Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
- - - -
AL DHAFRA PETROLEUM OPERATIONS COMPANY LTD.
TABLE OF CONTENTS
1.0 INTRODUCTION .................................................................................................................. 4
2.0 ITEMS TO BE QUOTED....................................................................................................... 5
3.0 DEFINITIONS & ABBREVIATIONS ..................................................................................... 5
3.1 DEFINATIONS ..................................................................................................................... 5
3.2 ABBREVIATIONS ................................................................................................................ 6
4.0 SPECIFICATION, CODES & STANDARDS ......................................................................... 6
5.0 SUPPLIER COMPLIANCE ................................................................................................... 7
6.0 DESIGN CHANGE................................................................................................................ 7
7.0 CONFLICT ........................................................................................................................... 8
8.0 SCOPE OF WORK AND SUPPLY ....................................................................................... 8
8.1 RESPONSIBILITY MATRIX ............................................................................................... 10
8.2 SUPPLY OF GRE PIPE WORK.......................................................................................... 11
8.3 FABRICATION ................................................................................................................... 11
8.4 SUPERVISION OF INSTALLATION OF PIPE WORK AT SITE ......................................... 12
8.5 INSPECTION AND TESTING ............................................................................................. 12
8.6 TRAINING .......................................................................................................................... 14
8.7 TECHNICAL SUPPORT ..................................................................................................... 14
8.8 EXCLUSIONS .................................................................................................................... 14
8.9 SPARE PARTS & CONSUMABLES .................................................................................. 14
8.10 STATUTORY APPROVAL & CERTIFICATION ................................................................. 15
8.11 VENDOR DATA & DOCUMENTATION REQUIREMENTS ................................................ 16
8.12 SUB SUPPLIER- SUB VENDOR SELECTION .................................................................. 17
9.0 GUARANTEE / WARANTEE .............................................................................................. 18
10.0 EXCEPTIONS AND DEVIATIONS ..................................................................................... 18
11.0 PROVEN TRACK RECORD ............................................................................................... 19
12.0 PRESERVATION & SHIPPING PREPARATION................................................................ 19
13.0 SPECIAL NOTE ................................................................................................................. 20
14.0 GENERAL DESIGN INFORMATION .................................................................................. 21
15.0 LIST OF ATTACHMENTS & ANNEXURES ....................................................................... 21
AL DHAFRA PETROLEUM OPERATIONS COMPANY LTD.
1.0 INTRODUCTION
The first field development target is the Haliba field, which is predominantly carbonate
reservoirs of the Lower Cretaceous Group formation in the Liwa basin area.
Technip, Abu Dhabi, carried out the Combined Concept and FEED of Haliba Development
Project.
Al Dhafra Petroleum Operations Company Limited, Abu Dhabi has awarded L&T Hydrocarbon
Engineering Ltd. (LTHE), from here on referred to as CONTRACTOR, the EPC works of
Haliba Development Project.
The Haliba Development plan consists of Full Field Development and full well stream transfer
to ADCO ASAB facilities for further processing through an export pipeline of ~65km. The
sustainable production from this field is envisaged to be 20000 ~ 40000 STBOPD.
The facilities in this greenfield project shall be designed to operate in two modes, fully
automated/unmanned and semi-automated with minimum manning, which includes Production
wells, Water supply wells, Water injection system, Water disposal well, Multiport Selector
Manifold, Multiphase Pumps (MPP), Flow lines, Export Pipeline (with permanent pigging
facilities) from Haliba Central Gathering Facilities to ADCO ASAB CDS including all tie-ins &
Overhead Line (OHL). The utility systems and associated infrastructure will be developed to
support Haliba facilities.
AL DHAFRA PETROLEUM OPERATIONS COMPANY LTD.
For the purpose of this document, the words and expressions listed below shall have the
meanings assigned as follows:
3.1 DEFINATIONS
3.2 ABBREVIATIONS
ADCO Abu Dhabi Company For Onshore Oil Operation
ES Engineering Specification
ATM Atmospheric
AMB Ambient
All applicable MESC Catalogues / data sheets along with MESC SPEs referred there in, as per
version 14.0 of Shell Global database.
