Detailed Project Report Lamosanghu-Jiri Road

Province Government
Palungtar Municipality

Gorkha,Nepal

Project Name: -Radhakrishnamandir-Badareykhola (0+000-3+589.25) and Badareykhola-Kaushaltar


(3+725.20-10+305.62)
SUMMARY OF COST

Sn. Description Amount Remarks

1 General Items 9,883,375.72 ###


2 Site Clearance 487,581.66 ###
3 Earthwork 7,797,576.49 ###
4 Pavement 139,490,685.84 ###
5 Cross Drainage Structure 11,589,500.74 ###
6 Retaining Structure 38,537,730.55
7 Side Drain 108,048,334.17 ###
8 Road Furniture and Traffic Safety Measures 1,267,067.08 ###
9 Bio-Engineering Works 894,943.83 ###
Sub Total A 317,996,796.08 ###
Add 13% VAT of Sub-total B 41,339,583.49 ###
Sub Total C ( Sub Total B + VAT ) 359,336,379.58
3% Contingencies of Sub-total A 9,539,903.88 ###

Grand Total (Including VAT and Contingencies) 368,876,283.46 ###


Including Vat &
Cost per Km 35,795,854.78 Contingencies
Excluding Vat &
Cost per Km 30,858,495.50 Contingencies

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

#REF!
#REF!
#REF!
#REF!
#REF!
Upgrading of Lamosangu-Jiri Road

Abstract of Cost
Item Description Unit Quantity Rate (NRs) Amount (NRs)
No.
1 General
1.1 Insurance for the loss of damage to works plant,
material, equipment property and personnel injury of
death and commission of bank security and
performance guarantee all complete
Job 1.00 3,000,000.00 3,000,000.00
1.2 Provide, operate and maintain Quality control
laboratory including equipment, accessories and
consumables for both field testing facilities and off-site
test with manpower as per Contract Documents.
( SS/SP-502,511) and as per the instruction of engineer

Month 27.00 75,000.00 2,025,000.00


1.3 Carry out routine maintenance of the existing road to
keep the road serviceable through out the Contract
period : (SS/SP-107) and as per the instruction of
engineer

a) During construction Km-Month 278.10 8054.31 2,239,903.61


b) During Defects Liability period until issue of Defect
Liability Certificate Km-Month 133.90 8054.31 1,078,472.11
1.4 Provide and establish camp for contractor's labour and
staff and demolish after completion of works and
mobilization and demobilization as per the
specifications. (SS/SP-109) and as per the instruction of
engineer
LS 1,000,000.00
1.5 Relocation of services / minor infrastructures, as per
Engineer's instructions. (SS/SP-103)
PS 200,000.00
1.6 The bidder's percentage addition to the net cost
provided in item 1.5 % 10.00 20,000.00
1.7 Provision and install Project Signboards in accordance
with specification No 2.00 10000.00 20,000.00
1.8 Provide a vehicle for a Engineer Ls 1.00 300000.00 300,000.00
Sub total Part 1 9,883,375.72
2 Site Clearance
2.1 Clearing of grass, removing roots, breaking sods,
levelling the surface and disposal as per specification
(SS/SP-201)
Sqm 10,000.00 24.87 248,745.00
2.2 Felling trees including cutting of trunks and branches,
removing the roots, stacking serviceable materials and
disposal of unserviceable materials to suitable place all
complete as per Contract Documents: (SS/SP-201)

a) 300mm-600mm girth size No 40.00 762.82 30,512.72


b) 600mm-900mm girth size No 30.00 2,902.03 87,060.75
C) 900mm-1800mm girth size No 15.00 8,084.21 121,263.19
Sub total Part 2 487,581.66

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

#REF!
#REF!
#REF!
#REF!
#REF!
Upgrading of Lamosangu-Jiri Road

Abstract of Cost
Item Description Unit Quantity Rate (NRs) Amount (NRs)
No.
3 Earthwork
3.1 Road way excavation (Road and Drain) in all type of
rock and soil including necessary haulage , disposal and
lift all complete (SS/SP-900)
Cum 54,231.15 102.40 5,553,257.73
3.2 Formation of Embankment including, compaction in
layers not exceeding 150mm. Compacted depth,
watering and haulage 10m. Etc. all complete asper
specification. (SS/SP-900)
Cum 11,837.40 189.60 2,244,318.76
Sub total Part 3 7,797,576.49
4 Pavement
DBST
4.1 Preparation of Sub-grade by grading,watering &
compaction for upgrading the road ( filling or cutting
depth of 10 to 20 cm ) in Gravel & boulder mixed soil.
( SS / SP -1003 )
Sqm 36,308.30 124.37 4,515,753.42
4.2 Providing , laying , spreading, levelling and compaction
of natuaral sand gravel Subbase grading as per table
12.1 of standard specification (SS/SP-1201)

Cum 10,892.49 3,657.54 39,839,676.40


4.3 Providing , laying , spreading, levelling and compaction
of crusher run materials for Base course (SS/SP-1202)
Cum 14,130.02 2,778.96 39,266,709.21
4.4
Supplying and applying Prime Coat / Tack Coat
MC30/MC70 including cleaning the road surface using
wire brushes, broom etc. before applying coat. ( SS / SP
1301, 1303 )
Lit 63,585.09 197.22 12,540,372.78
4.5 Supplying and applying Ist coat Bitumen Binder for
DBSD all complete work as per instruction of Engineer
( SS / SP 1301, 1303 ) Lit 84,780.12 169.64 14,381,858.23
4.6 Supplying and applying 2nd coat Bitumen Binder for
DBSD all complete work as per instruction of Engineer
( SS / SP 1301, 1303 ) Lit 70,650.10 169.64 11,984,881.86
4.7
Anti-stripping agents: Supplying and application of
Anti-stripping agents conforming to IS: 14982:2001 @
0.5% all complete as per the instruction of Engineer.
( SP - 1313, 1d )
Kg 777.15 370.02 287,559.31
4.8
Supplying, spreading and compaction of Ist coat
14mm nominal agreegate for DBSD as specified ( SS/SP
1301 ) all complete as per instruction of Engineer.
Mt 1,130.40 6,125.43 6,924,201.40
4.90
Supplying , spreading and compactation of 2nd coat
10mm nominal agreegate for DBSD as specified ( SS/SP
1301 ) all complete as per instruction of Engineer.
Mt 847.80 6,125.43 5,193,151.05
Sub Total A 139,490,685.84
Sub total Part 4 139,490,685.84
5 Cross Drainage Structures
5.1 Earthwork in excavation for foundation of structures in
all types of soil including 1.5m lift and disposal of
excavated materials at approved environmentally safe
tipping sites as per specification ( SS - 907 ) Cum 2,413.13 130.94 315,975.35

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

#REF!
#REF!
#REF!
#REF!
#REF!
Upgrading of Lamosangu-Jiri Road

Abstract of Cost
Item Description Unit Quantity Rate (NRs) Amount (NRs)
No.
5.2 Back filling in layers in foundation pits, trenches etc,

including compaction and watering etc. complete, lead

10m as per specification ( SS - 908 ) Cum 795.03 945.23 751,485.97


5.3

Providing & laying Dry-stone pitching in protection


work, lead 30m, lift 1.5m With stone size not less than
0.01m3 including levelling etc. complete. Cum 156.36 4,273.03 668,111.08
5.4 Providing and placing machine mixed cement concrete
M15/20 including compaction, curing, testing and lead
30m. all complete as per specification.( SS - 2000 )

Cum 149.20 13,682.18 2,041,358.96


5.5 Providing, preparing and installing Formwork for
concrete works including necessary supports and
removing after completion as per specification ( SS -
1800 )
Sqm 388.36 724.40 281,324.53
5.6 Providing and laying random rubble Stone masonary in
cement sand mortar M5 including scaffolding, curing,
preparation of mortar etc. all complete. (SS/SP-2600)
Cum 738.95 8,348.56 6,169,157.62

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

#REF!
#REF!
#REF!
#REF!
#REF!
Upgrading of Lamosangu-Jiri Road

Abstract of Cost
Item Description Unit Quantity Rate (NRs) Amount (NRs)
No.
5.70 Fabrication, placing in position and filling with stone of
Gabion boxes of hexagonal mesh with heavy coated GI
wires, mesh size 100mm x 120mm, mesh wire 10
SWG, selvedge wire 8 SWG and binding wire 12 SWG
all complete as per specification : ( SS - 2400 )

Cum 304.50 4,473.19 1,362,087.23


Sub total Part 5 11,589,500.74
6 Retaining Structure
6.1 Earthwork in excavation for foundation of structures in
all types of soil including 1.5m lift and disposal of
excavated materials at approved environmentally safe
tipping sites as per specification ( SS - 907 ) Cum 6,974.43
#REF! 130.94
11,902.33 913,230.91
#REF!
6.1 Providing
6.2 and
Fabrication, layinginRandom
placing positionrubble Stone
and filling masonary
with stone of
in cement
gabion sand
boxes ofmortar M7.5
hexagonal including
mesh scaffolding,
with heavy coated GI
curing,mesh
wires, preparation of mortar
size 100mm etc. allmesh
x 120mm, complete. (SS/SP-
wire 10
2600) selvedge wire 8 SWG and binding wire 12 SWG
SWG,
all complete as per specification : ( SS - 2400 )

Cum 1,400.00 4,473.19 6,262,470.02


6.3 Providing,laying and Geotextile / Geo-membrane
( filter fabrics ) , lead 30m as per specification ( SS -
3110 )
Sqm 920.00 136.49 125,566.56
6.4 Providing and laying Random rubble stone masonry
(Breast Walland Retaining Wall) in cement mortar
[ cement(1) : sand(4)] including scaffolding, curing,
preparation of mortar,finishing etc.all complete.
(SS/SP-2600)
cum 2,347.70 11,902.33 27,943,041.95
6.5 Back filling in layers in foundation pits, trenches etc,
including compaction and watering etc. complete, lead
10m as per specification ( SS - 908 ) Cum 3,484.25 945.23 3,293,421.11
Sub total Part 6 38,537,730.55
7 Side Drain
7.1 Earthwork in excavation for foundation of road side
drain in all types of soil including 1.5m lift and disposal
of excavated materials at approved environmentally
safe tipping sites as per specification ( SS - 907 )
Cum 6,664.76 102.40 682,469.60
7.2

Providing & laying Dry-stone pitching in protection


work, lead 30m, lift 1.5m With stone size not less than
0.01m3 including levelling etc. complete. Cum 1,545.84 4,273.03 6,605,439.63
7.3 Providing and laying Random rubble Stone masonary in

cement sand mortar M7.5 including scaffolding, curing,

preparation of mortar etc. all complete. (SS/SP-2600) Cum 7,132.85 11,902.33 84,897,551.42
7.4 Providing and placing machine mixed cement concrete

M15/20 including compaction, curing, testing and lead

30m. all complete as per specification. ( SS - 2000 ) Cum 1,159.38 13,682.18 15,862,873.52
Sub total Part 7 108,048,334.17
8 Road Furnitures and Traffic Safety Measures

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

#REF!
#REF!
#REF!
#REF!
#REF!
Upgrading of Lamosangu-Jiri Road

Abstract of Cost
Item Description Unit Quantity Rate (NRs) Amount (NRs)
No.
8.1 Supply and erecting traffic signs in place including
50mm dia. Steel tube, 2mm thick steel plates, cement
concrete, painting, writing and supporting steel angle
nut and bolt etc. all complete, as per Drawings. (SS/SP-
1501).
a) 60cm dia Circular, 60 cm equilateral triangle and 60cm

x 45 cm rectangular shaped sign ( single post ) No 50.00 3,608.67 180,433.33


b) 1.2m x0.75m size bigger traffic sign ( Information
Board )with back support and two or more post. No 25.00 10,714.85 267,871.29
8.2 Supplying and applying 10cm wide paint for road
marking including cleaning, watering, brooming etc. all
complete

More than two coats over new bituminous surface as


per specification ( SS - 1502 ) Rm 10,000.00 58.20 582,003.56
8.3 Supply and placing stone marker ( RCC kilometer post)

including excavation, backfilling, painting and writing

etc. all complete as per Drawings. (SS/SP-1503)


a) Standard Kilometer stone (placed at each km distance)
No 10.00 3,563.16 35,631.58
b) Bigger kilometer post (placed at each 5 km distance)
No 2.00 8,174.32 16,348.65
8.4 Supplying and fixing in place RCC delinator and guard
posts including excavation, back filling, painting and
erection etc. all complete as per drawings. (SS/SP-
1504)
No 150.00 1,340.85 201,127.32
Sub total Part 8 1,267,067.08
9 Bio - engineering Works
9.1 Providing and planting containerised tree and shrub
seedling, including pitting, transplanting, composing
and mulching, on slopes > 40deg. Pit size 10cm
diameter x 30cm depth. Mix compost with soil and
back fill into pit to 1/4 of pit volume.

No 4000.00 47.89 191,544.00


9.2 Providing and planting rooted tree stump cutting bare
root seedling, including pitting, transplanting,
composing and mulching, on slopes > 45deg. Pit size
10cm diameter x 20cm depth. Compost volume 1/4 of
volume of the pit mix with original soil.

No 425.00 45.53 19,351.08


9.3 Grass sodding works including sod cutting,
transporting, placing in position and water sprinkling
( Lead upto 10m)
Sqm 35000.00 19.54 684,048.75
Sub total Part 9 894,943.83
Sub- Total A 317,996,796.08
Sub Total B 317,996,796.08
Add 13% VAT of Sub-total B 41,339,583.49
Sub Total C ( Sub Total B + VAT ) 359,336,379.58
3% Contingencies of Sub-total A 9,539,903.88
Grand Total (Including VAT and Contingencies) 368,876,283.46

#VALUE!
TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

#REF!
#REF!
#REF!
#REF!
#REF!

bstract of Cost
Remarks

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

#REF!
#REF!
#REF!
#REF!
#REF!

bstract of Cost
Remarks

DBST

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

#REF!
#REF!
#REF!
#REF!
#REF!

bstract of Cost
Remarks

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

#REF!
#REF!
#REF!
#REF!
#REF!

bstract of Cost
Remarks

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

#REF!
#REF!
#REF!
#REF!
#REF!

bstract of Cost
Remarks

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosangu-Jiri Road

Detail Estimate
Item
Description No Length Breadth Height Quantity Unit Remarks
No.
1 General
Insurance for the loss of damage to works plant,
material, equipment property and personnel injury of
1.1 death and commission of bank security and
performance guarantee all complete
Total 1.00 Job
Provide, operate and maintain Quality control
laboratory including equipment, accessories and
consumables for both field testing facilities and off-site
1.2 test with manpower as per Contract Documents.
( SS/SP-502,511) and as per the instruction of
engineer

Total 27.00 month


Carry out routine maintenance of the existing road to
keep the road serviceable through out the Contract
1.3 period : (SS/SP-107) and as per the instruction of
engineer
a) During construction 27 10.30 278.10
Total 278.10 Km - Month
b) During Defects Liability period until issue of Defect 13 10.30 133.90
Liability Certificate
Total 133.90 Km - Month
Provide and establish camp for contractor's labour and
staff and demolish after completion of works and
1.4 mobilization and demobilization as per the
specifications. (SS/SP-109) and as per the instruction
of engineer
Total 1.00 LS
Relocation of services / minor infrastructures, as per
1.5
Engineer's instructions. (SS/SP-103)
Total PS
The bidder's percentage addition to the net cost
1.6
provided in item 1.5 10% of 1.5
Total %
Provision and install Project Signboards in accordance
1.7
with specification 2 2.00
Total 2.00 No
1.8 Provide a vehicle for a Engineer
1.00 No
2 Site Clearance

Clearing of grass, removing roots, breaking sods,


2.1 levelling the surface and disposal as per specification
(SS/SP-201) 1 5000.00 2.00 10,000.00
Total 10,000.00 Sqm
Felling trees including cutting of trunks and branches,
removing the roots, stacking serviceable materials and
2.2 disposal of unserviceable materials to suitable place all
complete as per Contract Documents: (SS/SP-201)

a) 300mm - 600mm girth size 1 40.00


Total 40.00 No
b) 600mm-900mm girth size 1 10.00
Total 30.00 No
c) 900mm-1800mm girth size 1 15.00
Total 15.00 No
3 Earthwork
Road way excavation (Road and Drain) in all type of
3.1 rock and soil including necessary haulage , disposal
and lift all complete (SS/SP-900)
Refer attached sheet 54231.153
Total 54,231.15 Cum
Formation of Embankment including, compaction in
layers not exceeding 150mm. Compacted depth,
3.2 watering and haulage 10m. Etc. all complete asper
specification. (SS/SP-900)
1 Refer attached sheet 11837.396
Total 11,837.40 Cum
4 Pavement
For DBST

Preparation of Sub-grade by grading,watering &


compaction for upgrading the road ( filling or cutting
4.1 depth of 10 to 20 cm ) in Gravel & boulder mixed soil.
( SS / SP -1003 ) Refer attached sheet 36,308.30 Sqm

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosangu-Jiri Road

Item
Description No Length Breadth Height Quantity Unit Remarks
No.
Providing , laying , spreading, levelling and compaction
of natuaral sand gravel Subbase grading as per table
4.2 12.1 of standard specification (SS/SP-1201)
Refer attached sheet 10,892.49 Cum

Providing , laying , spreading, levelling and compaction


4.3 of crusher run materials for Base course (SS/SP-
1202) Refer attached sheet 14,130.02 Cum

Supplying and applying Prime Coat / Tack Coat


MC30/MC70 including cleaning the road surface using
4.4
wire brushes, broom etc. before applying coat. ( SS /
SP 1301, 1303 ) Refer attached sheet 63,585.09 Lit

Supplying and applying Ist coat Bitumen Binder for


4.5 DBSD all complete work as per instruction of 84,780.12 Lit
Engineer ( SS / SP 1301, 1303 ) Refer attached sheet

Supplying and applying 2nd coat Bitumen Binder for


4.6 DBSD all complete work as per instruction of Engineer 70,650.10 Lit
( SS / SP 1301, 1303 ) Refer attached sheet

Anti-stripping agents: Supplying and application of Anti-


stripping agents conforming to IS: 14982:2001 @ 0.5% 777.15
4.7 Kg
all complete as per the instruction of Engineer. ( SP -
1313, 1d ) Refer attached sheet

Supplying, spreading and compaction of Ist coat


14mm nominal agreegate for DBSD as specified 1,130.40
4.8 Mt
( SS/SP 1301 ) all complete as per instruction of
Engineer. Refer attached sheet

Supplying , spreading and compactation of 2nd coat


10mm nominal agreegate for DBSD as specified 847.80
4.90 Mt
( SS/SP 1301 ) all complete as per instruction of
Engineer. Refer attached sheet

5 Cross Drainage Structures


Earthwork in excavation for foundation of structures in
all types of soil including 1.5m lift and disposal of
5.1 excavated materials at approved environmentally safe
tipping sites as per specification ( SS - 907 )
a) New
a) PC - 900mm dia 24 79.78 1,914.75
a) SC 1 498.38 498.38
Total 2,413.13 Cum
Back filling in layers in foundation pits, trenches etc,
including compaction and watering etc. complete, lead
5.2 10m as per specification ( SS - 908 )

a) New
a) PC - 900mm dia 24 22.57 541.62
b) New
a) SC 1 253.41 253.41
Total 795.03 Cum
Stone soling and levelling works including lead upto
5.3
30m
a) New
a) PC - 900mm dia 24 4.80 115.24
b)
Newa) SC 1 41.11 41.11
Total 156.36 Cum
Providing and placing machine mixed cement
concrete M15/20 including compaction, curing, testing
5.4 and lead 30m. all complete as per specification.( SS -
2000 )
a) New
a) PC - 900mm dia 24 6.22 149.20
Providing, preparing and installing Formwork for
concrete works including necessary supports and
5.5 removing after completion as per specification ( SS -
1800 )
a) New
a) PC - 900mm dia 24 9.77 234.49
a) SC 1 153.87
#REF! 153.87
#REF!
a) SC - 6m span
Total 388.36 sq m

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosangu-Jiri Road

Item
Description No Length Breadth Height Quantity Unit Remarks
No.
Providing and laying random rubble Stone masonary
in cement sand mortar M7.5 including scaffolding,
5.6 curing, preparation of mortar etc. all complete. (SS/SP-
2600)

a) New
a) PC - 900mm dia 24 20.74 497.72
b) New
a) SC 1 241.23 241.23
738.95 Cum
Fabrication, placing in position and filling with stone of
Gabion boxes of hexagonal mesh with heavy coated
GI wires, mesh size 100mm x 120mm, mesh wire 10
5.70 SWG, selvedge wire 8 SWG and binding wire 12 SWG
all complete as per specification : ( SS - 2400 )

a) New
a) PC - 900mm dia 24 12.00 288.00
a) SC 1 16.50
#REF! 16.50
#REF!
a) SC - 6m span
Total 304.50 Cum
6 Retaining Structure

Earthwork in excavation for foundation of structures in


all types of soil including 1.5m lift and disposal of
6.1 excavated materials at approved environmentally safe
tipping sites as per specification ( SS - 907 ) Refer attached sheet 6974.425
Total 6974.43 Cum
Fabrication, placing in position and filling with stone of
gabion boxes of hexagonal mesh with heavy coated
GI wires, mesh size 100mm x 120mm, mesh wire 10
6.2 SWG, selvedge wire 8 SWG and binding wire 12 SWG
all complete as per specification : ( SS - 2400 )

Gabion Retaining Wall


Refer attached sheet 1 Refer attached sheet 1400.00
Total 1400.00 Cum
Providing,laying and Geotextile / Geo-membrane
6.3 ( filter fabrics ) , lead 30m as per specification ( SS -
3110 )
Gabion Retaining Wall
Refer attached sheet 1 Refer attached sheet 360.00
Masonary BreastRefer
wall attached sheet 1 Refer attached sheet #REF!
Refer attached sheet 1 Refer attached sheet 560.00
Total 920.00 Sqm
Providing and laying Random rubble stone masonry
(Breast Walland Retaining Wall) in cement mortar
6.4 [ cement(1) : sand(4)] including scaffolding, curing,
preparation of mortar,finishing etc.all complete.
(SS/SP-2600) 1 2347.70 Cum
Back filling in layers in foundation pits, trenches etc,
including compaction and watering etc. complete, lead
6.5 10m as per specification ( SS - 908 )
Refer attached sheet 3484.250
Total 3484.25 Cum
7 Side Drain
Earthwork in excavation for foundation of road side
drain in all types of soil including 1.5m lift and
7.1 disposal of excavated materials at approved
environmentally safe tipping sites as per specification (
SS - 907 )
1 Refer attached sheet 6,664.76
Total 6664.757 Cum
Stone soling and levelling works including lead upto
7.2
30m
Type A 1 1,545.84
Total 1,545.84 Cum
Providing and laying Random rubble Stone masonary
in cement sand mortar M5 including scaffolding, curing,
7.3 preparation of mortar etc. all complete. (SS/SP-2600)
`
1 Refer attached sheet 7,132.85
Total 7,132.85 Cum
Providing and placing machine mixed cement
concrete M15/20 including compaction, curing, testing
7.4 and lead 30m. all complete as per specification. ( SS -
2000 )
Type A 1 Refer attached sheet 1,159.38
Total 1,159.38 Cum
Road Furnitures and Traffic Safety Measures
8

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosangu-Jiri Road

Item
Description No Length Breadth Height Quantity Unit Remarks
No.
Supply and erecting traffic signs in place including
50mm dia. Steel tube, 2mm thick steel plates, cement
8.1 concrete, painting, writing and supporting steel angle
nut and bolt etc. all complete, as per Drawings.
(SS/SP-1501).
60cm dia Circular, 60 cm equilateral triangle and
a) 60cm x 45 cm rectangular shaped sign ( single post )

50 50.00
Total 50.00 No
1.2m x0.75m size bigger traffic sign ( Information
b) Board )with back support and two or more post.

25 25.00
Total 25.00 No
Supplying and applying 10cm wide paint for road
8.2 marking including cleaning, watering, brooming etc. all
complete
More than two coats over new bituminous surface as
per specification ( SS - 1502 )
1 10000.00 10,000.00
Total 10,000.00 Rm

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosangu-Jiri Road

Item
Description No Length Breadth Height Quantity Unit Remarks
No.
Supply and placing stone marker ( RCC kilometer
post) including excavation, backfilling, painting and
8.3 writing etc. all complete as per Drawings. (SS/SP-
1503)
Standard Kilometer stone (placed at each km
a)
distance)
10 10.00
Total 10.00 No
Bigger kilometer post (placed at each 5 km distance)
b)
2 2.00
Total 2.00 No
Supplying and fixing in place RCC delinator and
guard posts including excavation, back filling, painting
8.4 and erection etc. all complete as per drawings.
(SS/SP-1504)
150 150.00
Total 150.00 No
9 Bio - engineering Works
Providing and planting containerised tree and shrub
seedling, including pitting, transplanting, composing
9.1 and mulching, on slopes > 40deg. Pit size 10cm
diameter x 30cm depth. Mix compost with soil and
back fill into pit to 1/4 of pit volume.
1 4000.00 4000.00
Total 4000.00 No
Providing and planting rooted tree stump cutting bare
root seedling, including pitting, transplanting,
9.2 composing and mulching, on slopes > 45deg. Pit size
10cm diameter x 20cm depth. Compost volume 1/4 of
volume of the pit mix with original soil.
1 425.00 425.00
Total 425.00 No
Grass sodding works including sod cutting,
9.3 transporting, placing in position and water sprinkling
( Lead upto 10m)
1 7000.00 5 35000.00
Total 35000.00 Sqm

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road
#REF!
Item
Description of Items Unit Rate Remarks
No.

2 Site Clearance
Clearing and grubbing of forest including uprooting, carrying and disposing of vegetation, grass,
2.1 bush, sapling and trees girth up to 300 mm (measured at a height of 1 m above the ground level). m2 24.87
lead 10m.
Cutting of trees (the girth measured at a height of 1 m above ground level) including cuttting of
2.2 trunks and branches, removing the roots, stacking serviceable materials and disposal of
unserviceable materials to 10m distance and back filling the depressions/pits
a. Above 300 to 600 mm girth nos. 762.82
b. Above 600 to 900 mm girth nos. 2,902.03
c. Above 900 to 1800 mm girth nos. 8,084.21
d. Above 1800 to 2400 mm girth nos. 13,266.40
Shifting of existing and re-erection of telephone pole (stress/pre-stress RCC pole) including
2.3 nos. 4,013.09
transportation excavation, back filing, compaction
3 Earthworks
Road way excavation including disposal upto 10m and lift upto 1.5 m etc. all complete as per
3.a cu.m 102.40
specification. (Soft Soil)

3.b Road way excavating and loading by excavator (PC - 200 ) in Soft Soil cu.m 66.10

3.c Road way excavation with combination of Manual and Machined excavation ( Soft Soil ) cu.m 177.25

Road way excavation including disposal upto 10m and lift upto 1.5 m etc. all complete as per
3.d cu.m 829.15
specification.
3.e Road way excavating and loading by excavator (PC - 200 ) in Hard Soil / Gravel / BMS cu.m 66.10
3.f Road way excavation with combination of Manual and Machined excavation cu.m 218.71

Road way excavation including disposal upto 10m and lift upto 1.5 m etc. all complete as per
3.g cu.m 2,280.16
specification.
3.h Road way excavating and loading by excavator ( PC - 200 ) in Soft Rock cu.m 73.69

3.i Road way excavation with combination of Manual and Machined excavation cu.m 514.98

Road way excavation including disposal upto 10m and lift upto 1.5 m etc. all complete as per
3.j cu.m 9,949.80
specification.
3.k Road way excavating and loading by excavator ( PC - 200 ) in Hard Rock cu.m 73.69

3.l Road way excavation with combination of Manual and Machined excavation cu.m 2,048.91

3.1 Road way excavation with combination of Manual and Machined excavation in all type of Soil cu.m 102.40

Formation of embankment including compaction in layers not exceeding 150mm. Compacted


3.2 cu.m 189.60
depth, watering and haulage 10m. etc. all complete as per specification.

4 Pavement

Scarifying existing Bitumenous pavement, Subbase and base upto 20 cm depth and breaking
4.01 Sqm 259.46
down, removal of oversized particles

4.02 Preparation of sub-grade filling or cutting depth of 10 to 20 cm in Gravel & boulder mixed soil. Sqm 124.37

Providing, laying, spreading, levelling and compaction of natural sand gravel sub-base grading as
4.03 cu.m 3,657.54
per table 12.1 of standard specification lead upto 10m
Providing, laying, spreading, watering, levelling and compaction of of crusher run materials for
4.04 cu.m 2,778.96
base course lead upto 10m
Providing and spraying bituminious Prime Coat / Tack Coat MC30/MC70 including cleaning the
4.05 Lit 197.22
road surface using wire, brushes, broom etc. before applying prime coat / Tack coat
Providing and spraying bituminious Coat for Surfacing Dressing cleaning the road surface using
4.06 Lit 169.64
wire, brushes, broom etc. before applying coat.
4.07 Applying of Antistripping Additive Kg 370.02
4.08 Providing and laying surface dressing chips with compaction Mt 6,125.43
4.09 Providing and laying semi-grouting with compaction 50mm thickness Cum 1,143.23
4.1 Providing mixing, laying and compaction of Premixed Carpet Cum 23,120.35
4.11 Providing mixing and laying Asphalt Concrete with compaction Cum 25,599.13
4 Cross Drainage works
Road way excavation including disposal upto 10m and lift upto 1.5 m etc. all complete as per
4.a cu.m 746.24
specification. (Soft Soil)

4.b Road way excavation with combination of Manual and Machined excavation ( Soft Soil ) cu.m 224.51

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Item
Description of Items Unit Rate Remarks
No.

Earth work excavation for trenches including shoring, struting, bracing, sheeting and disposal
4.c cu.m 1,243.73
upto 10m and lift upto 1.5 m etc. all complete as per specification. ( For hard soil/ Gravels)

Earthwork excavation for trenches with combination of Manual and Machined excavation ( Hard
4.d cu.m 301.62
Soil / Gravel BMS )

Earth work excavation for trenches including shoring, struting, bracing, sheeting and disposal
4.e cu.m 2,487.45
disposal upto 10m and lift upto 1.5 m etc. all complete as per specification. ( For soft rocks)

Earthwork excavation for trenches with combination of Manual and Machined excavation ( Soft
4.f cu.m 550.37
Rock )
Road way excavation including disposal upto 10m and lift upto 1.5 m etc. all complete as per
4.g cu.m 13,266.40
specification.
4.h Road way excavation with combination of Manual and Machined excavation cu.m 2,706.16
Earthwork excavation for trenches with combination of Manual and Machined excavation ( All
4.01 cu.m 130.94
Type of Soil )
Backfilling in layers in foundation pits, trenches etc. including compaction, watering etc. complete
4.02 cu.m 945.23
lead 10m. And depth of foundation upto 1.5m.
Providing & laying Dry-stone pitching in protection work, lead 30m, lift 1.5m With stone size not
4.03 cu.m 4,273.03
less than 0.01m3 including levelling etc. complete.
Providing and placing machine mixed cement concrete for the foundation and footing etc. in M15
4.04 including compaction, curing, testing and lead 30m. etc. all complete as per specification and cu.m 13,682.18
drawing.
Providing and placing machine mixed cement concrete M20 for the foundation and footing etc.
4.05 including compaction, curing, testing and lead 30m. etc. all complete as per specification and cu.m 14,687.32
drawing.
Providing and placing machine mixed cement concrete , M20 for the abutment, pier, wall etc.
4.06 including compaction, curing, testing and lead 30m. etc. all complete as per specification and cu.m 19,903.08
drawing.
Providing and placing machine mixed cement concrete, M25 for the super structure, deckslab,
4.07 girder etc. including compaction, curing, testing and lead 30m. etc. all complete as per cu.m 20,993.08
specification and drawing.
Providing , Preparing and Installing form work including necessary supports and removing after
4.08 cu.m 724.40
completion for Slab & Beam Structures.(Scrap value neglected)
Providing and laying Reinforcement including cutting, bending, binding, fixing in position and
4.09 Mt 118,693.77
lead 30m. etc. all complete as per specification and drawing.

Providing and laying Random rubble stone masonry in cement mortar including scaffolding,
curing, preparation of mortar etc. complete, masoned height 0-5m, lead 30m (Using Concrete
4.1 cu.m 11,902.33
mixer) mortar 35% (cement :sand) 1:4 including cement pointing in 1:2 cement sand mortar with
100 dia HDPE pipe for weep hole at interval of 1m both horizontal and vertical direction.

Providing, Mixing and Pointing cement mortar over masonry works including scaffolding etc.
4.11 cu.m 233.01
complete as per specification lead 30m
Back filling with graded filter materials in layer behind abutment with necessary watering and
4.12 cu.m 3,623.58
compaction, lead 30m, lift 1.5m
Providing and laying RCC pipes with or without collars, jointed with stiff mixture of cement mortar
4.13
in the proportion of 1:2 ( 1 cement : 2 fine sand ), lead upto 100m.
a. i) 300mm dia ( Int ) RCC Hume Pipe Rm 3,702.11
b. ii) 450mm dia ( Int ) RCC Hume Pipe Rm 1,653.43
c. iii) 600mm dia ( Int ) RCC Hume Pipe Rm 7,893.91
d. iv) 900mm dia ( Int ) RCC Hume Pipe Rm 12,997.79
4.1 Providing and laying two layers of Tarfelt Sqm 1,346.01
5 Retaining Structures
Fabrication of Gabion boxes/mattresses with diapharagms including rolling, cutting and weaving,
assembling it, placing in position including stretching, forming compartments, tying the side and
5.01
diaphargms with binding wire in each mesh, filling gabion box with stone including dressing,
beding, bonding and all transportation as per specification.
a. (3 x 1 x 1) box size cu.m 4,380.96
b. (2 x 1 x 1) box size cu.m 4,473.19
c. (1.5 x 1 x 1) box size cu.m 4,496.29
5.02 Providing and laying of High Density Polethene Pipe 110mm ( 4 Kg / cm2 ) Rm 438.13
5.03 Providing , laying and fixing of Geotextile ( filter fabrics ) Sqm 136.49
6 Road Furnitures and Trafiic Safety
6.01 Providing and painting of two coats of enamel painting with one coat primer Sqm 322.09

Supplying and erecting traffic sign in place including 50mm dia. Steel tube, 2mm. thick steel plate,
6.02
cement concrete, painting, writing and supporting steel angle nut and bolt etc. complete.

60cm. Dia. Circular, 60cm. equilateral traingle and 60cm.x 45cm. rectangular shaped sign (single
a. Nos. 3,608.67
post).

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Item
Description of Items Unit Rate Remarks
No.
b. 1.2m.x 0.75m. Size bigger traffic sign with back support and two or more post. Nos. 10,714.85
Supplying and applying paint for Road marking including cleaning, watering, brooming etc. all
6.03 Rm 58.20
complete ( 10cm wide strip ).
Supplying and placing R.C.C. kilometer post including excavation, back filling, painting and
6.04
writing etc. all complete as per specification.
a. Standard kilometer post (placed at each km.) Nos. 3,563.16
b. Bigger kilometer post (placed at each 5 km.) Nos. 8,174.32
Supplying and fixing in place R.C.C. delineator and guard post including excavation, back filling,
6.04 Nos. 1,340.85
painting and erection etc. all complete as per drawing.
7 Bio - engineering Works

Providing and planting grass slips on the 45deg - 60deg slope including preparation of slips
7.01 operation dingging planting a max of 5 cm depth with metal rod or hard - wood peg, depending on Sqm 295.61
the soil. The planting drills should be 10cm apart.

Providing and planting containerised tree and shrub seedling, including pitting, transplanting,
7.02 composing and mulching, on slopes > 40deg. Pit size 10cm diameter x 30cm depth. Mix Nos. 47.89
compost with soil and back fill into pit to 1/4 of pit volume.

Providing and planting rooted tree stump cutting bare root seedling, including pitting,
7.03 transplanting, composing and mulching, on slopes > 45deg. Pit size 10cm diameter x 20cm Nos. 45.53
depth. Compost volume 1/4 of volume of the pit mix with original soil.

7.04 Broadcasting grass seeds on slopes <40 degree seeding rate 25 gm per m2 Sqm 16.47

Planting single node culm cutting of grass (eg napier) on fill slopes <45 degree. Approx. length 15-
7.05 Nos. 2.80
20cm, including digging planting hole 10-20cm depth using a metal rod or hardwood peg.

