Sei sulla pagina 1di 3
WEST QURNA | ~SECTION-1 IR — INSPECTION REQUEST Contractor No.: AWQ0109 ExonMobil a au Produced Water Treatment M109 ROCATION:PS-S | IRNO:IR No CE-C0242 | IRISSUE DATE: 22 April 2017 DISCIPLINE: Civil Al-Fa0 Lab SUBJECT: Witness INSPECTION REQUIRED DATE:23 April 2017 TIME:09:00 REF.SPECIFICATION: ‘QW: FT-NSPDS-00-040901 REV.1 EARTHWORK . TQWA-CE1O91-COFND-D8-0002 REV.2. FOUNDATION FOR PRE SEPARATOR IDB REE DRAWINGS: ‘ABJ681050 PLAN SECTION & DETAIL; D8 _ REF. ITP: 1QWA-CE1092-CPCAC-00-0001 REV. 1 CIVIL INSPECTION AND TEST PLAN OTHERS REF. | "ATTACHMENT /CHECK LIST IF ANY: [NAME OF CONTRACTOR/SUBCONTRACTOR: (CPECC/MFCO ‘Our request the inspection of the following works for certficate/witness that all tems has been properly executed accordance with approved procedures, specifications, drawings and all items has been coordinated with future works. DISCRIPTION OF WORK TO BE WITNESS: ‘Sampling the backfilling second layer around the tank foundation for the purpose of compaction degree test in DS8 have been completed today 22-4-2017, Witness conducting the test. ‘COMMENTS: Claccertep Dacceptep WITH COMMENTS | Giresecteo Giwork is not ready Clunacceptable inspection result Ose comments Tick THIS 60x IF “NO” EMIL / SOC and ifit isa “WITNESS” as per ITP, (by ticking this box means CPECC needs to produce all the related documents and sign / close this IR) SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT SUBCONTRACTOR PEC COMPANY OTHERS PRINT NAME: PRINT NAME: PRINT NAME PRINT NAME Me Gry ‘SIGNATURE: «S DATE: ExonMobil Ect West Qurna | Form No. F70102Q ‘Contract:AWQ0109 Rev. 0 Project Location: Basra, Iraq Serial No. QUALITY CHECKSHEET - FIELD COMPACTION TEST RECORD. Tag Description [ SLEEPER Tag No. | Dss/mi109 ‘| Contract No. ‘AWQOI09 System No. | Contractor cPEcc. ‘Sub-System No. Drawing Reference | IQVO-CHTOSI-CDIND DET ton ss 1QWe-FT-NSPDS-00- 1QWO-CEIO91-CDEND-DS- 040901 REV. 22147201 Drawing No, _O001 Specification No. _EARTHWORK TestDate _7 [peer Lif Thickness Min, Compaction Required: 92% Laboratory Standard 20a Type Date 2017 _ Max. Density Optimum Moisture Field Test Equip: Type SIN Correction Factor a Te] Hominy] Monae pasion | Fea? Location Sketch no [Toate | MN | poet | ORM | 4S 1 (S| 1433] 4 [ec 2 (6 |[-62] 9g [cc 3 4 6 Comments: Contractor/Construction Rep. Contractor/Quality Rep. Company Rep. Name: name: Mer Gees Kane Hameed AL Signe Some? Slope C2 Date: Date: 7 8-4 - Jot Date: *PLit AL FAO COMPANY. FOR ENGINEERING TESTING gol SNG5jib . (cUBNI RA Wiesw) us] U fonmtons) NO: 947 Date: 11/02/2017 Fao Code:738/17 ‘yo\China Petroleum Engineering & Construction Corporation Sub\ Test Report (Re-Compaction of Soil) Information requested test : No. @ Date of test request ‘Area Location Executing company CE-C0027@ 05 -02-2017 DS-6 CPECC/MADAR ‘Test date : 09 -01-2017 Result: No. | Moisture content (%) | Dry Density (gm/em") | Compaction Degree (%) 1,785 9o7 17 | 1.755 95 ‘Max dry density (gm /em') 1.842 ‘Optimum moisture content (%) 15.2 Notes: The test for M.D.D done according to(ASTM D 1557-002), and for soil test according to (D2937-07). = The result represents sample tested only. ~The Sample brought and received by Mr: ( A « Executive Manager Ablam Almansor Shere M. Abass FP13-04 heeam Powel)

Potrebbero piacerti anche