Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
NOTE:
Maximum outrigger load calculated for the worst case scenario where the boom is directly above the nearest outrigger.
Use 75% Crane Load Chart only to determine lifting capacity (see 1.9)
Additional Comments
Page 1 of 2
Shell Eastern Petroleum (Pte) Ltd
Pulau Bukom Manufacturing site
No. Qty Type of Gear Type of Hitch (mm) Length (m) S.W.L (ton) Sling Load
Page 2 of 2