Grass sodding works including sod cutting, transporting, placing in position and water sprinkling
7.06 Sqm 19.54
( Lead upto 10m)

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

ANALYSIS OF RATE

Clearing and grubbing of forest including uprooting, carrying and disposing of vegetation, grass, bush, sapling and
Sp. No: 201 trees girth up to 300 mm (measured at a height of 1 m above the ground level). lead 10m.
Norms No: 2.01.01

Trees and sapling less than 15 numbers per 100 sq.m

Unit-Sqm
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 0.03 M/D 700.00 21.00 21.00
Tools 3% of Labour 0.63
Actual Cost 21.63
Rate for Sqm 15% Contractors profit & OH 3.24
NRs 24.87 Total Rate 24.87

Sp. No: 201 Cutting of trees (the girth measured at a height of 1 m above ground level) including cuttting of trunks and branches,
removing the roots, stacking serviceable materials and disposal of unserviceable materials to 10m distance and back
Norms No: 2.04 filling the depressions/pits

a. Above 300 to 600 mm girth


Unit-no.
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 0.92 M/D 700.00 644.00 644.00
Tools 3% of Labour 19.32
Actual Cost 663.32
Rate for no. 15% Contractors profit & OH 99.50
NRs 762.82 Total Rate 762.82

b. Above 600 to 900 mm girth


Unit- No
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 3.50 M/D 700.00 2,450.00 2450.00
Tools 3% of Labour 73.50
Actual Cost 2523.50
Rate for no. 15% Contractors profit & OH 378.53
NRs 2902.03 Total Rate 2902.03

c. Above 900 to 1800 mm girth


Unit- No
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 9.75 M/D 700.00 6,825.00 6825.00
Tools 3% of Labour 204.75
Actual Cost 7029.75
Rate for no. 15% Contractors profit & OH 1054.46
NRs 8084.21 Total Rate 8084.21

d. Above 1800 to 2400 mm girth


Unit- No
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 16.00 M/D 700.00 11,200.00 11200.00
Tools 3% of Labour 336.00
Actual Cost 11536.00
Rate for no. 15% Contractors profit & OH 1730.40
NRs 13266.40 Total Rate 13266.40

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Sp. No: 905 Road way excavation including disposal upto 10m and lift upto 1.5 m etc. all complete as per specification. (Soft Soil)
Norms No: 9.01
Soft soil

Unit-Cum
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 0.75 M/D 700.00 525.00 525.00
Tool & Plants 3% of Labour 15.75
Actual Cost 540.75
Rate per Cum 15% Contractors profit & OH 81.11
NRS 621.86 Total Rate 621.86

Sp. No: 905 Road way excavating and loading by excavator (PC - 200 ) in Soft Soil

Unit-Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.0 M/D -
Labour b) Unskilled 0.00469 M/D 700.00 3.28 3.28
c) Operator 0.0 M/D -
Material Diesel 0.1500 Lit 96.35 14.45 14.45
Lubricant ( 1% of Fuel ) 0.14
Equipment Hudraulic excavator 0.0220 Hr 1,800.00 39.60 39.60
Actual Cost 57.48
Rate per Cum 15% Contractors profit & OH 8.62
NRs 66.10 Total Rate 66.10

Road way excavation with combination of Manual and Machined excavation ( Soft Soil )
Sp. No: 905
Soft Soil

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Manual Excavation ( 20% ) 0.20 Cum 540.75 108.15 108.15
Machine Excavation ( 80% ) 0.80 Cum 57.48 45.98 45.98
Actual Cost 154.13
Rate per Cum 15% Contractors profit & OH 23.12
NRS 177.25 Total Rate 177.25

Sp. No: 905 Road way excavation including disposal upto 10m and lift upto 1.5 m etc. all complete as per specification.
Norms No: 9.01
Hard soil/Gravel BMS

Unit-Cum
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 1.00 M/D 700.00 700.00 700.00
Tool & Plants 3% of Labour 21.00
Actual Cost 721.00
Rate per Cum 15% Contractors profit & OH 108.15
NRS 829.15 Total Rate 829.15

Sp. No: 905 Road way excavating and loading by excavator (PC - 200 ) in Hard Soil / Gravel / BMS

Unit-Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.0 M/D -
Labour b) Unskilled 0.00469 M/D 700.00 3.28 3.28
c) Operator 0.0 M/D -
Material Diesel 0.1500 Lit 96.35 14.45 14.45
Lubricant ( 1% of Fuel ) 0.14
Equipment Hudraulic excavator 0.0220 Hr 1,800.00 39.60 39.60
Actual Cost 57.48
Rate per Cum 15% Contractors profit & OH 8.62
NRs 66.10 Total Rate 66.10

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Road way excavation with combination of Manual and Machined excavation


Sp. No: 905
Hard soil/Gravel BMS

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Manual Excavation ( 20% ) 0.20 Cum 721.00 144.20 144.20
Machine Excavation ( 80% ) 0.80 Cum 57.48 45.98 45.98
Actual Cost 190.18
Rate per Cum 15% Contractors profit & OH 28.53
NRS 218.71 Total Rate 218.71

Road way excavation including disposal upto 10m and lift upto 1.5 m etc. all complete as per specification.
Sp. No: 905

Soft rock
Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 2.75 M/D 700.00 1,925.00 1925.00
Tool & Plants 3% of Labour 57.75
Actual Cost 1982.75
Rate per Cum 15% Contractors profit & OH 297.41
NRS 2280.16 Total Rate 2280.16

Sp. No: 905 Road way excavating and loading by excavator ( PC - 200 ) in Soft Rock

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.0 M/D -
Labour b) Unskilled 0.00469 M/D 700.00 3.28 3.28
c) Operator 0.0 M/D -
Material Diesel 0.1500 Lit 96.35 14.45 14.45
Lubricant ( 1% of Fuel ) 0.14
Equipment Excavator + Breaker 0.0220 Hr 2,100.00 46.20 46.20
Actual Cost 64.08
Rate per Cum 15% Contractors profit & OH 9.61
NRs 73.69 Total Rate 73.69

Road way excavation with combination of Manual and Machined excavation


Sp. No: 905
Soft Rock

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Manual Excavation ( 20% ) 0.20 Cum 1982.75 396.55 396.55
Machined Excavation ( 80% ) 0.80 Cum 64.08 51.26 51.26
Actual Cost 447.81
Rate per Cum 15% Contractors profit & OH 67.17
NRS 514.98 Total Rate 514.98

Road way excavation including disposal upto 10m and lift upto 1.5 m etc. all complete as per specification.
Sp. No: 905

Hard rock
Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 12.00 M/D 700.00 8,400.00 8400.00
Tool & Plants 3% of Labour 252.00
Actual Cost 8652.00
Rate per Cum 15% Contractors profit & OH 1297.80
NRS 9949.80 Total Rate 9949.80

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Sp. No: 905 Road way excavating and loading by excavator ( PC - 200 ) in Hard Rock

Unit-Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.0 M/D -
Labour b) Unskilled 0.00469 M/D 700.00 3.28 3.28
c) Operator 0.0 M/D -
Material Diesel 0.1500 Lit 96.35 14.45 14.45
Lubricant ( 1% of Fuel ) 0.14
Equipment Excavator + Breaker 0.0220 Hr 2,100.00 46.20 46.20
Actual Cost 64.08
Rate per Cum 15% Contractors profit & OH 9.61
NRs 73.69 Total Rate 73.69

Road way excavation with combination of Manual and Machined excavation


Sp. No: 905
Hard Rock

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Manual Excavation ( 20% ) 0.20 Cum 8652.00 1,730.40 1730.40
Machined Excavation ( 80% ) 0.80 Cum 64.08 51.26 51.26
Actual Cost 1781.66
Rate per Cum 15% Contractors profit & OH 267.25
NRS 2048.91 Total Rate 2048.91

Road way excavation with combination of Manual and Machined excavation in all type of Soil
Sp. No: 905
All Type

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Soft Soil 25.76 Cum 154.13 39.70 39.70
Boulder Mixed Soil 3.68 Cum 190.18 7.00 7.00
Soft Rock 3.68 Cum 447.81 16.48 16.48
Hard Rock 3.68 Cum 1781.66 65.57 65.57
Actual Cost 89.04
Rate per Cum 15% Contractors profit & OH 13.36
NRS 102.40 Total Rate 102.40

Formation of embankment including compaction in layers not exceeding 150mm. Compacted depth, watering and
Sp. No: 905 haulage 10m. etc. all complete as per specification.
Norms No: 9.05.01
Unit- Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.002 M/d 980.00 1.96
Labour
b)Unskilled 0.008 M/d 700.00 5.60 7.56
Suitable material 1.10 Cum 101.47 111.62
Material Fuel 0.12 litre 96.35 11.56
Water 100.00 litre 0.16 16.00 139.18
Grader 0.005 Hr 1200.00 6.00
Equipment
Roller Vibrator 0.017 Hr 700.00 11.90 17.90
Tools & Plants 3% of labour cost 0.23
Actual Cost 164.87
Rate per Cum 15% Contractors profit & OH 24.73
NRs 189.60 Total Rate 189.60

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Preparation of sub-grade filling or cutting depth of 10 to 20 cm in Gravel & boulder mixed soil.
Sp. No: 1003
Norms No: 10.03.04
Unit- Sqm
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.000 M/d 980.00 -
Labour
b)Unskilled 0.150 M/d 700.00 105.00 105.00
Equipment 3% for Tools and Plants 3.15
Actual Cost 108.15
Rate per Sqm 15% Contractors profit & OH 16.22
NRs 124.37 Total Rate 124.37

Providing, laying, spreading, levelling and compaction of natural sand gravel sub-base grading as per table 12.1 of
Sp. No: 1201 standard specification lead upto 10m
Norms No: 12.01
Unit-Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.005 M/d 980.00 4.90
Labour
b)Unskilled 0.040 M/d 700.00 28.00 32.90
Sub base aggregate 1.28 Cum 2340.12 2,995.36
Material
Diesel 0.792 litre 96.35 76.31 3071.67
Grader 0.022 hr 1200.00 26.40
Vibrator roller 0.022 hr 700.00 15.40
Equipment
Water bowser 0.038 hr 550.00 20.90
Loader 0.011 hr 1200.00 13.20 75.90
Actual Cost 3180.47
Rate per Cum 15% Contractors profit & OH 477.07
NRs 3657.54 Total Rate 3657.54

Providing, laying, spreading, watering, levelling and compaction of of crusher run materials for base course lead upto
Sp. No: 1202 10m
Norms No: 12.06
Unit- Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.005 M/d 980.00 4.90
Labour
b)Unskilled 0.020 M/d 700.00 14.00 18.90
Base aggregate 1.200 Cum 1840.12 2,208.15
Material
Diesel 0.990 litre 96.35 95.39 2303.53
Grader 0.033 hr 1200.00 39.60
Vibrator roller 0.033 hr 700.00 23.10
Equipment
Water bowser 0.033 hr 550.00 18.15
Loader 0.011 hr 1200.00 13.20 94.05
Actual Cost 2416.48
Rate per Cum 15% Contractors profit & OH 362.47
NRs 2778.96 Total Rate 2778.96

Sp. No: 1301,1302 Providing and spraying bituminious Prime Coat / Tack Coat MC30/MC70 including cleaning the road surface using
wire, brushes, broom etc. before applying prime coat / Tack coat
Norms No: 13.03

Unit: Lit
Description Particular Quantity Unit Rate Amount Total
Skilled 0.003 M/d 980.00 2.94
Labour
Unskilled 0.046 M/d 700.00 32.20 35.14
Bitumen 1.050 Lit 91.22 95.78
Materials
Kerosene 0.100 Lit 96.35 9.63
Diesel 0.275 Lit 96.35 26.50 131.91
Boiler 0.0025 hr 180.00 0.45
Equipment Sprayer 0.0025 hr 1300.00 3.25
Air compressor 0.0030 hr 250.00 0.75 4.45
Actual Cost 171.50
Rate per Lit 15% Contractors OH 25.72
NRs 197.22 Total Rate 197.22

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Sp. No: 1301,1303 Providing and spraying bituminious Coat for Surfacing Dressing cleaning the road surface using wire, brushes, broom
etc. before applying coat.
Norms No: 13.05.01

Unit: Lit
Description Particular Quantity Unit Rate Amount Total
Skilled 0.002 M/d 980.00 1.96
Labour
Unskilled 0.014 M/d 700.00 9.80 11.76
Bitumen 1.050 Lit 91.22 95.78
Materials Kerosene 0.100 Lit 96.35 9.63
Diesel 0.270 Lit 96.35 26.01 131.43
Boiler 0.0025 hr 180.00 0.45
Equipment Distributor 0.0025 hr 1300.00 3.25
Air compressor 0.0025 hr 250.00 0.63 4.33
Actual Cost 147.51
Rate per Lit 15% Contractors OH 22.13
NRs 169.64 Total Rate 169.64

Sp. No:
Applying of Antistripping Additive
Norms No:

Unit: Kg
Description Particular Quantity Unit Rate Amount Total
Materials Antistripping Additive 1.00 Kg 321.75 321.75 321.75
Actual Cost 321.75
Rate per Lit 15% Contractors OH 48.26
NRs 370.02 Total Rate 370.02

Sp. No: 1301,1303


Providing and laying surface dressing chips with compaction
Norms No: 13.05.03

Unit: ton
Description Particular Quantity Unit Rate Amount Total
Skilled 0.0010 M/d 980.00 0.98
Labour
Unskilled 0.21 M/d 700.00 147.00 147.98
Chips 1.05 Mt 4230.12 4,441.63
Materials
Diesel 3.60 Lit 96.35 346.86 4788.49
Chips Spreader 0.1000 Hr 1500.00 150.00
Pneumatic Roller 0.2000 Hr 1200.00 240.00 390.00
Actual Cost 5326.47
Rate per Mt 15% Contractors OH 798.97
NRs 6125.43 Total Rate 6125.43

Sp. No: 1301,1304


Providing and laying semi-grouting with compaction 50mm thickness
Norms No: 13.06.01

Unit: 10 Sqm
Description Particular Quantity Unit Rate Amount Total
Skilled 0.21 M/d 980.00 205.80
Labour
Unskilled 1.80 M/d 700.00 1,260.00 1465.80
Bitumen 52.00 Lit 91.22 4,743.22
Kerosene 0.250 Lit 96.35 24.09
Materials
Diesel 2.52 Lit 96.35 242.80
Aggregates 0.75 Cum 4230.12 3,172.59 8182.70
Boiler 0.0700 Hr 180.00 12.60
Roller 0.0700 Hr 1200.00 84.00
Equipment
Sprayer 0.0700 Hr 1300.00 91.00
Agg. Spreader 0.0700 Hr 1500.00 105.00 292.60
Actual Cost 9941.10
Rate per Sqm 15% Contractors OH 1491.16
NRs 1143.23 Total Rate 11432.26

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Sp. No: 1307,1308


Providing mixing, laying and compaction of Premixed Carpet
Norms No: 13.09

Unit: Cum
Description Particular Quantity Unit Rate Amount Total
Skilled 0.45 M/d 980.00 441.00
Labour
Unskilled 4.50 M/d 700.00 3,150.00 3591.00
Bitumen 77.00 Lit 91.22 7,023.62
Materials Kerosene 7.700 Lit 96.35 741.88
Aggregates 1.20 Cum 6540.12 7,848.15 15613.65
Steel tyred Roller 0.5000 Hr 500.00 250.00
Equipment
Sprayer 0.5000 Hr 1300.00 650.00 900.00
Actual Cost 20104.65
Rate per Cum 15% Contractors OH 3015.70
NRs 23120.35 Total Rate 23120.35

Sp. No: 1307,1308


Providing mixing and laying Asphalt Concrete with compaction
Norms No: 13.10

Unit: Cum
Description Particular Quantity Unit Rate Amount Total
Skilled 0.03 M/d 980.00 29.40
Labour Unskilled 0.13 M/d 700.00 91.00
Foreman 0.01 M/d 700.00 7.00 127.40
Bitumen 117.00 Lit 91.22 10,672.25
Cement 0.022 t 15494.13 340.87
Materials
Diesel 10.45 Lit 96.35 1,006.84
Aggregates 1.20 Cum 6540.12 7,848.15 19868.11
Asphalt mixing plant 0.0440 Hr 400.00 17.60
Wheel Loader 0.6600 Hr 1200.00 792.00
Asphalt Paver 0.2200 Hr 1200.00 264.00
Equipment
Steel tyred Roller 0.5500 Hr 500.00 275.00
Pneumatic Roller 0.5500 Hr 1200.00 660.00
Tipper, Trucks 0.3200 Hr 800.00 256.00 2264.60
Actual Cost 22260.11
Rate per Cum 15% Contractors OH 3339.02
NRs 25599.13 Total Rate 25599.13

Sp. No: 905 Earth work excavation for trenches including shoring, struting, bracing, sheeting and disposal upto 10m and lift upto
Norms No: 9.02 1.5 m etc. all complete as per specification. ( For soft soil)

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 0.90 M/D 700.00 630.00 630.00
Tool & Plants 3% of Labour 18.90
Actual Cost 648.90
15% Contractors profit & OH 97.34
Rate per Cum Total Rate 746.24
NRS 746.24

Earthwork excavation for trenches with combination of Manual and Machined excavation ( Soft Soil )
Sp. No: 905
Soft soil

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Mannual Excavation ( 20% ) 0.20 Cum 746.24 149.25 149.25
Machined Excavation ( 80% ) 0.80 Cum 57.48 45.98 45.98
Actual Cost 195.23
Rate per Cum 15% Contractors profit & OH 29.28
NRS 224.51 Total Rate 224.51

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Sp. No: 905 Earth work excavation for trenches including shoring, struting, bracing, sheeting and disposal upto 10m and lift upto
Norms No: 9.02 1.5 m etc. all complete as per specification. ( For hard soil/ Gravels)

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 1.50 M/D 700.00 1,050.00 1050.00
Tool & Plants 3% of Labour 31.50
Actual Cost 1081.50
15% Contractors profit & OH 162.23
Rate per Cum Total Rate 1243.73
NRS 1243.73

Earthwork excavation for trenches with combination of Manual and Machined excavation ( Hard Soil / Gravel BMS )
Sp. No: 905
Hard soil/Gravel BMS

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Mannual Excavation ( 20% ) 0.20 Cum 1081.50 216.30 216.30
Machined Excavation ( 80% ) 0.80 Cum 57.48 45.98 45.98
Actual Cost 262.28
Rate per Cum 15% Contractors profit & OH 39.34
NRS 301.62 Total Rate 301.62

Earth work excavation for trenches including shoring, struting, bracing, sheeting and disposal disposal upto 10m and
Sp. No: 905 lift upto 1.5 m etc. all complete as per specification. ( For soft rocks)

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 3.00 M/D 700.00 2,100.00 2100.00
Tool & Plants 3% of Labour 63.00
Actual Cost 2163.00
Rate per Cum 15% Contractors profit & OH 324.45
NRS 2487.45 Total Rate 2487.45

Earthwork excavation for trenches with combination of Manual and Machined excavation ( Soft Rock )
Sp. No: 905
Soft Rock

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Mannual Excavation ( 20% ) 0.20 Cum 2163.00 432.60 432.60
Machined Excavation ( 80% ) 0.80 Cum 57.48 45.98 45.98
Actual Cost 478.58
Rate per Cum 15% Contractors profit & OH 71.79
NRS 550.37 Total Rate 550.37

Earth work excavation for trenches including shoring, struting, bracing, sheeting and disposal disposal upto 10m and
9.02.905.d ( I ) lift upto 1.5 m etc. all complete as per specification. ( For Hard Rock )

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 16.00 M/D 700.00 11,200.00 11200.00
Tool & Plants 3% of Labour 336.00
Actual Cost 11536.00
Rate per Cum 15% Contractors profit & OH 1730.40
NRS 13266.40 Total Rate 13266.40

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Earthwork excavation for trenches with combination of Manual and Machined excavation ( Soft Rock )
Sp. No: 905
Hard Rock

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Mannual Excavation ( 20% ) 0.20 Cum 11536.00 2,307.20 2307.20
Machined Excavation ( 80% ) 0.80 Cum 57.48 45.98 45.98
Actual Cost 2353.18
Rate per Cum 15% Contractors profit & OH 352.98
NRS 2706.16 Total Rate 2706.16

9.04.905.a Vertical lift of soil and gravel mixed soil above 1.5 m for every additional meter.

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 0.12 M/D 320.00 38.40 38.40
Tool & Plants 3% of Labour 1.15
Actual Cost 39.55
Rate per Cum 15% Contractors profit & OH 5.93
NRS 45.48 Total Rate 45.48

9.04.905.b Vertical lift of soil and rocky soil above 1.5 m for every additional meter.

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 0.15 M/D 320.00 48.00 48.00
Tool & Plants 3% of Labour 1.44
Actual Cost 49.44
Rate per Cum 15% Contractors profit & OH 7.42
NRS 56.86 Total Rate 56.86

Road way excavation including disposal upto 10m and lift upto 1.5 m etc. all complete as per specification.
9.01.905,a
Soft soil

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 0.75 M/D 320.00 240.00 240.00
Tool & Plants 3% of Labour 7.20
Actual Cost 247.20
Rate per Cum 15% Contractors profit & OH 37.08
NRS 284.28 Total Rate 284.28

Earthwork excavation for trenches with combination of Manual and Machined excavation ( All Type of Soil )
Sp. No: 905
All type of soil

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Soft Soil 25.76 Cum 224.51 57.83
Boulder Mixed Soil 3.68 Cum 262.28 9.65 9.65
Soft Rock 3.68 Cum 478.58 17.61 17.61
Hard Rock 3.68 Cum 2353.18 86.60 86.60

Actual Cost 113.86


Rate per Cum 15% Contractors profit & OH 17.08
NRS 130.94 Total Rate 130.94

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Backfilling in layers in foundation pits, trenches etc. including compaction, watering etc. complete lead 10m. And depth
Sp. No: 908 of foundation upto 1.5m.
Norms No: 9.10 ( a )
Unit-1Cum
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 1.14 M/D 700.00 798.00 798.00
Tools & Plants 3% of labour cost 23.94
Actual Cost 821.94
Rate per Cum 15% Contractors profit & OH 123.29
NRs 945.23 Total Rate 945.23

Providing & laying Dry-stone pitching in protection work, lead 30m, lift 1.5m With stone size not less than 0.01m3
New Norms including levelling etc. complete.
24.003.01
Unit-1 Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.60 M/d 980.00 588.00
Labour
b)Unskilled 2.00 M/d 700.00 1,400.00 1988.00
Material Stone 1.10 Cum 1516.40 1,668.04 1668.04
Tools & Plants 3% of labour cost 59.64
Actual Cost 3715.68
Rate per Cum 15% Contractors profit & OH 557.35
NRs 4273.03 Total Rate 4273.03

Providing and placing machine mixed cement concrete for the foundation and footing etc. in M15 including
Sp. No: 2000 compaction, curing, testing and lead 30m. etc. all complete as per specification and drawing.
Norms No: 20.01

Unit-1 Cum
Description Particular Quantity Unit Rate Amount Total
Skilled 0.50 M/D 980.00 490.00
Laour
Unskilled 3.50 M/D 700.00 2,450.00 2940.00
Cement 0.26 mt 15494.13 4,028.47
Aggregate 20-40mm 0.53 Cum 2740.12 1,452.27
Aggregate 10 -20mm 0.24 Cum 2740.12 657.63
Aggregate 10 & down 0.11 Cum 2740.12 301.41
Material
Sand 0.46 Cum 2788.31 1,282.62
Petrol 0.10 Lit 122.01 12.20
Diesel 3.00 Lit 96.35 289.05
Water 156.00 Lit 0.16 24.96 8048.61
Mixer (0.28/ 0.20 m3 ) 0.60 hr 1000.00 600.00
Equipment
Vibrator 0.25 hr 75.00 18.75 618.75
Quality Control 2.5 % of total 290.18
Actual Cost 11897.55
Rate per Cum 15% Contractors profit & OH 1784.63
NRs 13682.18 Total Rate 13682.18

Sp. No: 2000 Providing and placing machine mixed cement concrete M20 for the foundation and footing etc. including compaction,
Norms No: 20.01 (ii) curing, testing and lead 30m. etc. all complete as per specification and drawing.

Unit-1 Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.50 M/D 980.00 490.00
Labour
b) Unskilled 3.50 M/D 700.00 2,450.00 2940.00
Cement 0.32 mt 15494.13 4,958.12
Aggregate 20-40mm 0.52 Cum 2740.12 1,424.86
Aggregate 10-20mm 0.22 Cum 2740.12 602.83
Aggregate 10mm & down 0.12 Cum 2740.12 328.81
Material
Coarse sand 0.45 Cum 2788.31 1,254.74
Petrol 0.10 Lit 122.01 12.20
Diesel 3.00 Lit 96.35 289.05
Water 192.00 Lit 0.16 30.72 8901.33
Mixture 0.60 hr 1000.00 600.00
Equipment
Vibrator 0.25 hr 75.00 18.75 618.75
Quality Control 2.5% of total 311.50
Actual Cost 12771.59

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Rate per Cum 15% Contractors profit & OH 1915.74


NRs 14687.32 Total Rate 14687.32

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Providing and placing machine mixed cement concrete , M20 for the abutment, pier, wall etc. including compaction,
Sp. No: 2000 curing, testing and lead 30m. etc. all complete as per specification and drawing.
Norms No: 20.02(ii)

Unit-1 Cum
Description Particular Quantity Unit Rate Amount Total
a) Skilled 0.90 M/D 980.00 882.00
Labour
b) Unskilled 9.00 M/D 700.00 6,300.00 7182.00
Cement 0.33 mt 15494.13 5,113.06
Aggregate 10-20mm 0.58 Cum 2740.12 1,589.27
Aggregate 10mm & down 0.30 Cum 2740.12 822.04
Material Coarse sand 0.44 Cum 2788.31 1,226.86
Petrol 0.10 Lit 122.01 12.20
Diesel 3.00 Lit 96.35 289.05
Water 198.00 Lit 0.16 31.68 9084.15
Mixture 0.60 hr 1000.00 600.00
Equipment
Vibrator 0.25 hr 75.00 18.75 618.75
Quality Control 2.5% of total 422.12
Actual Cost 17307.03
Rate per Cum 15% Contractors profit & OH 2596.05
NRs 19903.08 Total Rate 19903.08

Providing and placing machine mixed cement concrete, M25 for the super structure, deckslab, girder etc. including
Sp. No: 2000 compaction, curing, testing and lead 30m. etc. all complete as per specification and drawing.
Norms No: 20.03(ii)

Unit-1 Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.90 M/D 980.00 882.00
Labour
b) Unskilled 9.00 M/D 700.00 6,300.00 7182.00
Cement 0.375 mt 15494.13 5,810.30
Aggregate 20-40mm 0.58 Cum 2940.12 1,705.27
Aggregate 10-20mm 0.30 Cum 2940.12 882.04
Material Coarse sand 0.45 Cum 2788.31 1,254.74
Petrol 0.10 Lit 122.01 12.20
Diesel 3.20 Lit 96.35 308.32
Water 225.00 Lit 0.16 36.00 10008.86
Mixture 0.60 hr 1000.00 600.00
Equipment
Vibrator 0.25 hr 75.00 18.75 618.75
Quality Control 2.5% of total 445.24
Actual Cost 18254.85
Rate per Cum 15% Contractors profit & OH 2738.23
NRs 20993.08 Total Rate 20993.08

Providing , Preparing and Installing form work including necessary supports and removing after completion for Slab &
Sp. No: 1804,1805 Beam Structures.(Scrap value neglected)
18.04 ( a )
( Assuming the timber shall be used 6 times )

Unit-10 Sqm
Description Particular Quantity Unit Rate Amount Total
a)Skilled 1.80 M/D 980.00 1,764.00
Labour
b) Unskilled 2.50 M/D 700.00 1,750.00 3514.00
Planks 38mm thick. 0.09 Cum 28224.00 2,540.16
Materials
Nails,spikes,etc. 2.50 Kg 97.99 244.96 2785.12
Actual Cost 6299.12
Rate per Sqm 15% Contractors OH 944.87
NRs 724.40 Total Rate 7243.99

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Providing and laying Reinforcement including cutting, bending, binding, fixing in position and lead 30m. etc. all
Sp. No: 2000 complete as per specification and drawing.
20.07 ( ii )

Unit- 1Mt
Description Particular Quantity Unit Rate Amount Total
a)Skilled 12.00 M/D 980.00 11,760.00
Labour
b) Unskilled 12.00 M/D 700.00 8,400.00 20160.00
Reinforcement 1.05 Mt 78254.13 82,166.83
Materials
Binding Wire 10.00 Kg 88.51 885.14 83051.98
Actual Cost 103211.98
NRs Rate per Mt 15% Contractors OH 15481.80
118693.77 Total Rate 118693.77

Providing and laying Random rubble stone masonry in cement mortar including scaffolding, curing, preparation of
mortar etc. complete, masoned height 0-5m, lead 30m (Using Concrete mixer) mortar 35% (cement :sand) 1:4
Sp. No: including cement pointing in 1:2 cement sand mortar with 100 dia HDPE pipe for weep hole at interval of 1m both
2602,2603,2607 horizontal and vertical direction.
26.03

Unit-1 Cum
Description Particular Quantity Unit Rate Amount Total
RRM
a)Skilled 1.5 M/d 980.00 1470
b)Unskilled 3.50 M/d 700.00 2,450.00
Labour
Pointing
a)Skilled 0.12075 M/d 980.00 118.335
b)Unskilled 0.14 M/d 700.00 96.60 4134.94
Stone 1.15 Cum 1516.40 1,743.86
Cement 0.155 Mt 15494.13 2,401.59
Cement for pointing 0.002 Mt 15494.13 26.73
Sand 0.45 Cum 2788.31 1,254.74
Material Sand for pointing 0.0038 Cum 2788.31 10.58
water 100.00 litre 0.16 16.00
Water for pointing 0.58 litre 0.16 0.09
Diesel 1.00 litre 96.35 96.35
100mm Dia HDPE Pipe 1.30 Rm 278.48 362.02 5911.96
Equipment Concrete Mixture 0.15 hr 1000.00 150.00 150.00
Quality control 1.5% of total 152.95
Actual Cost 10349.85
Rate per Cum 15% Contractors profit & OH 1552.48
NRs 11902.33 Total Rate 11902.33

Providing, Mixing and Pointing cement mortar over masonry works including scaffolding etc. complete as per
Sp. No: specification lead 30m
2602,2603,2610 (3)
26.07 ( Cement : sand ) 1:3

Unit- 100 Sqm


Description Particular Quantity Unit Rate Amount Total
a)Skilled 9.50 M/d 980.00 9,310.00
Labour
b)Unskilled 9.50 M/d 700.00 6,650.00 15960.00
Cement 0.15 Mt 15494.13 2,324.12
Material Sand 0.33 Cum 2788.31 920.14
water 50.00 litre 0.16 8.00 3252.26
Equipment Concrete Mixture 0.75 hr 1000.00 750.00 750.00
Quality control 1.5% of total 299.43
Actual Cost 20261.70
Rate per Sqm 15% Contractors profit & OH 3039.25
NRs 233.01 Total Rate 23300.95

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Back filling with graded filter materials in layer behind abutment with necessary watering and compaction, lead 30m, lift
Sp. No: 2404,3110 1.5m
24.11

Unit-1 Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.00 M/d 0.00 -
Labour
b)Unskilled 0.80 M/d 700.00 560.00 560.00
Material Graded filter material 1.10 Cum 2340.12 2,574.14 2574.14
Tools & Plants 3% of labour cost 16.80
Actual Cost 3150.94
Rate per Cum 15% Contractors profit & OH 472.64
NRs 3623.58 Total Rate 3623.58

Sp. No: 701 Providing and laying RCC pipes with or without collars, jointed with stiff mixture of cement mortar in the proportion of
Norms No: 17-1 Ga 1:2 ( 1 cement : 2 fine sand ), lead upto 100m.
( old )
i) 300mm dia ( Int ) RCC Hume Pipe
Unit- 32Rm
Description Particular Quantity Unit Rate Amount Total
Skilled 0.600 M/D 980.00 588.00
Laour
Unskilled 22.000 M/D 700.00 15,400.00 15988.00
RCC Hume Pipe ( 300 dia ) 32.00 Rm 2564.00 82,048.00
Cement 0.0830 Mt 15494.13 1,286.01
Material
Sand 0.1300 Cum 2788.31 362.48
Jute 3.630 Kg 90.99 330.28 84026.77
Tools & Plants 3 % of total 3000.44
Actual Cost 103015.21
Rate per Rm 15% Contractors profit & OH 15452.28
NRs 3702.11 Total Rate 118467.50

Providing and laying RCC pipes with or without collars, jointed with stiff mixture of cement mortar in the proportion of
Sp. No: 701 1:2 ( 1 cement : 2 fine sand ), lead upto 100m.
7.02 ( i )
ii) 450mm dia ( Int ) RCC Hume Pipe
Unit- 32 Rm
Description Particular Quantity Unit Rate Amount Total
Skilled 7.000 M/D 980.00 6,860.00
Laour
Unskilled 26.000 M/D 700.00 18,200.00 25060.00
RCC Hume Pipe ( 450 dia ) 32.00 Rm 529.97 16,958.96
Cement 0.1130 Mt 15494.13 1,750.84
Material
Sand 0.1750 Cum 2788.31 487.95
Jute 4.515 Kg 90.99 410.80 19608.55
Tools & Plants 3 % of total 1340.06
Actual Cost 46008.61
Rate per Rm 15% Contractors profit & OH 6901.29
NRs 1653.43 Total Rate 52909.90

Providing and laying RCC pipes with or without collars, jointed with stiff mixture of cement mortar in the proportion of
Sp. No: 701 1:2 ( 1 cement : 2 fine sand ), lead upto 100m.
7.02 ( i )
iii) 600mm dia ( Int ) RCC Hume Pipe
Unit-Rm
Description Particular Quantity Unit Rate Amount Total
Skilled 0.281 M/D 980.00 275.38
Laour
Unskilled 1.094 M/D 700.00 765.80 1041.18
RCC Hume Pipe ( 600 dia ) 1.00 Rm 5472.58 5,472.58
Cement 0.0068 Mt 15494.13 105.56
Material
Sand 0.0090 Cum 2788.31 25.09
Jute 0.219 Kg 90.99 19.93 5623.16
Tools & Plants 3 % of total 199.93
Actual Cost 6864.27
Rate per Rm 15% Contractors profit & OH 1029.64
NRs 7893.91 Total Rate 7893.91

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Providing and laying RCC pipes with or without collars, jointed with stiff mixture of cement mortar in the proportion of
Sp. No: 701 1:2 ( 1 cement : 2 fine sand ), lead upto 100m.
7.02 ( iii )
iv) 900mm dia ( Int ) RCC Hume Pipe
Unit-Rm
Description Particular Quantity Unit Rate Amount Total
Skilled 0.344 M/D 980.00 337.12
Laour
Unskilled 1.562 M/D 700.00 1,093.40 1430.52
RCC Hume Pipe ( 900 dia ) 1.000 Rm 9331.94 9,331.94
Cement 0.0091 Mt 15494.13 140.41
Material
Sand 0.013 Cum 2788.31 36.25
Jute 0.375 Kg 90.99 34.12 9542.71
Tools & Plants 3 % of total 329.20
Actual Cost 11302.43
Rate per Rm 15% Contractors profit & OH 1695.36
NRs 12997.79 Total Rate 12997.79

Providing and laying two layers of Tarfelt


Old Norms
18 ( 12 ) Kha Unit-10 Sqm
Description Particular Quantity Unit Rate Amount Total
Skilled 2.300 M/D 980.00 2,254.00
Laour
Unskilled 4.600 M/D 700.00 3,220.00 5474.00
Tarfelt 22.000 Sqm 107.53 2,365.66
Bitumin 25.000 Kg 91.22 2,280.39
Material
Sand 0.310 Cum 2788.31 864.38
Wood 80.000 Kg 9.00 720.00 6230.43
Actual Cost 11704.43
Rate per Sqm 15% Contractors profit & OH 1755.66
NRs 1346.01 Total Rate 13460.09

Sp. No: 701


Fabrication of Gabion boxes/mattresses with diapharagms including rolling, cutting and weaving, assembling it,
placing in position including stretching, forming compartments, tying the side and diaphargms with binding wire in each
mesh, filling gabion box with stone including dressing, beding, bonding and all transportation as per specification.
24.01.02,a, 24.02.01.a

(3 x 1 x 1) box size

Unit- Box
Description Particular Quantity Unit Rate Amount Total
i) Gabion Box Weaving
Skilled 0.50 M/D 980.00 490.00
Unskilled 0.22 M/D 700.00 154.00
ii)Plancing in position and
tightening&
Labour Unskilled 1.04 M/D 700.00 728.00

iii) Filling stone in gabion box


Skilled 0.75 M/D 980.00 735.00
Unskilled 2.25 M/D 700.00 1,575.00 3682.00
GI wire ( 10 SWG ) 35.01 Kg 86.75 3,037.26
Selvedge wire 4.51 Kg 86.75 391.26
Material
Binding Wire (12 SWG) 1.81 Kg 86.75 157.02
Boulder / stone 3.30 Cum 1516.40 5,004.13 8589.67
Actual Cost 12271.67
Rate per Cum 15% Contractors OH 1840.75
NRs 4704.14 Total Rate 14112.42

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Fabrication of Gabion boxes/mattresses with diapharagms including rolling, cutting and weaving, assembling it,
Sp. No: 701
placing in position including stretching, forming compartments, tying the side and diaphargms with binding wire in each
mesh, filling gabion box with stone including dressing, beding, bonding and all transportation as per specification.
24.01.02,a, 24.02.01.a

(3 x 1 x 1) box size

Unit- Box
Description Particular Quantity Unit Rate Amount Total
i)Plancing in position and
tightening&
Unskilled 1.04 M/D 700.00 728.00
ii) Filling stone in gabion box
Skilled 0.75 M/D 980.00 735.00
Unskilled 2.25 M/D 700.00 1,575.00 3038.00
gabion box 1.00 no 3229.43 3,229.43
Material Binding Wire (12 SWG) 1.81 Kg 86.75 157.02
Boulder / stone 3.30 Cum 1516.40 5,004.13 8390.58
Actual Cost 11428.58
Rate per Cum 15% Contractors OH 1714.29
NRs 4380.96 Total Rate 13142.87

Fabrication of Gabion boxes/mattresses with diapharagms including rolling, cutting and weaving, assembling it,
Sp. No: 701 placing in position including stretching, forming compartments, tying the side and diaphargms with binding wire in each
mesh, filling gabion box with stone including dressing, beding, bonding and all transportation as per specification.
24.01,02,b, 24.02,01.a

(2 x 1 x 1) box size

Unit- Box
Description Particular Quantity Unit Rate Amount Total
i) Gabion Box Weaving
Skilled 0.34 M/D 980.00 333.20
Unskilled 0.15 M/D 700.00 105.00
ii)Plancing in position and
Labour tightening&
Unskilled 0.75 M/D 700.00 525.00
iii) Filling stone in gabion box
Skilled 0.50 M/D 980.00 490.00
Unskilled 1.50 M/D 700.00 1,050.00 2503.20
GI wire ( 10 SWG ) 24.15 Kg 86.75 2,095.11
selvedge wire 3.41 Kg 86.75 295.83
Materials
Binding Wire (12 SWG) 1.30 Kg 86.75 112.78
Boulder / stone 2.20 Cum 1516.40 3,336.08 5839.81
Actual Cost 8343.01
Rate per Cum 15% Contractors OH 1251.45
NRs 4797.23 Total Rate 9594.46

Fabrication of Gabion boxes/mattresses with diapharagms including rolling, cutting and weaving, assembling it,
Sp. No: 701 placing in position including stretching, forming compartments, tying the side and diaphargms with binding wire in each
mesh, filling gabion box with stone including dressing, beding, bonding and all transportation as per specification.
24.01,02,b, 24.02,01.a

(2 x 1 x 1) box size

Unit- Box
Description Particular Quantity Unit Rate Amount Total
i)Plancing in position and
tightening&
Unskilled 0.75 M/D 700.00 525.00
Labour
ii) Filling stone in gabion box
Skilled 0.50 M/D 980.00 490.00
Unskilled 1.50 M/D 700.00 1,050.00 2065.00
Supply Gabion Box 1.00 box 2265.60 2,265.60
Material Binding Wire (12 SWG) 1.30 Kg 86.75 112.78
Boulder / stone 2.20 Cum 1516.40 3,336.08 5714.47
Actual Cost 7779.47
Rate per Cum 15% Contractors OH 1166.92
NRs 4473.19 Total Rate 8946.39