Where neither code nor standard is specified in Specifications / Attachment, Supplier shall
propose applicable codes and standard on which Supplier’s design and manufacturing is
based. In any case, Supplier must furnish a list of codes and standards other than those
specified in this document, which shall be followed by them during engineering for review and
approval by COMPANY / CONTRACTOR.
In both cases (a) and (b) above, Supplier is obligated to immediately (within 2 Week of such
Instance) bring to notice of COMPANY / CONTRACTOR in form of a “design change notice”
with adequate back up details and justifying the claim.
After Supplier issues the design change notice, COMPANY / CONTRACTOR shall review and
confirm acceptance in form of written acknowledgement and would provide authorization for
the applicable cost/time impact requesting Supplier to proceed with such design change.
Till the time such authorization is obtained from COMPANY / CONTRACTOR by Supplier,
Supplier shall not proceed with the design change. If Supplier has proceeded with design
change without raising the design change notice and COMPANY / CONTRACTOR doesn’t
agree to the design change notice subsequently, then Supplier shall not be eligible for any
such claim.
AL DHAFRA PETROLEUM OPERATIONS COMPANY LTD.
7.0 CONFLICT
The Requisition shall be read in conjunction with all other specifications and documents
attached.
In the event of any conflict actual or implied, among the documents, the most stringent
requirements shall be applicable. However, Supplier shall refer back to COMPANY /
CONTRACTOR for final decision.
During order execution stage, In the event of conflict, actual or implied, amongst documents
relating to this Requisition or enquiry or order, the more stringent requirement(s) shall apply.
Supplier shall identify and state such conflict(s) in the course of engineering / manufacturing to
obtain COMPANY / CONTRACTOR’s concurrence.
Similarly, if there is a conflict between the printed enclosures / catalogues / specification and
other statements of Supplier’s quotation, superior specification advantageous to COMPANY /
CONTRACTOR shall prevail.
In any areas of conflict, the order of precedence, commencing with the highest, shall be as
follows:
The following is the order of precedence in case of conflict:
UAE Laws, Standards and Regulations
ADNOC Code of Practice (for HSE)
Project Datasheets
Project Specification
ADCO Standards / Specifications
Shell DEPs
International Codes and Standards
The Shell DEP Standards (DEP Version – 39) shall be used with their relevant amendments by
ADCO, if any and the project specification.
Quantity shall be referred from Annexure 4, Preliminary GRE Bulk Material Summary.
All GRE Piping Items shall be supplied in accordance with Specification for GRE Piping/ Shell
DEP’s attached with the Material Requisition.
GRE Piping layout mark-up enclosed as Attachment B1.15 shows the basic routing of the
GRE pipe work. The Vendor shall advise any comments or changes required to satisfy his
design requirements.
Preliminary Isometrics will be provided by Contractor. Vendor shall comment on the same as
per detailed design requirement. Vendor shall furnish following with each isometric issued by
Contractor:
• All isometrics shall be duly stamped (Issued for Construction) by the vendor confirming all
the design aspect.
• Furnish line wise BOQ along with Isometrics. Line wise MTO shall include detailed
description of each component (pipe, elbow, branches, etc.) of related isometric including
support type, support details, etc.
• Furnish description of Support, type of support, detail support drawing, any special type of
supports etc.
Vendor shall inform the Company along with the bid any additional design data not furnished
in this specification, which may be required to carry out the detailed design work.
AL DHAFRA PETROLEUM OPERATIONS COMPANY LTD.
Layout NOTE 1
Stress analysis √
Detailed calculations √
Procurement / Manufacturing √
Quality
√
control/Inspection/Certification
Transportation/Logistic √
Fabrication √
Marking, Packing,
√
Preservation and Protection
On Site Training √
Special Tools √
Spare Parts √
Installation
REFER CL. 8.4
Pre-Commissioning /
Commissioning REFER CL. 8.4 & 8.5
Guarantee
√
AL DHAFRA PETROLEUM OPERATIONS COMPANY LTD.
