Sei sulla pagina 1di 2

NMAGEP

North Middle Area Gas Exploitation Project


CONTRACT № 67/2007
Steel Structure Installation
Check List
SYRIA GAS COMPANY SUBCONTRACTOR: CONTRACT №67/2007 STROYTRANSGAZ

Steel Structure Installation Report No:


Check List Date :
Area/Location :
Structure Title/Description :
Drawing(s) Namber :
№ Controls Acceptation Remarks
1 Set Completeness
2 Base plate positioning / elevation сheck
3 Verticality Check
4 Horizontality Check
5 Anchor Bolt Tightness Check
6 Weld Inspection
7 Grouting
Attachment :

Subcontractor (Foreman) : Contractor : Customer:

Signature : Signature : Signature :

Name : Name : Name :

Date: Date: Date: