AHPS-FAHUD SITE SURVEILLANCE REPORT

QA/QC

Location : Date & Time : FOREMAN

Inspector Name : Signature :

S.N. Activity Reviewed Yes No Comments

1 Foreman is available at site

2 AFC drawing available with Foreman?

3 General Mastic condition is good ?

4 Mastic temperature is ok?

5 Mastic applicators are qualified?

6 Verify Validity of the Mastic blue and white?check shelf life

Mastic application and sleeve installation procedure is


7
available with the crew.

8 MSDS/Mastic Procedure available at site?

9 Inspection Mirror available or not?

10 Proper Electrodes are available as per WPS

11 Check the packing and condition of electrodes

12 Welding Machine calibration is ok?

13 Electrode segregation is proper?

14 Portable oven used for basic electrodes?

15 Portable oven calibration ok or not?

16 Welder is qualified?

17 Earthing is done properly?

Joint Identification ,Date ,welder id , line no mentioned near


18
the joint

Pipe stored at site is in good condition. End caps are used


19
properly and identified?

20 Sleeve storage is proper

21 Material stored at canter properly

22 Fire Blanket available?

23 Welding Booth available?


24 Overall crew performance
Remarks (If any)
AHPS-FAHUD SITE SURVEILLANCE REPORT
QA/QC

Location : DATE
FOREMAN

Inspected By WELDER

S.N. Activity Checked Yes No Comments

1 Foreman is available at site

2 AFC drawing available with Foreman?

3 General Mastic condition is good ?

4 Mastic temperature is ok?

5 Mastic applicators are qualified?


Verify Validity of the Mastic blue and white?
6
Mastic application and sleeve installation procedure is
7 available with the crew.

8 MSDS/Mastic Procedure available at site?


Inspection Mirror available or not?
9
Proper Electrodes are available as per WPS
10

11 Check the packing and condition of electrodes

12 Welding Machine calibration is ok?

13 Electrode segregation is proper?

14 Portable oven used for basic electrodes?

15 Portable oven calibration ok or not?

16 Welder is qualified?
Earthing is done properly?
17
Proper Tempil Stick is available with welder?
18
WPS is available with welder ?
19
Welder following all parameter as per WPS?
20
Joint Identification ,Date ,welder id , line no mentioned near
21 the joint
Pipe stored at site is in good condition. End caps are used
22 properly and identified?

23 Sleeve storage is proper

24 Material stored at canter properly

25 Fire Blanket available?

26 Welding Booth available?


Overall crew performance
27
Remarks (If any)