NOTE-1 Basic piping layout mark-up is attached as attachment B1.15 for GRE piping system
design.
The bulk materials list enclosed as Annexure 4 shall give guidelines for the requirement
of the GRE material. The Vendor shall prepare detailed bill of material to satisfy the
scope of supply of complete GRE piping system. An appropriate contingency for the
GRE piping materials and fittings shall be included to account for the training, testing,
commissioning and field trial spares. These materials shall include, where necessary,
but not limited to, shavers, winches, saddles, band clamps, heating blankets, filler rings,
gaskets, bolts, repair couplings, special pipe support, repair lamination kits, any other
special tool etc. Gaskets and Hardware (Stud/bolt, washers) to be supplied by vendor.
8.3 FABRICATION
8.3.1 OFF-SITE FABRICATION
To minimize construction time and maintain quality control, the Vendor shall fabricate
and test the pipe work, as far as practically possible, off-site in the Vendor’s works, but
with due regards to local transportation requirements. This will not preclude the need to
hydro test on site. It is the Vendor’s responsibility to ensure all material is delivered to
site undamaged & on schedule.
The Vendor shall supply any installation material and equipment necessary to ensure the
integrity and accuracy of the field jointing to be performed on site. The Vendor shall
provide joint installation and bonding kits required for field installation with date stamps
showing the time of packaging, required storage conditions and date of expiry of shelf
life. The Vendor shall co-ordinate with the Purchaser/Contractor Site Representative
regarding the commencement of delivery of these bonding kits to suit the erection timing
such that the expiry date is not exceeded. The Vendor shall supply and deliver to site all
special installation equipment for the duration of the contract. Tools and tackles required
to be provided by the Purchaser/Contractor shall be specified in the Vendor’s offer (at
submission of bid).
procedures are made available at site to the construction Contractor. It is the Vendor’s
responsibility to ensure that the construction Contractor undertake the installation in
accordance with the Vendor’s procedures.
The Vendor’s scope of work at site shall include but not be limited to the following:
Supervision of installation & testing, Pre-commissioning/Commissioning of the complete
GRE pipe work, Training of Construction Contractor’s personnel and Technical support.
The Vendor is required to make available a qualified GRE Field Service Engineer, who
shall work with the Construction Contractor’s field construction team, for the duration of
the field GRE construction, testing and commissioning activities. His role shall be to
assist with the quality control and quality assurance aspects of the GRE joining activities,
the hydro testing of the GRE lines and other GRE related construction activities.
To fulfil the quality assurance requirement, Supplier shall accept free access of
COMPANY or their representative at any time until shipment. Shop inspection and tests
shall be carried out in accordance with the requirement specified in this Requisition, its
attachments, applicable codes and standards.
Inspection level “4” is applicable for these items. Product Certification requirement is EN
10204 Type 3.2
Supplier shall prepare project specific Inspection & Test Plan (ITP), NDT procedures &
other applicable test procedures for CONTRACTOR & COMPANY’s approval.
The Vendor shall submit a Quality Plan for the manufacture; fabrication and testing of the
pipe work in line with the requirements of DEP 31.40.10.19-Gen.
Vendor shall be responsible for arranging all type of inspections, as specified in the
approved Inspection & Test Plan. Vendor shall make inspection and testing in
accordance with Inspection Coordination procedure for Vendors (1-01-99-97-1604).
Vendor /Sub Vendors’ quality management system shall comply ISO 9001-2008 / ISO
9001- 2015 QMS requirements & shall have a valid certification.
Hydrostatic Testing
All pipes and fittings shall be hydrostatically tested in the shop. All the spools fabricated
at Vendor’s workshop shall be subjected to hydro test pressure prior to dispatch to site.