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Fabrication of Gabion boxes/mattresses with diapharagms including rolling, cutting and weaving, assembling it,
Sp. No: 701 placing in position including stretching, forming compartments, tying the side and diaphargms with binding wire in each
mesh, filling gabion box with stone including dressing, beding, bonding and all transportation as per specification.
24.01,02,c, 24.02,01.a

(1.5 x 1 x 1) box size


Unit- Box
Description Particular Quantity Unit Rate Amount Total
i) Gabion Box Weaving
Skilled 0.28 M/D 980.00 274.40
Unskilled 0.12 M/D 700.00 84.00
ii)Plancing in position and
Labour tightening&
Unskilled 0.68 M/D 700.00 476.00
iii) filling stone in gabion box
Skilled 0.38 M/D 980.00 367.50
Unskilled 1.13 M/D 700.00 787.50 1989.40
GI wire ( 10 SWG ) 19.75 Kg 86.75 1,713.39
selvedge wire 3.11 Kg 86.75 269.81
Materials
Binding Wire (12 SWG) 0.68 Kg 86.75 58.99
Boulder / stone 1.65 Cum 1516.40 2,502.06 4544.25
Actual Cost 6533.65
Rate per Cum 15% Contractors OH 980.05
NRs 5009.14 Total Rate 7513.70

Fabrication of Gabion boxes/mattresses with diapharagms including rolling, cutting and weaving, assembling it,
Sp. No: 701 placing in position including stretching, forming compartments, tying the side and diaphargms with binding wire in each
mesh, filling gabion box with stone including dressing, beding, bonding and all transportation as per specification.
24.01,02,c, 24.02,01.a

(1.5 x 1 x 1) box size


Unit- Box
Description Particular Quantity Unit Rate Amount Total
i)Plancing in position and
tightening&
Unskilled 0.68 M/D 700.00 476.00
ii) filling stone in gabion box
Skilled 0.38 M/D 980.00 367.50
Unskilled 1.13 M/D 700.00 787.50 1631.00
Gabion Box 1.00 no 1672.67 1,672.67
Materials Binding Wire (12 SWG) 0.68 Kg 86.75 58.99
Boulder / stone 1.65 Cum 1516.40 2,502.06 4233.73
Actual Cost 5864.73
Rate per Cum 15% Contractors OH 879.71
NRs 4496.29 Total Rate 6744.44

Sp. No: Providing and laying of High Density Polethene Pipe 110mm ( 4 Kg / cm2 )

Unit- Rm
Description Particular Quantity Unit Rate Amount Total
Skilled labour - M/d - -
Labour
Unskilled 0.000 M/d - 0.00
Marerial HDPe Pipe 1.00 Rm 380.99 380.99 380.99
Actual Cost 380.99
Rate per Sqm 15% Contractors profit & OH 57.15
NRs 438.13 Total Rate 438.13

Sp. No: 2404,3110 Providing , laying and fixing of Geotextile ( filter fabrics )
24.09
Unit- Sqm
Description Particular Quantity Unit Rate Amount Total
Skilled labour - M/d - -
Labour
Unskilled 0.017 M/d 700.00 11.90 11.90
Marerial Geotextile 1.20 Sqm 88.99 106.78 106.78
Actual Cost 118.68
Rate per Sqm 15% Contractors profit & OH 17.80
NRs 136.49 Total Rate 136.49

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Old Norms
Providing and painting of two coats of enamel painting with one coat primer
5-ka,kha,Ga
Unit- 100 Sqm
Description Particular Quantity Unit Rate Amount Total
Skilled labour 12.00 M/d 980.00 11,760.00
Labour
Unskilled 8.00 M/d 700.00 5,600.00 17360.00
Primer 8.00 Lit 302.99 2,423.89
Marerial
Enamel paint 16.00 Lit 513.99 8,223.77 10647.66
Actual Cost 28007.66
Rate per Sqm 15% Contractors profit & OH 4201.15
NRs 322.09 Total Rate 32208.81

Supplying and erecting traffic sign in place including 50mm dia. Steel tube, 2mm. thick steel plate, cement concrete,
painting, writing and supporting steel angle nut and bolt etc. complete.
Sp. No: 1501
15.01
a) 60cm. Dia. Circular, 60cm. equilateral traingle and 60cm.x 45cm. rectangular shaped sign (single post).
Unit- 1 no.
Description Particular Quantity Unit Rate Amount Total
Skilled labour 0.033 M/d 980.00 32.34
Labour
Unskilled 0.088 M/d 700.00 61.60 93.94
Enamel paint 0.10 lit 513.99 51.40
M15/20 PCC 0.03 m3 11897.55 356.93
Marerial Steel plate 0.25 m2 3885.75 971.44
Formwork 0.36 m2 629.91 226.77
Steel tube 2.50 m 575.00 1,437.50 3044.03
Actual Cost 3137.97
Rate per no. 15% Contractors profit & OH 470.70
NRs 3608.67 Total Rate 3608.67

Sp. No: 1501 Supplying and erecting traffic sign in place including 50mm dia. Steel tube, 2mm. thick steel plate, cement concrete,
15.01 painting, writing and supporting steel angle nut and bolt etc. complete.
b) 1.2m.x 0.75m. Size bigger traffic sign with back support and two or more post.
Unit- 1 no.
Description Particular Quantity Unit Rate Amount Total
Skilled labour 0.085 M/d 980.00 83.30
Labour
Unskilled 0.30 M/d 700.00 210.00 293.30
Enamel paint 0.40 lit 513.99 205.59
M15/20 PCC 0.12 m3 11897.55 1,427.71
Marerial Steel plate 1.00 m2 3885.75 3,885.75
Formwork 1.00 m2 629.91 629.91
Steel tube 5.00 m 575.00 2,875.00 9023.96
Actual Cost 9317.26
Rate per no. 15% Contractors profit & OH 1397.59
NRs 10714.85 Total Rate 10714.85

Supplying and applying paint for Road marking including cleaning, watering, brooming etc. all complete ( 10cm wide
Sp. No: 1502 strip ).
15.02
b) More than two coats over new bitumin surface.
Unit- Rm
Description Particular Quantity Unit Rate Amount Total
Skilled labour 0.005 M/d 980.00 4.90
Labour
Unskilled 0.007 M/d 700.00 4.90 9.80
Marerial Road marking paint 0.070 lit 582.99 40.81 40.81
Actual Cost 50.61
Rate per Rm. 15% Contractors profit & OH 7.59
NRs 58.20 Total Rate 58.20

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Supplying and placing R.C.C. kilometer post including excavation, back filling, painting and writing etc. all complete as
Sp. No: 1503
per specification.
15.03
a) Standard kilometer post (placed at each km.)
Unit- 1 no.
Description Particular Quantity Unit Rate Amount Total
Skilled labour 0.03 M/d 980.00 29.40
Labour
Unskilled 0.116 M/d 700.00 81.20 110.60
M20/20 RCC 0.06 m3 12771.59 766.30
M15/20 PCC 0.09 m3 11897.55 1,070.78
Marerial Formwork 0.50 m2 629.91 314.96
Enamel paint 0.12 lit 513.99 61.68
Reinforcement Bar 7.50 kg 103.21 774.09 2987.80
Actual Cost 3098.40
Rate per no. 15% Contractors profit & OH 464.76
NRs 3563.16 Total Rate 3563.16

Supplying and placing R.C.C. kilometer post including excavation, back filling, painting and writing etc. all complete as
Sp. No: 1503 per specification.
15.03
b) Bigger kilometer post (placed at each 5 km.)
Unit- 1 no.
Description Particular Quantity Unit Rate Amount Total
Skilled labour 0.08 M/d 980.00 78.40
Labour
Unskilled 0.30 M/d 700.00 210.00 288.40
M20/20 RCC 0.17 m3 12771.59 2,171.17
M15/20 PCC 0.23 m3 11897.55 2,736.44
Marerial Formwork 1.30 m2 629.91 818.89
Enamel paint 0.40 lit 513.99 205.59
Reinforcement Bar 8.60 kg 103.21 887.62 6819.71
Actual Cost 7108.11
Rate per no. 15% Contractors profit & OH 1066.22
NRs 8174.32 Total Rate 8174.32

Supplying and fixing in place R.C.C. delineator and guard post including excavation, back filling, painting and erection
Sp. No: 1504 etc. all complete as per drawing.
15.03

Unit- 1 no.
Description Particular Quantity Unit Rate Amount Total
Skilled labour 0.021 M/d 980.00 20.58
Labour
Unskilled 0.055 M/d 700.00 38.50 59.08
M20/20 RCC 0.03 m3 12771.59 383.15
Formwork 0.54 m2 629.91 340.15
Marerial
Enamel paint 0.18 lit 513.99 92.52
Reinforcement Bar 2.82 Kg 103.21 291.06 1106.88
Actual Cost 1165.96
Rate per no. 15% Contractors profit & OH 174.89
NRs 1340.85 Total Rate 1340.85

Providing and planting grass slips on the 45deg - 60deg slope including preparation of slips operation dingging
Sp. No: 2807 planting a max of 5 cm depth with metal rod or hard - wood peg, depending on the soil. The planting drills should be
10cm apart.
28.08.06

Unit- Sqm
Description Particular Quantity Unit Rate Amount Total
Skilled labour 0.000 M/d 980.00 -
Labour
Unskilled 0.300 M/d 700.00 210.00 210.00
Grass slips 100.00 No 0.25 25.00
Marerial Hessian Jute 0.27 m2 50.00 13.50
Wooden Peg 9.00 No 0.25 2.25 40.75
Equipment Khukuri 3% of Labour cost 6.30
Actual Cost 257.05
Rate per Sqm 15% Contractors profit & OH 38.56
NRs 295.61 Total Rate 295.61

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Providing and planting containerised tree and shrub seedling, including pitting, transplanting, composing and
Sp. No: 2807 mulching, on slopes > 40deg. Pit size 10cm diameter x 30cm depth. Mix compost with soil and back fill into pit to 1/4
of pit volume.
28.09.03

Unit- 10 No
Description Particular Quantity Unit Rate Amount Total
Skilled labour 0.000 M/d 980.00 -
Labour
Unskilled 0.400 M/d 700.00 280.00 280.00
Seedling 10.00 No 7.00 70.00
Marerial Compost 0.05 Cum 1000.00 50.00
Green mulch 0.04 Cum 200.00 8.00 128.00
Equipment Khanti , Doko 3% of Labour cost 8.40
Actual Cost 416.40
Rate per no. 15% Contractors profit & OH 62.46
NRs 47.89 Total Rate 478.86

Providing and planting rooted tree stump cutting bare root seedling, including pitting, transplanting, composing and
Sp. No: 2807 mulching, on slopes > 45deg. Pit size 10cm diameter x 20cm depth. Compost volume 1/4 of volume of the pit mix
with original soil.
28.09.06

Unit- 10 No
Description Particular Quantity Unit Rate Amount Total
Skilled labour 0.000 M/d 980.00 -
Labour
Unskilled 0.330 M/d 700.00 231.00 231.00
Seedling 10.00 No 12.00 120.00
Marerial Compost 0.03 Cum 1000.00 30.00
Green mulch 0.04 Cum 200.00 8.00 158.00
Equipment Khanti , Doko 3% of Labour cost 6.93
Actual Cost 395.93
Rate per no. 15% Contractors profit & OH 59.39
NRs 45.53 Total Rate 455.32

Sp. No: 2807 Broadcasting grass seeds on slopes <40 degree seeding rate 25 gm per m2
28.07.01

Unit-100 Sqm
Description Particular Quantity Unit Rate Amount Total

Labour a)Skilled 0 M/d 0.00 0


b)Unskilled 0.17 M/d 330.00 56.10 56.10
Material Seed 2.50 kg. 549.85 1,374.63 1374.63
1430.73
Equipment 0 0.00 0.00 1.68
Actual Cost 1432.41
Rate per Sqm 15% Contractors profit & OH 214.86
NRs 16.47 Total Rate 1647.27

Planting single node culm cutting of grass (eg napier) on fill slopes <45 degree. Approx. length 15-20cm, including
Sp. No: 2807 digging planting hole 10-20cm depth using a metal rod or hardwood peg.
28.08.01

Unit-100No.
Description Particular Quantity Unit Rate Amount Total

Labour a)Skilled 0 M/d 0.00 0


b)Unskilled 0.20 M/d 330.00 66.00 66.00
Material Grass cutting 100.00 No. 1.32 132.00 132.00
Hessian Jute 0.27 m2 162.00 43.74 43.74
175.74
Equipment 0 1.98
Actual Cost 243.72
Rate per No. 15% Contractors profit & OH 36.56
NRs 2.80 Total Rate 280.28

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Sp. No: 28.14 Grass sodding works including sod cutting, transporting, placing in position and water sprinkling ( Lead upto 10m)
28.14.01

Unit-Sqm
Description Particular Quantity Unit Rate Amount Total

Labour a)Skilled 0 M/d 0.00 0 16.50


b)Unskilled 0.05 M/d 330.00 16.50
Equipment 0 (Kodalo, Shovel)) 0.50
Actual Cost 17.00
Rate per Sqm 15% Contractors profit & OH 2.55
NRs 19.54 Total Rate 19.54

Excavation and disposal of slides manually haulage distance upto 50m


Sp. No: 905
Norms No: 9.11 ( b )

Unit-Cum
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 0.80 M/D 700.00 560.00 560.00
Tools 3% of Labour 16.80
Actual Cost 576.80
Rate for Sqm 15% Contractors profit & OH 86.52
NRs 663.32 Total Rate 663.32

Sp. No: 905 Excavationa and disposal of slides by excavator ( PC - 200 )

Unit-Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.0 M/D -
Labour b) Unskilled 0.00469 M/D 700.00 3.28 3.28
c) Operator 0.0 M/D -
Material Diesel 0.1500 Lit 96.35 14.45 14.45
Lubricant ( 1% of Fuel ) 0.14
Equipment Hydraulic excavator 0.0220 Hr 1,800.00 39.60 39.60
Actual Cost 57.48
Rate per Cum 15% Contractors profit & OH 8.62
NRs 66.10 Total Rate 66.10

Excavation and disposal of slides with combination of Manual and Machined excavation
Sp. No: 905
All type of soil

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Mannual ( 20% ) 0.20 Cum 663.32 132.66 132.66
Machined ( 80 % ) 0.80 Cum 66.10 52.88 52.88
Actual Cost 185.54
Rate per Cum 15% Contractors profit & OH 27.83
NRS 213.37 Total Rate 213.37

Disposal of excavated earth of all type of material including loading by machine and haulage as per instruction of
Sp. No: 905 Engineer
All type of soil

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
As per attached transportation
sheet 1.00 Cum 101.47 101.47 101.47
Actual Cost 101.47
Rate per Cum 15% Contractors profit & OH 15.22
NRS 116.69 Total Rate 116.69

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Sp. No: 1502 Shifting of existing and re-erection of electrical pole (stress/pre-stress RCC pole) including transportation excavation,
Norms No: 15.02 back filing, compaction

Unit- 5 Poles
Description Particular Quantity Unit Rate Amount Total
Skilled labour 6.000 M/d 980.00 5,880.00
Labour
Unskilled 30.000 M/d 700.00 21,000.00 26880.00
Tools 3% of labour cost 806.40
Actual Cost 27686.40
Rate per Pole 15% Contractors profit & OH 4152.96
NRs 6367.87 Total Rate 31839.36

Sp. No: 1502 Shifting of existing and re-erection of telephone pole (stress/pre-stress RCC pole) including transportation excavation,
Norms No: 15.02 back filing, compaction

Unit- 5 Poles
Description Particular Quantity Unit Rate Amount Total
Skilled labour 3.000 M/d 980.00 2,940.00
Labour
Unskilled 20.000 M/d 700.00 14,000.00 16940.00
Tools 3% of labour cost 508.20
Actual Cost 17448.20
Rate per Pole 15% Contractors profit & OH 2617.23
NRs 4013.09 Total Rate 20065.43

Sp. No: 202 Excavation of base in metalled road and removal of all materials including soling and screening, sorting out reusable
Norms No: 2.15 (a) materials and disposing unusable materials upto 20m lead.

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Skilled labour 0.010 M/d 980.00 9.80
Labour
Unskilled 0.890 M/d 700.00 623.00 632.80
Tools and Plants 3% of cost 18.98
Actual Cost 651.78
Rate per Cum 15% Contractors profit & OH 97.77
NRs 749.55 Total Rate 749.55

Sp. No: 202 Excavation of Subbase in metalled road and removal of all materials inluding soling and screening, sorting out
Norms No: 2.15 (a) reusable materials and disposing unusable materials upto 20m lead.

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Skilled labour 0.010 M/d 980.00 9.80
Labour
Unskilled 0.890 M/d 700.00 623.00 632.80
Tools and Plants 3% of cost 18.98
Actual Cost 651.78
Rate per Cum 15% Contractors profit & OH 97.77
NRs 749.55 Total Rate 749.55

Sp. No: 202 Excavation of Bitumenous materials in metalled road and removal of all materials including soling and screening,
Norms No: 2.15 (b) sorting out reusable materials and disposing unusable materials upto 20m lead.

Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Skilled labour 0.010 M/d 980.00 9.80
Labour
Unskilled 2.420 M/d 700.00 1,694.00 1703.80
Tools and Plants 3% of cost 51.11
Actual Cost 1754.91
Rate per Cum 15% Contractors profit & OH 263.24
NRs 2018.15 Total Rate 2018.15

202 Dismantling reinforced cement concrete work including stockpiling the reusable materials and disposal of unusable
Norms No: 2.08.03 materials to a location as directed by the Engineer within the work site.
Unit- Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.050 M/d 980.00 49.00
Labour
b)Unskilled 3.250 M/d 700.00 2,275.00 2324.00
Equipment 3% for Tools and Plants 69.72
Actual Cost 2393.72

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Rate per Cum 15% Contractors profit & OH 359.06


NRs 2752.78 Total Rate 2752.78

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

202 Dismantling Brick masonry work in cement motar masonry including stockpiling the reusable materials and disposal of
Norms No: 2.08.04 (iii) unusable materials to a location as directed by the Engineer within the work site
Unit- Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.100 M/d 980.00 98.00
Labour
b)Unskilled 1.900 M/d 700.00 1,330.00 1428.00
Equipment 3% for Tools and Plants 42.84
Actual Cost 1470.84
Rate per Cum 15% Contractors profit & OH 220.63
NRs 1691.47 Total Rate 1691.47

907 Excavation for foundation through all types of soil including relevant lift and disposal upto 20m (1.5-3m deep
Norms No: 9.07.01 (b) excavation)
Unit- Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.000 M/d 980.00 -
Labour
b)Unskilled 3.000 M/d 700.00 2,100.00 2100.00
Equipment 3% for Tools and Plants 63.00
Actual Cost 2163.00
Rate per Cum 15% Contractors profit & OH 324.45
NRs 2487.45 Total Rate 2487.45

Providing and laying M20/20 precast or cast in situ concrete in Kerbs ( 380 x200 x 250mm )with 12mm thick 1:3
cement sand mortar bedding and joint including foundation excavation levelling.
1401
Norms No: 1401 Unit- Rm
Description Particular Quantity Unit Rate Amount Total
a) Skilled 0.1 M/d 980.00 98.00
Labour
b) Unskilled 0.5 M/d 700.00 350.00 448.00
Materials M 20/20 concrete 0.0800 Cum 17,307.03 1,384.56 1,384.56
Rate per Rm Actual Cost 1,832.56
NRs 2107.44 = 15% Contractors OH 274.88
Total Rate 2,107.44

Providing and laying heavy duty with size of 60mm thick Interlocking Concrete block over 50mm thick stone dust
including compaction all complete.
Norms No: H 22 Unit- 10 Sqm
Description Particular Quantity Unit Rate Amount Total
a) Skilled 1 M/d 980.00 980.00
Labour
b) Unskilled 10 M/d 700.00 7,000.00 7,980.00
Interlocking Tile 11 Sqm - -
Materials
Stone dust 0.71 Cum 1,021.64 725.36 725.36
Rate per Sqm Actual Cost 8,705.36
NRs 1001.12 = 15% Contractors OH 1,305.80
Total Rate 10,011.16

202
Dismantling RCC Pipes ( excluding excavation and refilling )
Norms No: 2.17
a ) Upto 600mm dia
Unit- Rm
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.010 M/d 980.00 9.80
Labour
b)Unskilled 0.400 M/d 700.00 280.00 289.80
Equipment 3% for Tools and Plants 8.69
Actual Cost 298.49
Rate per Rm 15% Contractors profit & OH 44.77
NRs 343.27 Total Rate 343.27

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

202
Dismantling RCC Pipes ( excluding excavation and refilling )
Norms No: 2.17
b ) Above 600mm dia
Unit- Rm
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.010 M/d 980.00 9.80
Labour
b)Unskilled 0.800 M/d 700.00 560.00 569.80
Equipment 3% for Tools and Plants 17.09
Actual Cost 586.89
Rate per Rm 15% Contractors profit & OH 88.03
NRs 674.93 Total Rate 674.93

App Scarifying existing Bitumenous pavement, Subbase and base upto 20 cm depth and breaking down, removal of
Norms No: oversized particles

Unit- Sqm
Description Particular Quantity Unit Rate Amount Total
Material Diesel 0.054 l 96.35 5.24 5.24
Equipment Motor Grader 0.0034 hr 1200.00 4.08 4.08
Actual Cost 9.32
Rate per Sqm 15% Contractors profit & OH 1.40
NRs 10.72 Total Rate 10.72

App
Preparation of sub-grade for rehabilitation or other similar works (filling or cutting depth of 10 to 20 cm) in:
Norms No:
10.05 b)gravel & boulder mixed soil
Unit- Sqm
Description Particular Quantity Unit Rate Amount Total
Labour unskill 0.300 M/d 700.00 210.00 210.00
Equipment T & P 3% 6.30
Actual Cost 216.30
Rate per Sqm 15% Contractors profit & OH 32.45
NRs 248.75 Total Rate 248.75

Total Rate 259.46

Description of Item: Roadway excavation including disposal and relevant lift all complete as per specification all type of soil
Rate Analysis for Excavator PC 200

Q=QSTD*K*E(m3/hr)
Where,
Q=Estimated Production
Qstd= Estimated standard Production
K= Bucket Factor For PC-200 Qstd=107 cum/hr
E=Job Efficiency Correction Factor K*E (For soil type IV)= 0.41

Q= 107*0.41= 43.87 (cum/hr)

Swing Angle Range (0)=190


Convertion Factor of Backhoe, F=1.30

Cm= t1+t2+t3+t4
Where, Cm= Cycle time
t1= Excavating Time
t2= Swing Time (Loaded)
t3= Dumping Time
t4= Swing Time (Empty)
For rough estimation, Cm can be found as:
Cm=Cmstd X F(s) Cm= 27*1.6=43.20

Q= (q X 60 X 60 X K X E)/Cm
Q= (0.80 X 60 X 60 X 0.41)/43.2 = 27.33 cum/hr

T= 1/Q= 1/27.33 = 0.036(hr/cum)

Fuel Consumption ltr/hr for PC-200 Excavator= 12.00


Fuel consumption ltr/cum for PC-200 Excavator= 0.0833

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Description of Item: Excavation and disposal of slides including necessary lead in hard soil/BMS
Rate Analysis for Excavator PC 200

Q=QSTD*K*E(m3/hr)
Where,
Q=Estimated Production
Qstd= Estimated standard Production
K= Bucket Factor For PC-200 Qstd=107 cum/hr
E=Job Efficiency Correction Factor K*E (For soil type IV)= 0.41

Q= 107*0.41= 43.87 (cum/hr)

Swing Angle Range (0)=190


Convertion Factor of Backhoe, F=1.30

Cm= t1+t2+t3+t4
Where, Cm= Cycle time
t1= Excavating Time
t2= Swing Time (Loaded)
t3= Dumping Time
t4= Swing Time (Empty)
For rough estimation, Cm can be found as:
Cm=Cmstd X F(s) Cm= 19*1.3=24.70

Q= (q X 60 X 60 X K X E)/Cm
Q= (0.80 X 60 X 60 X 0.54)/24.7 = 45.64 cum/hr

T= 1/Q= 1/43.87 = 0.023(hr/cum)

Fuel Consumption ltr/hr for PC-200 Excavator= 12.00


Fuel consumption ltr/cum for PC-200 Excavator= 0.0833

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Quantity Estimate of Pipe Culvert (900 mm dia)


Assumptions:
Abutment Height = 2.42 m Catch pit wall height = 2.00 m
Pavement Thickness = 0.32 m Pipe length = 10.00 m
Diameter of Pipe = 0.90 m Thickness of Pipe = 0.100 m
Overall diameter = 1.100 m

Length Breadth Height


Description of Works Nos. Quantity Units
(m) (m) (m)
1. Earth Excavation
i) Head Wall 1 3.00 1.45 1.21 5.27
ii) Catch pit 1 4.10 4.10 2.00 33.62
iii) Pipe portion 1 7.35 1.38 1.96 19.80
iv) Stone soling portion
a) Catchpit 1 4.10 4.10 0.15 2.52
b) Below Head wall 1 3.00 1.45 0.15 0.65
c) Below Pipe Portion 1 7.89 1.38 0.15 1.63
v) PCC lining
a) Catchpit 1 4.10 4.10 0.10 1.68
b) Below Head wall 1 3.00 1.45 0.10 0.44
c) Below Pipe Portion 1 7.89 1.38 0.20 2.17
vi) Gabion Works U/S & D/S
a) U/S Protection 1 3.00 1.00 1.00 3.00
b) D/S Protection 1 3.00 2.00 1.00 6.00
1 3.00 1.00 1.00 3.00
79.78 Cum

2. Back Fill
i) Carriage way 1 8.22 1.38 2.21 24.99
Deduction for pipe -1 7.35 0.95 - 6.98
ii) Hill Side Wall 1 4.10 0.30 2.00 2.46
iii) Catchpit side walls 2 1.50 0.35 2.00 2.10
22.57 Cum

3. Stone Soling
i) Catchpit soling 1 4.10 4.10 0.15 2.52
ii) Below Head Wall 1 3.00 1.45 0.15 0.65
iii) Below Pipe Portion 1 7.89 1.38 0.15 1.63
4.80 Cum
4. Concrete Works (M15/20)
i) Catchpit 1 4.10 4.10 0.10 1.68
ii) Below Head Wall 1 3.00 1.45 0.10 0.44
iii) Below hume pipe 1 10.00 1.38 0.20 2.75
1 10.00 1.38 0.16 2.20
Deduction of Pipe Portion 1 10.00 0.09 - 0.85
6.22 Cum

5. Formwork
i) Below Head Wall 1 8.90 0.10 0.89
ii) At Catchpit 1 16.80 0.10 1.68
iii) for Bedding Concrete 2 10.00 0.36 7.20
9.77 Sqm

6. Stone Masonry Works (M7.5)


i) Head Wall 1 3.00 0.98 2.42 7.09
Deduction for pipe -1 0.66 0.95 - 0.63
ii) Inlet Wall 1 3.00 0.83 2.00 4.95
Deduction for pipe -1 0.60 0.95 - 0.57
iii) Hill side wall 1 3.00 0.83 2.00 4.95
iv) Side walls 2 1.50 0.83 2.00 4.95
20.74 Cum

7. Filter Material(Pervious) Behind behind


wall structures
i) Head Wall 1 3.00 0.20 2.42 1.45
Deduction for pipe -1 0.95 0.20 - 0.19
ii) Inlet Wall 1 3.00 0.20 2.00 1.20
Deduction for pipe -1 0.95 0.20 - 0.19
iii) Hill side wall 1 3.00 0.20 2.00 1.20
iv) Side walls 2 1.50 0.20 2.00 1.20
4.67 Cum

8. 900 mm dia RCC Hume Pipe (NP3) 1 8.50 8.50 Rm

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Length Breadth Height


Description of Works Nos. Quantity Units
(m) (m) (m)

9. Gabion Works
i) U/S Protection works 1 3.00 1.00 1.00 3.00
ii)D/S Protection 1 3.00 2.00 1.00 6.00
1 3.00 1.00 1.00 3.00
12.00 Cum

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Quantity Estimate of Slab Culvert


Assumptions:

Clear Depth (H) = 3.00 m


Span(S)= 6.00 m Bars dia
Road Width 10.00 m Unit weig
Total Width of Slab( Road Width + kerb Width)(W) 10.80 m Wing Wall
H1= 4.00 m D= 3 m
T= 0.40 m D1= 4 m ###
T1= 0.20 m E= 2.6 m
T2= 0.15 m F= 4.85 m
A= 0.77 m F1= 4.20 m
B= 3.04 m G= 1.39 m
L= 5.54 m ```

Bar Bending Schedule of kerb: Dia Bar Spacing No. L Total L


10 mm @ 100 c/c 56 1.74 97.44
10 mm 2 * 6nos 12 5.44 65.28
Bar Bending schedule of Abutment Seat Dia Bar Spacing No. L Total L
10 mm 2 * 9nos 18 10.80 194.4 Mark s1
10 mm @ 200 c/c 110 1.94 213.4 Mark s2
16 mm @ 250 c/c 177 0.6 106.2 Mark s3

Bar Bending schedule of Culvert(Excluding


Dia Bar Spacing No. L Total L
kerb and Abutment Seat):
20 mm @ 150 c/c 73 5.04 367.92 Mark a1
12 mm @ 200 c/c 39 11 429.00 Mark a2
10 mm @ 200 c/c 55 5.04 277.20 Mark a3
10 mm @ 200 c/c 39 11 429.00 Mark a4
12 mm 2 nos. 2 11 22.00 Mark a5

Length Breadth Height


SN Description of Works Nos. Quantity Units Remarks
(m) (m) (m)
1 Earthwork in Excavation
i) Abutment 2 10.80 3.24 4.45 311.43
ii) Wing Walls 4 4.85 2.20 2.59 110.18
iii) Aprons U/S and Down Steam 2 8.60 4.20 0.50 36.12 L=(2S+2E)/2, B=F1
iv) Middle Portion 1 10.80 6.00 0.50 32.40
v) Gabion Apron 1 11.00 3.00 0.25 8.25
498.38 Cum
2 PCC M15 in foundation
i) Abutment 2 10.80 3.24 0.45 31.49
ii) Wing Walls 4 4.85 2.20 0.45 19.16
iii) Aprons U/S and Down Steam 2 8.60 4.20 0.20 14.45 L=(2S+2E)/2, B=F1
iv) Middle Portion 1 10.80 6.00 0.20 12.96
78.06 Cum
3 Stone Soling
i) Aprons U/S and Down Steam 2 8.60 4.20 0.30 21.67 L=(2S+2E)/2, B=F1
ii) Middle Portion 1 10.80 6.00 0.30 19.44
41.11 Cum
4 Random Rubble Masonry Works in M5
i) Abutment 2 10.80 1.91 4.00 164.59
ii) Wing Walls 4 4.85 1.25 3.00 72.60
iii) U/S and D/S Cut Off 2 11.20 0.30 0.60 4.03
241.23 Cum
5 Concrete Work (M25/20)
i) Slab 1 7.14 10.80 0.40 30.84 L=S+2*(A-T1)
ii) kerb 2 7.14 area 0.15 m2 2.11
iii) Concrete Cap 2 10.80 area 0.20 m2 4.22
37.17 Cum
6 Reinforcement
i) Bar Bending Schedule of kerb:
Mark a6 56 1.74 @ 0.62kg/m 60.41
Mark a7 12 5.44 @ 0.62kg/m 40.47
ii) Bar Bending schedule of Abutment Seat:
18
Mark s1 10.80 @ 0.62kg/m 120.53
110
Mark s2 1.94 @ 0.62kg/m 132.31
177
Mark s3 0.60 @ 1.58kg/m 167.80
iii) Bar Bending schedule of Culvert(Excluding kerb and Abutment Seat):
Mark a1 73 5.04 @ 2.47kg/m 908.76
Mark a2 39 11.00 @ 0.89kg/m 381.81
Mark a3 55 5.04 @ 0.62kg/m 171.86
Mark a4 39 11.00 @ 0.62kg/m 265.98
Mark a5 2 11.00 @ 0.89kg/m 19.58

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Total Reinforcement Qty = 2,269.51 Kg


7 Formwork
i) Abutment Capping 2 10.80 1.10 23.76 P=(2*T+2*T2)*W
ii) Slab side faces 1 36.68 0.40 14.67 P=2*(S+2*A1)+2*W
iii) Slab bottom face 1 6.00 10.80 64.80
iv) Foundation Slab vertical faces 2 28.08 0.45 25.27
v) Wing wall foundation vertical faces 4 14.09 0.45 25.36
153.87 Sqm

8 Gabion Apron D/S Protection 1 11.00 3.00 0.50 16.50 Cum

9 Filter Material (Pervious Material)


i) Abutment 2 10.80 0.25 3.00 16.20 H=75%of total
ii) Wing wall 4 4.85 0.25 2.25 10.91
27.11 Cum
10 Back Filling
i) Abutment 2 10.80 2.27 4.00 196.13
ii) Wing walls 4 4.85 1.45 3.00 84.39
Deduct Filter material - 27.11
253.41 Cum
11 Tarfelt
i) Slab Base 2 10.80 0.57 12.31
12.31 Sqm

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Quantity Estimate of Causeway
Assumptions:
Span = 10.00 m
Slab Width = 7.00 m
Slab thickness = 0.20 m
Bed PCC thickness 0.075 m
Bed Stone Soling 0.15 m
Total Depth = 0.43 m
Main Bars = 12 dia @ 300 c/c
Distribution Bar 12 dia @ 300 c/c
Side Slope = 7.00% Longitudinal Beam Thickness 0.4 m
Longitudinal dowel bars = 12 dia @ 300 c/c Height of D/S Protection Work = 2m
Transverse dowel bars = 12 dia @ 300 c/c U/S Longitudinal Beam Height 1m
Stirrups 8 dia @ 300 c/c Longitudinal Beam Thickness 0.3 m
Length Breadth Height
Description of Works Nos. Quantity Units
(m) (m) (m)
1. Earthwork in Excavation
Middle portion 1 3.33 7.00 0.425 9.92 m³
Approaching portion 2 3.34 7.00 0.425 19.88 m³
U/S Cutoff CRRM 0 6.67 1.00 0.500 -
D/S ProtectionCRRM Wall 1 10.00 1.25 1.500 18.75
U/S Gabion Protection 1 6.67 3.00 0.500 10.00
D/S Gabion Protection 1 6.67 3.00 0.500 10.00
68.55 m³

2. 15cm thick stone soling


Causeway slab 1 10.02 7.00 0.15 10.52 m³

3. Bed PCC (M15/40)


Causeway slab 1 10.02 7.00 0.075 5.26 m³

4. Concrete Work (M25/20)


Causeway slab 1 10.02 7.00 0.20 14.02 m³
f 1 10.02 0.30 1.00 3.00 m³
Cut off Beam Longitudinal D/S 1 10.02 0.70 0.50 3.51 m³
Cutt off Beam Transverse 2 7.00 0.30 0.20 0.84 m³
21.37 m³

5. Reinforcement
a) Main bar T1(12mm Ф) (6 Panal) 73 3.70 @ 0.89kg/m 239.29 kg.
b) Distribution bar T2(12mm Ф) (6 Panal) 76 3.53 @ 0.89kg/m 238.99 kg.
c) U/S Longitudinal Beam Main Bar 6 3.53 @ 0.89kg/m 18.87 kg.
d) D/S Longitudinal Beam Main Bar 6 3.53 @ 0.89kg/m 18.87 kg.
e) U/SLongitudinal Beam Stirrup 36 2.48 @ 0.39kg/m 34.82 kg.
f) D/S Longitudinal Beam Stirrup 36 2.28 @ 0.39kg/m 32.01 kg.
g) Main Bar Transverse Beam 4 3.70 @ 0.89kg/m 13.17 kg.
h) Transverse Beam Stirrup 51 2.28 @ 0.39kg/m 45.35 kg.
i) Longitudinal joint (12mm Ф) 34 0.75 @ 0.89kg/m 22.92 kg.
j) Transverse joint(12mm Ф) 48 0.75 @ 0.89kg/m 32.04 kg.
Total Reinforcement Qty = 696.33 kg.

