Week 1 ( 10/12 - 14/12 )

12/12

Skim instant filla

Plaster dinding merekah

13/12
Membuat acuan untuk refuse bin 1m×1m dan kerja simen dilakukan

Plan refuse bin

14/12

Asphalt paver, asphalt roller

Kasar
Week 2 ( 17/12 - 21/12)

17/12

Menggali lubang pada setiap tempat yang akan masukkan tiang listrik ke dalam
lubang

Didirikan lubang

Padatkan tanah didalam lubang

18/12
19/12

Pemasangan “cable

defect bumbung

Check dekfect dalam rumah

20/12
Plaster syiling Cornice
compound

21/12

asphalt

Plate compactor,vibrator roller


Week 3 ( 24/12 - 28/12 )

24/12

Ukur jarak jalan menggunakan “walking measure”

25/12 - cuti krismas

26/12

Barrier watermark

27/12
PLAN TAPAK BINA TAMAN SERI MUTIARA

Inspection slab and beam


28/12

Plan of slab and beam

Inspection of beam and slab

concrete first floor of DT1 “ Vibration poker” pastikan tidak terlalu


lama di sesuatu tempat kerana ia akan
mengasingkan campuran
konkrit

31/12 Column Inspection


Column inspection

Plan column

1/1/2019
Format DO Summary

2/1

Perjumpaan pagi pegawai OSHA


Format Pile Summary

3/1 - sistem perpaipan

1. Gali lubang menggunakan jentera 2. masukkan untuk mengeluarkan


bahan bagi mengelakkan paip
tersumbat
3. Layur paip menggunakan api dan sabung. Pastikan paip disapu gam

4. Sambung paip ke paip besar dan simen

4/1

1. Mampatkan tanah menggunakan stapping rammer compaction soil


2. Letakkan crusher
run. Mampatkan
crusher run
menggunakan
vibrator plate/
compactor plate

3 . Formwork slab.Letakkan plastik dan brc 4. concrete ground slab

pastikan letak “ Concrete cover” supaya

brc tidak bersentuh dgn lantai


8/1 ground beam

1. Fabricate formwork according to dimension and specification

required in the drawing

2. Install steel reinforcement bar as required. Make sure Install

any service equipment before concrete.


3. Fill the formwork with concrete (Grade as per drawing) by layers.

Compact each layer using vibrator poker. Avoid any shock or

vibration after pouring.


9/1 quantity surveyor

Quantity for tile


10/1

11/1 precast culvert

1. Box culvert is laid on sand bedding. Before placing the sand bedding, excavate deeper and placed a
layer of hard core.

2. compact sand bedding by tamping and screeded off to the required level.
3. Spread a layer of 3 mm thick mortar on top of the legs of a U-shape section to ensure uniform
bearing between the U-Shape section and lid slad

4. Filling the lifting holes with mortar or left as weep holes after installation.
5. Complete the culvert structure wing walls, construct aprons and kerb as required to prevent erosion
of the bedding.

14/1-18/1

14/1 surveying

1. Set up the receivers

2. Measure the antenna height

3. Measure height if the antenna above the station marker.

4. Measure the antenna height above the control point or marker, either the sland height or the
vertical height.

5. Record the antenna height, point name and start time in the field notes.
receivers
15/1 CBR TEST

1. The CBR test is performed by measuring the pressure required to penetrate a soil sample with a
plunger of standard area.

2. The measured pressure is then divided by the pressure required to achieve an equal penetration on
a standard crushed rock material.

The harder the surface, the higher the CBR value. Typically, a value of 2% equates to clay, while some
sands may have a CBR value of 10%. High quality sub-base will have a value of between 80-100%
(maximum).

3. The CBR test is carried out on soils with a maximum particle size of 20mm. (Note: For material
greater than 20mm please see Plate Bearing Tests). The technique involves driving a small cylindrical
plunger (approx 50mm) into the ground at a uniform rate, using a four wheel drive vehicle as the
reaction load to provide the force.

4. Tests are normally carried out at surface level or at depths of between 500-1000mm in 20-30m
intervals along the proposed construction centreline.