The Construction Contractor shall carry out the hydrostatic testing of the installed pipe
work under the Vendor’s supervision. The responsibility for the testing shall lie with the
Vendor.
The installed pipe work system shall be hydraulically tested in accordance with Para 10
of DEP 31.40.10.19-Gen.The test shall be witnessed by the Company / Purchaser.
The Vendor shall prepare a procedure for field testing of pipes and fittings. The
procedure shall be approved by Company / Purchaser and shall be in accordance with
the following minimum requirements:
- Any restrictions on line pressurization rates;
- Identification of hold points during pressurization and depressurization rates together
with recommendations regarding any intermediate pressure tests.
The Vendor shall allow in his scope of work the supply of his proprietary materials
consumed during testing as well as for the rectification of the defects shown up by the
hydro test (for example, at least one extra flange for the intermediate hydro test).
AL DHAFRA PETROLEUM OPERATIONS COMPANY LTD.
Commissioning
The Vendor shall provide input to the General Commissioning Procedure developed by
the installation Contractor and shall identify all elements that may be required because of
the nature of the product. This shall include any restrictions on rate of line pressurization
with product. However, Vendor shall be available at site during commissioning of GRE
system.
8.6 TRAINING
Vendor shall submit the detailed training and assessment procedure for jointers,
inspectors and supervisors. The procedure shall be approved by Company before start
of training activities.
Training shall be provided by GRE vendor and the assessment of training and final
approval of jointers, supervisors & inspectors shall be done by QA/QC function.
The Vendor shall include in his scope on-site training and pre-qualification of
Construction Contractor’s personnel. The Vendor shall provide any necessary and
sufficient material and special equipment to demonstrate and train. Only personnel who
have undergone this formal training and pre-qualification shall be allowed to undertake
GRE jointing activities.
The vendor shall also provide technical support to the Company and Contractor
throughout the design and construction of the pipe work.
8.8 EXCLUSIONS
Provision of construction labour and lifting equipment for installation of the pipe work
shall be by the Construction Contractor.
The spare parts shall be packed separate from the main order. Each type of item shall
be packed and duly marked with the Purchase Order, applicable number (if any) and
spare parts identification numbers, related tag numbers etc.
Supplier shall supply all spare parts required during erection, pre-commissioning,
commissioning & start-up of the item, which shall include any parts requirement,
replacement, fragile parts, construction allowance for bulk material, consumables etc. as
per their recommendation.
Itemized Packing list of spare to be provided separately by Supplier along with dispatch
of spares as per Annexure 5.
Supplier to provide filled Spare parts interchangeability record format for all Spares
mentioned.
Insurance/capital Spares: Insurance/capital spares are defined as high value items that
are required to be stored in order to prevent unacceptable production loss or other costs.
These parts shall be recommended by the Supplier and reviewed by COMPANY
(operation team). Supplier shall complete the relevant sections of SPIR Forms (Refer
Annexure 5 for SPIR form) in respect of these spares. COMPANY will review the
COMPANY SPIR forms. These spare parts are part of the WORK.
2-years operating spares are required after the completion of the start-up for a duration
of 2 years. Supplier shall submit a list of such envisaged 2 years spare in the COMPANY
specific SPIR forms as part of the WORK. Supplier recommended operating spares list
shall be submitted for contractor approval.
Supplier shall submit the statutory certifications from National (UAE specific) and
International authorities for all items to be procured under this requisition as applicable.
AL DHAFRA PETROLEUM OPERATIONS COMPANY LTD.
In case for any item, Supplier does not have statutory certifications, they shall assume
full responsibility to approach the authorities and obtain the certification. They shall obtain
all back-up documentation from the manufacturer, which are required to be submitted to
the authorities for obtaining the certification. A copy of application along with the
enclosures is to be submitted to COMPANY / CONTRACTOR for reference.
Supplier shall submit this certification prior to dispatch. Accordingly, they shall plan their
activity considering usual duration required by the authorities for issuing the certification.
