CHAPTER PAGE
INTRODUCTION ................................................................................................................i
CHAPTERS
CHAPTER 1 – ENERGIZATION.............................................................................1
APPENDICES (Optional)
Appendix A .............................................................................................................1
Appendix B .............................................................................................................1
Appendix C .............................................................................................................1
INTRODUCTION
This report prepared for explain the function of COD flow process , offer
strategies for COD step , Relate document ,Technical step and Period for all activity to
COD date.
1. ENERGIZATION
The first step after Substation and Transmission line complete the
company shall electricity energize to Substation and Transmission line for equipment,
Utility, and all technical part function tested. The company shall AC withstand test for
Substation, Transmission line (115 kV) and Collecting system(33kV) 24 Hr without inject
power to Grid.
to PEA.
Inspection
The company shall submit the plan of first energization plan at least
The company shall submit invite letter to EGAT and PEA for first
The company shall submit invite letter for first energization meeting
before first energization to ERC. SPP shall complete 90 % of overall project before
2. FIRST SYNCHRONIZATION
withstand the company shall be first synchronization test with EGAT and PEA .
1. Construction permit.
(>15 days)
2. Construction permit.
(>10 days)
The company shall submit invite letter to EGAT and PEA for first
SPP shall first synchronization with power inject with EGAT and PEA.
SPP shall monitor Voltage, Current, Phase, Frequency, Equipment temperature rise,
withstand and First synchronization complete without any issue. The company shall
1. Reject at 25%.
2. Reject at 50%.
3. Reject at 75%.
4. Reject at 100%.
agreement to EGAT 1/3 of PPA contract at least 10 days before COD date.
PEA shall submit PQ & Load Reject Test to EGAT before COD
meeting date.
The company shall submit invite letter to EGAT and PEA for COD
3.5 COD