5. A minimum of three tests are usually carried out at each site.

6. Procedure :

Install the equipment record the data at least 3 point on site

1. Cleaning(preparation works) 2. angle filler (preparation works)


3, cemseal F100N Fibre Mesh Reinforce 4. 1st coat of ceamseal water proofing compund

Provide for bathroom,roof top

18/1 corner bead

1. Install the corner bead at corner window, door column and other.

2. Make sure corner bead is balance us the water level.

3. Use the topping compund to paste it.

Provide to corner like window, door and other

Type of corner bead

1. Install the formwork of staircase. 2, install the brc of staircase.

2. 3.
3, Install the
step formwork
of staircase.

4. Concrete staircase. 5, vibrate concrete use vibrator poker

5.
22/1 roof trusses

1. Install the roof trusses.

2. Install the fascia board 3. install the sisalation foil and wire mesh

4, install the glass wool and metal sheet

23/1 cube test

1) The ready mixed concrete with certain mix proportion is poured into the mould in 3 layers
and each layer must be tamped 25 times using the compacting steel. The mould in filled up by using
the hand float until it overflow and leveled the surface. Make 6 sample cubes.

2) The concrete is left for 24 hours.


3) sink into the water for cuirring.
4) The date of the mixture for every cube is recorded and all 3 cubes in the curring tank is submerged
also be tested after 7 days and 3 cube for 14 days.
a) Curring b) record weight of cube c) record the maximum load for each cube
24/1 column

1. Determine the alignment by referring to gridline

2. Construction of ground floor column is initiated from starter bar of stump, pad footing or pile cap

3. Install steel reinforcement bar as required

4. Fabricate formwork according to dimension and specification required in the drawing

5. Fill the formwork with concrete.Compact each layer using vibrator poker

6. Open formwork after 3 days or with the approval of the S.O

25/1 skim coat

1. Base must be dry and clean.

2. Make a mix of skim coat. Mix until smooth, creamy consistency is obtained.

3. Scoop and apply skim coat as smoothly.

4. Apply the skim coat for 2nd layer. Apply between 3-5mm thickness.
28/1 boundary stone

29/1 landscape]

Perancangan

1. Menanam pokokconocarpus erectus di hadapan rumah

2. Membuat island

3. Menanam pokok di halaman rumah.

4. Kerja menanam rumput “cow grass”

Kerja tanam pokok

1. Gali lubang mengunakan cangkul.

2. Masukkan baja. Dan tanam pokok.

5. Pokok kecil tidak ditanam berdekatan pokok besar supaya tidak terhalang daripada

terkena cahaya matahari.

30/1 window frame


31/1 u channel
1/2 brickwork

1. Familiarize the setting out and dimensioning of brickworks on construction drawing

2. make the mortar mixed ratio as specified in the construction drawing / specification

3. Apply bricks for the first layer using thread.Pegs, beams, floors, and straightness tests are tested using
spirit level gauge, gauge and bracket.

4. Apply to next layer. Make sure all height is according drawing.

11/1 BOMBA INSPECtion


12/1 pile point

1. Mark 4 corner aligned raccording to boundary stone. The centerlines are marked using wood.

2. Levelling work is done to get balanced surface. Make a wooden fence “profile board”. Height is
‘finish floor level’ ( FFL )

3. nails are driven at locations along the line which is described according to drawing, to obtain

the grid line on the floor.

4. the line is marked using a yarn holding between nails the lines perpendicular to the base line

is also marked as required.

5. Finally, by direct measurements from grid lines are marked to give the column centre.
13/1 corring test

1. Kerja 'coring' dilakukan dikawasan yang ditentukan.(500m2/sampel atau min 2 lubang)

2. Ketebalan sampel diukur menggunakan pita ukur. perlu dicatat didalam borang yang disediakan.

3. Lubang pengorekan perlu di tutup dengan Cold Mix atau Hot Mix dan dipadatkan dengan
sempurna
14/1 MPK inspection

JKR inspection
15/1 STP inspection
Boundary stone
18/2/2019 PILING

Type of hammer : 3 tone hydaraulic hammer

Pile size,D : 150mm×150mm

Pile Working Load,L :

Mass of Hammer,W : 3T

Factor of Safety,f : 2.0

Maximum Length of Pile,l :

Mass of Pile,P1 :

Mass of driving Assembly,P2 :

Total Mass (P1+P2),P :

Temporary Compression :

Of Pile & Soil,C

Drop of Hammer,h :

Coefficient of Resitution,o :

Hydraulic Hammer Factor,Ao :