IR - INSPECTION REQUEST
WEST QUANAI~seCTIONS a i eee
P Mob Contractor No,: AWQ0109
Kon lo | Project Title: isis jece
Produced Water Treatment M109
sUBEct: Inspection INSPECTION REQUIRED DATE:11 February 2017 | TIME:11:00
REE.SPECIFICATION: 1QWA-FT-NSPDS 00-080001 REV.1 EARTHWORK
REF. DRAWING 1QWO-CE1091-LDPLT-D7-0001 REV. D DS7 PLOT PLAN,
RFF. ITP: 'QWA-CE1092:CPQAC-00-0001CVIL REV. CINSPECTION AND TEST PLAN
OTHERS REF:
[ATTACHMENT /CHECK LIST A i
NAME OF CONTRACTOR/S ¢ | ePECC/At WADAR
‘Our request the inspection of the following works for certficate/witness that all tems has been properly executed in
accordance with approved procedures, specifications, drawings and all items has been coordinated with future works.
DDISCRIPTION OF WORK TO BE INSPECTED:
‘We completed compaction of first layer in DS8, Request inspection the elevations for this layer
‘COMMENTS:
Cfaccerren | Glaccerren wirt comments DrevecreD
Works not ready.
unacceptable inspection result
| Cisee comments
Tick THis BOX IF “NO” EMIL / SOC and ifitisa “WITNESS” as per ITP,
(by ticking this box means CPECC needs to produce all the related documents and sign / close this IR)
SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT
‘SUBCONTRACTOR cPece ‘COMPANY OTHERS
PRINT NAME: PRINT NAME: PRIN WA PRINT NAME
rmay fe ldir | shiny rae Santon
SGNATURE GRATORE! — SGNATORE
wo WM
pate: 1-2 2el? [oar sJ-2~7e1, | pave: feb —_—‘| are:G6
4
: (Mreco
DS6
B.M=2.997M B.S=1.44M
H.1=4,.437
plagill jae ds yi
tall
1 CY glial) g & pill
www.mfcoig.com
ESSNGER eS sEG en SEY el
Req.F.S = 2.812
1 2.86 4.577
2 2.88 1.557
3 2.85 1.587
4 2.83 1.607 |
5 2.82 1.617
6 2.83 1.607
7 2.86 1.577 |
8 2.87 1.567
a) 2.84 1.597
40 2.85 1.587 |
AVERAGE = 1.588 |
MFCO SURVEYOR CPECC SURVEYOR
Mohammed Atimed Ma Gang
Le
ExxonMobil
Salam dns
C ble