Supplier shall submit data & documents required for post order stage and final
documents as per ANNEXURE 3 (Vendor Documentation List) and agreements in KOM.
Relevant Paragraphs in terms & conditions and Kick off Meeting (KOM) shall form the
basis for documentation requirements.
Supplier shall check and duly stamp their entire sub-suppliers’ drawings and documents
before submitting to COMPANY / CONTRACTOR for review. If they submit their sub-
suppliers’ drawings / documents to COMPANY / CONTRACTOR for review without a
proper indication ensuring completion of the review activity at their end, the documents
shall be returned without any review and any delay due to this shall be attributed to
Supplier.
Suppliers / sub-suppliers under its new name with prior approval. Any such approval
shall however, not release the Supplier from any of his obligation under the contract;
neither shall any such approval signify instruction to use such a sub-supplier. All
approved sub-suppliers are deemed to have been freely chosen by the Supplier at
his own risk.
It shall be the responsibility of Supplier to check that the selected models of the item
shall meet the performance track record requirements as stated in the Specifications.
Supplier shall make an independent assessment of capability of all the sub-suppliers
for timely deliveries of material / equipment. Any delays in deliveries by sub-
supplier(s) shall not be a cause of schedule and cost implication.
For sub-suppliers included in each category, it will be Supplier’s responsibility to
ensure that item being ordered on approved sub-supplier has been manufactured
and supplied by them (range, thickness, size, capacity, material etc.) in past similar
projects or any reputed Refinery / Hydrocarbon Sector under Third Party Inspection.
Guarantee from Supplier shall cover mechanical and structural integrity, workmanship and
material of construction used of the complete package including their bought out items. The
performance guarantee shall be project specifications, applicable codes and standards
referred in this Requisition. Commercial implication with respect to non-fulfilment any
guaranteed specification shall as defined in commercial part of Purchase Order.
Supplier shall select item very carefully to meet the specified requirement ensuring proven
track record of satisfactory performance of selected item for similar service, meeting proven
track record / experience record requirements of project specifications as applicable. Supplier
shall not offer prototype item or special design, which was not used in the past successfully.
Supplier shall revise or replace item at any stage of the project, if Proven Track Record
submitted by Supplier does not meet the criteria or is not sufficient.
Supplier shall submit the procedure to protect and preserve the items being quoted
during transportation and storage at the construction site. Adequate packing shall be
provided to protect against rust, corrosion and damage during transportation and storage.
Supplier shall submit preliminary shipping / packing list indicating Number of boxes,
estimated size of package, Volume, Weight, Tag number etc.
AL DHAFRA PETROLEUM OPERATIONS COMPANY LTD.
Supplier shall take Protection and Preservation measures for the items supplied by them
in accordance with their specification considering a storage period of Twelve months from
date of shipping.
All moving parts shall be suitably locked to arrest movement during transportation, with
proper identification. All ports and openings shall be sealed. Threaded connection shall
be plugged with molded plastic caps or plug. It is Supplier’s responsibility to ensure all
items are adequately protected during shipment.
All packing shall be in accordance with DEP 31.40.10.19-Gen specification &
recommended practice for the use of GRE.
13.1 Supplier shall provide following minimum documents / information along with the offer.
13.2 Supplier shall specify their local support capability. This includes the spare parts
inventory and maintenance capabilities.
13.3 Supplier shall comply with the document control list format, the specification format, title
block requirements, comment resolution sheet, etc. as per CONTRACTOR /
COMPANY’s requirements.
13.4 Final Vendor Dossier including inspection and test records, certificates and drawings and
data shall be submitted in 1 set of Hard copies in addition to Soft copies over DVD. MS
Office and AutoCAD is some of the stipulated software. Wherever the output from
Supplier is not a generated output, then Supplier shall provide the scanned output in the
AL DHAFRA PETROLEUM OPERATIONS COMPANY LTD.
form of PDF file. All documentation shall be provided in English language only. All
VENDOR drawings and data shall be "As-Built" and not "as quoted" as part of final
documentation.