6. Formwork (2*L/3+2*B/2)*6 1 82.00 0.20 16.40 m²

7. Coursed random rubble masonry in M5 cement


sand mortar
Upstream cutoff wall 0 10.00 1.00 0.50 - m³
Downstream protection wall 1 10.00 0.85 2.00 17.00 m³
17.00 m³
8. Gabion apron
U/S Protection Works 1 6.67 3.00 0.50 10.00
2 3.00 1.00 0.50 3.00
D/S Protection Works 1 6.67 3.00 0.50 10.00
2 3.00 1.00 0.50 13.00
36.00 m³

9. Filter Material behind wall structure 1 10.00 0.25 1.75 4.37 m³

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

#REF!
#REF!
#REF!
#REF!
Quantity Estimate of Road Works

Total Length of Road 10035.00 m


Deduction (Existing Slab Culvert & Bridge) 0.00 m
Net length of Road way 10035.00 m
S.N. Description of Item No Length Breadth Height Quantity Remark
1 Sub Grade Preparation 1 10035.00 9.00 90315.00
Total 90315.00 Sq m

2 Gravel Sub Base Preparation(Carriageway) 1 10035.00 7.00 0.20 14049.00


Gravel Sub Base Preparation (Shoulder) #REF!
Total #REF! Cu m

3 Crushed Stone Base Preparation 1 10035.00 7.00 0.15 10536.75


Total 10536.75 Cu m

4 Prime Coat for Asphalt Concrete 1 10035.00 7.00 70245.00 1.2 lit/ m2
Total 84294.00 lit

5 Tack Coat for Asphalt Concrete 1 10035.00 7.00 70245.00 0.9 lit/ m2
Total 63220.50 lit

6 Asphalt Concrete 1 10035.00 7.00 0.04 2809.80


Total 2809.80 cum

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Quantity Estimate of Road Works

S.N. Description of Item No Length Breadth Height Quantity Remark


1 Sub Grade Preparation 1 10035.00 8.00 80280.00
Only 45% of
Extra widening on sharp curves 1 162.04 2.50 405.10 alignment
Total 36308.30 Sq m
2 Gravel Sub Base Preparation 1 10035.00 8.00 0.30 24084.00
Only 45% of
Extra widening on sharp curves 1 162.04 2.50 0.30 121.53 alignment
Total 10892.49 Cu m
3 Crushed Stone Base Preparation 1 10035.00 7.00 0.20 14049.00
Extra widening on sharp curves 1 162.04 2.50 0.20 81.02
Total 14130.02 Cu m
4 Prime Coat for DBST and
Emulsion 1 10035.00 7.00 70245.00 0.9 lit/ m2
Extra widening on sharp curves 1 162.04 2.50 405.10
Total 63585.09 lit
5 Bitumen for 1st Coat (For carraige
way and Shoulder) 1 10035.00 7.00 70245.00 1.2 lit/ m2
Extra widening on sharp curves 1 162.04 2.50 405.10
Total 84780.12 lit
6 Bitumen for 2nd Coat (For carraige
way and Shoulder) 1 10035.00 7.00 70245.00 1.0 lit/ m2
Extra widening on sharp curves 1 162.04 2.50 405.10
Total 70650.10 lit
8 14 mm nominal size aggregate for
1st Coat (For carraige way and
Shoulder) 1 10035.00 7.00 70245.00
Extra widening on sharp curves 1 162.04 2.50 405.10
70650.10 Sq m
Total application rate 16kg / sq m 1130.40 Mt
9
10 mm nominal size aggregate for
2 nd Coat (For carraige way and
Shoulder) 1 10035.00 7.00 70245.00
Extra widening on sharp curves 1 162.04 2.50 405.10
Total 70650.10 Sq m
Total application rate 12 kg / sq m 847.80 Mt
10
Anti-stripping agents: Supplying
and application of Anti-stripping
agents conforming to IS:
14982:2001 @ 0.5% all complete
as per the instruction of Engineer.
( SP - 1313, 1d )
1 st Coat 84780.12 lit
2 nd Coat 70650.10 lit
Total 777.15 kg
11 Scarifying existing Bitumenous
pavement, Subbase and base
upto 20 cm depth and breaking
down, removal of oversized Only 50% of
particles total width
1 st Coat 1 10035.00 3.50 17561.25 Sq m
Total 17561.25 Sq m

TAEC-TSE-Tech-SITARA-JV
Quantity Estimate of Box Culvert
Span (m) 3.00 No 0.00

S. N Particulars No Length(m) Width (m) Height (m) Quantity Unit

1 Earthwork excavation in hard Soil


U/S Catchpit Area 0 4.00 1.50 1.00 0.00
Culvert Area 0 4.00 10.00 1.00 0.00
Approach Slab Area 0 3.00 10.00 0.30 0.00
D/S launching Apron 0 2.00 6.00 0.30 0.00
Guide / Wing wall 0 6.00 1.00 1.00 0.00
River Side 0 6.00 1.00 1.00 0.00
Sub Total 0.00 m3
2 Stone Solling / boulder filling
Bottom of Box 0 4.00 10.00 0.10 0.00
Approach Slab Area 0 3.00 10.00 0.10 0.00
Masonary Wall U/S Side 0 1.50 1.00 0.10 0.00
Sub Total 0.00 m3
Uncoarsed rubble masonary work
3 1:4 c/m
Masonary Wall U/S Side 0 1.50 0.90 1.50 0.00
Sub Total 0.00 m3
4 RCC Work M20 Grade
Bottom of Box 0 3.70 10.00 0.40 0.00
U/S & D/S Side 0 3.70 1.00 0.35 0.00
U/S & D/S sode Cutoff wall 0 3.70 1.00 0.20 0.00
Box Side Wall 0 0.35 10.00 2.00 0.00
Bottom of Approach Slab 0 0.30 10.00 0.35 0.00
Top of Box 0 3.70 10.00 0.35 0.00
Sub Total 0.00 m3
Re- bars/ Torsteel bending placing
5 and bainding 1 % of RCC Volume 0.00
Sub Total 0.00 Kg

6 Gabion work for Wing / Guide wall


D/S launching Apron 0 2.00 6.00 0.50 0.00
Guide / Wing wall 0 6.00 1.00 2.00 0.00
River Side 0 6.00 1.00 2.00 0.00
Sub Total 0.00 m3
7 P.C.C. (1:2:4) for Approach Slab 0 3.00 10.00 0.30 0.00
Sub Total 0.00 m3
8 Formworks
Inside Box 0 8.00 9.00 0.00
Side of Box 0 2.75 9.00 0.00
Side of Wall 0 0.35 2.35 0.00
Side of Approach Slab 0 3.00 0.30 0.00
cutoff wall 0 1.00 3.70 0.00
Sub Total 0.00
Quantity Estimate of Box Culvert
Span (m) 4.00 No 0.00

S. N Particulars No Length(m) Width (m) Height (m) Quantity Unit

1 Earthwork excavation in hard Soil


U/S Catchpit Area 0 5.00 1.50 1.00 0.00
Culvert Area 0 5.00 10.00 1.00 0.00
Approach Slab Area 0 3.00 10.00 0.30 0.00
D/S launching Apron 0 3.00 6.00 0.30 0.00
Guide / Wing wall 0 6.00 1.00 1.00 0.00
River Side 0 6.00 1.00 1.00 0.00
Sub Total 0.00 m3
2 Stone Solling / boulder filling
Bottom of Box 0 5.00 10.00 0.10 0.00
Approach Slab Area 0 3.00 10.00 0.10 0.00
Masonary Wall U/S Side 0 1.50 1.00 0.10 0.00
Sub Total 0.00 m3
Uncoarsed rubble masonary work
3 1:4 c/m
Masonary Wall U/S Side 0 1.50 0.90 1.50 0.00
Sub Total 0.00 m3
4 RCC Work M20 Grade
Bottom of Box 0 4.70 10.00 0.40 0.00
U/S & D/S Side 0 4.70 1.00 0.35 0.00
U/S & D/S sode Cutoff wall 0 4.70 1.00 0.20 0.00
Box Side Wall 0 0.35 10.00 2.00 0.00
Bottom of Approach Slab 0 0.30 10.00 0.35 0.00
Top of Box 0 4.70 10.00 0.35 0.00
Sub Total 0.00 m3
Re- bars/ Torsteel bending placing
5 and bainding 1 % of RCC Volume 0.00
Sub Total 0.00 Kg

6 Gabion work for Wing / Guide wall


D/S launching Apron 0 3.00 6.00 0.50 0.00
Guide / Wing wall 0 6.00 1.00 2.00 0.00
River Side 0 6.00 1.00 2.00 0.00
Sub Total 0.00 m3
7 P.C.C. (1:2:4) for Approach Slab 0 3.00 10.00 0.30 0.00
Sub Total 0.00 m3
8 Formworks
Inside Box 0 10.00 9.00 0.00
Side of Box 0 2.75 9.00 0.00
Side of Wall 0 0.35 2.35 0.00
Side of Approach Slab 0 3.00 0.30 0.00
cutoff wall 0 1.00 4.70 0.00
Sub Total 0.00
Detailed Project Report Lamosanghu-Jiri Road

District Rates
Rate of
Sn Description Unit Adopted Rate Remarks
Gorkha'

1 Unskilled Labour Md 700.00 700.00


2 Skilled Labour (Carpenter, masons) Md 980.00 980.00

Skilled Labour (for blacktopping


3 Md 980.00 980.00
works)
4 Operator Md
5 Engineer Md
6 Technicians Md
7 Semi skilled Md

District Market Construction Material Rate


Rate of
Sn Description Unit Rate Remarks
Gorkha
1 Aggregate crushed
1.1 10mm Cum 2,000.00 2,000.00
1.2 20 mm Cum 2,000.00 2,000.00
1.3 40 mm Cum 900.00 900.00
Aggregate uncrushed ( River
2
single )
2.1 10mm Cum 1,800.00 1,800.00
2.2 20 mm Cum 1,800.00 1,800.00
2.3 40 mm Cum 1,800.00 1,800.00
5-70 mm Cum
3 Antistripping agent Additives Kg 320.00 320.00
4 Binding wire Kg 86.76 86.76
5 Bitumen 80 /100 Kg 88.23 88.23
6 Bolt Kg
7 Boulder / Rubble Cum 1,411.20 1,411.20
8 Brick No 9.10 9.10
9 Cement ( Indian ) Mt -
10 Cement ( Nepali ) Mt 13880.00 13,880.00
11 Plywood
3mm Sqm 171.60 171.60
4mm Sqm 213.02 213.02
6mm Sqm 349.11 349.11
8mm Sqm 384.61 384.61
10mm Sqm 494.35 494.35
12mm Sqm 573.96 573.96
19mm Sqm 863.90 863.90
12 Diesel Lit 93.36 93.36
13 Enamel Lit 511.00 511.00
14 Firewood Kg 9.00 9.00
15 Geotextile Sqm 86.00 86.00
16 GI Wire(heavy coated)
7 and 8 gauge Kg 85.00 85.00
10 gauge Kg 85.00 85.00
12 gauge Kg 85.00 85.00
Maccaferi Box Gabion
1.5x1x1 Box 1604.00 1,604.00
2x1x1 Box 2182.00 2,182.00
3x1x1 Box 3110.00 3,110.00
17 Gravel
17.1 ( 5 - 70 mm ) Cum 1587.60 1,587.60 Source
17.2 ( 5 - 40 mm ) Cum 1587.60 1,587.60 Source
17.3 ( 5 - 20 mm ) Cum 1587.60 1,587.60 Source
17.4 ( 5 - 08 mm ) Cum 1587.60 1,587.60 Source
18 HDPe Pipe ( 100 mm Dia ) Rm 378.00 378.00 235 per Kg
19 Interlocking Tile ( 60mm ) Sqm
20 Jute Kg 88.00 88.00
21 Kerosene/ Diesel Lit 93.36 93.36
22 Kukath for Form Work Cum 28,224.00 28,224.00
23 Nail Kg 95.00 95.00
24 Petrol Lit 119.03 119.03
25 Primer Lit 300.00 300.00

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road
26 RCC Hume Pipe ( NP3 )
450 mm Rm -
600 mm Rm 4,700.00 4,700.00
900 mm Rm 8,300.00 8,300.00
28 Road Marking Paint Lit 580.00 580.00
29 Salwood Cum 101,430.00 101,430.00
30 Sand Cum 2,116.80 2,116.80
31 Soil for Filling Cum
32 Steel Reinforcement Mt 76500.00 76,500.00
33 Stone Dust Cum 333.33 333.33
Structural Steel ( Angle, Channel,
34 Kg
I- Beam , Plate )
35 Steel Plate including fitting Sqm 3,885.75 3,885.75
36 Steel Tube ( Iron Black Pipe ) Rm 575.00 575.00
37 Tarfelt Sqm 107.53 107.53
38 Water Lit 0.16 0.16

District Equipment Rate


Rate of
S.N Description Unit Adopted Rate Remarks
Gorkha
1 Air compressor Per Hr 250.00 250.00
2 Asphalt Paver Per Hr 1,200.00 1,200.00
3 Asphalt Plant Per Hr 650.00
4 Bach Hoe Loader ( JCB ) Per Hr 1,200.00 1,200.00
5 Bitumen Distributor Per Hr 1,300.00 1,300.00
6 Bitumen Heater Per Hr
7 Boiler Per Hr 180.00 180.00
8 Cap Crane15t Per Hr
9 Concrete mixture Per Hr 1,000.00 1,000.00
10 Dozer Track Per Hr
11 Excavator Track Per Hr 1,800.00 1,800.00
12 Excavator + Breaker Per Hr 2,100.00 2,100.00
13 Flat bed truck Per Hr 450.00 450.00
14 Grader Motor Per Hr 1,200.00 1,200.00
15 Loader Wheel Per Hr 1,200.00 1,200.00
16 Truck Tipper Per Hr 800.00 800.00
17 Roller 3 wheel Per Hr 500.00 500.00
18 Roller Pneumatics Per Hr 1,200.00 1,200.00
19 Roller Vibrator Per Hr 1,200.00 1,200.00
20 Spreader Chips Per Hr 1,500.00 1,500.00
21 Vibrator with needle Per Hr 75.00 75.00
22 Water tanker Per Hr 550.00 550.00
23 Water Pump ( Upto 6" dia ) Per Hr 150.00 150.00

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Local Material Collection


Description of works: Collection of rubble of required size, hauling distance10m. and stacking. Unit: 1 m 3

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
8.01.01 a) Unskilled md 4.00 700.00 2800.00 ( 40 - 70 mm size)
8.01.01 b) Unskilled md 3.20 700.00 2240.00 ( 70 - 100 mm size)

Description of works: Collection and seiving gravel including stacking within 10m. Hauling distance. Unit: 1 m 3
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
8.01.02.a) Unskilled md 2.00 700.00 1400.00 ( 5 - 70 mm size)
8.01.02.b) Unskilled md 3.20 700.00 2240.00 ( 5 - 40 mm size)
8.01.02.c) Unskilled md 4.70 700.00 3290.00 ( 5 - 20 mm size)
8.01.02.d) Unskilled md 8.00 700.00 5600.00 ( 5 - 08 mm size)

Description of works: Collection of rubble of required size, hauling distance10m. and stacking. Unit: 1 m 3
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
8.01.03 Unskilled md 1.40 700.00 980.00

Description of works: Collection and seiving sand within 10m. hauling distance. Unit: 1 m 3
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
8.01.04.a) Unskilled md 4.00 700.00 2800.00 ( Quarry output less than 33%)
8.01.04.b) Unskilled md 3.00 700.00 2100.00 ( Quarry output 33 - 66 %)
8.01.04.c) Unskilled md 1.43 700.00 1001.00 ( Quarry output more than 66%)

Description of works: Collection, quarring and seiving sand in hilly areas within 10m. hauling distance. Unit: 1 m 3
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
8.01.05 Unskilled md 1.50 700.00 1050.00

Description of works: Washing broken stone, gravel and sand. Unit:


Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

8.01.08 Unskilled md 1.50 700.00 1050.00

Description of works: Washing rubble Unit: 1 m 3


Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
8.01.08 Unskilled md 0.40 700.00 280.00

Description of works: Breaking stones including Collection, seiving and stacking within 10m. Unit: 1 m 3
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
8.02.01.a) Unskilled md 6.00 700.00 4200.00 ( 70 - 100 mm size)
8.02.01.b) Unskilled md 8.00 700.00 5600.00 ( 40 - 70 mm size)
8.02.01.c) Unskilled md 12.00 700.00 8400.00 ( 20 - 40 mm size)
8.02.01.d) Unskilled md 18.00 700.00 12600.00 ( 10 - 20 mm size)
8.02.01.e) Unskilled md 25.00 700.00 17500.00 ( 5 - 10 mm size)

Description of works: Making blocks of required size out of stratified rocks including hammer dressing, hauling distance 10m. and stacking. Unit: 1 m 3
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
8.02.02 Unskilled md 5.88 700.00 4116.00

Description of works: Making rubbles of required size including breaking with distance 10m. and stacking. Unit: 1 m 3
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
8.02.04 Unskilled md 5.50 700.00 3850.00

Description of works: Transportation of water by manpower including loading, hauling, unloading and stacking. Unit: 1000 lit
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
8.03.17(a) Unskilled md 0.47 700.00 329.00 a) First 10 m. with haul and unload 0.33 per lit
8.03.17(b) Unskilled md 0.12 700.00 84.00 b) Every additional 10m. upto 100m 0.08 per lit

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Description of works: Transportation of materials by truck, including loading, unloading and stacking by manpower lead upto 10m using 8 tonne capacity Truck.
Spec. Clause No. 800 Travel time (T) for truck to be used for this activity shall be determined as follows:
T=2x{d1/v1+d2/v2+d3/v3+………………..dn/vn}, where d1,d2,d3………dn and v1,v2,v3……..vn are the streches of distances to be travelled and corresponding average speeds on these
streches. [ T = 2*(d1/v1+d2/v2+……dn/vn) = ] (T=travel time for truck in
Description of works Unit Activity No d1 v1 d2 v2 d3 v3 d4 v4 …. …. dn vn Travel time T (hrs) Remarks
Excavated earthwork soil material m3 8.04.2.1.a T = 2 15.00 20.00 3.00 30.00 = 0.20
Excavated earthwork rock material m3 8.04.2.1.b T = 2 15.00 20.00 3.00 30.00 = 0.20
Sand, Stone dust (Local) m3 8.04.2.2 T= 2 15.00 20.00 30.00 30.00 = 2.00
Sand, Stone dust m3 8.04.2.3 T= 2 15.00 20.00 30.00 30.00 = 2.00
Crushed Aggregate m3 8.04.2.3 T= 2 15.00 20.00 30.00 30.00 = 2.00
Gravel, river shingle, broken stone, m3 8.04.2.3 T= 2 15.00 20.00 30.00 30.00 = 2.00
aggregates,
Gravel, Riverand bats (Local)
shingle, aggregates(RCC) m3 8.04.2.4 T= 2 15.00 20.00 30.00 30.00 = 2.00
Boulder, Cobbles, quarry stone m3 8.04.2.4 T= 2 15.00 20.00 5.00 30.00 = 0.33
Brick 1000 nos 8.04.2.6 T= 2 15.00 20.00 95.00 30.00 6.33
Cement (Nepali) t 8.04.2.7 T= 2 15.00 20.00 100.00 30.00 = 6.67
Cement (Indian) t 8.04.2.8 T= 2 15.00 20.00 100.00 30.00 = 6.67
Reinforcement Steel and gabion wire t 8.04.2.8 T= 2 15.00 20.00 100.00 30.00 = 6.67
Bitumen / Diesel / Kerosene 1000 lit 8.04.2.9 T= 2 15.00 20.00 100.00 30.00 = 6.67
Gi,Ci, Pipe and Fittings , Black pipe t 8.03.10 T= 2 15.00 20.00 100.00 30.00 = 6.67
Timber for temporary works m3 8.04.2.11 T= 2 15.00 20.00 3.00 30.00 = 0.20
Timber for temporary works m3 8.04.2.11 T= 2 15.00 20.00 3.00 30.00 = 0.20
Fabricated Structural Timber m4 8.04.2.12 T = 2 15.00 20.00 3.00 30.00 = 0.20
Fabricated Structural Steel m5 8.04.2.13 T = 2 15.00 20.00 3.00 30.00 = 0.20
RCC hume pipe of 900mm dia m 8.04.2.16.a T = 2 15.00 20.00 100.00 30.00 = 6.67
RCC hume pipe of 750mm dia m 8.04.2.16.b T= 2 15.00 20.00 100.00 30.00 = 6.67
RCC hume pipe of 600mm dia m 8.04.2.16.c T= 2 15.00 20.00 100.00 30.00 = 6.67
RCC hume pipe of 450mm dia m 8.04.2.16.c T= 2 15.00 20.00 100.00 30.00 = 6.67
RCC hume pipe of 300mm dia m 8.04.2.16.c T= 2 15.00 20.00 100.00 30.00 = 6.67
Water 1000 lit 8.04.2.17 T= 2 15.00 20.00 30.00 = 0.00
Elastomeric bearing No 19.01 T= 2 15.00 20.00 30.00 = 0.00
Steel bearing No 20.01 T= 2 15.00 20.00 30.00 = 0.00
Expansion joint m 21.01 T= 2 15.00 20.00 30.00 = 0.00

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

Activity No: 8.04.02 F/Y: 073/74


Spec. Clause No. 800
Description of works: Transportation of materials by truck, including loading, unloading and stacking by manpower lead upto 10m using 8 tonne capacity Truck Place:

Labour Materials Equipment


Description of works Unit Remarks
Type Unit Qty. Rate Amount Type Unit Quantity. Rate Amount Type Unit Quantity. Rate Amount
1)Excavated earthwork soil material m3 Unskilled md 0.00 700.00 0.00 Fuel lit 2 xT= 0.400 93.36 37.35 Truck hr 0.15 x (T+0.75)= 0.143 450.00 64.13
disposal
Sub total of Labour + Materials + Equipments = 101.47 Contractor's overhead expenses 15% = Unit rate = 101.47

1)Excavated earthwork rock material m3 Unskilled md 0.00 700.00 0.00 Fuel lit 2.3xT= 0.460 93.36 42.95 Truck hr 0.18x(T+0.75)= 0.171 450.00 76.95
disposal
Sub total of Labour + Materials + Equipments = 119.90 Contractor's overhead expenses 15% = Unit rate = 119.90

2) Sand/Stone dust (local) m3 Unskilled md 0.30 700.00 210.00 Fuel lit 1.7xT= 3.400 93.36 317.43 Truck hr 0.13x(T+0.75)= 0.358 450.00 160.88
Sub total of Labour + Materials + Equipments = 688.31 Contractor's overhead expenses 15% = Unit rate = 688.31
2a)Sand/stone dust m3 Unskilled md 0.30 700.00 210.00 Fuel lit 1.7xT= 3.400 93.36 317.43 Truck hr 0.13x(T+0.75)= 0.358 450.00 160.88
Sub total of Labour + Materials + Equipments = 688.31 Contractor's overhead expenses 15% = Unit rate = 688.31

3.a) Gravel, river shingle, broken stone, m3 Unskilled md 0.50 700.00 350.00 Fuel lit 2.1xT= 4.200 93.36 392.12 Truck hr 0.16x(T+0.75)= 0.440 450.00 198.00
aggregates, and bats (Local) Sub total of Labour + Materials + Equipments = Contractor's overhead expenses 15% = Unit rate =
940.12 940.12

3.b) Gravel, river shingle, broken stone, Unskilled md 0.50 700.00 350.00 Fuel lit 2.1xT= 4.200 93.36 392.12 Truck hr 0.16x(T+0.75)= 0.440 450.00 198.00
m3
aggregates, and bats (RCC)
Sub total of Labour + Materials + Equipments = 940.12 Contractor's overhead expenses 15% = Unit rate = 940.12

4) Boulder, Cobbles, quarry stone m3 Unskilled md 0.50 700.00 350.00 Fuel lit 2.7xT 0.900 93.36 84.03 Truck hr 0.21x(T+0.75)= 0.228 450.00 102.38
Sub total of Labour + Materials + Equipments = 536.40 Contractor's overhead expenses 15% = Unit rate = 536.40

6) Brick 1000 Nos Unskilled md 0.60 700.00 420.00 Fuel lit 4xT 25.333 93.36 2365.19 Truck hr 0.31x(T+0.75)= 2.196 450.00 988.13
Sub total of Labour + Materials + Equipments = 3773.32 Contractor's overhead expenses 15% = Unit rate = 3773.32
7) Cement t Unskilled md 0.40 700.00 280.00 Fuel lit 1.5xT 10.0000 93.36 933.63 Truck hr 0.12x(T+0.75)= 0.890 450.00 400.50
Sub total of Labour + Materials + Equipments = 1614.13 Contractor's overhead expenses 15% = Unit rate = 1614.13

8) Reinforcement Steel and gabion wire t Unskilled md 0.60 700.00 420.00 Fuel lit 1.5xT 10.0000 93.36 933.63 Truck hr 0.12x(T+0.75)= 0.890 450.00 400.50
Sub total of Labour + Materials + Equipments = 1754.13 Contractor's overhead expenses 15% = Unit rate = 1754.13

9) Bitumen 1000 lit Unskilled md 1.00 700.00 700.00 Fuel lit 2.6xT 17.333 93.36 1618.29 Truck hr 0.2x(T+0.75)= 1.483 450.00 667.50
Sub total of Labour + Materials + Equipments = 2985.79 Contractor's overhead expenses 15% = Unit rate = 2985.79

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report Lamosanghu-Jiri Road

10)Gi,Ci, Pipe and Fittings , Black pipe t Unskilled md 1.00 700.00 700.00 Fuel lit 1.5xT 10.000 93.36 933.63 Truck hr 0.12x(T+0.75)= 0.890 450.00 400.50
Sub total of Labour + Materials + Equipments = 2034.13 Contractor's overhead expenses 15% = Unit rate = 2034.13

11) Timber for temporary works m3 Unskilled md 0.30 700.00 210.00 Fuel lit 1.4xT 0.280 93.36 26.14 Truck hr 0.11x(T+0.75)= 0.105 450.00 47.03
Sub total of Labour + Materials + Equipments = 283.17 Contractor's overhead expenses 15% = Unit rate = 283.17
12) Fabricated structural timber m3 Unskilled md 0.50 700.00 350.00 Fuel lit 2xT 0.400 93.36 37.35 Truck hr 0.15x(T+1.25)= 0.218 450.00 97.88
Sub total of Labour + Materials + Equipments = 485.22 Contractor's overhead expenses 15% = Unit rate = 485.22
13) Fabricated structural steel t Unskilled md 4.00 700.00 2800.00 Fuel lit 1.5xT 0.300 93.36 28.01 Truck hr 0.12x(T+1.25)= 0.174 450.00 78.30
Skilled md 0.40 980.00 392.00
Sub total of Labour + Materials + Equipments = 3298.31 Contractor's overhead expenses 15% = Unit rate = 3298.31
16) RCC Hume pipe
a) RCC hume pipe of 900mm m Skilled md 0.04 980.00 39.20 Fuel lit 0.78xT 5.200 93.36 485.49 Truck hr 0.06x(T+1.75)= 0.505 450.00 227.25
Unskilled md 0.40 700.00 280.00
Sub total of Labour + Materials + Equipments = 1031.94 Contractor's overhead expenses 15% = Unit rate = 1031.94

m Skilled md 0.03 980.00 29.40 Fuel lit 0.69xT 4.600 93.36 429.47 Truck hr 0.055x(T+1.75)= 0.463 450.00 208.31
b) RCC hume pipe of 750mm dia
Unskilled md 0.33 700.00 231.00
Sub total = 260.40 Sub total = 429.47 Sub total = 208.31
Sub total of Labour + Materials + Equipments = 898.18 Contractor's overhead expenses 15% = Unit rate = 898.18

c) RCC hume pipe of 600mm m Skilled md 0.02 980.00 19.60 Fuel lit 0.6xT 4.000 93.36 373.45 Truck hr 0.054x(T+1.75)= 0.455 450.00 204.53
Unskilled md 0.25 700.00 175.00
Sub total = 194.60 Sub total = 373.45 Sub total = 204.53
Sub total of Labour + Materials + Equipments = 772.58 Contractor's overhead expenses 15% = Unit rate = 772.58

d) RCC hume pipe of 450mm m Skilled md 0.02 700.00 14.00 Fuel lit 0.55xT 2.667 93.36 248.97 Truck hr 0.04x(T+1.75)= 0.337 450.00 151.50
Unskilled md 0.17 700.00 115.50
Sub total = 129.50 Sub total = 248.97 Sub total = 151.50
Sub total of Labour + Materials + Equipments = 529.97 Contractor's overhead expenses 15% = Unit rate = 529.97
d) RCC hume pipe of 300mm m Skilled md 0.01 980.00 9.80 Fuel lit 0.4xT 2.667 93.36 248.97 Truck hr 0.04x(T+1.75)= 0.337 450.00 151.50
Unskilled md 0.13 700.00 91.00
Sub total = 100.80 Sub total = 248.97 Sub total = 151.50
Sub total of Labour + Materials + Equipments = 501.27 Contractor's overhead expenses 15% = Unit rate = 501.27
17) Water 1000 lit Skilled md 0.01 980.00 9.80 Fuel lit 1.5xT 0.000 93.36 0.00 Truck hr 0.12x(T+0.75)= 0.090 450.00 40.50
Unskilled md 0.10 700.00 70.00 Pump 10cmdia hr 0.050 1200.00 60.00
Sub total = 79.80 Sub total = 0.00 Sub total = 40.50
Sub total of Labour + Materials + Equipments = 120.30 Contractor's overhead expenses 15% = Unit rate = 0.12

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
District Labour, Collection Rate of Materials, Fuel and Equipment Hire Rate
Updated Rates
Royalty Total Rate
District Rate Collection Transportation
Description Unit (C+R+ Remarks
(D) Rate (C) Rate ( Tp )
(R) Tp)
S.N.
A Labour
1 Unskilled Labour Md 700.00 700.00
2 Skilled Labour (Carpenter, masons) Md 980.00 980.00

Skilled Labour (for blacktopping works) Md 980.00


3 980.00
4 Operator Md - -
5 Engineer Md - -
6 Technicians Md - -
7 Semi skilled Md - -

B Material
1 Aggregate Crushed
1.1 10mm Cum 2,000.00 17,500.00 940.12 2,940.12
1.2 20 mm Cum 2,000.00 12,600.00 940.12 2,940.12
1.3 40 mm Cum 900.00 8,400.00 940.12 1,840.12
2 Aggregate uncrushed ( River Bed )
2.1 5-10mm Cum 1,800.00 5600.00 940.12 2,740.12
2.2 5-20mm Cum 1,800.00 3290.00 940.12 2,740.12
2.3 5-40mm Cum 1,800.00 2240.00 940.12 2,740.12
3 Antistripping agent Additives Kg 320.00 1.75 321.75
4 Binding wire Kg 86.76 1.75 88.51
5 Bitumen 80 /100 Kg 88.23 2.99 91.22
6 Bolt Kg - -
7 Boulder / Rubble Cum 1,411.20 980.00 536.40 1,516.40
8 Brick No 9.10 3.77 9.10
9 Cement ( Indian ) Mt - -
10 Cement ( Nepali ) Mt 13,880.00 1614.13 15,494.13
11 Plywood
4mm Sqm 171.60 5.61 177.21
6mm Sqm 213.02 8.42 221.44
8mm Sqm 349.11 11.23 360.34
10mm Sqm 494.35 14.03 508.38
12mm Sqm 573.96 16.84 590.80
19mm Sqm 863.90 26.66 890.56
12 Diesel Lit 93.36 2.99 96.35
13 Enamel Paint Lit 511.00 2.99 513.99
14 Firewood Kg 9.00 9.00
15 Geotextile Sqm 86.00 2.99 88.99
16 GI Wire(heavy coated)
7 and 8 gauge Kg 85.00 1.75 86.75
10 gauge Kg 85.00 1.75 86.75
12 gauge Kg 85.00 1.75 86.75
16.1 Maccaferi Box Gabion
1.5x1x1 Box 1,604.00 68.67 1,672.67
2x1x1 Box 2,182.00 83.60 2,265.60
3x1x1 Box 3,110.00 119.43 3,229.43
17 Gravel -
17.1 ( 5 - 70 mm ) Cum 1,587.60 1400.00 940.12 2,340.12
17.2 ( 5 - 40 mm ) Cum 1,587.60 2240.00 940.12 3,180.12
17.3 ( 5 - 20 mm ) Cum 1,587.60 3290.00 940.12 4,230.12
17.4 ( 5 - 08 mm ) Cum 1,587.60 5600.00 940.12 6,540.12
18 HDPE Pipe - 100 mm dia Kg 378.00 2.99 380.99
19 Interlocking Tile ( 60mm thick ) Sqm - -
20 Jute Kg 88.00 2.99 90.99
21 Kerosene Lit 93.36 2.99 96.35
22 Kukath for Form Work Cum 28,224.00 28,224.00
23 Nail Kg 95.00 2.99 97.99
24 Petrol Lit 119.03 2.99 122.01
25 Primer Lit 300.00 2.99 302.99
26 RCC Hume Pipe ( NP3 )
450 mm Rm - 529.97 529.97
600 mm Rm 4,700.00 772.58 5,472.58
900 mm Rm 8,300.00 1031.94 9,331.94
27 RCC Hume Pipe Collar
450 mm Rm - -
600 mm No - -
900 mm No - -
28 Road Marking Paint Lit 580.00 2.99 582.99
29 Salwood Cum 101,430.00 101,430.00
30 Sand Cum
( Quarry output less than 33%) 2,116.80 2800.00 688.31 3,488.31

TAEC-TSE-Tech-SITARA-JV
Detailed Project Report

Royalty Total Rate


District Rate Collection Transportation
Description Unit (C+R+ Remarks
(D) Rate (C) Rate ( Tp )
(R) Tp)
S.N.
( Quarry output 33 - 66 %) 2,116.80 2100.00 688.31 2,788.31
( Quarry output more than 66%) 2,116.80 1001.00 688.31 1,689.31
Hilly Area 2,116.80 1050.00 688.31 1,738.31
31 Soil for Filling excavated Earth Cum - 101.47 101.47
32 Steel reinforcement (Fe-415) Mt 76,500.00 1754.13 78,254.13
33 Stone Dust Cum 333.33 688.31 1,021.64 from Sipaghat
Structural Steel ( Angle, Channel, I-
34 Beam , Plate ) Kg - -
35 Steel Plate including fitting Kg 3,885.75 3,885.75
36 Steel Tube ( Iron Black Pipe ) Rm 575.00 575.00
37 Tarfelt Sqm 107.53 107.53
38 Water Lit 0.16 0.16

Updated Equipment Rate


S.N Description Unit Rate Remarks
1 Air compressor Per Hr 250.00
2 Asphalt Paver Per Hr 1,200.00
3 Asphalt Plant Per Hr 400.00
4 Backhoe Loader ( JCB ) Per Hr 1,200.00
5 Bitumen Distributor Per Hr 1,300.00
6 Bitumen Heater Per Hr 180.00
7 Boiler Per Hr 180.00
8 Cap Crane15t Per Hr 3,500.00
9 Concrete mixture Per Hr 1,000.00
10 Dozer Track Per Hr 1,800.00
11 Excavator Track Per Hr 1,800.00
12 Excavator + Breaker Per Hr 2,100.00
13 Flat bed truck Per Hr 450.00
14 Grader Motor Per Hr 1,200.00
15 Loader Wheel Per Hr 1,200.00
16 Truck Tipper Per Hr 800.00
17 Roller 3 wheel Per Hr 500.00
18 Roller Pneumatics Per Hr 1,200.00
19 Roller Vibrator Per Hr 700.00
20 Spreader Chips Per Hr 1,500.00
21 Vibrator with needle Per Hr 75.00
22 Water bowser Per Hr 550.00
23 Water Pump ( Upto 4" dia ) Per Hr 150.00

TAEC-TSE-Tech-SITARA-JV
Khurkot-Ghurmi Sector Appendix - 3

Government of Nepal
Ministry of Physical Planning and Works
Department of Roads
Puspalal ( Mid -hill ) Highway Project
Babarmahal, Kathmandu.

Project : Detail Engineering Survey & Design of Khurkot-Ghurmi Sector

ANALYSIS OF RATE

Item no. 1 Clearing and grubbing of forest including uprooting, carrying and disposing of vegetation, gra
Trees and sapling less than 15 numbers per 100 sq.m
Unit-1 Sqm
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 0.03 M/D 315.00 9.45 9.45
Tools 3% of Labour 0.28
Actual Cost 9.73
Rate for Sqm 15% Contractors profit 1.46
NRs 11.19 Total Rate 11.19

Cutting of trees (the girth measured at a height of 1 m above ground level) including cuttting
Item no. 2 of trunks and branches, removing the roots, stacking serviceable materials and disposal of
unserviceable materials to 10m distance and back filling the depressions/pits
a. Above 300 to 600 mm girth
Unit-1 no.
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 0.92 M/D 315.00 289.80 289.80
Tools 3% of Labour 8.69
Actual Cost 298.49
Rate for no. 15% Contractors profit 44.77
NRs 343.27 Total Rate 343.27

b. Above 600 to 900 mm girth


Unit-1 No
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 3.50 M/D 315.00 1102.50 1102.50
Tools 3% of Labour 33.08
Actual Cost 1135.58
Rate for no. 15% Contractors profit 170.34
NRs 1305.91 Total Rate 1305.91

Road way excavation including disposal upto 10m and lift upto 1.5 m etc. all complete as per
Item no. 3
specification.
a. Hard soil/Gravel BMS
Unit-Cum
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 1.00 M/D 315.00 315.00 315.00
Tool & Plants 3% of Labour 9.45
Actual Cost 324.45
Rate per Cum 15% Contractors profit 48.67
NRs 373.12 Total Rate 373.12

Analysis of Rates-66
Khurkot-Ghurmi Sector Appendix - 3

Government of Nepal
Ministry of Physical Planning and Works
Department of Roads
Puspalal ( Mid -hill ) Highway Project
Babarmahal, Kathmandu.

Project : Detail Engineering Survey & Design of Khurkot-Ghurmi Sector

ANALYSIS OF RATE
b. Road way excavating and loading by excavator (capacity 0.8 cum) in Hard Soil / Gravel / BMS
Unit-Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.0 M/D -
Labour b) Unskilled 0.0 M/D - -
c) Operator 0.0 M/D -
Material Diesel 0.1500 Lit 85.00 12.75 12.75
Equipment Hudraulic excavator 0.0125 Hr 1,400.00 17.50 17.50
Actual Cost 30.25
Rate per Cum 15% Contractors profit 4.54
NRs 34.79 Total Rate 34.79

c. Road way excavation with combination of Manual and Machined excavation


Hard soil/Gravel BMS
Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Manual Excavation ( 20% ) 0.20 Cum 324.45 64.89 64.89
Machine Excavation ( 80% 0.80 Cum 30.25 24.20 24.20
Actual Cost 89.09
Rate per Cum 15% Contractors profit 13.36
NRs 102.45 Total Rate 102.45

Road way excavation including disposal upto 10m and lift upto 1.5 m etc. all complete as per
Item no. 4
specification.
a. Soft rock
Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 2.75 M/D 320.00 880.00 880.00
Tool & Plants 3% of Labour 26.40
Actual Cost 906.40
Rate per Cum 15% Contractors profit & OH 135.96
NRs 1042.36 Total Rate 1042.36

b. Road way excavating and loading by excavator (capacity 0.8 cum) in Soft Rock
Unit- Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.0 M/D -
Labour b) Unskilled 0.0 M/D - -
c) Operator 0.0 M/D -
Material Diesel 0.2064 Lit 85.00 17.54 17.54
Equipment Hydraulic excavator 0.0172 Hr 1,400.00 24.08 24.08
Actual Cost 41.62
Rate per Cum 15% Contractors profit & OH 6.24
NRs 47.87 Total Rate 47.87

Analysis of Rates-67
Khurkot-Ghurmi Sector Appendix - 3

Government of Nepal
Ministry of Physical Planning and Works
Department of Roads
Puspalal ( Mid -hill ) Highway Project
Babarmahal, Kathmandu.

