Sei sulla pagina 1di 2
- IR - INSPECTION REQUEST WEST QUANAI~seCTIONS a i eee P Mob Contractor No,: AWQ0109 Kon lo | Project Title: isis jece Produced Water Treatment M109 sUBEct: Inspection INSPECTION REQUIRED DATE:11 February 2017 | TIME:11:00 REE.SPECIFICATION: 1QWA-FT-NSPDS 00-080001 REV.1 EARTHWORK REF. DRAWING 1QWO-CE1091-LDPLT-D7-0001 REV. D DS7 PLOT PLAN, RFF. ITP: 'QWA-CE1092:CPQAC-00-0001CVIL REV. CINSPECTION AND TEST PLAN OTHERS REF: [ATTACHMENT /CHECK LIST A i NAME OF CONTRACTOR/S ¢ | ePECC/At WADAR ‘Our request the inspection of the following works for certficate/witness that all tems has been properly executed in accordance with approved procedures, specifications, drawings and all items has been coordinated with future works. DDISCRIPTION OF WORK TO BE INSPECTED: ‘We completed compaction of first layer in DS8, Request inspection the elevations for this layer ‘COMMENTS: Cfaccerren | Glaccerren wirt comments DrevecreD Works not ready. unacceptable inspection result | Cisee comments Tick THis BOX IF “NO” EMIL / SOC and ifitisa “WITNESS” as per ITP, (by ticking this box means CPECC needs to produce all the related documents and sign / close this IR) SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT ‘SUBCONTRACTOR cPece ‘COMPANY OTHERS PRINT NAME: PRINT NAME: PRIN WA PRINT NAME rmay fe ldir | shiny rae Santon SGNATURE GRATORE! — SGNATORE wo WM pate: 1-2 2el? [oar sJ-2~7e1, | pave: feb —_—‘| are: G6 4 : (Mreco DS6 B.M=2.997M B.S=1.44M H.1=4,.437 plagill jae ds yi tall 1 CY glial) g & pill www.mfcoig.com ESSNGER eS sEG en SEY el Req.F.S = 2.812 1 2.86 4.577 2 2.88 1.557 3 2.85 1.587 4 2.83 1.607 | 5 2.82 1.617 6 2.83 1.607 7 2.86 1.577 | 8 2.87 1.567 a) 2.84 1.597 40 2.85 1.587 | AVERAGE = 1.588 | MFCO SURVEYOR CPECC SURVEYOR Mohammed Atimed Ma Gang Le ExxonMobil Salam dns C ble

Potrebbero piacerti anche