Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Cilegon-Banten, INDONESIA
PT. KHI PIPE INDUSTRIES
(Krakatau Steel Group)
Map of Indonesian
Integrated Gas Pipe Line
Project
3
Competitive Advantages
4
International Quality Certification
5
International Quality Certification
7
Pipe Manufacture and Coating Plant Facilities
Spiral Pipe Line
ERW Line
8
Production Capacities For Coating Facility
Corrosion Protection For Plant II
External
3 LPE/5LPP : 800.000 SQM/year Internal
FBE : 800.000 SQM/year Flow Coat Epoxy : 800.000 SQM/year
Cement Lining : 2000 SQM / day
Application of Coating
All of key players in Indonesia using anti corrosion protection and anti mechanical
damage for onshore (above/underground) and offshore service.
10
11
• List of line pipe project for sour service requirements supplied by KHI.
12
Research & Development
Test For Sour Service Application
13
Research & Development
Bursting Test
15
Corrosion Coating
16
Multi Layers Coating System
17
Schematic of 3 Layer Pipe Coating
18
Pipeline Coating Performance Comparison
19
Fusion Bonded Epoxy (FBE) Process
-Check for steel defect (i.e. sliver,)
-Check for salt contamination Check wall thickness after grinding
Reject/Hold -Check blasting profile -Monitor elapsed time between
40-60 oC blasting-coating
3 oC above dew point -Check surface cleanliness -Check RH
SA 2.5
-Transfer pipe Identification
-Check for surface contaminant
-Check surface condition (i.e.
damage free…etc)
Temperature control
350-500 micron 180-230 oC
(single/dual)
In house QC Lab
CD Test, Adhesion, Bending, Internal coating process
Tensile, elongation, impact
<60 oC Reject/reprocess
-Check coating thickness (quarantine)
-Check visual coating appearance
- Check cutback dimension / taper -Pipe Marking / colour coding Concrete coating process
-Install rope separator
Adhesive & PE/PP Extruder
21
3 LPE External Coating Process
-Check for steel defect (i.e. sliver,)
Check wall thickness after grinding
Reject/Hold -Check for salt contamination
-Monitor elapsed time between
40-60 oC -Check blasting profile blasting-coating
3 oC above dew point -Check surface cleanliness -Check RH
<60 oC Reject/reprocess
-Check coating thickness (quarantine)
-Check visual coating appearance
- Check cutback dimension / taper -Pipe Marking / colour coding Concrete coating process
-Install rope separator
Internal Coating Process -Check for steel defect (i.e. sliver,
lamination..etc)
-Check blasting profile
-Check surface cleanliness
40-60 oC
SA 2.5 -Check wall thickness after grinding
3 oC above dew point
-Monitor elapsed time between
blasting-coating
-Check RH
80-120 micron
Reject/reprocess
(quarantine)
Enclosed curing
room complete with Concrete coating process
air blower
-Check wet & dry film thickness
-Check coating visual appearance-
In house QC-Lab glossiness and roughness
-Check for pinholes (glass sides) -Check cut back dimensions
-Check for adhesion, -Re-stencil pipe marking / colour
cure/stripping, flexibility, hot coding
water immersion (steel panel)
Flow Process Multilayer Coating
In-Coming Rack
External Blast Clean Blaster Pre-Heat (Hold Point)
Reject / Hold
* Check for steel defects (i.e. slivers, lamination) * Check surface cleanliness
* Check for salt contamination * Check blasting profile