Project : Detail Engineering Survey & Design of Khurkot-Ghurmi Sector

ANALYSIS OF RATE
c. Road way excavation with combination of Manual and Machined excavation
Soft Rock
Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Manual Excavation ( 20% ) 0.20 Cum 906.40 181.28 181.28
Machined Excavation ( 80% 0.80 Cum 41.62 33.30 33.30
Actual Cost 214.58
Rate per Cum 15% Contractors profit & OH 32.19
NRs 246.77 Total Rate 246.77

Formation of embankment including compaction in layers not exceeding 150mm. Compacted


Item no. 5
depth, watering and haulage 10m. etc. all complete as per specification.
Unit-1 Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.00 M/d 460.00 0.00
Labour
b)Unskilled 0.50 M/d 320.00 160.00 160.00
Suitable material 1.10 Cum 160.00 176.00
Material Fuel 0.08 litre 85.00 6.80
Water 100.00 litre 0.10 10.00 192.80
Equipment Roller 8-10t 0.017 Hr 2500.00 42.50 42.50
Tools & Plants 3% of labour cost 4.80
Actual Cost 400.10
Rate per Cum 15% Contractors profit & OH 60.02
NRs 460.12 Total Rate 460.12

Providing, laying, spreading, levelling and compaction of natural sand gravel sub-base
Item no. 6
grading as per table 12.1 of standard specification lead upto 10m
Unit-1 Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.005 M/d 460.00 2.30
Labour
b)Unskilled 0.040 M/d 320.00 12.80 15.10
Sub base aggregate 1.28 Cum 600.00 768.00
Material
Diesel 0.792 litre 85.00 67.32 835.32
Grader 0.022 hr 2000.00 44.00
Vibrator roller 0.022 hr 2000.00 44.00
Equipment
Water bowser 0.038 hr 550.00 20.90
Loader 0.011 hr 1500.00 16.50 125.40
Actual Cost 975.82
Rate per Cum 15% Contractors profit & OH 146.37
NRs 1122.19 Total Rate 1122.19

Analysis of Rates-68
Khurkot-Ghurmi Sector Appendix - 3

Government of Nepal
Ministry of Physical Planning and Works
Department of Roads
Puspalal ( Mid -hill ) Highway Project
Babarmahal, Kathmandu.

Project : Detail Engineering Survey & Design of Khurkot-Ghurmi Sector

ANALYSIS OF RATE
Providing, laying, spreading, watering, levelling and compaction of of crusher run materials
Item no. 7
for base course lead upto 10m
Unit-1 Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.005 M/d 460.00 2.30
Labour
b)Unskilled 0.020 M/d 320.00 6.40 8.70
Base aggregate 1.200 Cum 1200.00 1440.00
Material
Diesel 0.990 litre 85.00 84.15 1524.15
Grader 0.033 hr 2000.00 66.00
Vibrator roller 0.033 hr 2000.00 66.00
Equipment
Water bowser 0.033 hr 550.00 18.15
Loader 0.011 hr 1500.00 16.50 166.65
Actual Cost 1699.50
Rate per Cum 15% Contractors profit & OH 254.93
NRs 1954.43 Total Rate 1954.43

Providing and spraying bituminious Prime Coat MC30/MC70 including cleaning the road
Item no. 8
surface using wire, brushes, broom etc. before applying prime coat.

Unit: Lit
Description Particular Quantity Unit Rate Amount Total
Skilled 0.003 M/d 460.00 1.38
Labour
Unskilled 0.046 M/d 320.00 14.72 16.10
Bitumen 1.050 Lit 80.00 84.00
Materials
Kerosene 0.100 Lit 85.00 8.50 115.88
Diesel 0.275 Lit 85.00 23.38
Boiler 0.0025 hr 500.00 1.25
Equipment Sprayer 0.0025 hr 1000.00 2.50
Air compressor 0.0030 hr 500.00 1.50 5.25
Actual Cost 137.23
Rate per Lit 15% Contractors profit & OH 20.58
NRs 157.81 Total Rate 157.81

Analysis of Rates-69
Khurkot-Ghurmi Sector Appendix - 3

Government of Nepal
Ministry of Physical Planning and Works
Department of Roads
Puspalal ( Mid -hill ) Highway Project
Babarmahal, Kathmandu.

Project : Detail Engineering Survey & Design of Khurkot-Ghurmi Sector

ANALYSIS OF RATE
Item no. 9 Providing mixing and laying Asphalt Concrete with compaction
Unit: Cum
Description Particular Quantity Unit Rate Amount Total
Skilled 0.03 M/d 460.00 13.80
Labour Unskilled 0.13 M/d 320.00 41.60
Foreman 0.01 M/d 320.00 3.20 58.60
Bitumen 117.00 Lit 80.00 9360.00
Cement 0.022 t 12000.00 264.00
Materials
Diesel 10.45 Lit 85.00 888.25
Aggregates 1.20 Cum 1250.00 1500.00 12012.25
Asphalt mixing plant 0.0440 Hr 500.00 22.00
Wheel Loader 0.6600 Hr 1500.00 990.00
Asphalt Paver 0.2200 Hr 1400.00 308.00
Equipment
Steel tyred Roller 0.5500 Hr 500.00 275.00
Pneumatic Roller 0.5500 Hr 2500.00 1375.00
Tipper, Trucks 0.3200 Hr 450.00 144.00 3114.00
Actual Cost 15184.85
Rate per Cum 15% Contractors profit & OH 2277.73
NRs 17462.58 Total Rate 17462.58

Earth work excavation for trenches including shoring, struting, bracing, sheeting and
Item no. 10 disposal upto 10m and lift upto 1.5 m etc. all complete as per specification. ( For hard soil/
Gravels)
a. Manual Excavation
Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 1.50 M/D 320.00 480.00 480.00
Tool & Plants 3% of Labour 14.40
Actual Cost 494.40
15% Contractors profit & OH 74.16
Rate per Cum Total Rate 568.56
NRs 568.56

b. Earthwork excavation for trenches with combination of Manual and Machined excavation
Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Mannual Excavation ( 60% 0.60 Cum 494.40 296.64 296.64
Machined Excavation ( 40% 0.40 Cum 30.25 12.10 12.10
Actual Cost 308.74
Rate per Cum 15% Contractors profit & OH 46.31
NRs 355.05 Total Rate 355.05

Analysis of Rates-70
Khurkot-Ghurmi Sector Appendix - 3

Government of Nepal
Ministry of Physical Planning and Works
Department of Roads
Puspalal ( Mid -hill ) Highway Project
Babarmahal, Kathmandu.

Project : Detail Engineering Survey & Design of Khurkot-Ghurmi Sector

ANALYSIS OF RATE
Earth work excavation for trenches including shoring, struting, bracing, sheeting and
Item no. 11 disposal disposal upto 10m and lift upto 1.5 m etc. all complete as per specification. ( For
soft rocks)
a. Manual Excavation
Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 3.00 M/D 320.00 960.00 960.00
Tool & Plants 3% of Labour 28.80
Actual Cost 988.80
Rate per Cum 15% Contractors profit & OH 148.32
NRs 1137.12 Total Rate 1137.12

b. Earthwork excavation for trenches with combination of Manual and Machined excavation
Soft Rock
Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Mannual Excavation ( 70% 0.70 Cum 988.80 692.16 692.16
Machined Excavation ( 30% 0.30 Cum 30.25 9.08 9.08
Actual Cost 701.24
Rate per Cum 15% Contractors profit & OH 105.19
NRs 806.42 Total Rate 806.42

c. Earthwork excavation for trenches with combination of Manual and Machined excavation
All type of soil
Unit- Cum
Description Particular Quantity Unit Rate Amount Total
Hard Soil / Gravel /
Boulder Mixed ( 70% ) 0.70 Cum 308.74 216.12 216.12
Soft Rock ( 30 % ) 0.30 Cum 701.24 210.37 210.37
Actual Cost 426.49
Rate per Cum 15% Contractors profit & OH 63.97
NRs 490.46 Total Rate 490.46

Backfilling in layers in foundation pits, trenches etc. including compaction, watering etc.
Item no. 12
complete lead 10m. And depth of foundation upto 1.5m.
Unit-1Cum
Description Particular Quantity Unit Rate Amount Total
Labour Unskilled 1.14 M/D 320.00 364.80 364.80
Tools & Plants 3% of labour cost 10.94
Actual Cost 375.74
Rate per Cum 15% Contractors profit & OH 56.36
NRs 432.11 Total Rate 432.11

Analysis of Rates-71
Khurkot-Ghurmi Sector Appendix - 3

Government of Nepal
Ministry of Physical Planning and Works
Department of Roads
Puspalal ( Mid -hill ) Highway Project
Babarmahal, Kathmandu.

Project : Detail Engineering Survey & Design of Khurkot-Ghurmi Sector

ANALYSIS OF RATE
Item no. 13 Stone soling and leveling works including lead upto 30m
Unit-1 Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 1.00 M/d 460.00 460.00
Labour
b)Unskilled 3.50 M/d 320.00 1120.00 1580.00
Stone 1.10 Cum 900.00 990.00
Material
Sand 0.71 Cum 650.00 461.50 1451.50
Tools & Plants 3% of labour cost 47.40
Actual Cost 3078.90
Rate per Cum 15% Contractors profit & OH 461.84
NRs 3540.74 Total Rate 3540.74

Providing and placing machine mixed non structural cement concrete in 1:2:4 ratio including
Item no. 14
compaction, curing, testing and lead 30m. etc. all complete as per specification and drawing.
Unit-1 Cum
Description Particular Quantity Unit Rate Amount Total
Skilled 0.50 M/D 460.00 230.00
Labour
Unskilled 3.50 M/D 320.00 1120.00 1350.00
Cement 0.32 mt 12000.00 3840.00
Aggregate 20-40mm 0.52 Cum 1200.00 624.00
Aggregate 10 -20mm 0.33 Cum 1250.00 412.50
Material Sand 0.45 Cum 650.00 292.50
Petrol 0.10 Lit 116.00 11.60
Diesel 3.00 Lit 85.00 255.00
Water 192.00 Lit 0.10 19.20 5454.80
Mixer (0.28/ 0.20 m3 ) 0.60 hr 500.00 300.00
Equipment
Vibrator 0.25 hr 80.00 20.00 320.00
Quality Control 2.5 % of total 178.12
Actual Cost 7302.92
Rate per Cum 15% Contractors profit & OH 1095.44
NRs 8398.36 Total Rate 8398.36

Analysis of Rates-72
Khurkot-Ghurmi Sector Appendix - 3

Government of Nepal
Ministry of Physical Planning and Works
Department of Roads
Puspalal ( Mid -hill ) Highway Project
Babarmahal, Kathmandu.

Project : Detail Engineering Survey & Design of Khurkot-Ghurmi Sector

ANALYSIS OF RATE
Providing and placing machine mixed cement concrete , M20 for the abutment, pier, wall etc.
Item no. 15 including compaction, curing, testing and lead 30m. etc. all complete as per specification
and drawing.
Unit-1 Cum
Description Particular Quantity Unit Rate Amount Total
a) Skilled 0.90 M/D 460.00 414.00
Labour
b) Unskilled 9.00 M/D 320.00 2880.00 3294.00
Cement 0.32 mt 12000.00 3840.00
Aggregate 20-40mm 0.52 Cum 1200.00 624.00
Aggregate 10-20mm 0.22 Cum 1225.00 269.50
Aggregate 10mm & down 0.12 Cum 1250.00 150.00
Material
Coarse sand 0.45 Cum 650.00 292.50
Petrol 0.10 Lit 116.00 11.60
Diesel 3.00 Lit 85.00 255.00
Water 192.00 Lit 0.10 19.20 5461.80
Mixture 0.60 hr 500.00 300.00
Equipment
Vibrator 0.25 hr 80.00 20.00 320.00
Quality Control 2.5% of total 226.90
Actual Cost 9302.70
Rate per Cum 15% Contractors profit & OH 1395.40
NRs 10698.10 Total Rate 10698.10

Providing and placing machine mixed cement concrete, M25 for the super structure,
Item no. 16 deckslab, girder etc. including compaction, curing, testing and lead 30m. etc. all complete
as per specification and drawing.
Unit-1 Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.80 M/D 460.00 368.00
Labour b) Unskilled 6.00 M/D 320.00 1920.00
c) Operator 0.20 M/D 460.00 92.00 2380.00
Cement 0.375 mt 12000.00 4500.00
Aggregate 20-40mm 0.58 Cum 1225.00 710.50
Aggregate 10-20mm 0.30 Cum 1250.00 375.00
Material Coarse sand 0.45 Cum 650.00 292.50
Petrol 0.10 Lit 116.00 11.60
Diesel 3.00 Lit 85.00 255.00
Water 225.00 Lit 0.10 22.50 6167.10
Mixture 0.60 hr 500.00 300.00
Equipment
Vibrator 0.25 hr 80.00 20.00 320.00
Quality Control 2.5% of total 221.68
Actual Cost 9088.78
Rate per Cum 15% Contractors profit & OH 1363.32
NRs 10452.09 Total Rate 10452.09

Analysis of Rates-73
Khurkot-Ghurmi Sector Appendix - 3

Government of Nepal
Ministry of Physical Planning and Works
Department of Roads
Puspalal ( Mid -hill ) Highway Project
Babarmahal, Kathmandu.

Project : Detail Engineering Survey & Design of Khurkot-Ghurmi Sector

ANALYSIS OF RATE
Providing , Preparing and Installing form work including necessary supports and removing
Item no. 17
after completion for foundation and footings.(Scrap value neglected)
( Assuming the plank shall be used eight times )
(Assuming the struts,ballies,etc. can be used for 12 times.)
Unit-10 Sqm
Description Particular Quantity Unit Rate Amount Total
a)Skilled 1.50 M/D 460.00 690.00
Labour
b) Unskilled 2.00 M/D 320.00 640.00 1330.00
Planks 38mm thick. 0.42 Cum 3750.00 1575.00
Materials struts, ballies, etc. 0.00 Cum 0.00 0.00
Nails,spikes,etc. 1.00 Kg 90.00 90.00 1665.00
Actual Cost 2995.00
Rate per Sqm 15% Contractors profit & OH 449.25
NRs 344.43 Total Rate 3444.25

Providing and laying Reinforcement including cutting, bending, binding, fixing in position
Item no. 18
and lead 30m. etc. all complete as per specification and drawing.
Unit- 1Mt
Description Particular Quantity Unit Rate Amount Total
a)Skilled 12.00 M/D 460.00 5520.00
Labour
b) Unskilled 12.00 M/D 320.00 3840.00 9360.00
Reinforcement 1.15 Mt 75000.00 86250.00
Materials
Binding Wire 10.00 Kg 95.00 950.00 87200.00
Actual Cost 96560.00
NRs Rate per Mt 15% Contractors profit & OH 14484.00
111044.00 Total Rate 111044.00

Providing and laying Random rubble stone masonry in cement mortar including scaffolding,
Item no. 19 curing, preparation of mortar etc. complete, masoned height 0-5m, lead 30m (Using
Concrete mixer) mortar 35% (cement :sand) 1:4
Unit-1 Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 1.50 M/d 460.00 690.00
Labour
b)Unskilled 3.50 M/d 320.00 1120.00 1810.00
Stone 1.15 Cum 900.00 1035.00
Cement 0.155 Mt 12000.00 1860.00
Material Sand 0.45 Cum 650.00 292.50
water 100.00 litre 0.10 10.00
Diesel 1.00 litre 85.00 85.00 3282.50
Equipment Concrete Mixture 0.15 hr 500.00 75.00 75.00
Quality control 1.5% of total 77.51
Actual Cost 5245.01
Rate per Cum 15% Contractors profit & OH 786.75
NRs 6031.76 Total Rate 6031.76

Analysis of Rates-74
Khurkot-Ghurmi Sector Appendix - 3

Government of Nepal
Ministry of Physical Planning and Works
Department of Roads
Puspalal ( Mid -hill ) Highway Project
Babarmahal, Kathmandu.

Project : Detail Engineering Survey & Design of Khurkot-Ghurmi Sector

ANALYSIS OF RATE
Back filling behind abutment by sand and gravel spreading layers including sprinkling water
Item no. 20
and manual compaction with haulage 10m.
Unit-1 Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.00 M/d 0.00 0.00
Labour
b)Unskilled 0.70 M/d 320.00 224.00 224.00
Sand 0.55 Cum 650.00 357.50
Material
Gravel 0.55 Cum 600.00 330.00 687.50
Tools & Plants 3% of labour cost 6.72
Actual Cost 918.22
Rate per Cum 15% Contractors profit & OH 137.73
NRs 1055.95 Total Rate 1055.95

Providing and laying RCC pipes with or without collars, jointed with stiff mixture of cement
Item no. 21
mortar in the proportion of 1:2 ( 1 cement : 2 fine sand ), lead upto 100m.
a. 600mm dia ( Int ) RCC Hume Pipe
Unit-Rm
Description Particular Quantity Unit Rate Amount Total
Skilled 0.281 M/D 460.00 129.26
Laour
Unskilled 1.094 M/D 320.00 350.08 479.34
RCC Hume Pipe ( 600 dia ) 1.00 Rm 4725.00 4725.00
Cement 0.0068 Mt 12000.00 81.76
Material
Sand 0.0090 Cum 650.00 5.85
Jute 0.219 Kg 100.00 21.90 4834.51
Tools & Plants 3 % of total 159.42
Actual Cost 5473.26
Rate per Rm 15% Contractors profit & OH 820.99
NRs 6294.25 Total Rate 6294.25

b. 900mm dia ( Int ) RCC Hume Pipe


Unit-Rm
Description Particular Quantity Unit Rate Amount Total
Skilled 0.344 M/D 460.00 158.24
Laour
Unskilled 1.562 M/D 320.00 499.84 658.08
RCC Hume Pipe ( 900 dia ) 1.000 Rm 8465.00 8465.00
Cement 0.0091 Mt 12000.00 108.74
Material
Sand 0.013 Cum 650.00 8.45
Jute 0.375 Kg 100.00 37.50 8619.69
Tools & Plants 3 % of total 278.33
Actual Cost 9556.11
Rate per Rm 15% Contractors profit & OH 1433.42
NRs 10989.52 Total Rate 10989.52

Analysis of Rates-75
Khurkot-Ghurmi Sector Appendix - 3

Government of Nepal
Ministry of Physical Planning and Works
Department of Roads
Puspalal ( Mid -hill ) Highway Project
Babarmahal, Kathmandu.

Project : Detail Engineering Survey & Design of Khurkot-Ghurmi Sector

ANALYSIS OF RATE
Item no. 22 Providing and laying two layers of Tarfelt
Unit-10 Sqm
Description Particular Quantity Unit Rate Amount Total
Skilled 2.300 M/D 460.00 1058.00
Laour
Unskilled 4.600 M/D 320.00 1472.00 2530.00
Tarfelt 22.000 Sqm 100.00 2200.00
Bitumin 25.000 Kg 80.00 2000.00
Material
Sand 0.310 Cum 650.00 201.50
Wood 80.000 Kg 4.30 344.00 4745.50
Actual Cost 7275.50
Rate per Sqm 15% Contractors profit & OH 1091.33
NRs 836.68 Total Rate 8366.83

Fabrication of Gabion boxes/mattresses with diapharagms including rolling, cutting and


weaving, assembling it, placing in position including stretching, forming compartments, tying
Item no. 23
the side and diaphargms with binding wire in each mesh, filling gabion box with stone
including dressing, beding, bonding and all transportation as per specification.
a. (3 x 1 x 1) box size
Unit- Box
Description Particular Quantity Unit Rate Amount Total
i) Gabion Box Weaving
Skilled 0.50 M/D 460.00 230.00
Unskilled 0.22 M/D 320.00 70.40
ii)Plancing in position and
tightening&
Labour
Unskilled 1.04 M/D 320.00 332.80
iii) Filling stone in gabion
box
Skilled 0.75 M/D 460.00 345.00
Unskilled 2.25 M/D 320.00 720.00 1698.20
GI wire ( 10 SWG ) 35.01 Kg 85.00 2975.85
Selvedge wire 4.51 Kg 85.00 383.35
Material
Binding Wire (12 SWG) 1.81 Kg 95.00 171.95
Boulder / stone 3.30 Cum 900.00 2970.00 6501.15
Actual Cost 8199.35
Rate per Cum 15% Contractors profit & OH 1229.90
NRs 3143.08 Total Rate 9429.25

Analysis of Rates-76
Khurkot-Ghurmi Sector Appendix - 3

Government of Nepal
Ministry of Physical Planning and Works
Department of Roads
Puspalal ( Mid -hill ) Highway Project
Babarmahal, Kathmandu.

Project : Detail Engineering Survey & Design of Khurkot-Ghurmi Sector

ANALYSIS OF RATE

b. (2 x 1 x 1) box size
Unit- Box
Description Particular Quantity Unit Rate Amount Total
i) Gabion Box Weaving

Skilled 0.34 M/D 460.00 156.40


Unskilled 0.15 M/D 320.00 48.00
ii)Plancing in position and
Labour tightening&
Unskilled 0.75 M/D 320.00 240.00
iii) Filling stone in gabion
box
Skilled 0.50 M/D 460.00 230.00
Unskilled 1.50 M/D 320.00 480.00 1154.40
GI wire ( 10 SWG ) 24.15 Kg 85.00 2052.75
selvedge wire 3.41 Kg 85.00 289.85
Materials
Binding Wire (12 SWG) 1.30 Kg 95.00 123.50
Boulder / stone 2.20 Cum 900.00 1980.00 4446.10
Actual Cost 5600.50
Rate per Cum 15% Contractors profit & OH 840.08
NRs 3220.2875 Total Rate 6440.58

c. (1.5 x 1 x 1) box size


Unit- Box
Description Particular Quantity Unit Rate Amount Total
i) Gabion Box Weaving
Skilled 0.28 M/D 460.00 128.80
Unskilled 0.12 M/D 320.00 38.40
ii)Plancing in position and
tightening&
Labour
Unskilled 0.68 M/D 320.00 217.60
iii) filling stone in gabion
box
Skilled 0.38 M/D 460.00 172.50
Unskilled 1.13 M/D 320.00 360.00 917.30
GI wire ( 10 SWG ) 19.75 Kg 85.00 1678.75
selvedge wire 3.11 Kg 85.00 264.35
Materials
Binding Wire (12 SWG) 0.68 Kg 95.00 64.60
Boulder / stone 1.65 Cum 900.00 1485.00 3492.70
Actual Cost 4410.00
Rate per Cum 15% Contractors profit & OH 661.50
NRs 3381 Total Rate 5071.50

Analysis of Rates-77
Khurkot-Ghurmi Sector Appendix - 3

Government of Nepal
Ministry of Physical Planning and Works
Department of Roads
Puspalal ( Mid -hill ) Highway Project
Babarmahal, Kathmandu.

Project : Detail Engineering Survey & Design of Khurkot-Ghurmi Sector

ANALYSIS OF RATE
Item no. 24 Providing , laying and fixing of Geotextile ( filter fabrics )
Unit- Sqm
Description Particular Quantity Unit Rate Amount Total
Skilled labour - M/d - -
Labour
Unskilled 0.017 M/d 320.00 5.44 5.44
Marerial Geotextile 1.20 Sqm 70.00 84.00 84.00
Actual Cost 89.44
Rate per Sqm 15% Contractors profit & OH 13.42
NRs 102.86 Total Rate 102.86

Item no. 25 Providing and painting of two coats of enamel painting with one coat primer
Unit- 100 Sqm
Description Particular Quantity Unit Rate Amount Total
Skilled labour 12.00 M/d 460.00 5520.00
Labour
Unskilled 8.00 M/d 320.00 2560.00 8080.00
Primer 8.00 Lit 230.00 1840.00
Marerial
Enamel paint 16.00 Lit 300.00 4800.00 6640.00
Actual Cost 14720.00
Rate per Sqm 15% Contractors profit & OH 2208.00
NRs 169.28 Total Rate 16928.00

Supplying and erecting traffic sign in place including 50mm dia. Steel tube, 2mm. thick steel
Item no. 26 plate, cement concrete, painting, writing and supporting steel angle nut and bolt etc.
complete.
a. 60cm. Dia. Circular, 60cm. equilateral traingle and 60cm.x 45cm. rectangular shaped sign (single
post).
Unit- 1 no.
Description Particular Quantity Unit Rate Amount Total
Skilled labour 0.033 M/d 460.00 15.18
Labour
Unskilled 0.088 M/d 320.00 28.16 43.34
Enamel paint 0.10 lit 300.00 30.00
M15/20 PCC 0.03 m3 7302.92 219.09
Marerial Steel plate 0.25 m2 1805.50 451.38
Formwork 0.36 m2 299.50 107.82
Steel tube 2.50 m 115.00 287.50 1095.78
Actual Cost 1139.12
Rate per no. 15% Contractors profit & OH 170.87
NRs 1309.99 Total Rate 1309.99

Analysis of Rates-78
Khurkot-Ghurmi Sector Appendix - 3

Government of Nepal
Ministry of Physical Planning and Works
Department of Roads
Puspalal ( Mid -hill ) Highway Project
Babarmahal, Kathmandu.

Project : Detail Engineering Survey & Design of Khurkot-Ghurmi Sector

ANALYSIS OF RATE
b. 1.2m.x 0.75m. Size bigger traffic sign with back support and two or more post.
Unit- 1 no.
Description Particular Quantity Unit Rate Amount Total
Skilled labour 0.085 M/d 460.00 39.10
Labour
Unskilled 0.30 M/d 320.00 96.00 135.10
Enamel paint 0.40 lit 300.00 120.00
M15/20 PCC 0.12 m3 7302.92 876.35
Marerial Steel plate 1.00 m2 1805.50 1805.50
Formwork 1.00 m2 299.50 299.50
Steel tube 5.00 m 115.00 575.00 3676.35
Actual Cost 3811.45
Rate per no. 15% Contractors profit & OH 571.72
NRs 4383.17 Total Rate 4383.17

Supplying and applying paint for Road marking including cleaning, watering, brooming etc.
Item no. 27
all complete ( 10cm wide strip ).
Unit- Rm
Description Particular Quantity Unit Rate Amount Total
Skilled labour 0.005 M/d 460.00 2.30
Labour
Unskilled 0.007 M/d 320.00 2.24 4.54
Marerial Road marking paint 0.070 lit 450.00 31.50 31.50
Actual Cost 36.04
Rate per Rm. 15% Contractors profit & OH 5.41
NRs 41.45 Total Rate 41.45

Providing and placing machine mixed cement concrete M20 for the foundation and footing
Item no. 28 etc. including compaction, curing, testing and lead 30m. etc. all complete as per
specification and drawing.
Unit-1 Cum
Description Particular Quantity Unit Rate Amount Total
a)Skilled 0.50 M/D 460.00 175.00
Labour
b) Unskilled 3.50 M/D 320.00 700.00 875.00
Cement 0.32 mt 12000.00 4000.00
Aggregate 20-40mm 0.52 Cum 1200.00 312.00

Aggregate 10-20mm 0.22 Cum 1225.00 132.00


Material Aggregate 10mm & down 0.12 Cum 1250.00 72.00
Coarse sand 0.45 Cum 650.00 112.50
Petrol 0.10 Lit 116.00 7.80
Diesel 3.00 Lit 60.18 180.53
Water 192.00 Lit 0.10 180.53 4997.36
Mixture 0.60 hr 500.00 120.00
Equipment
Vibrator 0.25 hr 80.00 25.00 145.00
Quality Control 2.5% of total 150.43
Actual Cost 6167.79

Analysis of Rates-79
Khurkot-Ghurmi Sector Appendix - 3

Government of Nepal
Ministry of Physical Planning and Works
Department of Roads
Puspalal ( Mid -hill ) Highway Project
Babarmahal, Kathmandu.

Project : Detail Engineering Survey & Design of Khurkot-Ghurmi Sector

ANALYSIS OF RATE
Rate per Cum 15% Contractors profit & OH 925.17
NRs 7092.96 Total Rate 7092.96

Analysis of Rates-80
Khurkot-Ghurmi Sector Appendix - 3

Government of Nepal
Ministry of Physical Planning and Works
Department of Roads
Puspalal ( Mid -hill ) Highway Project
Babarmahal, Kathmandu.

Project : Detail Engineering Survey & Design of Khurkot-Ghurmi Sector

ANALYSIS OF RATE
Supplying and placing R.C.C. kilometer post including excavation, back filling, painting and
Item no. 29
writing etc. all complete as per specification.
a. Standard kilometer post (placed at each km.)
Unit- 1 no.
Description Particular Quantity Unit Rate Amount Total
Skilled labour 0.03 M/d 460.00 13.80
Labour
Unskilled 0.116 M/d 320.00 37.12 50.92
M20/20 RCC 0.06 m3 6167.79 370.07
M15/20 PCC 0.09 m3 7302.92 657.26
Marerial Formwork 0.50 m2 299.50 149.75
Enamel paint 0.12 lit 300.00 36.00
Reinforcement Bar 7.50 kg 96.56 724.20 1937.28
Actual Cost 1988.20
Rate per no. 15% Contractors profit & OH 298.23
NRs 2286.43 Total Rate 2286.43

b. Bigger kilometer post (placed at each 5 km.)


Unit- 1 no.
Description Particular Quantity Unit Rate Amount Total
Skilled labour 0.08 M/d 460.00 36.80
Labour
Unskilled 0.30 M/d 320.00 96.00 132.80
M20/20 RCC 0.17 m3 6167.79 1048.52
M15/20 PCC 0.23 m3 7302.92 1679.67
Marerial Formwork 1.30 m2 299.50 389.35
Enamel paint 0.40 lit 300.00 120.00
Reinforcement Bar 8.60 kg 96.56 830.42 4067.96
Actual Cost 4200.76
Rate per no. 15% Contractors profit & OH 630.11
NRs 4830.88 Total Rate 4830.88

Supplying and fixing in place R.C.C. delineator and guard post including excavation, back
Item no. 30
filling, painting and erection etc. all complete as per drawing.
Unit- 1 no.
Description Particular Quantity Unit Rate Amount Total
Skilled labour 0.021 M/d 460.00 9.66
Labour
Unskilled 0.055 M/d 320.00 17.60 27.26
M20/20 RCC 0.03 m3 6167.79 185.03
Formwork 0.54 m2 299.50 161.73
Marerial
Enamel paint 0.18 lit 300.00 54.00
Reinforcement Bar 2.82 lit 96.56 272.30 673.06
Actual Cost 700.32
Rate per no. 15% Contractors profit & OH 105.05
NRs 805.37 Total Rate 805.37

Analysis of Rates-81
ABSTRACT OF QUANTITY
Description
Drain Volume Left 3793.15604
Drain Volume Right 3339.69504
GWRET 1400
MWBRT 2347.695
Cut Volume 54231.153
Fill Volume 11837.396
Ordinary Fill Volume 0
Str. Cut Volume 6974.425
Drain Cut Volume 6664.757
Backfill Volume 3484.25
Pavement Volume 2952.93
Base Layer Volume 12648.113
SubBase Volume 13267.746
SubGrade Volume 0
Capping Layer Volume 1336.716
Abstract of Cost

Project Name: -Radhakrishnamandir-Badareykhola (0+000-3+589.25) and Badareykhola-Kaushaltar (3+725.20-10+305.6


Item No. Description Unit Quantity Amount (NRs)
1 General
Insurance for the loss of damage to works
plant, material, equipment property and
personnel injury of death and commission of
bank security and performance guarantee all
1.1 complete Job 1.00 3,000,000.00

Provide, operate and maintain Quality control


laboratory including equipment, accessories
and consumables for both field testing facilities
and off-site test with manpower as per Contract
Documents.( SS/SP-502,511) and as per the
1.2 instruction of engineer Month 27.00 2,025,000.00
Carry out routine maintenance of the existing
road to keep the road serviceable through out
the Contract period : (SS/SP-107) and as per
1.3 the instruction of engineer
a) During construction Km-Month 278.10 2,239,903.61
b) During Defects Liability period until issue of DeKm-Month 133.90 1,078,472.11

Provide and establish camp for contractor's


labour and staff and demolish after completion
of works and mobilization and demobilization
as per the specifications. (SS/SP-109) and as
1.4 per the instruction of engineer LS 1,000,000.00

Relocation of services / minor infrastructures,


1.5 as per Engineer's instructions. (SS/SP-103) PS 200,000.00
The bidder's percentage addition to the net
1.6 cost provided in item 1.5 % 10.00 20,000.00
Provision and install Project Signboards in
1.7 accordance with specification No 2.00 20,000.00

1.8 Provide a vehicle for a Engineer Ls 1.00 300,000.00


Sub total Part 1 9,883,375.72
2 Site Clearance
Clearing of grass, removing roots, breaking
sods, levelling the surface and disposal as per
2.1 specification (SS/SP-201) Sqm 10,000.00 248,745.00

Felling trees including cutting of trunks and


branches, removing the roots, stacking
serviceable materials and disposal of
unserviceable materials to suitable place all
complete as per Contract Documents: (SS/SP-
2.2 201)
a) 300mm-600mm girth size No 40.00 30,512.72
b) 600mm-900mm girth size No 30.00 87,060.75
C) 900mm-1800mm girth size No 15.00 121,263.19
Sub total Part 2 487,581.66
3 Earthwork
Road way excavation (Road and Drain) in all
type of rock and soil including necessary
haulage , disposal and lift all complete
3.1 (SS/SP-900) Cum 54,231.15 5,553,257.73
Formation of Embankment including,
compaction in layers not exceeding 150mm.
Compacted depth, watering and haulage 10m.
Etc. all complete asper specification. (SS/SP-
3.2 900) Cum 11,837.40 2,244,318.76
Sub total Part 3 8178623.68
4 Pavement
Asphalt Concrete

Preparation of Sub-grade by grading,watering


& compaction for upgrading the road ( filling
or cutting depth of 10 to 20 cm ) in Gravel &
4.1 boulder mixed soil. ( SS / SP -1003 ) Sqm 90,315.00 11,232,702.34
Providing , laying , spreading, levelling and
compaction of natuaral sand gravel Subbase
grading as per table 12.1 of standard
4.2 specification (SS/SP-1201) Cum #REF! #REF!
Providing , laying , spreading, levelling and
compaction of crusher run materials for Base
4.3 course (SS/SP-1202) Cum 10,536.75 29,281,168.62
Supplying and applying Prime Coat
MC30/MC70 including cleaning the road
surface using wire brushes, broom etc. before
4.4 applying coat. ( SS / SP 1301, 1303 ) Ltr 84,294.00 16,624,623.52
Supplying and applying Tack Coat
MC30/MC70 including cleaning the road
surface using wire brushes, broom etc. before
4.5 applying coat. ( SS / SP 1301, 1303 ) Ltr 63,220.50 10,724,545.66
Anti-stripping agents: Supplying and
Providing , laying
application , spreading,
of Anti-stripping levelling
agents and
conforming
compaction
to of Asphalt
IS: 14982:2001 concrete
@ 0.5% as per table
all complete as per
4.6 the
4.19 12.1instruction
of standardof specification
Engineer. ( SP (SS/SP-1201)
- 1313, 1d ) Cum
Kg 2,809.80
#REF! 71,928,425.34
#REF!
Sub Total B #REF!
Sub total Part 4 #REF!
5 Cross Drainage Structures
Earthwork in excavation for foundation of
structures in all types of soil including 1.5m lift
and disposal of excavated materials at
approved environmentally safe tipping sites as
5.1 per specification ( SS - 907 ) Cum 212.23119 27789.54
Back filling in layers in foundation pits,
trenches etc, including compaction and
watering etc. complete, lead 10m as per
5.2 specification ( SS - 908 ) Cum 34.69319308 32793.08
Providing & laying Dry-stone pitching in
protection work, lead 30m, lift 1.5m With stone
size not less than 0.01m3 including levelling
5.3 etc. complete. Cum 8.57235 36629.94
Providing and placing machine mixed cement
concrete M15/20 including compaction, curing,
testing and lead 30m. all complete as per
5.4 specification.( SS - 2000 ) Cum 10.3832 142064.78

Providing and placing machine mixed cement


concrete M25/20 including compaction, curing,
testing and lead 30m. all complete as per
5.5 specification. ( SS - 2000 ) Cum 21.37 313868.1
Providing, preparing and installing Formwork
for concrete works including necessary
supports and removing after completion as per
5.5 specification ( SS - 1800 ) Sqm 15.9408 11547.5
Providing and laying Reinforcement bar for
RCC works including cutting bending, binding,
fixing in position and lead 30m. all complete as
5.7 per specification. (SS/SP-2000) Mt 0.69633 82650.03
Providing and laying random rubble Stone
masonary in cement sand mortar M5 including
scaffolding, curing, preparation of mortar etc.
5.6 all complete. (SS/SP-2600) Cum 41.47668392 346270.58
Providing and laying ( filling ) with graded filter
material including compaction as per
5.9 specification ( SS - 3110 ) Cum 4.37 15835.03
Providing and laying RCC hume pipes (NP3)
with groove joints, jointed with stiff mixture of
cement mortar (1 cement : 2 fine sand)
complete in place as per specification: (SS/SP-
5.1 701) 0
a) 900mm diameter (internal) Rm 17 220962.49
5.11 Providing and laying of Tarfelt Sqm 8.892 11968.72

Fabrication, placing in position and filling with


stone of Gabion boxes of hexagonal mesh
with heavy coated GI wires, mesh size 100mm
x 120mm, mesh wire 10 SWG, selvedge wire 8
SWG and binding wire 12 SWG all complete
5.7 as per specification : ( SS - 2400 ) Cum 304.50 107356.63
Sub total Part 5 704452.05
6 Retaining Structure
Earthwork in excavation for foundation of
structures in all types of soil including 1.5m lift
and disposal of excavated materials at
approved environmentally safe tipping sites as
6.1 per specification ( SS - 907 ) Cum 6974.43 913,230.91

Fabrication, placing in position and filling with


stone of gabion boxes of hexagonal mesh with
heavy coated GI wires, mesh size 100mm x
120mm, mesh wire 10 SWG, selvedge wire 8
SWG and binding wire 12 SWG all complete
6.2 as per specification : ( SS - 2400 ) Cum 1400.00 6,262,470.02
Providing,laying and Geotextile / Geo-
membrane ( filter fabrics ) , lead 30m as per
6.3 specification ( SS - 3110 ) Sqm 920.00 125,566.56

Providing and laying Random rubble stone


masonry (Breast Walland Retaining Wall) in
cement mortar [ cement(1) : sand(4)] including
scaffolding, curing, preparation of
mortar,finishing etc.all complete. (SS/SP-
6.4 2600) cum 2347.70 27,943,041.95
Back filling in layers in foundation pits,
trenches etc, including compaction and
watering etc. complete, lead 10m as per
6.5 specification ( SS - 908 ) Cum 3484.25 3,293,421.11
Sub total Part 6 38,537,730.55
7 Side Drain
Earthwork in excavation for foundation of road
side drain in all types of soil including 1.5m lift
and disposal of excavated materials at
approved environmentally safe tipping sites as
7.1 per specification ( SS - 907 ) Cum 6664.757 682,469.60
Providing & laying Dry-stone pitching in
protection work, lead 30m, lift 1.5m With stone
size not less than 0.01m3 including levelling
7.2 etc. complete. Cum 1,545.84 6,605,439.63
Providing and laying Random rubble Stone
masonary in cement sand mortar M7.5
including scaffolding, curing, preparation of
7.3 mortar etc. all complete. (SS/SP-2600) Cum 7,132.85 84,897,551.42