13.5 Vendor shall submit unit rates for all GRE items and Consumables. Any variation in order
quantity shall be settled based on these unit rates.
13.6 Vendor shall submit Diem rates for Field service, supervision for installation, pre
commissioning, commissioning, training etc. Any variation shall be settled based on
these rates.
13.7 For Soil details refer geotechnical Investigation report attached with requisition. Refer
Attachment B1.10 and B1.11
GRE Items shall be designed in line with Specification / attachments / SPEs and all documents
specified in section 15.0.
REVISION
Sl. No DESCRIPTION DOCUMENT NUMBER
NUMBER
A. DATASHEET
B1 PROJECT SPECIFICATIONS
B2 ADCO SPECIFICATION
LIST OF ANNEXURES
Note-1: Major DEPs (Version 39) are listed. DEPs which are cross referred are also applicable.
Page 1 of 1
ANNEXURE 1
Vendor:
OWNER : ALDHAFRA PETROLEUM OPERATIONAL COMPANY LTD Vendor reference no.:
PROJECT TITLE : HALIBA DEVLOPMENT PROJECT
REQUISITION NO : 1-01-99-93-1612
ITEM NAME : GRE PIPING
Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.
Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser
Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.
Category D : Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.
CATEGORY
FINAL
REFERENCE
Sl. STATUS
REQUISTION / SPECIFIED REQUIREMENT COMMENTS / DEVIATIONS OFFERED BY SUPPLIER TECHNICAL JUSTIFICATION CONTRACTOR'S DECISION PMC / OWNER'S DECISION
No. (OPEN /
SPECIFICATION
CLOSE)
Material Requisition No./ Rev: 1-01-99-93-1612/ Rev A
Bidder Name & Reference No:
ANNEXURE 2
Supplier’s Compliance
SUPPLIER’S Compliance
Sr. No. Statement
/ Confirmation
Supplier confirms that he has checked that complete requisition is received by him along with all Annexure and
1
Attachments.
2 The offer against above mentioned requisition is in full compliance with respect to defined scope of work and supply.
Supplier confirms that all the items / model offered are completely suitable for the ambient conditions, process data and
meets functional requirements as specified in this Requisition / Specifications / Datasheets. Selection of model number
is solely Supplier’s responsibility.
3
Supplier shall replace or rectify the offered items at no extra charge and time implication, if found unsuitable at a later
date, at any stage of the project.
Supplier confirms that the offer includes all the accessories and special tools for the safe operation, maintenance,
4 smooth functioning, installation and commissioning for the items in his scope of supply. Any such item requirement
discovered at a later date even after purchaser has reviewed the Supplier documents shall be to Supplier’s account.
Material Requisition No./ Rev: 1-01-99-93-1612/ Rev A
Bidder Name & Reference No:
ANNEXURE 2
Supplier’s Compliance
SUPPLIER’S Compliance
Sr. No. Statement
/ Confirmation
Supplier confirms that the statutory certifications and approval will be provided by him as per the Requisition for the
5
items in his scope of supply and work.
Supplier confirms that the offered items are exactly in line with this Requisition requirement. Wherever, the offered
items are selected as better option or higher option or not able to meet the requirements or deviated from the
requirements, the same is listed / highlighted in the “Deviations / clarifications List” only.
6
Deviations listed elsewhere in the offer other then the “Deviation / Clarification List” shall not be considered as
deviation. In case of No Deviation, then also Supplier to submit the deviation format duly signed & stamped with “NO
DEVIATION” stated therein.
Supplier confirmed that item is offered by him or from his sub-supplier, are proven and has checked before offering that
7
the same has proven track record of satisfactory performance in the past for the similar application.
If the supplier is an agent only then they shall get in writing from their principals / manufacturer the guarantee and the
8 undertaking with respect to the offer / quality / selection and performance of the offered items. Supplier has attached
letter from the principals / manufacturer along with the offer.
