 REV. lot Drawing No, tots Specification No, EARTHWORK Test Date _2017 Type Fill NA Lif Thickness _NA Min, Compaction Require: 95% Laboratory Standard 0-4 Type Date 2017 Max, Density _1:829 Optimum Moisture _18% Field Test Equip: Type six Correction Factor ; Tor | Beam | Nome | Dy] Comasion | Bao Loonilon Skatoh Now| Depth | se | penaiy | Sen | Rs 1 19 |isos_|s7 ww 2 4/1629 [99 ed 3 7 |i6ss_[o2 Comments: jon Cad Re Contractor/Quality Rep. ‘Company Rep. Toe bide ed vane “ahammed| brah (>be Hussein Sha te7 Dee) AL pee (O-polh pac 1674 | AE *PL/t* AL FAO COMPANY. FOR ENGINEERING TESTING ‘Yo\China Petroleum Engineering & Construction Corporation Sub\ Test Report (Compaction of Soil) Information requested test : No. @ Date of test request | dees Executing company CE-C 0195@ 09 -04-2017 | DS8-M109/ subgrade layer CPECC/MFCO, Test date : 10-04-2017 Result: “Moisture content Dry Densit No. oe ei me ‘Compaction Degree (%) 1 1» 1.595 87 2 4 1.629 89 Oy ‘Max dry density (gm /em’) 1.829 Optimum moisture content _(%) 18 Notes: The test for M.D.D done according to(ASTM D 1557-002), and for soil test according to (1D2937-07), ~ The result represents sample tested only. ~The Sample brought and received by Mr. ( ). Ahlam Almansor ie Reece FP13-04 heeam Ea) eee eS gE PES Pogelai(2

Potrebbero piacerti anche