Providing and placing machine mixed cement


concrete M15/20 including compaction, curing,
testing and lead 30m. all complete as per
7.4 specification. ( SS - 2000 ) Cum 1,159.38 15,862,873.52
Sub total Part 7 108,048,334.17
8 Road Furnitures and Traffic Safety Measures

Supply and erecting traffic signs in place


including 50mm dia. Steel tube, 2mm thick
steel plates, cement concrete, painting, writing
and supporting steel angle nut and bolt etc. all
8.1 complete, as per Drawings. (SS/SP-1501).
60cm dia Circular, 60 cm equilateral triangle
and 60cm x 45 cm rectangular shaped sign
a) ( single post ) No 50.00 180,433.33
1.2m x0.75m size bigger traffic sign
( Information Board )with back support and two
b) or more post. No 25.00 267,871.29
Supplying and applying 10cm wide paint for
road marking including cleaning, watering,
8.2 brooming etc. all complete
More than two coats over new bituminous
surface as per specification ( SS - 1502 ) Rm 10,000.00 582,003.56
Supply and placing stone marker ( RCC
kilometer post) including excavation,
backfilling, painting and writing etc. all
8.3 complete as per Drawings. (SS/SP-1503)
Standard Kilometer stone (placed at each km
a) distance) No 10.00 35,631.58
Bigger kilometer post (placed at each 5 km
b) distance) No 2.00 16,348.65
Supplying and fixing in place RCC delinator
and guard posts including excavation, back
filling, painting and erection etc. all complete as
8.4 per drawings. (SS/SP-1504) No 150.00 201,127.32
Sub total Part 8 1,267,067.08
9 Bio - engineering Works

Providing and planting containerised tree and


shrub seedling, including pitting, transplanting,
composing and mulching, on slopes > 40deg.
Pit size 10cm diameter x 30cm depth. Mix
compost with soil and back fill into pit to 1/4 of
9.1 pit volume. No 4000.00 191,544.00

Providing and planting rooted tree stump


cutting bare root seedling, including pitting,
transplanting, composing and mulching, on
slopes > 45deg. Pit size 10cm diameter x
20cm depth. Compost volume 1/4 of volume of
9.2 the pit mix with original soil. No 425.00 19,351.08
Grass sodding works including sod cutting,
transporting, placing in position and water
9.3 sprinkling ( Lead upto 10m) Sqm 35000.00 684,048.75
Sub total Part 9 894,943.83
Sub- Total 1~9 317,996,796.08
Add 13% VAT of Sub-total B 41,339,583.49
3% Contingencies of Sub-total A 9,539,903.88
Grand Total (Including VAT and Contingencies) 368,876,283.46

