This document is a checklist for auditing compliance with positive isolation implementation at a site. It contains 17 items that are checked for yes or no, including the availability of locks, tags, and isolation tools, documentation of energy sources and procedures, training records, and whether proper locking, tagging, and safe work procedures are followed. The checklist is used to calculate the percentage of compliance with positive isolation requirements.
This document is a checklist for auditing compliance with positive isolation implementation at a site. It contains 17 items that are checked for yes or no, including the availability of locks, tags, and isolation tools, documentation of energy sources and procedures, training records, and whether proper locking, tagging, and safe work procedures are followed. The checklist is used to calculate the percentage of compliance with positive isolation requirements.
This document is a checklist for auditing compliance with positive isolation implementation at a site. It contains 17 items that are checked for yes or no, including the availability of locks, tags, and isolation tools, documentation of energy sources and procedures, training records, and whether proper locking, tagging, and safe work procedures are followed. The checklist is used to calculate the percentage of compliance with positive isolation requirements.
Checklist for Compliance of Positive Isolation Implementation at Site
Site Audit on Positive Isolation on Date:
ITEM Yes No
S No SYSTEM AUDIT- Check List
1 Positive Isolation Display/ Posters Availability of Locks & P.I tools :- a)Personal Locks (TISCO Employee & Contractors) b) Equipment Locks c) Group Locks d) Scissor Locks e) Group Isolation Box f) Lock/Key storage Box g) Equipment & Group Identification tags h) Wire Loops i) Valve Locking device 2 3Record of locks for TISCO Employees & Contractors 4Documents for Energy Source Identification 5Documents for Isolation Procedure/Method 6Display of Life saving Rules at Site 7P.I inclusion in Job Safety Plan / SWP for shut down activities 8 Records available with List of employees trained & authorized for Level 1, Level 1A & 9 Level Record2 of Control stop points & Procedure for each 10 Awareness of P.I. system for Employees & Contractor
JOB SITE AUDIT-Check List
11 Whether all Enegy source covered for Isolation 12 Whether Energy source has been positively Isolated in Safe Mode with Locking Device Whether Concept of Equipment Lock, Group Isolation has been addressed where desired 13 Whether Individulas(Tata Steel Employee) and Supervisor( Contracor Employees) have put their 14 Lock 15 Whether Tags have been put Properly marked 16 Whether SWP/OCP for Isolation Procedure placed in /Gr Isolation/Isolation Box 17 Whether Concept over Use of Positive Isolation Procedure is clear amongst employees
Total Yes= Total No= % Compliance= (Yesx100)/Total(17)