* Check pipe surface temperature • Monitor elapsed time between blasting and
* Check pipe wall thickness (if excessive grinding) coating (Weather Control: %RH)
Extrusion of Adhesive
Inspection Rack Cutback and Top Coat PE plus
(Hold Point) Brushing Holiday Testing Water Quenching sinter coat FBE Base Coat Application Induction Heat
Reject (Re-process)/
Quarantine
To Concrete Coating
Plant
To FBE stockpile area
Cathodic Disbondment Test Peel Constant Rate Bending Test Adhesion Test
25
Requirements of 3LPE/5LPP Coating
In Service Performance : Peel Test
26
Concrete Weight Coating
27
28
Concrete Weight Coating (CWC) Impingement Process
Weighbridge
In-house QC
Lab
(Hold Point)
29
CWC Machine Facilities
Batching Plant
Machine Facilities
31
Major Experience of PT. KHI Pipe Industries,
Line Pipe in Oil & Gas Industries
State Gas Company (PGN) 2013 6124 24”x14.27 mm WT API 5 L X-65 Bitung – Cimanggis Project
32
PT. KHI Pipe Industries Experiences for Supplying HFRW Pipe
Perusahaan Gas 2007-2009 60 KM 4 – 12.75 Inch Gas Distribution For East Java,
Negara ( PGN ) Banten Area , Batam Riau, & East
and Surabaya Java
Indonesia
Chevron Pacific 2007-2009 260 KM 4 – 12,75 Inch North Duri Development Riau
Indonesia Project Indonesia
2007- 2009 42 KM 6 Inch East Kalimantan Gas Balikpapan
VICO Indonesia Distribution System East Kalimantan
Indonesia
Medco Indonesia 2008 30 KM 6 – 8 Inch Crude Oil Pipeline South Sumatera
System Indonesia
EMP kangean 2008 12 KM 6 Inch East Java Gas Pipeline East Java
Indonesia
PERTAMINA 2007- 2009 60 KM 4 – 12 Inch Crude Oil Pipeline System Sumatera and
Java
Indonesia
Pertamina 2010 75 Km 10 Inch Oil Transmission West Java
Indonesia
ConocoPhillips 2012 54 Km 12.75 Inch Gas Distribution South Sumatera
33
PT. KHI Pipe Industries Experiences for Supplying HFRW Pipe
(Continued)
PT Pertamina Hulu 2014 28.67 KM 10,752 Inch Proyek FPRO – ECOM North West Java
Energi ONWJ Offshore
PT Wijaya Karya 2014 17.59 KM 4.5 – 20 inch - Proyek Upgrading Tanjung Uban
(Persero) Tbk Fasilitas Penimbunan
Gasoline di Tanjung
Uban
34
Major Experiences of FBE and 3LPE/PP Coating
Pertamina 2007 6 KM (3lPE) 32 Inch Relocation of East Java Gas East Java
Pipeline Project Indonesia
Pertamina 2008 120 KM (3LPE) 16 Inch Cikampek Balongan Oil West Java
Pipeline Project Indonesia
Perusahaan Gas 2008 40 KM (3LPE) 6 – 12 Inch West Java Gas Distribution West Java
Negara ( PGN ) System Indonesia
PLN – Power Plant 2008 24 KM (3LPE) 24 Inch Gas Pipeline Muara Karang
System For Power Jakarta
Plant Indonesia
EMP kangean 2008 12 KM (3LPE) 6 Inch East Java Gas Pipeline East Java
Indonesia
ConocoPhillips 2012 70 KM (3LPE PP) 6-12 Inch Letang Tengah Rawa South Sumatera
Optimization
Pertamina / Pertagas 2015 300 KM ( 3LPE ) 28 Inch Semarang - Gersik Central to East Java
Major Experiences of FBE and 3LPE/PP Coating
PT PGN SBU Pusat 2014 23 KM (3LPE) 12 & 16 Inch PGN SBU I Jabodetabek and
West Java
36
Major Experiences For Offshore Line Pipe and CWC
OD
Client / Project WT (INCH) Grade Length (M) Remarks
(INCH)
IAPCO / MAXUS 20 0.375 X - 52 5500 Line pipe included CWC
Line pipe included CWC
ARCO / ARII 24 0.562 X - 65 31000
Line pipe included CWC
TOTAL TUNU Ph. 7 20 - 36 0.5 - 0.622 X - 65 10000
TOTAL E&P INDONESIE 14 0.374 X-60 6000 Line pipe included CWC
37
Thank you very much
www.khipipe.com