#VALUE!
aushaltar (3+725.20-10+305.62)
Remarks
AREA(m2) VOLUME(m3)
Chainage Cut Area Base Fill A Ord Fill Ar Str.Cut Are Back Area Mean Dist. Cut Vol. Base Fill Vol.
0 6.018 0 0 0 0 5 30.088 0
10 5.243 0 0 0 0 10 52.425 0
20 6.048 0 0 0 0 10 60.475 0
30 4.548 0 0 0 0 10 45.475 0
40 2.635 0.003 0 0 0 10 26.35 0.025
50 1.65 0.065 0 0 0 10 16.5 0.65
60 3.238 0.09 0 0 0 10 32.375 0.9
70 3.488 0 0 0 0 10 34.875 0
80 3.828 0.013 0 0 0 10 38.275 0.125
90 3.668 0.023 0 0 0 10 36.675 0.225
100 4.767 0.028 0 0 0 10 47.675 0.275
110 4.335 0 0 0 0 10 43.35 0
120 3.235 0.028 0 0 0 10 32.35 0.275
130 3.345 0.03 0 0 0 10 33.45 0.3
140 5.622 0.003 0 0 0 10 56.225 0.025
150 5.065 0 0 0 0 10 50.65 0
160 5.66 0 0 0 0 10 56.6 0
170 5.795 0 0 0 0 10 57.95 0
180 3.495 0.01 0 0 0 10 34.95 0.1
190 3.295 0 0 0 0 10 32.95 0
200 3.515 0.025 0 0 0 10 35.15 0.25
210 5.41 0 0 0 0 10 54.1 0
220 3.955 0.098 0 0 0 10 39.55 0.975
230 4.372 0.145 0 0 0 10 43.725 1.45
240 5.91 0.023 0 0 0 10 59.1 0.225
250 7.438 0 0 0 0 10 74.375 0
260 10.885 0 0 0 0 10 108.85 0
270 11.48 0 0 0 0 10 114.8 0
280 10.175 0 0 0 0 10 101.75 0
290 7.593 0 0 0 0 10 75.925 0
300 5.935 0 0 0 0 10 59.35 0
310 3.795 0.005 0 0 0 10 37.95 0.05
320 4.328 0.048 0 0 0 10 43.275 0.475
330 4.773 0.085 0 0 0 10 47.725 0.85
340 3.143 0.095 0 0 0 10 31.425 0.95
350 3.553 0 0 0 0 10 35.525 0
360 2 0.068 0 0 0 10 20 0.675
370 2.13 1.05 0 0 0 10 21.3 10.5
380 3.995 0.685 0 0 0 10 39.95 6.85
390 3.733 1.215 0 0 0 10 37.325 12.15
400 3.068 1.317 0 0 0 10 30.675 13.175
410 4.142 0 0 0 0 10 41.425 0
420 6.953 0 0 0 0 10 69.525 0
430 10.495 0 0 0 0 10 104.95 0
440 10.335 0 0 0 0 10 103.35 0
450 10.663 0 0 0 0 10 106.625 0
460 5.865 0.01 0 0 0 10 58.65 0.1
470 6.425 0.038 0 0 0 10 64.25 0.375
480 3.395 0.523 0 0 0 10 33.95 5.225
490 3.225 0.745 0 0 0 10 32.25 7.45
500 2.488 0.17 0 0 0 10 24.875 1.7
510 5.885 0 0 0 0 10 58.85 0
520 7.605 0 0 0 0 10 76.05 0
530 12.618 0 0 0 0 10 126.175 0
540 6.625 0 0 0 0 10 66.25 0
550 7.813 0 0 0 0 10 78.125 0
560 3.675 0.12 0 0 0 10 36.75 1.2
570 1.92 1.205 0 0 0 10 19.2 12.05
580 1.663 1.988 0 0 0 10 16.625 19.875
590 1.028 0.883 0 0 0 10 10.275 8.825
600 6.73 0.648 0 0 0 10 67.3 6.475
610 10.267 0.025 0 0 0 10 102.675 0.25
620 5.01 0.01 0 0 0 10 50.1 0.1
630 13.4 0.013 0 0 0 10 134 0.125
640 9.235 0 0 0 0 10 92.35 0
650 10.698 0 0 0 0 10 106.975 0
660 11.013 0 0 0 0 10 110.125 0
670 8.508 0 0 0 0 10 85.075 0
680 10.255 0 0 0 0 10 102.55 0
690 9.813 0 0 0 0 10 98.125 0
700 6.523 0 0 0 0 10 65.225 0
710 6.803 0.043 0 0 0 10 68.025 0.425
720 2.578 0.125 0 0 0 10 25.775 1.25
730 3.4 0 0 0 0 10 34 0
740 4.787 0 0 0 0 10 47.875 0
750 4.048 0.005 0 0 0 10 40.475 0.05
760 4.78 0.04 0 0 0 10 47.8 0.4
770 6.39 0 0 0 0 10 63.9 0
780 3.903 0.005 0 0 0 10 39.025 0.05
790 3.46 0 0 0 0 10 34.6 0
800 0.523 0.213 0 0 0 10 5.225 2.125
810 1.445 0.27 0 0 0 10 14.45 2.7
820 1.893 0.043 0 0 0 10 18.925 0.425
830 0.793 0.178 0 0 0 10 7.925 1.775
840 2.195 0.108 0 0 0 10 21.95 1.075
850 1.155 2.03 0 0 0 10 11.55 20.3
860 0.33 2.075 0 0 0 10 3.3 20.75
870 0.278 1.353 0 0 0 10 2.775 13.525
880 0.393 0.745 0 0 0 10 3.925 7.45
890 2.608 0.083 0 0 0 10 26.075 0.825
900 5.9 0 0 0 0 10 59 0
910 7.448 0 0 0 0 10 74.475 0
920 6.26 0 0 0 0 10 62.6 0
930 7.18 0 0 0 0 10 71.8 0
940 5.94 0 0 0 0 10 59.4 0
950 3.975 0 0 0 0 10 39.75 0
960 1.373 0.168 0 0 0 10 13.725 1.675
970 1.603 0.157 0 0 0 10 16.025 1.575
980 2.375 0.123 0 0 0 10 23.75 1.225
990 1.9 0.218 0 0 0 10 19 2.175
1000 4.383 0.035 0 0 0 10 43.825 0.35
1010 5.895 0.003 0 0 0 10 58.95 0.025
1020 5 0.003 0 0 0 10 50 0.025
1030 8.94 0.07 0 0 0 10 89.4 0.7
1040 5.87 0 0 0 0 10 58.7 0
1050 3.715 1.295 0 0 0 10 37.15 12.95
1060 3.39 0.13 0 0 0 10 33.9 1.3
1070 2.41 0.34 0 0 0 10 24.1 3.4
1080 2.96 3.898 0 0 0 10 29.6 38.975
1090 3.808 3.993 0 0 0 10 38.075 39.925
1100 5.372 2.51 0 0 0 10 53.725 25.1
1110 2.925 2.41 0 0 0 10 29.25 24.1
1120 5.988 0.723 0 0 0 10 59.875 7.225
1130 2.7 1.185 0 0 0 10 27 11.85
1140 1.95 1.963 0 0 0 10 19.5 19.625
1150 4.46 1.725 0 0 0 10 44.6 17.25
1160 7.615 1.938 0 0 0 10 76.15 19.375
1170 7.805 0.458 0 0 0 10 78.05 4.575
1180 6.725 0.19 0 0 0 10 67.25 1.9
1190 2.998 0.088 0 0 0 10 29.975 0.875
1200 7.185 0.29 0 0 0 10 71.85 2.9
1210 3.918 0.01 0 0 0 10 39.175 0.1
1220 11.96 0 0 0 0 10 119.6 0
1230 10.97 0 0 0 0 10 109.7 0
1240 1.863 0.075 0 0 0 10 18.625 0.75
1250 2.658 0.19 0 0 0 10 26.575 1.9
1260 1.353 0.038 0 0 0 10 13.525 0.375
1270 1.343 0.563 0 0 0 10 13.425 5.625
1280 1.817 0.685 0 0 0 10 18.175 6.85
1290 1.62 0.448 0 0 0 10 16.2 4.475
1300 0 3.205 0 0 0 10 0 32.05
1310 0.403 1.388 0 0 0 10 4.025 13.875
1320 1.238 2.903 0 0 0 10 12.375 29.025
1330 5.903 0.168 0 0 0 10 59.025 1.675
1340 8.62 0 0 0 0 10 86.2 0
1350 7.405 0 0 0 0 10 74.05 0
1360 5.71 0 0 0 0 10 57.1 0
1370 2.903 0 0 0 0 10 29.025 0
1380 8.352 0.02 0 0 0 10 83.525 0.2
1390 8.405 0 0 0 0 10 84.05 0
1400 7.735 0 0 0 0 10 77.35 0
1410 3.445 0.005 0 0 0 10 34.45 0.05
1420 2.05 0.073 0 0 0 10 20.5 0.725
1430 3.563 0.018 0 0 0 10 35.625 0.175
1440 1.452 0.075 0 0 0 10 14.525 0.75
1450 3.12 0.003 0 0 0 10 31.2 0.025
1460 2.615 0.008 0 0 0 10 26.15 0.075
1470 2.248 0.028 0 0 0 10 22.475 0.275
1480 3.572 0.003 0 0 0 10 35.725 0.025
1490 2.588 0.308 0 0 0 10 25.875 3.075
1500 2.205 0.063 0 0 0 10 22.05 0.625
1510 1.983 0.105 0 0 0 10 19.825 1.05
1520 2.86 0.01 0 0 0 10 28.6 0.1
1530 0.848 1.072 0 0 0 10 8.475 10.725
1540 1.615 0.09 0 0 0 10 16.15 0.9
1550 1.808 0.347 0 0 0 10 18.075 3.475
1560 5.602 0.023 0 0 0 10 56.025 0.225
1570 10.71 0 0 0 0 10 107.1 0
1580 10.035 0.003 0 0 0 10 100.35 0.025
1590 7.863 0 0 0 0 10 78.625 0
1600 7.293 0 0 0 0 10 72.925 0
1610 6.645 0.01 0 0 0 10 66.45 0.1
1620 9.62 0 0 0 0 10 96.2 0
1630 14.945 0.005 0 0 0 10 149.45 0.05
1640 8.113 0.168 0 0 0 10 81.125 1.675
1650 0.635 0.323 0 0 0 10 6.35 3.225
1660 0 4.913 0 0 0 10 0 49.125
1670 0.228 1.202 0 0 0 10 2.275 12.025
1680 2.885 0.463 0 0 0 10 28.85 4.625
1690 4.53 0.073 0 0 0 10 45.3 0.725
1700 5.343 0.008 0 0 0 10 53.425 0.075
1710 4.388 0.04 0 0 0 10 43.875 0.4
1720 3.447 0.423 0 0 0 10 34.475 4.225
1730 5.36 0.2 0 0 0 10 53.6 2
1740 3.828 4.53 0 0 0 10 38.275 45.3
1750 4.543 3.175 0 0 0 10 45.425 31.75
1760 9.125 0 0 0 0 10 91.25 0
1770 6.883 0 0 0 0 10 68.825 0
1780 7.185 0.043 0 0 0 10 71.85 0.425
1790 10.153 0 0 0 0 10 101.525 0
1800 6.51 0 0 0 0 10 65.1 0
1810 5.358 0.025 0 0 0 10 53.575 0.25
1820 4.095 0.015 0 0 0 10 40.95 0.15
1830 4.543 0 0 0 0 10 45.425 0
1840 2.91 0.05 0 0 0 10 29.1 0.5
1850 2.17 0.13 0 0 0 10 21.7 1.3
1860 3.823 0 0 0 0 10 38.225 0
1870 8.898 0 0 0 0 10 88.975 0
1880 7.65 0 0 0 0 10 76.5 0
1890 3.503 0.248 0 0 0 10 35.025 2.475
1900 0.148 1.745 0 0 0 10 1.475 17.45
1910 3.41 0 0 0 0 10 34.1 0
1920 12.113 0.005 0 0 0 10 121.125 0.05
1930 16.45 0 0 0 0 10 164.5 0
1940 8.703 0 0 0 0 10 87.025 0
1950 1.763 0.18 0 0 0 10 17.625 1.8
1960 0.893 0.968 0 0 0 10 8.925 9.675
1970 0.74 0.708 0 0 0 10 7.4 7.075
1980 2.543 1.143 0 0 0 10 25.425 11.425
1990 3.838 1.293 0 0 0 10 38.375 12.925
2000 2.26 2.18 0 0 0 10 22.6 21.8
2010 3.205 0.688 0 0 0 10 32.05 6.875
2020 5.135 0 0 0 0 10 51.35 0
2030 7.488 0.113 0 0 0 10 74.875 1.125
2040 12.153 0 0 0 0 10 121.525 0
2050 12.365 0 0 0 0 10 123.65 0
2060 13.205 0 0 0 0 10 132.05 0
2070 11.578 0 0 0 0 10 115.775 0
2080 12.225 0 0 0 0 10 122.25 0
2090 11.313 0 0 0 0 10 113.125 0
2100 10.93 0 0 0 0 10 109.3 0
2110 6.28 0 0 0 0 10 62.8 0
2120 5.76 0 0 0 0 10 57.6 0
2130 5.668 0.01 0 0 0 10 56.675 0.1
2140 2.853 0.163 0 0 0 10 28.525 1.625
2150 5.915 0.033 0 0 0 10 59.15 0.325
2160 10.535 0 0 0 0 10 105.35 0
2170 13.468 0 0 0 0 10 134.675 0
2180 13.908 0 0 0 0 10 139.075 0
2190 13.333 0 0 0 0 10 133.325 0
2200 6.385 0.045 0 0 0 10 63.85 0.45
2210 5.845 0 0 0 0 10 58.45 0
2220 5.433 0 0 0 0 10 54.325 0
2230 3.545 0.118 0 0 0 10 35.45 1.175
2240 1.202 0.413 0 0 0 10 12.025 4.125
2250 0.245 2.098 0 0 0 10 2.45 20.975
2260 0.208 1.343 0 0 0 10 2.075 13.425
2270 0.18 2.098 0 0 0 10 1.8 20.975
2280 0.085 1.895 0 0 0 10 0.85 18.95
2290 2.235 0.193 0 0 0 10 22.35 1.925
2300 3.008 0.03 0 0 0 10 30.075 0.3
2310 6.563 0 0 0 0 10 65.625 0
2320 4.703 0.11 0 0 0 10 47.025 1.1
2330 1.205 0.925 0 0 0 10 12.05 9.25
2340 0.02 1.973 0 0 0 10 0.2 19.725
2350 0.135 1.655 0 0 0 10 1.35 16.55
2360 0.488 2.48 0 0 0 10 4.875 24.8
2370 1.058 0.53 0 0 0 10 10.575 5.3
2380 5.01 0 0 0 0 10 50.1 0
2390 8.435 0 0 0 0 10 84.35 0
2400 6.265 0.165 0 0 0 10 62.65 1.65
2410 4.75 0.09 0 0 0 10 47.5 0.9
2420 1.418 0.075 0 0 0 10 14.175 0.75
2430 4.105 0.135 0 0 0 10 41.05 1.35
2440 2.352 0.038 0 0 0 10 23.525 0.375
2450 3.788 0.003 0 0 0 10 37.875 0.025
2460 10.58 0 0 0 0 10 105.8 0
2470 9.18 0 0 0 0 10 91.8 0
2480 8.74 0 0 0 0 10 87.4 0
2490 2.203 0.16 0 0 0 10 22.025 1.6
2500 3.49 0.003 0 0 0 10 34.9 0.025
2510 3.613 1.63 0 0 0 10 36.125 16.3
2520 1.953 0.873 0 0 0 10 19.525 8.725
2530 4.23 0.53 0 0 0 10 42.3 5.3
2540 3.993 1.11 0 0 0 10 39.925 11.1
2550 4.903 0.113 0 0 0 10 49.025 1.125
2560 6.213 0 0 0 0 10 62.125 0
2570 6.395 0.48 0 6.565 2.348 10 63.95 4.8
2580 7.28 0.028 0 10.24 4.973 10 72.8 0.275
2590 6.505 0.075 0 7.623 3.553 10 65.05 0.75
2600 6.905 0.003 0 9.198 4.895 10 69.05 0.025
2610 7.6 0.063 0 8.515 4.898 10 76 0.625
2620 8.153 0.053 0 9.495 5.775 10 81.525 0.525
2630 6.998 1.013 0 9.23 4.73 10 69.975 10.125
2640 4.3 0.905 0 11.852 6.53 10 43 9.05
2650 6.423 0.003 0 9.415 4.77 10 64.225 0.025
2660 3.26 0.145 0 9.658 6.28 10 32.6 1.45
2670 3.985 0.015 0 0 0 10 39.85 0.15
2680 9.33 0 0 0 0 10 93.3 0
2690 6.348 0.287 0 0 0 10 63.475 2.875
2700 4.1 0.003 0 0 0 10 41 0.025
2710 2.713 0.413 0 0 0 10 27.125 4.125
2720 1.218 0.333 0 0 0 10 12.175 3.325
2730 1.255 0.113 0 0 0 10 12.55 1.125
2740 1.158 0.268 0 0 0 10 11.575 2.675
2750 2.06 0.113 0 0 0 10 20.6 1.125
2760 4.503 0 0 0 0 10 45.025 0
2770 3.935 0.003 0 0 0 10 39.35 0.025
2780 3.383 0.03 0 0 0 10 33.825 0.3
2790 3.468 0.083 0 0 0 10 34.675 0.825
2800 4.685 0 0 0 0 10 46.85 0
2810 3.4 0.043 0 0 0 10 34 0.425
2820 2.415 0.03 0 0 0 10 24.15 0.3
2830 1.668 0.293 0 0 0 10 16.675 2.925
2840 3.653 0.708 0 0 0 10 36.525 7.075
2850 3.41 1.285 0 0 0 10 34.1 12.85
2860 3.595 0.083 0 0 0 10 35.95 0.825
2870 3.273 0.055 0 0 0 10 32.725 0.55
2880 1.317 0.35 0 0 0 10 13.175 3.5
2890 2.025 0.18 0 0 0 10 20.25 1.8
2900 2.68 0.103 0 0 0 10 26.8 1.025
2910 4.215 0.21 0 0 0 10 42.15 2.1
2920 1.778 0.093 0 0 0 10 17.775 0.925
2930 0.505 0.483 0 0 0 10 5.05 4.825
2940 1.058 0.33 0 0 0 10 10.575 3.3
2950 2.095 0.468 0 4.4 1.108 10 20.95 4.675
2960 5.048 0.268 0 0 0 10 50.475 2.675
2970 3.14 0.055 0 0 0 10 31.4 0.55
2980 2.395 0.233 0 0 0 10 23.95 2.325
2990 1.73 0.735 0 0 0 10 17.3 7.35
3000 4.54 1.263 0 0 0 10 45.4 12.625
3010 1.058 0.783 0 0 0 10 10.575 7.825
3020 1.365 1.358 0 0 0 10 13.65 13.575
3030 2.332 0.333 0 0 0 10 23.325 3.325
3040 3.775 0.195 0 0 0 10 37.75 1.95
3050 4.068 0.618 0 8.298 3.73 10 40.675 6.175
3060 3.635 0.243 0 0 0 10 36.35 2.425
3070 3.458 0.64 0 6.398 2.947 10 34.575 6.4
3080 4.945 4.205 0 7.113 2.6 10 49.45 42.05
3090 5.04 2.505 0 8.783 3.572 10 50.4 25.05
3100 6.335 0.03 0 10.79 5.385 10 63.35 0.3
3110 2.638 0.228 0 9.033 5.51 10 26.375 2.275
3120 5 0.59 0 5.043 2.193 10 50 5.9
3130 5.648 0.1 0 10.665 5.428 10 56.475 1
3140 4.935 0 0 0 0 10 49.35 0
3150 4.51 0 0 0 0 10 45.1 0
3160 1.93 0.018 0 0 0 10 19.3 0.175
3170 0.855 0.313 0 0 0 10 8.55 3.125
3180 0.275 1.398 0 0 0 10 2.75 13.975
3190 0.445 1.08 0 0 0 10 4.45 10.8
3200 1.788 0.843 0 0 0 10 17.875 8.425
3210 0.605 3.043 0 0 0 10 6.05 30.425
3220 1.895 1.943 0 0 0 10 18.95 19.425
3230 5.16 0.008 0 0 0 10 51.6 0.075
3240 6.193 0.165 0 10.68 5.38 10 61.925 1.65
3250 9.533 0 0 0 0 10 95.325 0
3260 9.658 0 0 0 0 10 96.575 0
3270 9.753 0 0 0 0 10 97.525 0
3280 8.307 0 0 0 0 10 83.075 0
3290 4.545 0 0 0 0 10 45.45 0
3300 0.8 0.675 0 0 0 10 8 6.75
3310 1.505 0.407 0 0 0 10 15.05 4.075
3320 1.455 0.105 0 0 0 10 14.55 1.05
3330 5.57 0 0 0 0 10 55.7 0
3340 10.225 0 0 0 0 10 102.25 0
3350 11.193 0 0 0 0 10 111.925 0
3360 12.19 0 0 0 0 10 121.9 0
3370 12.725 0 0 0 0 10 127.25 0
3380 11.17 0.003 0 9.178 4.55 10 111.7 0.025
3390 6.175 0.058 0 11.568 6.448 10 61.75 0.575
3400 4.073 0.213 0 6.93 4.125 10 40.725 2.125
3410 1.718 3.135 0 0 0 10 17.175 31.35
3420 0.567 4.638 0 0 0 10 5.675 46.375
3430 0.61 7.48 0 0 0 10 6.1 74.8
3440 0 11.017 0 0 0 10 0 110.175
3450 0 10.938 0 0 0 10 0 109.375
3460 0.723 6.615 0 4.102 1.283 10 7.225 66.15
3470 0.03 9.655 0 4.392 1.033 10 0.3 96.55
3480 0 13.053 0 0 0 10 0 130.525
3490 0 8.725 0 0 0 10 0 87.25
3500 0 7.243 0 0 0 10 0 72.425
3510 0 7.988 0 0 0 10 0 79.875
3520 3.118 0.685 0 0 0 10 31.175 6.85
3530 6.455 0.193 0 10.19 6.543 10 64.55 1.925
3540 11.81 0.127 0 7.763 4.178 10 118.1 1.275
3550 14.013 0 0 15.005 9.795 10 140.125 0
3560 14.26 0.115 0 8.71 4.78 10 142.6 1.15
3570 11.225 0 0 0 0 10 112.25 0
3580 6.113 0.003 0 0 0 9.56 58.436 0.024
3589.12 5.34 0.498 0 0 0 4.56 24.35 2.269
3725.2 0 14.583 0 0 0 2.4 0 34.998
3730 4.808 0.4 0 0 0 7.4 35.576 2.96
3740 6.56 0.033 0 0 0 10 65.6 0.325
3750 3.018 3.075 0 0 0 10 30.175 30.75
3760 2.738 0.643 0 0 0 10 27.375 6.425
3770 4.098 0.1 0 0 0 10 40.975 1
3780 5.838 0 0 0 0 10 58.375 0
3790 5.793 0.003 0 0 0 10 57.925 0.025
3800 5.457 0.008 0 0 0 10 54.575 0.075
3810 3.943 0.018 0 0 0 10 39.425 0.175
3820 2.6 0.07 0 0 0 10 26 0.7
3830 2.865 0 0 0 0 10 28.65 0
3840 3.57 0.528 0 0 0 10 35.7 5.275
3850 4.92 0.425 0 0 0 10 49.2 4.25
3860 5.698 0.055 0 0 0 10 56.975 0.55
3870 4.92 0.185 0 0 0 10 49.2 1.85
3880 3.63 0.065 0 0 0 10 36.3 0.65
3890 5.267 0.035 0 0 0 10 52.675 0.35
3900 4.883 0.32 0 0 0 10 48.825 3.2
3910 3.44 0.523 0 0 0 10 34.4 5.225
3920 1.623 0.355 0 0 0 10 16.225 3.55
3930 4.605 0.46 0 0 0 10 46.05 4.6
3940 4.59 0.115 0 0 0 10 45.9 1.15
3950 3.398 0 0 0 0 10 33.975 0
3960 1.518 0.04 0 0 0 10 15.175 0.4
3970 0.463 1.848 0 0 0 10 4.625 18.475
3980 0.205 0.79 0 0 0 10 2.05 7.9
3990 0.03 2.04 0 0 0 10 0.3 20.4
4000 0.005 0.695 0 0 0 10 0.05 6.95
4010 0.52 0.428 0 0 0 10 5.2 4.275
4020 1.13 0.13 0 0 0 10 11.3 1.3
4030 0.07 0.823 0 0 0 10 0.7 8.225
4040 0 3.9 0 0 0 10 0 39
4050 0.025 2.438 0 0 0 10 0.25 24.375
4060 0.33 0.815 0 0 0 10 3.3 8.15
4070 2.098 0.268 0 0 0 10 20.975 2.675
4080 4.933 0.563 0 0 0 10 49.325 5.625
4090 5.428 0 0 0 0 10 54.275 0
4100 5.198 0.013 0 0 0 10 51.975 0.125
4110 3.185 0 0 0 0 10 31.85 0
4120 1.15 0.328 0 0 0 10 11.5 3.275
4130 1.608 0.23 0 0 0 10 16.075 2.3
4140 2.453 0.193 0 0 0 10 24.525 1.925
4150 5.408 0 0 0 0 10 54.075 0
4160 6.85 0 0 0 0 10 68.5 0
4170 5.36 0.01 0 0 0 10 53.6 0.1
4180 5.08 0.01 0 0 0 10 50.8 0.1
4190 5.582 0.005 0 0 0 10 55.825 0.05
4200 4.953 0.083 0 0 0 10 49.525 0.825
4210 3.713 0.088 0 0 0 10 37.125 0.875
4220 6.428 0.165 0 0 0 10 64.275 1.65
4230 4.89 0.345 0 0 0 10 48.9 3.45
4240 2.798 0.045 0 0 0 10 27.975 0.45
4250 3.145 0 0 0 0 10 31.45 0
4260 4.778 0 0 0 0 10 47.775 0
4270 3.65 0.003 0 0 0 10 36.5 0.025
4280 3.66 0.05 0 0 0 10 36.6 0.5
4290 3.383 0.03 0 0 0 10 33.825 0.3
4300 5.715 0.138 0 0 0 10 57.15 1.375
4310 7.703 0.465 0 0 0 10 77.025 4.65
4320 4.355 0.725 0 0 0 10 43.55 7.25
4330 4.65 0.118 0 0 0 10 46.5 1.175
4340 6.395 0.248 0 0 0 10 63.95 2.475
4350 6.013 0.048 0 0 0 10 60.125 0.475
4360 7.398 0 0 0 0 10 73.975 0
4370 8.193 0 0 0 0 10 81.925 0
4380 9.25 0 0 0 0 10 92.5 0
4390 8.773 0.003 0 0 0 10 87.725 0.025
4400 8.295 0.06 0 0 0 10 82.95 0.6
4410 6.658 0 0 0 0 10 66.575 0
4420 5.763 0 0 0 0 10 57.625 0
4430 5.273 0 0 0 0 10 52.725 0
4440 5.288 0.02 0 0 0 10 52.875 0.2
4450 6.235 0.03 0 0 0 10 62.35 0.3
4460 6.535 0 0 0 0 10 65.35 0
4470 4.588 0 0 0 0 10 45.875 0
4480 5.142 0.02 0 0 0 10 51.425 0.2
4490 5.418 0 0 0 0 10 54.175 0
4500 5.535 0.27 0 0 0 10 55.35 2.7
4510 5.788 0.023 0 0 0 10 57.875 0.225
4520 2.227 2.028 0 0 0 10 22.275 20.275
4530 2.875 0.123 0 0 0 10 28.75 1.225
4540 3.108 0.12 0 0 0 10 31.075 1.2
4550 3.218 0.168 0 0 0 10 32.175 1.675
4560 3.98 0.018 0 0 0 10 39.8 0.175
4570 3.758 0 0 0 0 10 37.575 0
4580 4.483 0.075 0 0 0 10 44.825 0.75
4590 3.745 0.07 0 0 0 10 37.45 0.7
4600 4.845 0.018 0 0 0 10 48.45 0.175
4610 6.79 0 0 0 0 10 67.9 0
4620 8.36 0 0 0 0 10 83.6 0
4630 6.08 0 0 0 0 10 60.8 0
4640 6.013 0.003 0 0 0 10 60.125 0.025
4650 2.705 0.213 0 0 0 10 27.05 2.125
4660 2.288 0.105 0 0 0 10 22.875 1.05
4670 2.695 0.2 0 0 0 10 26.95 2
4680 4.65 0.373 0 0 0 10 46.5 3.725
4690 4.037 0.07 0 0 0 10 40.375 0.7
4700 4.57 0.04 0 0 0 10 45.7 0.4
4710 4.505 0.073 0 0 0 10 45.05 0.725
4720 3.83 0.175 0 0 0 10 38.3 1.75
4730 4.823 0.148 0 0 0 10 48.225 1.475
4740 5.375 0.12 0 0 0 10 53.75 1.2
4750 6.725 0.008 0 0 0 10 67.25 0.075
4760 4.343 0.075 0 0 0 10 43.425 0.75
4770 3.128 0.148 0 0 0 10 31.275 1.475
4780 2.79 0.018 0 0 0 10 27.9 0.175
4790 3.885 0.01 0 0 0 10 38.85 0.1
4800 2.965 0.448 0 0 0 10 29.65 4.475
4810 2.81 0.14 0 0 0 10 28.1 1.4
4820 2.75 0 0 0 0 10 27.5 0
4830 1.613 0.113 0 0 0 10 16.125 1.125
4840 1.05 0.418 0 0 0 10 10.5 4.175
4850 1.868 0.257 0 0 0 10 18.675 2.575
4860 2.273 0.103 0 0 0 10 22.725 1.025
4870 2.075 0.13 0 0 0 10 20.75 1.3
4880 4.16 0.055 0 0 0 10 41.6 0.55
4890 9.775 0.005 0 0 0 10 97.75 0.05
4900 10.975 0.008 0 25.222 11.898 10 109.75 0.075
4910 12.443 0.228 0 12.418 2.705 10 124.425 2.275
4920 11.415 0.838 0 9.993 2.313 10 114.15 8.375
4930 5.915 2.24 0 22.968 12.52 10 59.15 22.4
4940 4.348 4.727 0 0 0 10 43.475 47.275
4950 0.855 7.423 0 0 0 10 8.55 74.225
4960 0.528 5.34 0 0 0 10 5.275 53.4
4970 0.93 10.578 0 6.35 2.26 10 9.3 105.775
4980 2.863 3.393 0 3.605 1.178 10 28.625 33.925
4990 7.395 0.8 0 6.635 4.105 10 73.95 8
5000 6.845 1.327 0 0 0 10 68.45 13.275
5010 7.813 0.123 0 0 0 10 78.125 1.225
5020 5.255 0.673 0 0 0 10 52.55 6.725
5030 1.155 1.255 0 0 0 10 11.55 12.55
5040 0.56 4.225 0 0 0 10 5.6 42.25
5050 0.233 2.09 0 0 0 10 2.325 20.9
5060 0.065 2.04 0 0 0 10 0.65 20.4
5070 0.343 4.398 0 0 0 10 3.425 43.975
5080 0.975 4.088 0 8.852 4.69 10 9.75 40.875
5090 1.843 0.893 0 0 0 10 18.425 8.925
5100 1.428 1.355 0 8.892 4.455 10 14.275 13.55
5110 9.343 0.703 0 0 0 10 93.425 7.025
5120 1.25 0.565 0 0 0 10 12.5 5.65
5130 6.795 0.507 0 0 0 10 67.95 5.075
5140 6.51 0.79 0 0 0 10 65.1 7.9
5150 6.102 0.873 0 0 0 10 61.025 8.725
5160 6.685 0.4 0 0 0 10 66.85 4
5170 7.565 0 0 0 0 10 75.65 0
5180 9.668 0.18 0 0 0 10 96.675 1.8
5190 10.71 1.475 0 0 0 10 107.1 14.75
5200 13.04 2.783 0 0 0 10 130.4 27.825
5210 15.163 0 0 0 0 10 151.625 0
5220 13.235 0.142 0 0 0 10 132.35 1.425
5230 10.65 0.7 0 0 0 10 106.5 7
5240 9.86 0 0 0 0 10 98.6 0
5250 5.918 1.16 0 0 0 10 59.175 11.6
5260 0.345 7.815 0 0 0 10 3.45 78.15
5270 0 13.727 0 0 0 10 0 137.275
5280 0 7.718 0 0 0 10 0 77.175
5290 0.65 3.353 0 0 0 10 6.5 33.525
5300 0.303 1.058 0 0 0 10 3.025 10.575
5310 0.803 5.043 0 0 0 10 8.025 50.425
5320 1.823 1.545 0 0 0 10 18.225 15.45
5330 0.063 5.138 0 0 0 10 0.625 51.375
5340 0.625 4.19 0 0 0 10 6.25 41.9
5350 0.39 0.465 0 0 0 10 3.9 4.65
5360 1.105 2.273 0 0 0 10 11.05 22.725
5370 0 2.895 0 0 0 10 0 28.95
5380 0 4.375 0 0 0 10 0 43.75
5390 0 7.303 0 0 0 10 0 73.025
5400 2.403 1.105 0 0 0 10 24.025 11.05
5410 9.83 0.475 0 0 0 10 98.3 4.75
5420 6.16 0.045 0 0 0 10 61.6 0.45
5430 4.933 0.505 0 0 0 10 49.325 5.05
5440 2.602 2.798 0 0 0 10 26.025 27.975
5450 1.248 0.855 0 0 0 10 12.475 8.55
5460 2.185 0.095 0 15.578 10.028 10 21.85 0.95
5470 4.593 0.035 0 13.655 8.168 10 45.925 0.35
5480 3.24 0.063 0 11.815 6.638 10 32.4 0.625
5490 1.663 0.64 0 0 0 10 16.625 6.4
5500 2.485 0.005 0 0 0 10 24.85 0.05
5510 6.433 0.063 0 0 0 10 64.325 0.625
5520 7.448 0 0 0 0 10 74.475 0
5530 6.92 0.03 0 0 0 10 69.2 0.3
5540 3.79 0.415 0 11.685 6.088 10 37.9 4.15
5550 1.773 3.733 0 6.485 3.018 10 17.725 37.325
5560 0.183 7.415 0 8.472 2.625 10 1.825 74.15
5570 0.123 8.578 0 8.318 2.675 10 1.225 85.775
5580 0.05 10.878 0 3.728 0.615 10 0.5 108.775
5590 0.135 12.99 0 3.01 0.29 10 1.35 129.9
5600 0 18.225 0 0 0 10 0 182.25
5610 0 18.88 0 0 0 10 0 188.8
5620 0.003 18.283 0 1.415 0.04 10 0.025 182.825
5630 0 22.773 0 0 0 10 0 227.725
5640 0 32.763 0 0 0 10 0 327.625
5650 0 19.788 0 0 0 10 0 197.875
5660 0 22.385 0 0 0 10 0 223.85
5670 0.018 16.033 0 3.16 0.673 10 0.175 160.325
5680 0 15.323 0 1.98 0.4 10 0 153.225
5690 0.09 6.98 0 6.433 2.153 10 0.9 69.8
5700 0 6.873 0 0 0 10 0 68.725
5710 0.045 1.905 0 0 0 10 0.45 19.05
5720 4.91 3.673 0 0 0 10 49.1 36.725
5730 7.05 0 0 0 0 10 70.5 0
5740 5 1.57 0 0 0 10 50 15.7
5750 7.413 3.88 0 0 0 10 74.125 38.8
5760 15.068 3.197 0 0 0 10 150.675 31.975
5770 17.413 0 0 0 0 10 174.125 0
5780 12.333 0 0 0 0 10 123.325 0
5790 5.983 9.39 0 0 0 10 59.825 93.9
5800 7.543 3.313 0 12.575 6.56 10 75.425 33.125
5810 6.91 0.79 0 13.788 7.37 10 69.1 7.9
5820 5.745 2.293 0 8.868 3.805 10 57.45 22.925
5830 7.97 0.468 0 5.778 2.213 10 79.7 4.675
5840 0.185 2.38 0 0 0 10 1.85 23.8
5850 0.04 5.953 0 5.2 0.868 10 0.4 59.525
5860 0 15.478 0 0.713 0.075 10 0 154.775
5870 0.698 8.17 0 2.285 0.473 10 6.975 81.7
5880 1.115 6.455 0 0 0 10 11.15 64.55
5890 9.688 0.14 0 0 0 10 96.875 1.4
5900 6.21 0.04 0 0 0 10 62.1 0.4
5910 1.228 0.018 0 0 0 10 12.275 0.175
5920 0.003 4.6 0 2.798 0.775 10 0.025 46
5930 0 11.503 0 0 0 10 0 115.025
5940 0 11.25 0 0 0 10 0 112.5
5950 0 8.012 0 0 0 10 0 80.125
5960 0 11.475 0 0 0 10 0 114.75
5970 0 7.925 0 0 0 10 0 79.25
5980 0 3.433 0 0 0 10 0 34.325
5990 0 4.613 0 0 0 10 0 46.125
6000 0.013 1.35 0 0 0 10 0.125 13.5
6010 0 2.07 0 0 0 10 0 20.7
6020 0.013 6.935 0 3.743 1.133 10 0.125 69.35
6030 0 15.233 0 0 0 10 0 152.325
6040 0 21.313 0 0 0 10 0 213.125
6050 0 22.47 0 0 0 10 0 224.7
6060 0 20.76 0 0 0 10 0 207.6
6070 0 18.07 0 0 0 10 0 180.7
6080 0 11.835 0 0 0 10 0 118.35
6090 0.125 4.713 0 0 0 10 1.25 47.125
6100 1.875 0.048 0 0 0 10 18.75 0.475
6110 3.11 0.088 0 0 0 10 31.1 0.875
6120 3.705 0.005 0 0 0 10 37.05 0.05
6130 5.343 0.043 0 0 0 10 53.425 0.425
6140 4.135 0.278 0 0 0 10 41.35 2.775
6150 3.23 0.525 0 0 0 10 32.3 5.25
6160 3.345 0.875 0 0 0 10 33.45 8.75
6170 2.585 0.728 0 0 0 10 25.85 7.275
6180 2.197 0.468 0 0 0 10 21.975 4.675
6190 2.822 0.39 0 0 0 10 28.225 3.9
6200 4.12 0.225 0 0 0 10 41.2 2.25
6210 4.707 0.098 0 0 0 10 47.075 0.975
6220 5.015 0 0 0 0 10 50.15 0
6230 7.503 0 0 0 0 10 75.025 0
6240 11.218 0 0 0 0 10 112.175 0
6250 10.83 0 0 0 0 10 108.3 0
6260 11.065 0 0 0 0 10 110.65 0
6270 9.682 0 0 0 0 10 96.825 0
6280 7.363 0.4 0 0 0 10 73.625 4
6290 4.102 0 0 0 0 10 41.025 0
6300 1.105 0.085 0 0 0 10 11.05 0.85
6310 0 6.49 0 0 0 10 0 64.9
6320 0.15 6.163 0 0 0 10 1.5 61.625
6330 1.155 0.865 0 0 0 10 11.55 8.65
6340 1.73 0.265 0 0 0 10 17.3 2.65
6350 2.145 0.195 0 0 0 10 21.45 1.95
6360 1.082 0.142 0 0 0 10 10.825 1.425
6370 2.188 0.068 0 0 0 10 21.875 0.675
6380 2.33 0.07 0 0 0 10 23.3 0.7
6390 2.033 0.023 0 0 0 10 20.325 0.225
6400 2.12 0.005 0 0 0 10 21.2 0.05
6410 2.465 0.103 0 0 0 10 24.65 1.025
6420 2.72 0.013 0 0 0 10 27.2 0.125
6430 5.843 0 0 0 0 10 58.425 0
6440 9.745 0 0 0 0 10 97.45 0
6450 13.96 0 0 0 0 10 139.6 0
6460 14.69 0 0 0 0 10 146.9 0
6470 17.01 0 0 0 0 10 170.1 0
6480 19.125 0.003 0 0 0 10 191.25 0.025
6490 8.635 0 0 0 0 10 86.35 0
6500 1.043 0.233 0 0 0 10 10.425 2.325
6510 1.485 0.363 0 0 0 10 14.85 3.625
6520 5.513 1.243 0 0 0 10 55.125 12.425
6530 6.298 0 0 0 0 10 62.975 0
6540 5.765 0.548 0 0 0 10 57.65 5.475
6550 4.665 0.025 0 0 0 10 46.65 0.25
6560 3.943 0 0 0 0 10 39.425 0
6570 3.158 0.365 0 0 0 10 31.575 3.65
6580 2.928 0.287 0 0 0 10 29.275 2.875
6590 3.985 1.07 0 0 0 10 39.85 10.7
6600 5.07 0.008 0 0 0 10 50.7 0.075
6610 7.795 0 0 0 0 10 77.95 0
6620 9.267 0 0 0 0 10 92.675 0
6630 8.628 0 0 0 0 10 86.275 0
6640 5.783 0 0 0 0 10 57.825 0
6650 5.86 0.523 0 0 0 10 58.6 5.225
6660 6.288 0.003 0 0 0 10 62.875 0.025
6670 5.313 0.063 0 0 0 10 53.125 0.625
6680 4.955 0 0 0 0 10 49.55 0
6690 3.838 0.033 0 0 0 10 38.375 0.325
6700 3.353 0 0 0 0 10 33.525 0
6710 4.32 0 0 0 0 10 43.2 0
6720 4.1 0.018 0 0 0 10 41 0.175
6730 4.245 0.01 0 0 0 10 42.45 0.1
6740 4.008 0.023 0 0 0 10 40.075 0.225
6750 3.563 0.065 0 0 0 10 35.625 0.65
6760 2.4 0.248 0 0 0 10 24 2.475
6770 1.76 0.525 0 0 0 10 17.6 5.25
6780 0.908 1.063 0 0 0 10 9.075 10.625
6790 0.282 1.803 0 0 0 10 2.825 18.025
6800 0.453 1.61 0 0 0 10 4.525 16.1
6810 1.233 0.905 0 0 0 10 12.325 9.05
6820 2.02 0.425 0 0 0 10 20.2 4.25
6830 3.25 0.153 0 0 0 10 32.5 1.525
6840 4.705 0.05 0 0 0 10 47.05 0.5
6850 4.813 0.25 0 0 0 10 48.125 2.5
6860 5 0.02 0 0 0 10 50 0.2
6870 4.22 0.178 0 0 0 10 42.2 1.775
6880 3.545 0.01 0 0 0 10 35.45 0.1
6890 3.86 0.01 0 0 0 10 38.6 0.1
6900 4.207 0.045 0 0 0 10 42.075 0.45
6910 4.733 0.02 0 0 0 10 47.325 0.2
6920 4.52 0.218 0 0 0 10 45.2 2.175
6930 4.287 0.025 0 0 0 10 42.875 0.25
6940 4.198 0.005 0 0 0 10 41.975 0.05
6950 4.138 0.003 0 0 0 10 41.375 0.025
6960 4.783 0 0 0 0 10 47.825 0
6970 2.322 0.103 0 0 0 10 23.225 1.025
6980 2.553 0.183 0 0 0 10 25.525 1.825
6990 1.94 0.635 0 0 0 10 19.4 6.35
7000 5.175 0.003 0 0 0 10 51.75 0.025
7010 6.148 0 0 0 0 10 61.475 0
7020 9.343 0 0 0 0 10 93.425 0
7030 11.988 0 0 0 0 10 119.875 0
7040 16.052 0 0 0 0 10 160.525 0
7050 15.445 0 0 0 0 10 154.45 0
7060 13.27 0 0 0 0 10 132.7 0
7070 9.773 0 0 0 0 10 97.725 0
7080 10.86 0 0 0 0 10 108.6 0
7090 8.63 0 0 0 0 10 86.3 0
7100 9.753 0 0 0 0 10 97.525 0
7110 12.915 0 0 0 0 10 129.15 0
7120 13.26 0 0 0 0 10 132.6 0
7130 13.155 0 0 0 0 10 131.55 0
7140 2.71 0.965 0 0 0 10 27.1 9.65
7150 1.998 0.66 0 0 0 10 19.975 6.6
7160 1.885 0.335 0 0 0 10 18.85 3.35
7170 3.197 0.113 0 0 0 10 31.975 1.125
7180 5.81 0 0 0 0 10 58.1 0
7190 5.997 0.013 0 0 0 10 59.975 0.125
7200 5.528 0.003 0 0 0 10 55.275 0.025
7210 5.465 0 0 0 0 10 54.65 0
7220 4.86 0.015 0 0 0 10 48.6 0.15
7230 4.935 0.018 0 0 0 10 49.35 0.175
7240 5.148 0.018 0 0 0 10 51.475 0.175
7250 5.473 0.005 0 0 0 10 54.725 0.05
7260 6.113 0.125 0 0 0 10 61.125 1.25
7270 6.25 0.018 0 0 0 10 62.5 0.175
7280 6.663 0.008 0 0 0 10 66.625 0.075
7290 4.71 0.093 0 0 0 10 47.1 0.925
7300 4.392 0.093 0 0 0 10 43.925 0.925
7310 3.828 0.048 0 0 0 10 38.275 0.475
7320 4.188 0.025 0 0 0 10 41.875 0.25
7330 3.913 0.013 0 0 0 10 39.125 0.125
7340 4.428 0 0 0 0 10 44.275 0
7350 5.033 0 0 0 0 10 50.325 0
7360 4.945 0.003 0 0 0 10 49.45 0.025
7370 4.903 0.015 0 0 0 10 49.025 0.15
7380 5.063 0.02 0 0 0 10 50.625 0.2
7390 5.598 0 0 0 0 10 55.975 0
7400 4.68 0.05 0 0 0 10 46.8 0.5
7410 3.823 0.08 0 0 0 10 38.225 0.8
7420 2.955 0.093 0 0 0 10 29.55 0.925
7430 2.245 0.16 0 0 0 10 22.45 1.6
7440 1.803 0.643 0 0 0 10 18.025 6.425
7450 2.045 0.948 0 0 0 10 20.45 9.475
7460 2.05 0.72 0 0 0 10 20.5 7.2
7470 2.048 1.253 0 0 0 10 20.475 12.525
7480 2.25 1.197 0 0 0 10 22.5 11.975
7490 2.975 0.893 0 0 0 10 29.75 8.925
7500 3.085 1.5 0 0 0 10 30.85 15
7510 3.368 1.213 0 0 0 10 33.675 12.125
7520 3.203 5.025 0 0 0 10 32.025 50.25
7530 3.308 1.82 0 0 0 10 33.075 18.2
7540 3.335 3.193 0 0 0 10 33.35 31.925
7550 2.96 1.738 0 0 0 10 29.6 17.375
7560 2.723 0.683 0 0 0 10 27.225 6.825
7570 2.643 0.358 0 0 0 10 26.425 3.575
7580 2.425 0.265 0 0 0 10 24.25 2.65
7590 2.643 0.138 0 0 0 10 26.425 1.375
7600 3.003 0.11 0 0 0 10 30.025 1.1
7610 2.023 0.22 0 0 0 10 20.225 2.2
7620 1.47 0.398 0 0 0 10 14.7 3.975
7630 0.185 1.32 0 0 0 10 1.85 13.2
7640 0.013 2.29 0 0 0 10 0.125 22.9
7650 0 2.835 0 0 0 10 0 28.35
7660 0 4.94 0 0 0 10 0 49.4
7670 0 6.265 0 0 0 10 0 62.65
7680 0 5.95 0 0 0 10 0 59.5
7690 0 5.235 0 0 0 10 0 52.35
7700 0 4.543 0 0 0 10 0 45.425
7710 0 5.913 0 0 0 10 0 59.125
7720 0 4.403 0 0 0 10 0 44.025
7730 0 3.915 0 0 0 10 0 39.15
7740 0 2.703 0 0 0 10 0 27.025
7750 0.423 1.698 0 0 0 10 4.225 16.975
7760 1.68 0.795 0 0 0 10 16.8 7.95
7770 2.07 1.948 0 0 0 10 20.7 19.475
7780 3.315 1.833 0 0 0 10 33.15 18.325
7790 4.61 0.018 0 0 0 10 46.1 0.175
7800 6.608 0.023 0 0 0 10 66.075 0.225
7810 6.538 0 0 0 0 10 65.375 0
7820 3.99 0.053 0 0 0 10 39.9 0.525
7830 4.995 0.03 0 0 0 10 49.95 0.3
7840 7.405 0 0 0 0 10 74.05 0
7850 8.445 0 0 0 0 10 84.45 0
7860 8.448 0 0 0 0 10 84.475 0
7870 9.222 0 0 0 0 10 92.225 0
7880 9.838 0 0 0 0 10 98.375 0
7890 10.733 0 0 0 0 10 107.325 0
7900 12.088 0 0 0 0 10 120.875 0
7910 11.18 0 0 0 0 10 111.8 0
7920 10.43 0 0 0 0 10 104.3 0
7930 9.483 0 0 0 0 10 94.825 0
7940 9.31 0 0 0 0 10 93.1 0
7950 6.61 0 0 0 0 10 66.1 0
7960 5.905 0 0 0 0 10 59.05 0
7970 6.093 0 0 0 0 10 60.925 0
7980 5.925 0 0 0 0 10 59.25 0
7990 5.483 0 0 0 0 10 54.825 0
8000 5.043 0 0 0 0 10 50.425 0
8010 4.803 0 0 0 0 10 48.025 0
8020 5.24 0 0 0 0 10 52.4 0
8030 5.573 0 0 0 0 10 55.725 0
8040 6.963 0.003 0 0 0 10 69.625 0.025
8050 7.658 0.008 0 0 0 10 76.575 0.075
8060 8.993 0.078 0 0 0 10 89.925 0.775
8070 10.097 0.11 0 0 0 10 100.975 1.1
8080 9.678 0 0 0 0 10 96.775 0
8090 6.425 0.028 0 0 0 10 64.25 0.275
8100 3.56 0.178 0 0 0 10 35.6 1.775
8110 1.303 0.273 0 0 0 10 13.025 2.725
8120 0 1.045 0 0 0 10 0 10.45
8130 0.09 1.64 0 0 0 10 0.9 16.4
8140 0.44 0.905 0 0 0 10 4.4 9.05
8150 0.853 0.627 0 0 0 10 8.525 6.275
8160 0.567 0.518 0 0 0 10 5.675 5.175
8170 1.55 0.24 0 0 0 10 15.5 2.4
8180 2.36 0.09 0 0 0 10 23.6 0.9
8190 3.058 0.018 0 0 0 10 30.575 0.175
8200 3.86 0 0 0 0 10 38.6 0
8210 4.52 0.003 0 0 0 10 45.2 0.025
8220 6.098 0 0 0 0 10 60.975 0
8230 7.11 0 0 0 0 10 71.1 0
8240 8.04 0 0 0 0 10 80.4 0
8250 11.915 0 0 0 0 10 119.15 0
8260 12.565 0 0 0 0 10 125.65 0
8270 12.858 0 0 0 0 10 128.575 0
8280 13.985 0 0 0 0 10 139.85 0
8290 15.798 0 0 0 0 10 157.975 0
8300 17.783 0 0 0 0 10 177.825 0
8310 15.6 0 0 0 0 10 156 0
8320 13.985 0.003 0 0 0 10 139.85 0.025
8330 12.315 0 0 0 0 10 123.15 0
8340 10.895 0 0 0 0 10 108.95 0
8350 11.005 0 0 0 0 10 110.05 0
8360 12.448 0 0 0 0 10 124.475 0
8370 13 0 0 0 0 10 130 0
8380 16.335 0 0 0 0 10 163.35 0
8390 17.243 0 0 0 0 10 172.425 0
8400 14.168 0 0 0 0 10 141.675 0
8410 9.3 0 0 0 0 10 93 0
8420 5.668 0 0 0 0 10 56.675 0
8430 3.343 0.645 0 0 0 10 33.425 6.45
8440 3.025 0.193 0 0 0 10 30.25 1.925
8450 3.165 0.148 0 0 0 10 31.65 1.475
8460 3.94 0.078 0 0 0 10 39.4 0.775
8470 6.838 0.003 0 0 0 10 68.375 0.025
8480 9.057 0 0 0 0 10 90.575 0
8490 8.783 0 0 0 0 10 87.825 0
8500 9.078 0 0 0 0 10 90.775 0
8510 6.875 0 0 0 0 10 68.75 0
8520 8.025 0 0 0 0 10 80.25 0
8530 7.95 1.23 0 0 0 10 79.5 12.3
8540 7.578 1.895 0 0 0 10 75.775 18.95
8550 8.95 0.11 0 0 0 10 89.5 1.1
8560 11.678 0 0 0 0 10 116.775 0
8570 12.455 0 0 0 0 10 124.55 0
8580 12.408 0 0 0 0 10 124.075 0
8590 10.083 0 0 0 0 10 100.825 0
8600 5.443 0.025 0 0 0 10 54.425 0.25
8610 2.725 0.108 0 0 0 10 27.25 1.075
8620 5.888 0 0 0 0 10 58.875 0
8630 8.295 0 0 0 0 10 82.95 0
8640 8.595 0 0 0 0 10 85.95 0
8650 10.833 0.127 0 0 0 10 108.325 1.275
8660 11.015 0 0 0 0 10 110.15 0
8670 10.295 0 0 0 0 10 102.95 0
8680 9.858 0 0 0 0 10 98.575 0
8690 8.083 0 0 0 0 10 80.825 0
8700 5.3 0 0 0 0 10 53 0
8710 5.227 0 0 0 0 10 52.275 0
8720 6.582 0.018 0 0 0 10 65.825 0.175
8730 8.968 0.98 0 0 0 10 89.675 9.8
8740 11.085 0.01 0 0 0 10 110.85 0.1
8750 14.863 0 0 0 0 10 148.625 0
8760 16.36 0 0 0 0 10 163.6 0
8770 17.2 0 0 0 0 10 172 0
8780 17.18 0 0 0 0 10 171.8 0
8790 15.78 0 0 0 0 10 157.8 0
8800 16.43 0 0 0 0 10 164.3 0
8810 14.888 0 0 0 0 10 148.875 0
8820 13.938 0 0 0 0 10 139.375 0
8830 13.868 0 0 0 0 10 138.675 0
8840 15.075 0 0 0 0 10 150.75 0
8850 13.698 0 0 0 0 10 136.975 0
8860 15.163 0 0 0 0 10 151.625 0
8870 18.425 0 0 0 0 10 184.25 0
8880 19.62 0 0 0 0 10 196.2 0
8890 21.505 0 0 0 0 10 215.05 0
8900 19.483 0 0 0 0 10 194.825 0
8910 16.675 0 0 0 0 10 166.75 0
8920 14.895 0 0 0 0 10 148.95 0
8930 14.068 0 0 0 0 10 140.675 0
8940 13.408 0 0 0 0 10 134.075 0
8950 15.248 0 0 0 0 10 152.475 0
8960 9.9 0 0 0 0 10 99 0
8970 7.528 0 0 0 0 10 75.275 0
8980 8.227 0 0 0 0 10 82.275 0
8990 9.477 0 0 0 0 10 94.775 0
9000 8.19 0 0 0 0 10 81.9 0
9010 6.883 0 0 0 0 10 68.825 0
9020 5.267 0 0 0 0 10 52.675 0
9030 5.033 0.085 0 0 0 10 50.325 0.85
9040 4.908 0.02 0 0 0 10 49.075 0.2
9050 3.84 0.088 0 0 0 10 38.4 0.875
9060 2.693 0.298 0 0 0 10 26.925 2.975
9070 2.058 0.545 0 0 0 10 20.575 5.45
9080 1.67 0.195 0 0 0 10 16.7 1.95
9090 1.513 1.663 0 0 0 10 15.125 16.625
9100 3.09 1.575 0 0 0 10 30.9 15.75
9110 4.378 1.07 0 0 0 10 43.775 10.7
9120 5.582 1.01 0 0 0 10 55.825 10.1
9130 6.215 0.282 0 0 0 10 62.15 2.825
9140 9.25 0.003 0 0 0 10 92.5 0.025
9150 15.278 0 0 0 0 10 152.775 0
9160 11.075 0 0 0 0 10 110.75 0
9170 8.465 0.157 0 0 0 10 84.65 1.575
9180 9.47 0.345 0 0 0 10 94.7 3.45
9190 9.073 0 0 0 0 10 90.725 0
9200 8.738 0 0 0 0 10 87.375 0
9210 10.373 0 0 0 0 10 103.725 0
9220 10.538 0 0 0 0 10 105.375 0
9230 10.008 0 0 0 0 10 100.075 0
9240 7.218 0.085 0 0 0 10 72.175 0.85
9250 4.418 0 0 0 0 10 44.175 0
9260 4.258 0.375 0 0 0 10 42.575 3.75
9270 2.467 0.708 0 0 0 10 24.675 7.075
9280 2.638 1.213 0 0 0 10 26.375 12.125
9290 2.215 0.015 0 0 0 10 22.15 0.15
9300 4.035 0.493 0 0 0 10 40.35 4.925
