Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Applications
With the iPD transponder – available as an optional extra – it is even possible to pre-
cisely locate partial discharges and determine the cable length during operation.
BAUR GmbH · Raiffeisenstraße 8, 6832 Sulz, Austria · T +43 (0)5522 4941-0 · F +43 (0)5522 4941-3 · headoffice@baur.at · www.baur.eu
Technical data
–– 8 x BNC connector
–– Sync Transmitter (incl. batteries)
–– Peli case for accessories
–– Earthing conductor
–– Mains supply cord
–– User manual Comments
Options PD Detected
Channel 1
Cable
Channel 2
Switchgear Cable
Channel 3
Switchgear Cable
Channel 4
Switchgear Cable Switchgear
Total Number of PD 138 0 138 0 315 0
▪▪ iPD transponder
Ave PD per Power Cycle 874 pC 0 dBmV 678 pC 0 dBmV 370 pC 0 dBmV
Maximum PD Detected 4035 pC 0 dBmV 4035 pC 0 dBmV 4035 pC 0 dBmV