Material Requisition No./ Rev: 1-01-99-93-1612/ Rev A
Bidder Name & Reference No:
ANNEXURE 2
Supplier’s Compliance
SUPPLIER’S Compliance
Sr. No. Statement
/ Confirmation
9
In both cases (a) and (b) above, Supplier is obligated to immediately bring to notice of Purchaser in form of a
“design change notice” with adequate back up details and justifying the claim.
After Supplier issues the design change notice, Purchaser shall review and confirm acceptance in form of
written acknowledgement and would provide authorization for the applicable cost/time impact requesting
Supplier to proceed with such design change.
Material Requisition No./ Rev: 1-01-99-93-1612/ Rev A
Bidder Name & Reference No:
ANNEXURE 2
Supplier’s Compliance
SUPPLIER’S Compliance
Sr. No. Statement
/ Confirmation
Till the time such authorization is obtained from Purchaser by Supplier, Supplier shall not proceed with the
design change. If Supplier has proceeded with design change without raising the design change notice and
Purchaser doesn’t agree to the design change notice subsequently, then Supplier shall not be eligible for any
such claim.
Supplier confirmed that all items shall be suitable for the applicable services and design parameters mentioned in this
10
requisition.
AL DHAFRA PETROLEUM OPERATIONS COMPANY LTD.
MATERIAL REQUISITION FOR GRE PIPING
ANNEXURE 3 : VENDOR DOCUMENTATION LIST
Project Title: Haliba Development Project Date: 28/03/2018 Page 1 of 5
COMPANY No. 1-01-99-93-1612 Rev. A LTHE No. 6015-HDP-LTHE-99-PP-MR-1612 Rev. A
1. GENERAL
All documents shall be in English language only. If document(s) are not in English language,
those shall accompany a translated version by an authorized agency.
Units / Dimension used on Engineering Documents shall be SI, with exception of
standardized imperial nominal sizes of pipe, valve flanges, bolting, etc.
Supplier shall assign project specific document number to the documents prepared for this
project. Purchaser will issue document numbering procedure or slot of document numbers to
the supplier for the documentation for items in his scope.
The document shall be prepared following project specific format, title block requirement.
This will be provided to supplier post order stage.
All technical communications and comments on documents shall be done through Technical
communication format and Technical comment format which are attached with this
requisition.
Supplier shall identify changes, by suitable method, when revised document is submitted
with respect to earlier submission.
Supplier shall provide documents in hard copies and soft copies (native files) in requisite
number of sets. When native file is not generated by supplier or his sub-supplier, then,
scanned documents / output in form of soft file shall be provided.
The Installation, Operation & Maintenance manual(s) shall be provided as soft copies also,
over and above the required numbers of hard copies, as specified.
All comments must be incorporated into documentation by the supplier in order to receive
final code, unless it is agreed in writing by Purchaser for waiver of comments.
The above does not absolve or limit the responsibility of supplier. Supplier shall also be
responsible for the correctness and completeness of the documents/ drawings submitted
by them to purchaser with respect to the requirements of requisition/ order. While the
submission of documents/ drawings, supplier is responsible to ensure:
• Correctness of all the inputs required for the preparation of the document submitted.
• Interface with the other engineering functions are taken care by supplier.
• Wherever applicable, supplier shall submit document including make and model
number, incorporating sub-supplier’s data and the document shall accompany
technical catalogues for offered make/ model.
Review by purchaser may not necessarily be exhaustive in nature. It is responsibility of
supplier from supply of goods / services point of view that these are as per the
requirements of requisition / contract and supplier is bound by this commitment till the
completion of the project / contract whichever is later in spite of/ in addition to review by
supplier
AL DHAFRA PETROLEUM OPERATIONS COMPANY LTD.
