Sei sulla pagina 1di 5

Presupuesto de materiales para la constucc

Caracteristicas
Itén Fecha
Material Med. Material
1 Monday, June 08, 2015 acero kg
2 Tuesday, June 09, 2015 arena m3
3 Wednesday, June 10, 2015 cemento kg
4 Thursday, June 11, 2015 Fierro m
5 Friday, June 12, 2015 plomo kg
6 Saturday, June 13, 2015 hierro kg
7 Sunday, June 14, 2015 ladrillo unidad
8 Monday, June 15, 2015 roca suelta m3
9 Tuesday, June 16, 2015 roca fija m3
10 Wednesday, June 17, 2015 cunetas ml
11 Thursday, June 18, 2015 Afirmado traslado 1 km traslado/Km
12 Friday, June 19, 2015 aluminio kg
13 Saturday, June 20, 2015 madera cm
T
la constucción de un puente
Finanzas
Med. Venta Cost U Cantidad Costo total
kg S/. 50.00 120 S/. 6,000.00
m3 S/. 60.00 70 S/. 4,200.00
bolsa S/. 25.00 50 S/. 1,250.00
unidad S/. 30.00 75 S/. 2,250.00
unidad S/. 25.00 40 S/. 1,000.00
kg S/. 30.00 50 S/. 1,500.00
millar S/. 500.00 10 S/. 5,000.00
m3 S/. 130.00 11 S/. 1,430.00
m3 S/. 130.00 28 S/. 3,640.00
ml S/. 1.26 100 S/. 126.00
m3 S/. 520.00 1 S/. 520.00
kg S/. 25.00 35 S/. 875.00
m S/. 50.00 29 S/. 1,450.00
Total S/. 1,576.26 S/. 619.00 S/. 29,241.00
Presupuesto de RRHH para la constucción de un Pue
Caracteristicas Finanzas
Cantiidad Costo por
RRHH
Itén Fecha de RRHH Hora
1 Friday, May 22, 2015 Ingeniero civil 1 S/. 80.00
2 Saturday, May 23, 2015 ingeniero de caminos 1 S/. 70.00
3 Sunday, May 24, 2015 ingeniero electrico 1 S/. 80.00
4 Monday, May 25, 2015 Arquitecto 1 S/. 60.00
5 Tuesday, May 26, 2015 Maestro Constructor 2 S/. 40.00
6 Wednesday, May 27, 2015 Oficiales 2 S/. 35.00
7 Thursday, May 28, 2015 Operarios de maquinaria 2 S/. 35.00
8 Friday, May 29, 2015 Obrero 5 S/. 30.00
Total S/. 430.00
ión de un Puente
Finanzas
Cantidad Costo total
Horas
50 S/. 4,000.00
50 S/. 3,500.00
50 S/. 4,000.00
40 S/. 2,400.00
100 S/. 2,000.00
100 S/. 1,750.00
100 S/. 1,750.00
120 S/. 720.00
610 S/. 20,120.00
Presupuesto General en
construccion de un puente
Material S/. 29,241.00
RRHH S/. 20,120.00
TOTAL S/. 49,361.00