MATERIAL REQUISITION FOR GRE PIPING
ANNEXURE 3 : VENDOR DOCUMENTATION LIST
Project Title: Haliba Development Project Date: 28/03/2018 Page 3 of 5
COMPANY No. 1-01-99-93-1612 Rev. A LTHE No. 6015-HDP-LTHE-99-PP-MR-1612 Rev. A
Submission
Doc. Schedule
Sl Drawing / Document / Data Required
Category From date of
No Required with Bid
(I/R) L.O.I.
(in weeks)
1 Supplier’s Project Organization Chart I 6
Supplier’s drawing/document
2 R 2
submission schedule
2 (To be
Fabrication / Production / Delivery
3 R updated on
Schedule
monthly basis)
Catalogue & Brochure of offered With
4 I Yes
items datasheets
Complete technical proposal,
5 R Yes
including all filled-in format
12 Quality Plan R 6
22 NDT procedure R 12
26 Training Procedure I
Note 3
27 Pipe Joining Procedure Specification I
3 (After sub
33 Unpriced copy of sub orders I
purchase order)
4 Weeks after
34 QA / QC Manual I
dispatch
During
36 Manufacturing book I
Shipment
6 week prior to
38 Technical book I
shipment
Notes:
1. Above listed documents / drawings are minimum documents required for review / records
/interface engineering any additional documents required during post order detail
engineering stage Contractor to furnish the same without any implication to COMPANY
2. Number of Hard Copies / Soft Copies will be discussed during Kick-off meeting stage.
3. Schedule submission dates will be discussed and finalised during Kick-off meeting stage.
Page 1 of 1
ANNEXURE 4
Description
Equipment
SPIR
Sheet no
FLOC
Rev No
(Spare Part Interchangeability Record)
SPIR No
SAP Eqipment No
Manufacturer
Equipment
2 Haliba Development Project 0
Equipment Vendor
MODEL/TYPE
NOTES:-
Currency
Signature
1. QUOTE ORIGINAL IDENTIFICATION NUMBERS (COMPONENT MANUFACTURER PART NUMBER)
3
Legends FOR ALL ITEMS OF THIRD PARTY MANUFACTURED (BEARINGS, MECHANICAL SEALS, ETC.)
2. INDICATE QUANTITIES ONLY WHEN INCLUDED IN EQUIPMENT P.O. ALONG WITH MAIN ORDER.
to be filled by Equipment Supplier
to be filled by L&T-HE
EQUIPMENT SERIAL
Quotation Date
to be filled by Al-Dhafra REMINDER:
Spare Qty for
NUMBER
Name
1. ALL THE DRAWINGS AND PART LIST FOR THE PARTS LISTED IN ALONG WITH PART NUMBER Spare Qty of
Date
Spare Qty for FIRST 2YR rest of
4 REFERENCE DOCUMENT TO BE ATTACHED AS "SPIR DOCUMENTS". INSURANCE/CAPITAL
OPERATION Equipment
2. LEADING PARTICULARS OF THE EQUIPMENT, DATA / SPECIFICATION SHEET TO BE ATTACHED SPARE
Life Cycle
ALONG WITH SPIR.
L&T-HE's RECOMMENDATION
(EX-Works & 1.5yr Validity)
POSITION PART NUMBER Weblink for Verification of PART NUMBER
TECHNICAL NAME OF PART SAP-CODE of PART
UNIT OF MEASURE
ITEM NUMBER
EQUI
NO
OF
6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
1
1
1
1
1
1
0 1 0 0
0 2 0 0
0 3 0 0
0 4 0 0
0 5 0 0
0 6 0 0
0 7 0 0
0 8 0 0
NUMBER OF PARTS INSTALLED IN EQUIPMENT TAG
0 9 0 0
0 10 0 0
0 11 0 0
0 12 0 0
0 13 0 0
7 0 14 0 0
0 15 0 0
0 16 0 0
0 17 0 0
0 18 0 0
0 19 0 0
0 20 0 0
0 21 0 0
0 22 0 0
0 23 0 0
0 24 0 0
0 25 0 0
0 26 0 0
0 27 0 0
0 28 0 0