9310 6.568 1.688 0 0 0 10 65.675 16.875
9320 8.488 0 0 0 0 10 84.875 0
9330 8.097 0.29 0 0 0 10 80.975 2.9
9340 8.038 0 0 0 0 10 80.375 0
9350 7.16 0.05 0 0 0 10 71.6 0.5
9360 5.325 0.03 0 0 0 10 53.25 0.3
9370 4.128 0.053 0 0 0 10 41.275 0.525
9380 3.12 0.943 0 0 0 10 31.2 9.425
9390 2.618 0.19 0 0 0 10 26.175 1.9
9400 2.64 0.23 0 0 0 10 26.4 2.3
9410 2.178 0.51 0 0 0 10 21.775 5.1
9420 2.29 0.315 0 0 0 10 22.9 3.15
9430 2.983 0.783 0 0 0 10 29.825 7.825
9440 6.098 0.218 0 0 0 10 60.975 2.175
9450 9.43 0 0 0 0 10 94.3 0
9460 10.988 0 0 0 0 10 109.875 0
9470 11.155 0 0 0 0 10 111.55 0
9480 8.4 0 0 0 0 10 84 0
9490 5.513 0 0 0 0 10 55.125 0
9500 5.285 0 0 0 0 10 52.85 0
9510 5.55 0 0 0 0 10 55.5 0
9520 4.535 0 0 0 0 10 45.35 0
9530 3.723 0 0 0 0 10 37.225 0
9540 3.04 0.003 0 0 0 10 30.4 0.025
9550 1.993 0.24 0 0 0 10 19.925 2.4
9560 1.748 0.025 0 0 0 10 17.475 0.25
9570 1.975 0.583 0 0 0 10 19.75 5.825
9580 2.08 0.958 0 0 0 10 20.8 9.575
9590 3.053 0.545 0 0 0 10 30.525 5.45
9600 3.63 0.363 0 0 0 10 36.3 3.625
9610 4.368 0.103 0 0 0 10 43.675 1.025
9620 4.55 0.045 0 0 0 10 45.5 0.45
9630 4.883 0.175 0 0 0 10 48.825 1.75
9640 4.815 0.14 0 0 0 10 48.15 1.4
9650 3.325 0.065 0 0 0 10 33.25 0.65
9660 5.415 0.043 0 0 0 10 54.15 0.425
9670 11.988 0 0 0 0 10 119.875 0
9680 18.71 0 0 0 0 10 187.1 0
9690 24.633 0 0 0 0 10 246.325 0
9700 25.513 0 0 0 0 10 255.125 0
9710 30.993 0 0 0 0 10 309.925 0
9720 29.513 0 0 0 0 10 295.125 0
9730 12.318 0 0 0 0 10 123.175 0
9740 19.925 0 0 0 0 10 199.25 0
9750 18.205 0 0 0 0 10 182.05 0
9760 11.675 0 0 0 0 10 116.75 0
9770 11.303 0 0 0 0 10 113.025 0
9780 13.078 0 0 0 0 10 130.775 0
9790 14.205 0 0 0 0 10 142.05 0
9800 13.505 0 0 0 0 10 135.05 0
9810 10.283 0.065 0 0 0 10 102.825 0.65
9820 9.7 0 0 0 0 10 97 0
9830 8.283 0 0 0 0 10 82.825 0
9840 7.503 0 0 0 0 10 75.025 0
9850 7.123 0 0 0 0 10 71.225 0
9860 7.51 0 0 0 0 10 75.1 0
9870 5.37 0.005 0 0 0 10 53.7 0.05
9880 1.775 0.363 0 0 0 10 17.75 3.625
9890 0 3.03 0 0 0 10 0 30.3
9900 0 9.387 0 0 0 10 0 93.875
9910 0 15.775 0 0 0 10 0 157.75
9920 0 13.98 0 0 0 10 0 139.8
9930 0.885 4.725 0 0 0 10 8.85 47.25
9940 3.168 14.343 0 0 0 10 31.675 143.425
9950 1.655 3.845 0 0 0 10 16.55 38.45
9960 2.248 15.245 0 0 0 10 22.475 152.45
9970 0.567 4.55 0 0 0 10 5.675 45.5
9980 0 4.383 0 0 0 10 0 43.825
9990 0.805 2.717 0 0 0 10 8.05 27.175
10000 2.025 1.138 0 0 0 10 20.25 11.375
10010 5.108 2.14 0 0 0 10 51.075 21.4
10020 8.458 0.975 0 15.308 9.148 10 84.575 9.75
10030 10.413 0.11 0 19.65 11.688 10 104.125 1.1
10040 12.783 0.003 0 0 0 10 127.825 0.025
10050 2.828 2.598 0 0 0 10 28.275 25.975
10060 0.615 5.1 0 1.447 0.138 10 6.15 51
10070 0.535 6.763 0 2.755 0.42 10 5.35 67.625
10080 0.692 3.385 0 0 0 10 6.925 33.85
10090 2.58 3.253 0 5.578 1.755 10 25.8 32.525
10100 0.708 4.658 0 4.548 1.043 10 7.075 46.575
10110 1.638 3.9 0 1.26 0.07 10 16.375 39
10120 7.065 0.113 0 7.675 2.818 10 70.65 1.125
10130 12.88 0 0 0 0 10 128.8 0
10140 10.847 0 0 0 0 10 108.475 0
10150 7.313 0.043 0 0 0 10 73.125 0.425
10160 6.495 0.153 0 0 0 10 64.95 1.525
10170 5.69 0.483 0 0 0 10 56.9 4.825
10180 9.708 0.123 0 0 0 10 97.075 1.225
10190 10.633 0.005 0 0 0 10 106.325 0.05
10200 5.858 0.28 0 0 0 10 58.575 2.8
10210 6.823 2.03 0 0 0 10 68.225 20.3
10220 4.88 1.053 0 21.543 12.58 10 48.8 10.525
10230 5.435 0.16 0 25.82 15.723 10 54.35 1.6
10240 6.403 0.008 0 19.993 12.108 10 64.025 0.075
10250 6.838 0.627 0 18.837 11.498 10 68.375 6.275
10260 6.477 1.045 0 20.257 12.465 10 64.775 10.45
10270 4.43 1.055 0 19.878 12.878 10 44.3 10.55
10280 7.268 0.793 0 5.655 1.963 10 72.675 7.925
10290 3.26 1.89 0 0 0 10 32.6 18.9
10300 3.935 0.543 0 0 0 7.81 30.732 4.237
10305.62 3.718 0.75 0 0 0 2.81 10.446 2.108
54231.153 11837.396
Ord Fill Vol. Str.Cut Vol. Back Vol. Soil Type Drain Cut Area Drain Cut Vol.
0 0 0 BOULDERMIXSOIL 0.935 4.675
0 0 0 BOULDERMIXSOIL 0.848 8.475
0 0 0 BOULDERMIXSOIL 0.935 9.35
0 0 0 BOULDERMIXSOIL 0.935 9.35
0 0 0 BOULDERMIXSOIL 0.863 8.625
0 0 0 BOULDERMIXSOIL 0.585 5.85
0 0 0 BOULDERMIXSOIL 0.588 5.875
0 0 0 BOULDERMIXSOIL 0.825 8.25
0 0 0 BOULDERMIXSOIL 0.745 7.45
0 0 0 BOULDERMIXSOIL 0.688 6.875
0 0 0 BOULDERMIXSOIL 0.648 6.475
0 0 0 BOULDERMIXSOIL 0.855 8.55
0 0 0 BOULDERMIXSOIL 0.69 6.9
0 0 0 BOULDERMIXSOIL 0.66 6.6
0 0 0 BOULDERMIXSOIL 0.84 8.4
0 0 0 BOULDERMIXSOIL 0.84 8.4
0 0 0 BOULDERMIXSOIL 0.935 9.35
0 0 0 BOULDERMIXSOIL 0.925 9.25
0 0 0 BOULDERMIXSOIL 0.82 8.2
0 0 0 BOULDERMIXSOIL 0.84 8.4
0 0 0 BOULDERMIXSOIL 0.718 7.175
0 0 0 BOULDERMIXSOIL 0.915 9.15
0 0 0 BOULDERMIXSOIL 0.828 8.275
0 0 0 BOULDERMIXSOIL 0.73 7.3
0 0 0 BOULDERMIXSOIL 0.67 6.7
0 0 0 BOULDERMIXSOIL 0.925 9.25
0 0 0 BOULDERMIXSOIL 0.877 8.775
0 0 0 BOULDERMIXSOIL 0.925 9.25
0 0 0 BOULDERMIXSOIL 0.888 8.875
0 0 0 BOULDERMIXSOIL 0.935 9.35
0 0 0 BOULDERMIXSOIL 0.84 8.4
0 0 0 BOULDERMIXSOIL 0.76 7.6
0 0 0 BOULDERMIXSOIL 0.648 6.475
0 0 0 BOULDERMIXSOIL 0.618 6.175
0 0 0 BOULDERMIXSOIL 0.583 5.825
0 0 0 BOULDERMIXSOIL 0.88 8.8
0 0 0 BOULDERMIXSOIL 0.535 5.35
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.483 4.825
0 0 0 BOULDERMIXSOIL 0.45 4.5
0 0 0 BOULDERMIXSOIL 0.853 8.525
0 0 0 BOULDERMIXSOIL 0.933 9.325
0 0 0 BOULDERMIXSOIL 0.925 9.25
0 0 0 BOULDERMIXSOIL 0.877 8.775
0 0 0 BOULDERMIXSOIL 0.915 9.15
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.458 4.575
0 0 0 BOULDERMIXSOIL 0.475 4.75
0 0 0 BOULDERMIXSOIL 0.483 4.825
0 0 0 BOULDERMIXSOIL 0.475 4.75
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.458 4.575
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.458 4.575
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.512 5.125
0 0 0 BOULDERMIXSOIL 0.68 6.8
0 0 0 BOULDERMIXSOIL 0.935 9.35
0 0 0 BOULDERMIXSOIL 0.888 8.875
0 0 0 BOULDERMIXSOIL 0.895 8.95
0 0 0 BOULDERMIXSOIL 0.935 9.35
0 0 0 BOULDERMIXSOIL 0.935 9.35
0 0 0 BOULDERMIXSOIL 0.825 8.25
0 0 0 BOULDERMIXSOIL 0.825 8.25
0 0 0 BOULDERMIXSOIL 0.84 8.4
0 0 0 BOULDERMIXSOIL 0.84 8.4
0 0 0 BOULDERMIXSOIL 0.64 6.4
0 0 0 BOULDERMIXSOIL 0.53 5.3
0 0 0 BOULDERMIXSOIL 0.84 8.4
0 0 0 BOULDERMIXSOIL 0.915 9.15
0 0 0 BOULDERMIXSOIL 0.895 8.95
0 0 0 BOULDERMIXSOIL 0.673 6.725
0 0 0 BOULDERMIXSOIL 0.935 9.35
0 0 0 BOULDERMIXSOIL 0.793 7.925
0 0 0 BOULDERMIXSOIL 0.848 8.475
0 0 0 BOULDERMIXSOIL 0.538 5.375
0 0 0 BOULDERMIXSOIL 0.817 8.175
0 0 0 BOULDERMIXSOIL 0.665 6.65
0 0 0 BOULDERMIXSOIL 0.383 3.825
0 0 0 BOULDERMIXSOIL 0.627 6.275
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.248 2.475
0 0 0 BOULDERMIXSOIL 0.198 1.975
0 0 0 BOULDERMIXSOIL 0.41 4.1
0 0 0 BOULDERMIXSOIL 0.53 5.3
0 0 0 BOULDERMIXSOIL 0.935 9.35
0 0 0 BOULDERMIXSOIL 0.877 8.775
0 0 0 BOULDERMIXSOIL 0.888 8.875
0 0 0 BOULDERMIXSOIL 0.888 8.875
0 0 0 BOULDERMIXSOIL 0.925 9.25
0 0 0 BOULDERMIXSOIL 0.885 8.85
0 0 0 BOULDERMIXSOIL 0.533 5.325
0 0 0 BOULDERMIXSOIL 0.543 5.425
0 0 0 BOULDERMIXSOIL 0.528 5.275
0 0 0 BOULDERMIXSOIL 0.49 4.9
0 0 0 BOULDERMIXSOIL 0.748 7.475
0 0 0 BOULDERMIXSOIL 0.888 8.875
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.713 7.125
0 0 0 BOULDERMIXSOIL 0.888 8.875
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.583 5.825
0 0 0 BOULDERMIXSOIL 0.413 4.125
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.458 4.575
0 0 0 BOULDERMIXSOIL 0.458 4.575
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.46 4.6
0 0 0 BOULDERMIXSOIL 0.488 4.875
0 0 0 BOULDERMIXSOIL 0.645 6.45
0 0 0 BOULDERMIXSOIL 0.48 4.8
0 0 0 BOULDERMIXSOIL 0.768 7.675
0 0 0 BOULDERMIXSOIL 0.895 8.95
0 0 0 BOULDERMIXSOIL 0.935 9.35
0 0 0 BOULDERMIXSOIL 0.643 6.425
0 0 0 BOULDERMIXSOIL 0.665 6.65
0 0 0 BOULDERMIXSOIL 0.698 6.975
0 0 0 BOULDERMIXSOIL 0.84 8.4
0 0 0 BOULDERMIXSOIL 0.73 7.3
0 0 0 BOULDERMIXSOIL 0.705 7.05
0 0 0 BOULDERMIXSOIL 0.133 1.325
0 0 0 BOULDERMIXSOIL 0.325 3.25
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.495 4.95
0 0 0 BOULDERMIXSOIL 0.915 9.15
0 0 0 BOULDERMIXSOIL 0.855 8.55
0 0 0 BOULDERMIXSOIL 0.448 4.475
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.958 9.575
0 0 0 BOULDERMIXSOIL 0.918 9.175
0 0 0 BOULDERMIXSOIL 0.848 8.475
0 0 0 BOULDERMIXSOIL 0.833 8.325
0 0 0 BOULDERMIXSOIL 0.668 6.675
0 0 0 BOULDERMIXSOIL 0.768 7.675
0 0 0 BOULDERMIXSOIL 0.575 5.75
0 0 0 BOULDERMIXSOIL 0.89 8.9
0 0 0 BOULDERMIXSOIL 0.79 7.9
0 0 0 BOULDERMIXSOIL 0.673 6.725
0 0 0 BOULDERMIXSOIL 0.84 8.4
0 0 0 BOULDERMIXSOIL 0.438 4.375
0 0 0 BOULDERMIXSOIL 0.68 6.8
0 0 0 BOULDERMIXSOIL 0.745 7.45
0 0 0 BOULDERMIXSOIL 0.84 8.4
0 0 0 BOULDERMIXSOIL 0.502 5.025
0 0 0 BOULDERMIXSOIL 0.54 5.4
0 0 0 BOULDERMIXSOIL 0.65 6.5
0 0 0 BOULDERMIXSOIL 0.84 8.4
0 0 0 BOULDERMIXSOIL 0.935 9.35
0 0 0 BOULDERMIXSOIL 0.855 8.55
0 0 0 BOULDERMIXSOIL 0.935 9.35
0 0 0 BOULDERMIXSOIL 0.935 9.35
0 0 0 BOULDERMIXSOIL 0.458 4.575
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.078 0.775
0 0 0 BOULDERMIXSOIL 0 0
0 0 0 BOULDERMIXSOIL 0 0
0 0 0 BOULDERMIXSOIL 0.26 2.6
0 0 0 BOULDERMIXSOIL 0.705 7.05
0 0 0 BOULDERMIXSOIL 0.84 8.4
0 0 0 BOULDERMIXSOIL 0.853 8.525
0 0 0 BOULDERMIXSOIL 0 0
0 0 0 BOULDERMIXSOIL 0.14 1.4
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.483 4.825
0 0 0 BOULDERMIXSOIL 0.483 4.825
0 0 0 BOULDERMIXSOIL 0.458 4.575
0 0 0 BOULDERMIXSOIL 0.203 2.025
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.295 2.95
0 0 0 BOULDERMIXSOIL 0.728 7.275
0 0 0 BOULDERMIXSOIL 0.84 8.4
0 0 0 BOULDERMIXSOIL 0.75 7.5
0 0 0 BOULDERMIXSOIL 0.535 5.35
0 0 0 BOULDERMIXSOIL 0.935 9.35
0 0 0 BOULDERMIXSOIL 0.833 8.325
0 0 0 BOULDERMIXSOIL 0.877 8.775
0 0 0 BOULDERMIXSOIL 0.638 6.375
0 0 0 BOULDERMIXSOIL 0.05 0.5
0 0 0 BOULDERMIXSOIL 0.8 8
0 0 0 BOULDERMIXSOIL 0.833 8.325
0 0 0 BOULDERMIXSOIL 0.925 9.25
0 0 0 BOULDERMIXSOIL 0.915 9.15
0 0 0 BOULDERMIXSOIL 0.475 4.75
0 0 0 BOULDERMIXSOIL 0.413 4.125
0 0 0 BOULDERMIXSOIL 0.293 2.925
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.458 4.575
0 0 0 BOULDERMIXSOIL 0.458 4.575
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.443 4.425
0 0 0 BOULDERMIXSOIL 0.458 4.575
0 0 0 BOULDERMIXSOIL 0.458 4.575
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.458 4.575
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.728 7.275
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.385 3.85
0 0 0 BOULDERMIXSOIL 0.203 2.025
0 0 0 BOULDERMIXSOIL 0.093 0.925
0 0 0 BOULDERMIXSOIL 0.078 0.775
0 0 0 BOULDERMIXSOIL 0.483 4.825
0 0 0 BOULDERMIXSOIL 0.28 2.8
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0 0
0 0 0 BOULDERMIXSOIL 0.205 2.05
0 0 0 BOULDERMIXSOIL 0.458 4.575
0 0 0 BOULDERMIXSOIL 0.333 3.325
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.458 4.575
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.188 1.875
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.203 2.025
0 0 0 BOULDERMIXSOIL 0.315 3.15
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.35 3.5
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.458 4.575
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 65.65 23.475 BOULDERMIXSOIL 0.355 3.55
0 102.4 49.725 BOULDERMIXSOIL 0.393 3.925
0 76.225 35.525 BOULDERMIXSOIL 0.363 3.625
0 91.975 48.95 BOULDERMIXSOIL 0.355 3.55
0 85.15 48.975 BOULDERMIXSOIL 0.388 3.875
0 94.95 57.75 BOULDERMIXSOIL 0.355 3.55
0 92.3 47.3 BOULDERMIXSOIL 0.393 3.925
0 118.525 65.3 BOULDERMIXSOIL 0.388 3.875
0 94.15 47.7 BOULDERMIXSOIL 0.35 3.5
0 96.575 62.8 BOULDERMIXSOIL 0.363 3.625
0 0 0 BOULDERMIXSOIL 0.435 4.35
0 0 0 BOULDERMIXSOIL 0.435 4.35
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.263 2.625
0 0 0 BOULDERMIXSOIL 0.218 2.175
0 0 0 BOULDERMIXSOIL 0.22 2.2
0 0 0 BOULDERMIXSOIL 0.163 1.625
0 0 0 BOULDERMIXSOIL 0.213 2.125
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.37 3.7
0 0 0 BOULDERMIXSOIL 0.388 3.875
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.323 3.225
0 0 0 BOULDERMIXSOIL 0.178 1.775
0 0 0 BOULDERMIXSOIL 0.125 1.25
0 0 0 BOULDERMIXSOIL 0.458 4.575
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.458 4.575
0 0 0 BOULDERMIXSOIL 0.095 0.95
0 0 0 BOULDERMIXSOIL 0.165 1.65
0 0 0 BOULDERMIXSOIL 0.215 2.15
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.133 1.325
0 0 0 BOULDERMIXSOIL 0.09 0.9
0 0 0 BOULDERMIXSOIL 0.053 0.525
0 44 11.075 BOULDERMIXSOIL 0.458 4.575
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.287 2.875
0 0 0 BOULDERMIXSOIL 0.295 2.95
0 0 0 BOULDERMIXSOIL 0.24 2.4
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.328 3.275
0 0 0 BOULDERMIXSOIL 0.43 4.3
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.448 4.475
0 82.975 37.3 BOULDERMIXSOIL 0.368 3.675
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 63.975 29.475 BOULDERMIXSOIL 0.363 3.625
0 71.125 26 BOULDERMIXSOIL 0.355 3.55
0 87.825 35.725 BOULDERMIXSOIL 0.388 3.875
0 107.9 53.85 BOULDERMIXSOIL 0.355 3.55
0 90.325 55.1 BOULDERMIXSOIL 0.347 3.475
0 50.425 21.925 BOULDERMIXSOIL 0.603 6.025
0 106.65 54.275 BOULDERMIXSOIL 0.757 7.575
0 0 0 BOULDERMIXSOIL 0.835 8.35
0 0 0 BOULDERMIXSOIL 0.888 8.875
0 0 0 BOULDERMIXSOIL 0.66 6.6
0 0 0 BOULDERMIXSOIL 0.188 1.875
0 0 0 BOULDERMIXSOIL 0.413 4.125
0 0 0 BOULDERMIXSOIL 0.418 4.175
0 0 0 BOULDERMIXSOIL 0.428 4.275
0 0 0 BOULDERMIXSOIL 0.32 3.2
0 0 0 BOULDERMIXSOIL 0.278 2.775
0 0 0 BOULDERMIXSOIL 0.413 4.125
0 106.8 53.8 BOULDERMIXSOIL 0.395 3.95
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.935 9.35
0 0 0 BOULDERMIXSOIL 0.935 9.35
0 0 0 BOULDERMIXSOIL 0.87 8.7
0 0 0 BOULDERMIXSOIL 0.76 7.6
0 0 0 BOULDERMIXSOIL 0.713 7.125
0 0 0 BOULDERMIXSOIL 0.638 6.375
0 0 0 BOULDERMIXSOIL 0.893 8.925
0 0 0 BOULDERMIXSOIL 0.915 9.15
0 0 0 BOULDERMIXSOIL 0.915 9.15
0 0 0 BOULDERMIXSOIL 0.915 9.15
0 0 0 BOULDERMIXSOIL 0.935 9.35
0 91.775 45.5 BOULDERMIXSOIL 0.835 8.35
0 115.675 64.475 BOULDERMIXSOIL 0.763 7.625
0 69.3 41.25 BOULDERMIXSOIL 0.743 7.425
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.415 4.15
0 0 0 BOULDERMIXSOIL 0.423 4.225
0 0 0 BOULDERMIXSOIL 0.045 0.45
0 0 0 BOULDERMIXSOIL 0.003 0.025
0 41.025 12.825 BOULDERMIXSOIL 0.368 3.675
0 43.925 10.325 BOULDERMIXSOIL 0.07 0.7
0 0 0 BOULDERMIXSOIL 0.023 0.225
0 0 0 BOULDERMIXSOIL 0 0
0 0 0 BOULDERMIXSOIL 0 0
0 0 0 BOULDERMIXSOIL 0 0
0 0 0 BOULDERMIXSOIL 0.468 4.675
0 101.9 65.425 BOULDERMIXSOIL 0.388 3.875
0 77.625 41.775 BOULDERMIXSOIL 0.393 3.925
0 150.05 97.95 BOULDERMIXSOIL 0.355 3.55
0 87.1 47.8 BOULDERMIXSOIL 0.355 3.55
0 0 0 BOULDERMIXSOIL 0.42 4.2
0 0 0 BOULDERMIXSOIL 0.84 8.03
0 0 0 BOULDERMIXSOIL 0.478 2.177
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0.583 4.311
0 0 0 BOULDER MIX SOIL 0.563 5.625
0 0 0 BOULDER MIX SOIL 0.555 5.55
0 0 0 BOULDER MIX SOIL 0.51 5.1
0 0 0 BOULDER MIX SOIL 0.555 5.55
0 0 0 BOULDER MIX SOIL 0.558 5.575
0 0 0 BOULDER MIX SOIL 0.558 5.575
0 0 0 BOULDER MIX SOIL 0.54 5.4
0 0 0 BOULDER MIX SOIL 0.555 5.55
0 0 0 BOULDER MIX SOIL 0.505 5.05
0 0 0 BOULDER MIX SOIL 0.455 4.55
0 0 0 BOULDER MIX SOIL 0.575 5.75
0 0 0 BOULDER MIX SOIL 0.835 8.35
0 0 0 BOULDER MIX SOIL 1.082 10.825
0 0 0 BOULDER MIX SOIL 0.838 8.375
0 0 0 BOULDER MIX SOIL 0.98 9.8
0 0 0 BOULDER MIX SOIL 1.035 10.35
0 0 0 BOULDER MIX SOIL 0.788 7.875
0 0 0 BOULDER MIX SOIL 0.778 7.775
0 0 0 BOULDER MIX SOIL 0.632 6.325
0 0 0 BOULDER MIX SOIL 0.558 5.575
0 0 0 BOULDER MIX SOIL 0.875 8.75
0 0 0 BOULDER MIX SOIL 1.058 10.575
0 0 0 BOULDER MIX SOIL 0.935 9.35
0 0 0 BOULDER MIX SOIL 0.4 4
0 0 0 BOULDER MIX SOIL 0.098 0.975
0 0 0 BOULDER MIX SOIL 0.053 0.525
0 0 0 BOULDER MIX SOIL 0.335 3.35
0 0 0 BOULDER MIX SOIL 0.763 7.625
0 0 0 BOULDER MIX SOIL 0.675 6.75
0 0 0 BOULDER MIX SOIL 0.043 0.425
0 0 0 BOULDER MIX SOIL 0.133 1.325
0 0 0 BOULDER MIX SOIL 0.368 3.675
0 0 0 BOULDER MIX SOIL 0.533 5.325
0 0 0 BOULDER MIX SOIL 0.24 2.4
0 0 0 BOULDER MIX SOIL 0.698 6.975
0 0 0 BOULDER MIX SOIL 1.103 11.025
0 0 0 BOULDER MIX SOIL 1.115 11.15
0 0 0 BOULDER MIX SOIL 1.08 10.8
0 0 0 BOULDER MIX SOIL 0.478 4.775
0 0 0 BOULDER MIX SOIL 0.632 6.325
0 0 0 BOULDER MIX SOIL 0.543 5.425
0 0 0 BOULDER MIX SOIL 1.1 11
0 0 0 BOULDER MIX SOIL 1.1 11
0 0 0 BOULDER MIX SOIL 1.103 11.025
0 0 0 BOULDER MIX SOIL 1.103 11.025
0 0 0 BOULDER MIX SOIL 1.115 11.15
0 0 0 BOULDER MIX SOIL 0.935 9.35
0 0 0 BOULDER MIX SOIL 0.865 8.65
0 0 0 BOULDER MIX SOIL 0.703 7.025
0 0 0 BOULDER MIX SOIL 0.578 5.775
0 0 0 BOULDER MIX SOIL 0.895 8.95
0 0 0 BOULDER MIX SOIL 0.918 9.175
0 0 0 BOULDER MIX SOIL 0.545 5.45
0 0 0 BOULDER MIX SOIL 0.548 5.475
0 0 0 BOULDER MIX SOIL 0.988 9.875
0 0 0 BOULDER MIX SOIL 1.015 10.15
0 0 0 BOULDER MIX SOIL 0.708 7.075
0 0 0 BOULDER MIX SOIL 0.555 5.55
0 0 0 BOULDER MIX SOIL 0.555 5.55
0 0 0 BOULDER MIX SOIL 0.935 9.35
0 0 0 BOULDER MIX SOIL 0.558 5.575
0 0 0 BOULDER MIX SOIL 0.908 9.075
0 0 0 BOULDER MIX SOIL 1.098 10.975
0 0 0 BOULDER MIX SOIL 1.082 10.825
0 0 0 BOULDER MIX SOIL 1.108 11.075
0 0 0 BOULDER MIX SOIL 1.125 11.25
0 0 0 BOULDER MIX SOIL 0.98 9.8
0 0 0 BOULDER MIX SOIL 1.08 10.8
0 0 0 BOULDER MIX SOIL 1.105 11.05
0 0 0 BOULDER MIX SOIL 1.108 11.075
0 0 0 BOULDER MIX SOIL 1.038 10.375
0 0 0 BOULDER MIX SOIL 1.02 10.2
0 0 0 BOULDER MIX SOIL 1.108 11.075
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 1.035 10.35
0 0 0 BOULDER MIX SOIL 1.1 11
0 0 0 BOULDER MIX SOIL 0.993 9.925
0 0 0 BOULDER MIX SOIL 1.05 10.5
0 0 0 BOULDER MIX SOIL 0.353 3.525
0 0 0 BOULDER MIX SOIL 0.788 7.875
0 0 0 BOULDER MIX SOIL 0.863 8.625
0 0 0 BOULDER MIX SOIL 0.783 7.825
0 0 0 BOULDER MIX SOIL 1.01 10.1
0 0 0 BOULDER MIX SOIL 1.125 11.25
0 0 0 BOULDER MIX SOIL 0.873 8.725
0 0 0 BOULDER MIX SOIL 0.933 9.325
0 0 0 BOULDER MIX SOIL 0.548 5.475
0 0 0 BOULDER MIX SOIL 0.538 5.375
0 0 0 BOULDER MIX SOIL 0.548 5.475
0 0 0 BOULDER MIX SOIL 0.565 5.65
0 0 0 BOULDER MIX SOIL 1.115 11.15
0 0 0 BOULDER MIX SOIL 0.595 5.95
0 0 0 BOULDER MIX SOIL 0.803 8.025
0 0 0 BOULDER MIX SOIL 0.403 4.025
0 0 0 BOULDER MIX SOIL 0.62 6.2
0 0 0 BOULDER MIX SOIL 0.877 8.775
0 0 0 BOULDER MIX SOIL 0.935 9.35
0 0 0 BOULDER MIX SOIL 0.938 9.375
0 0 0 BOULDER MIX SOIL 0.755 7.55
0 0 0 BOULDER MIX SOIL 0.825 8.25
0 0 0 BOULDER MIX SOIL 0.823 8.225
0 0 0 BOULDER MIX SOIL 1.095 10.95
0 0 0 BOULDER MIX SOIL 0.893 8.925
0 0 0 BOULDER MIX SOIL 0.475 4.75
0 0 0 BOULDER MIX SOIL 1.02 10.2
0 0 0 BOULDER MIX SOIL 1.085 10.85
0 0 0 BOULDER MIX SOIL 0.345 3.45
0 0 0 BOULDER MIX SOIL 0.695 6.95
0 0 0 BOULDER MIX SOIL 0.515 5.15
0 0 0 BOULDER MIX SOIL 0.555 5.55
0 0 0 BOULDER MIX SOIL 0.078 0.775
0 0 0 BOULDER MIX SOIL 0.308 3.075
0 0 0 BOULDER MIX SOIL 0.638 6.375
0 0 0 BOULDER MIX SOIL 0.605 6.05
0 0 0 BOULDER MIX SOIL 0.885 8.85
0 0 0 BOULDER MIX SOIL 0.55 5.5
0 252.225 118.975 BOULDER MIX SOIL 0.465 4.65
0 124.175 27.05 BOULDER MIX SOIL 0.523 5.225
0 99.925 23.125 BOULDER MIX SOIL 0.533 5.325
0 229.675 125.2 BOULDER MIX SOIL 0.465 4.65
0 0 0 BOULDER MIX SOIL 0.55 5.5
0 0 0 BOULDER MIX SOIL 0.543 5.425
0 0 0 BOULDER MIX SOIL 0.555 5.55
0 63.5 22.6 BOULDER MIX SOIL 0.453 4.525
0 36.05 11.775 BOULDER MIX SOIL 0.468 4.675
0 66.35 41.05 BOULDER MIX SOIL 0.77 7.7
0 0 0 BOULDER MIX SOIL 0.548 5.475
0 0 0 BOULDER MIX SOIL 0.923 9.225
0 0 0 BOULDER MIX SOIL 0.525 5.25
0 0 0 BOULDER MIX SOIL 0.043 0.425
0 0 0 BOULDER MIX SOIL 0.45 4.5
0 0 0 BOULDER MIX SOIL 0.293 2.925
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0.015 0.15
0 88.525 46.9 BOULDER MIX SOIL 0.135 1.35
0 0 0 BOULDER MIX SOIL 0.287 2.875
0 88.925 44.55 BOULDER MIX SOIL 0.383 3.825
0 0 0 BOULDER MIX SOIL 0.555 5.55
0 0 0 BOULDER MIX SOIL 0.555 5.55
0 0 0 BOULDER MIX SOIL 0.538 5.375
0 0 0 BOULDER MIX SOIL 0.523 5.225
0 0 0 BOULDER MIX SOIL 0.405 4.05
0 0 0 BOULDER MIX SOIL 0.06 0.6
0 0 0 BOULDER MIX SOIL 0.54 5.4
0 0 0 BOULDER MIX SOIL 0.565 5.65
0 0 0 BOULDER MIX SOIL 0.55 5.5
0 0 0 BOULDER MIX SOIL 1.105 11.05
0 0 0 BOULDER MIX SOIL 1.093 10.925
0 0 0 BOULDER MIX SOIL 1.023 10.225
0 0 0 BOULDER MIX SOIL 0.608 6.075
0 0 0 BOULDER MIX SOIL 0.555 5.55
0 0 0 BOULDER MIX SOIL 0.56 5.6
0 0 0 BOULDER MIX SOIL 0.505 5.05
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0.172 1.725
0 0 0 BOULDER MIX SOIL 0.778 7.775
0 0 0 BOULDER MIX SOIL 0.168 1.675
0 0 0 BOULDER MIX SOIL 0.353 3.525
0 0 0 BOULDER MIX SOIL 0.388 3.875
0 0 0 BOULDER MIX SOIL 0.103 1.025
0 0 0 BOULDER MIX SOIL 0.105 1.05
0 0 0 BOULDER MIX SOIL 0.38 3.8
0 0 0 BOULDER MIX SOIL 0.555 5.55
0 0 0 BOULDER MIX SOIL 0.115 1.15
0 0 0 BOULDER MIX SOIL 0.043 0.425
0 0 0 BOULDER MIX SOIL 0.12 1.2
0 0 0 BOULDER MIX SOIL 0.56 5.6
0 0 0 BOULDER MIX SOIL 0.738 7.375
0 0 0 BOULDER MIX SOIL 0.788 7.875
0 0 0 BOULDER MIX SOIL 0.563 5.625
0 0 0 BOULDER MIX SOIL 0.54 5.4
0 0 0 BOULDER MIX SOIL 0.53 5.3
0 155.775 100.275 BOULDER MIX SOIL 0.473 4.725
0 136.55 81.675 BOULDER MIX SOIL 0.49 4.9
0 118.15 66.375 BOULDER MIX SOIL 0.465 4.65
0 0 0 BOULDER MIX SOIL 0.558 5.575
0 0 0 BOULDER MIX SOIL 0.543 5.425
0 0 0 BOULDER MIX SOIL 0.548 5.475
0 0 0 BOULDER MIX SOIL 0.543 5.425
0 0 0 BOULDER MIX SOIL 0.555 5.55
0 116.85 60.875 BOULDER MIX SOIL 0.47 4.7
0 64.85 30.175 BOULDER MIX SOIL 0.49 4.9
0 84.725 26.25 BOULDER MIX SOIL 0.425 4.25
0 83.175 26.75 BOULDER MIX SOIL 0.325 3.25
0 37.275 6.15 BOULDER MIX SOIL 0.048 0.475
0 30.1 2.9 BOULDER MIX SOIL 0.433 4.325
0 0 0 BOULDER MIX SOIL 0.005 0.05
0 0 0 BOULDER MIX SOIL 0.005 0.05
0 14.15 0.4 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 31.6 6.725 BOULDER MIX SOIL 0 0
0 19.8 4 BOULDER MIX SOIL 0 0
0 64.325 21.525 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0.157 1.575
0 0 0 BOULDER MIX SOIL 0.558 5.575
0 0 0 BOULDER MIX SOIL 1.1 11
0 0 0 BOULDER MIX SOIL 0.558 5.575
0 0 0 BOULDER MIX SOIL 0.565 5.65
0 0 0 BOULDER MIX SOIL 0.558 5.575
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 0.548 5.475
0 0 0 BOULDER MIX SOIL 0.555 5.55
0 125.75 65.6 BOULDER MIX SOIL 0.468 4.675
0 137.875 73.7 BOULDER MIX SOIL 0.468 4.675
0 88.675 38.05 BOULDER MIX SOIL 0.475 4.75
0 57.775 22.125 BOULDER MIX SOIL 0.565 5.65
0 0 0 BOULDER MIX SOIL 0.428 4.275
0 52 8.675 BOULDER MIX SOIL 0.25 2.5
0 7.125 0.75 BOULDER MIX SOIL 0 0
0 22.85 4.725 BOULDER MIX SOIL 0.455 4.55
0 0 0 BOULDER MIX SOIL 0.518 5.175
0 0 0 BOULDER MIX SOIL 0.898 8.975
0 0 0 BOULDER MIX SOIL 1.008 10.075
0 0 0 BOULDER MIX SOIL 0.475 4.75
0 27.975 7.75 BOULDER MIX SOIL 0.013 0.125
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0.145 1.45
0 0 0 BOULDER MIX SOIL 0.013 0.125
0 0 0 BOULDER MIX SOIL 0.15 1.5
0 0 0 BOULDER MIX SOIL 0.127 1.275
0 37.425 11.325 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0.125 1.25
0 0 0 BOULDER MIX SOIL 0.17 1.7
0 0 0 BOULDER MIX SOIL 0.355 3.55
0 0 0 BOULDER MIX SOIL 0.845 8.45
0 0 0 BOULDER MIX SOIL 0.835 8.35
0 0 0 BOULDER MIX SOIL 1.063 10.625
0 0 0 BOULDER MIX SOIL 1.035 10.35
0 0 0 BOULDER MIX SOIL 0.627 6.275
0 0 0 BOULDER MIX SOIL 0.56 5.6
0 0 0 BOULDER MIX SOIL 0.565 5.65
0 0 0 BOULDER MIX SOIL 0.567 5.675
0 0 0 BOULDER MIX SOIL 0.518 5.175
0 0 0 BOULDER MIX SOIL 0.385 3.85
0 0 0 BOULDER MIX SOIL 0.783 7.825
0 0 0 BOULDER MIX SOIL 0.968 9.675
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 1.105 11.05
0 0 0 BOULDER MIX SOIL 1.115 11.15
0 0 0 BOULDER MIX SOIL 1.077 10.775
0 0 0 BOULDER MIX SOIL 1.105 11.05
0 0 0 BOULDER MIX SOIL 1.093 10.925
0 0 0 BOULDER MIX SOIL 0.685 6.85
0 0 0 BOULDER MIX SOIL 1.105 11.05
0 0 0 BOULDER MIX SOIL 0.978 9.775
0 0 0 BOULDER MIX SOIL 0.105 1.05
0 0 0 BOULDER MIX SOIL 0.453 4.525
0 0 0 BOULDER MIX SOIL 1.103 11.025
0 0 0 BOULDER MIX SOIL 0.65 6.5
0 0 0 BOULDER MIX SOIL 0.632 6.325
0 0 0 BOULDER MIX SOIL 0.645 6.45
0 0 0 BOULDER MIX SOIL 0.757 7.575
0 0 0 BOULDER MIX SOIL 1.105 11.05
0 0 0 BOULDER MIX SOIL 0.98 9.8
0 0 0 BOULDER MIX SOIL 0.978 9.775
0 0 0 BOULDER MIX SOIL 0.86 8.6
0 0 0 BOULDER MIX SOIL 0.988 9.875
0 0 0 BOULDER MIX SOIL 1.085 10.85
0 0 0 BOULDER MIX SOIL 1.115 11.15
0 0 0 BOULDER MIX SOIL 1.085 10.85
0 0 0 BOULDER MIX SOIL 1.098 10.975
0 0 0 BOULDER MIX SOIL 1.12 11.2
0 0 0 BOULDER MIX SOIL 1.103 11.025
0 0 0 BOULDER MIX SOIL 1.095 10.95
0 0 0 BOULDER MIX SOIL 0.54 5.4
0 0 0 BOULDER MIX SOIL 0.665 6.65
0 0 0 BOULDER MIX SOIL 0.555 5.55
0 0 0 BOULDER MIX SOIL 0.555 5.55
0 0 0 BOULDER MIX SOIL 0.773 7.725
0 0 0 BOULDER MIX SOIL 1.018 10.175
0 0 0 BOULDER MIX SOIL 0.54 5.4
0 0 0 BOULDER MIX SOIL 0.54 5.4
0 0 0 BOULDER MIX SOIL 0.538 5.375
0 0 0 BOULDER MIX SOIL 0.343 3.425
0 0 0 BOULDER MIX SOIL 1.077 10.775
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 1.1 11
0 0 0 BOULDER MIX SOIL 0.692 6.925
0 0 0 BOULDER MIX SOIL 1.108 11.075
0 0 0 BOULDER MIX SOIL 1.03 10.3
0 0 0 BOULDER MIX SOIL 1.1 11
0 0 0 BOULDER MIX SOIL 0.965 9.65
0 0 0 BOULDER MIX SOIL 1.12 11.2
0 0 0 BOULDER MIX SOIL 1.08 10.8
0 0 0 BOULDER MIX SOIL 1.1 11
0 0 0 BOULDER MIX SOIL 1.08 10.8
0 0 0 BOULDER MIX SOIL 1.023 10.225
0 0 0 BOULDER MIX SOIL 0.915 9.15
0 0 0 BOULDER MIX SOIL 1.053 10.525
0 0 0 BOULDER MIX SOIL 1.025 10.25
0 0 0 BOULDER MIX SOIL 0.748 7.475
0 0 0 BOULDER MIX SOIL 0.12 1.2
0 0 0 BOULDER MIX SOIL 0.003 0.025
0 0 0 BOULDER MIX SOIL 0.003 0.025
0 0 0 BOULDER MIX SOIL 0.008 0.075
0 0 0 BOULDER MIX SOIL 0.115 1.15
0 0 0 BOULDER MIX SOIL 0.31 3.1
0 0 0 BOULDER MIX SOIL 0.733 7.325
0 0 0 BOULDER MIX SOIL 1.053 10.525
0 0 0 BOULDER MIX SOIL 1.075 10.75
0 0 0 BOULDER MIX SOIL 1.105 11.05
0 0 0 BOULDER MIX SOIL 0.87 8.7
0 0 0 BOULDER MIX SOIL 0.87 8.7
0 0 0 BOULDER MIX SOIL 0.975 9.75
0 0 0 BOULDER MIX SOIL 0.71 7.1
0 0 0 BOULDER MIX SOIL 0.965 9.65
0 0 0 BOULDER MIX SOIL 0.728 7.275
0 0 0 BOULDER MIX SOIL 1.023 10.225
0 0 0 BOULDER MIX SOIL 0.975 9.75
0 0 0 BOULDER MIX SOIL 1.055 10.55
0 0 0 BOULDER MIX SOIL 1.075 10.75
0 0 0 BOULDER MIX SOIL 0.933 9.325
0 0 0 BOULDER MIX SOIL 0.763 7.625
0 0 0 BOULDER MIX SOIL 0.563 5.625
0 0 0 BOULDER MIX SOIL 1.098 10.975
0 0 0 BOULDER MIX SOIL 1.115 11.15
0 0 0 BOULDER MIX SOIL 1.105 11.05
0 0 0 BOULDER MIX SOIL 1.09 10.9
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 1.1 11
0 0 0 BOULDER MIX SOIL 1.08 10.8
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 1.12 11.2
0 0 0 BOULDER MIX SOIL 1.07 10.7
0 0 0 BOULDER MIX SOIL 1.12 11.2
0 0 0 BOULDER MIX SOIL 1.095 10.95
0 0 0 BOULDER MIX SOIL 1.085 10.85
0 0 0 BOULDER MIX SOIL 1.085 10.85
0 0 0 BOULDER MIX SOIL 0.733 7.325
0 0 0 BOULDER MIX SOIL 0.558 5.575
0 0 0 BOULDER MIX SOIL 0.233 2.325
0 0 0 BOULDER MIX SOIL 0.71 7.1
0 0 0 BOULDER MIX SOIL 1.09 10.9
0 0 0 BOULDER MIX SOIL 1.035 10.35
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 0.55 5.5
0 0 0 BOULDER MIX SOIL 0.56 5.6
0 0 0 BOULDER MIX SOIL 0.545 5.45
0 0 0 BOULDER MIX SOIL 0.555 5.55
0 0 0 BOULDER MIX SOIL 0.563 5.625
0 0 0 BOULDER MIX SOIL 0.86 8.6
0 0 0 BOULDER MIX SOIL 1.058 10.575
0 0 0 BOULDER MIX SOIL 1.065 10.65
0 0 0 BOULDER MIX SOIL 0.708 7.075
0 0 0 BOULDER MIX SOIL 0.81 8.1
0 0 0 BOULDER MIX SOIL 0.925 9.25
0 0 0 BOULDER MIX SOIL 0.945 9.45
0 0 0 BOULDER MIX SOIL 1.023 10.225
0 0 0 BOULDER MIX SOIL 1.1 11
0 0 0 BOULDER MIX SOIL 1.1 11
0 0 0 BOULDER MIX SOIL 1.075 10.75
0 0 0 BOULDER MIX SOIL 1.05 10.5
0 0 0 BOULDER MIX SOIL 1.065 10.65
0 0 0 BOULDER MIX SOIL 1.087 10.875
0 0 0 BOULDER MIX SOIL 1 10
0 0 0 BOULDER MIX SOIL 0.845 8.45
0 0 0 BOULDER MIX SOIL 0.773 7.725
0 0 0 BOULDER MIX SOIL 0.618 6.175
0 0 0 BOULDER MIX SOIL 0.165 1.65
0 0 0 BOULDER MIX SOIL 0.157 1.575
0 0 0 BOULDER MIX SOIL 0.233 2.325
0 0 0 BOULDER MIX SOIL 0.28 2.8
0 0 0 BOULDER MIX SOIL 0.388 3.875
0 0 0 BOULDER MIX SOIL 0.548 5.475
0 0 0 BOULDER MIX SOIL 0.483 4.825
0 0 0 BOULDER MIX SOIL 0.295 2.95
0 0 0 BOULDER MIX SOIL 0.252 2.525
0 0 0 BOULDER MIX SOIL 0.465 4.65
0 0 0 BOULDER MIX SOIL 0.148 1.475
0 0 0 BOULDER MIX SOIL 0.023 0.225
0 0 0 BOULDER MIX SOIL 0.293 2.925
0 0 0 BOULDER MIX SOIL 0.543 5.425
0 0 0 BOULDER MIX SOIL 0.49 4.9
0 0 0 BOULDER MIX SOIL 0.615 6.15
0 0 0 BOULDER MIX SOIL 0.608 6.075
0 0 0 BOULDER MIX SOIL 0.49 4.9
0 0 0 BOULDER MIX SOIL 0.733 7.325
0 0 0 BOULDER MIX SOIL 0.025 0.25
0 0 0 BOULDER MIX SOIL 0.028 0.275
0 0 0 BOULDER MIX SOIL 0.23 2.3
0 0 0 BOULDER MIX SOIL 0.058 0.575
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0.105 1.05
0 0 0 BOULDER MIX SOIL 0.183 1.825
0 0 0 BOULDER MIX SOIL 0.038 0.375
0 0 0 BOULDER MIX SOIL 0.245 2.45
0 0 0 BOULDER MIX SOIL 0.443 4.425
0 0 0 BOULDER MIX SOIL 0.347 3.475
0 0 0 BOULDER MIX SOIL 0.653 6.525
0 0 0 BOULDER MIX SOIL 1.063 10.625
0 0 0 BOULDER MIX SOIL 1.072 10.725
0 0 0 BOULDER MIX SOIL 1.075 10.75
0 0 0 BOULDER MIX SOIL 0.773 7.725
0 0 0 BOULDER MIX SOIL 1.04 10.4
0 0 0 BOULDER MIX SOIL 1.105 11.05
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 1.125 11.25
0 0 0 BOULDER MIX SOIL 1.1 11
0 0 0 BOULDER MIX SOIL 1.115 11.15
0 0 0 BOULDER MIX SOIL 1.08 10.8
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 1.13 11.3
0 0 0 BOULDER MIX SOIL 1.07 10.7
0 0 0 BOULDER MIX SOIL 1.125 11.25
0 0 0 BOULDER MIX SOIL 1.095 10.95
0 0 0 BOULDER MIX SOIL 1.12 11.2
0 0 0 BOULDER MIX SOIL 1.095 10.95
0 0 0 BOULDER MIX SOIL 1.115 11.15
0 0 0 BOULDER MIX SOIL 1.08 10.8
0 0 0 BOULDER MIX SOIL 1.09 10.9
0 0 0 BOULDER MIX SOIL 1.12 11.2
0 0 0 BOULDER MIX SOIL 1.093 10.925
0 0 0 BOULDER MIX SOIL 1.087 10.875
0 0 0 BOULDER MIX SOIL 1.048 10.475
0 0 0 BOULDER MIX SOIL 1.072 10.725
0 0 0 BOULDER MIX SOIL 1.033 10.325
0 0 0 BOULDER MIX SOIL 0.703 7.025
0 0 0 BOULDER MIX SOIL 0.738 7.375
0 0 0 BOULDER MIX SOIL 0.97 9.7
0 0 0 BOULDER MIX SOIL 0.69 6.9
0 0 0 BOULDER MIX SOIL 0.63 6.3
0 0 0 BOULDER MIX SOIL 0.648 6.475
0 0 0 BOULDER MIX SOIL 0.22 2.2
0 0 0 BOULDER MIX SOIL 0.12 1.2
0 0 0 BOULDER MIX SOIL 0.268 2.675
0 0 0 BOULDER MIX SOIL 0.285 2.85
0 0 0 BOULDER MIX SOIL 0.113 1.125
0 0 0 BOULDER MIX SOIL 0.365 3.65
0 0 0 BOULDER MIX SOIL 0.68 6.8
0 0 0 BOULDER MIX SOIL 0.885 8.85
0 0 0 BOULDER MIX SOIL 1.028 10.275
0 0 0 BOULDER MIX SOIL 1.05 10.5
0 0 0 BOULDER MIX SOIL 1.09 10.9
0 0 0 BOULDER MIX SOIL 1.108 11.075
0 0 0 BOULDER MIX SOIL 1.058 10.575
0 0 0 BOULDER MIX SOIL 1.095 10.95
0 0 0 BOULDER MIX SOIL 1.09 10.9
0 0 0 BOULDER MIX SOIL 1.085 10.85
0 0 0 BOULDER MIX SOIL 1.093 10.925
0 0 0 BOULDER MIX SOIL 1.108 11.075
0 0 0 BOULDER MIX SOIL 1.085 10.85
0 0 0 BOULDER MIX SOIL 1.103 11.025
0 0 0 BOULDER MIX SOIL 1.105 11.05
0 0 0 BOULDER MIX SOIL 1.1 11
0 0 0 BOULDER MIX SOIL 1.08 10.8
0 0 0 BOULDER MIX SOIL 1.08 10.8
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 1.095 10.95
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 1.095 10.95
0 0 0 BOULDER MIX SOIL 1.12 11.2
0 0 0 BOULDER MIX SOIL 1.08 10.8
0 0 0 BOULDER MIX SOIL 0.425 4.25
0 0 0 BOULDER MIX SOIL 0.885 8.85
0 0 0 BOULDER MIX SOIL 0.883 8.825
0 0 0 BOULDER MIX SOIL 0.888 8.875
0 0 0 BOULDER MIX SOIL 1 10
0 0 0 BOULDER MIX SOIL 1.123 11.225
0 0 0 BOULDER MIX SOIL 1.113 11.125
0 0 0 BOULDER MIX SOIL 1.105 11.05
0 0 0 BOULDER MIX SOIL 1.098 10.975
0 0 0 BOULDER MIX SOIL 1.103 11.025
0 0 0 BOULDER MIX SOIL 0.543 5.425
0 0 0 BOULDER MIX SOIL 0.545 5.45
0 0 0 BOULDER MIX SOIL 0.88 8.8
0 0 0 BOULDER MIX SOIL 1.13 11.3
0 0 0 BOULDER MIX SOIL 1.085 10.85
0 0 0 BOULDER MIX SOIL 1.125 11.25
0 0 0 BOULDER MIX SOIL 1.13 11.3
0 0 0 BOULDER MIX SOIL 0.983 9.825
0 0 0 BOULDER MIX SOIL 0.863 8.625
0 0 0 BOULDER MIX SOIL 1.08 10.8
0 0 0 BOULDER MIX SOIL 1.108 11.075
0 0 0 BOULDER MIX SOIL 1.103 11.025
0 0 0 BOULDER MIX SOIL 1.09 10.9
0 0 0 BOULDER MIX SOIL 1.103 11.025
0 0 0 BOULDER MIX SOIL 1.12 11.2
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 1.085 10.85
0 0 0 BOULDER MIX SOIL 1.098 10.975
0 0 0 BOULDER MIX SOIL 0.973 9.725
0 0 0 BOULDER MIX SOIL 1.04 10.4
0 0 0 BOULDER MIX SOIL 0.813 8.125
0 0 0 BOULDER MIX SOIL 1.095 10.95
0 0 0 BOULDER MIX SOIL 1.103 11.025
0 0 0 BOULDER MIX SOIL 1.108 11.075
0 0 0 BOULDER MIX SOIL 1.098 10.975
0 0 0 BOULDER MIX SOIL 1.108 11.075
0 0 0 BOULDER MIX SOIL 1.115 11.15
0 0 0 BOULDER MIX SOIL 1.095 10.95
0 0 0 BOULDER MIX SOIL 1.1 11
0 0 0 BOULDER MIX SOIL 1.093 10.925
0 0 0 BOULDER MIX SOIL 1.08 10.8
0 0 0 BOULDER MIX SOIL 1.12 11.2
0 0 0 BOULDER MIX SOIL 1.075 10.75
0 0 0 BOULDER MIX SOIL 1.12 11.2
0 0 0 BOULDER MIX SOIL 1.1 11
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 1.093 10.925
0 0 0 BOULDER MIX SOIL 1.108 11.075
0 0 0 BOULDER MIX SOIL 1.07 10.7
0 0 0 BOULDER MIX SOIL 1.105 11.05
0 0 0 BOULDER MIX SOIL 1.13 11.3
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 1.12 11.2
0 0 0 BOULDER MIX SOIL 1.07 10.7
0 0 0 BOULDER MIX SOIL 1.1 11
0 0 0 BOULDER MIX SOIL 1.095 10.95
0 0 0 BOULDER MIX SOIL 1.06 10.6
0 0 0 BOULDER MIX SOIL 1.1 11
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 1.067 10.675
0 0 0 BOULDER MIX SOIL 0.923 9.225
0 0 0 BOULDER MIX SOIL 1.045 10.45
0 0 0 BOULDER MIX SOIL 0.835 8.35
0 0 0 BOULDER MIX SOIL 0.515 5.15
0 0 0 BOULDER MIX SOIL 0.418 4.175
0 0 0 BOULDER MIX SOIL 0.55 5.5
0 0 0 BOULDER MIX SOIL 0.39 3.9
0 0 0 BOULDER MIX SOIL 0.555 5.55
0 0 0 BOULDER MIX SOIL 0.558 5.575
0 0 0 BOULDER MIX SOIL 0.555 5.55
0 0 0 BOULDER MIX SOIL 0.885 8.85
0 0 0 BOULDER MIX SOIL 1.128 11.275
0 0 0 BOULDER MIX SOIL 1.087 10.875
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 0.888 8.875
0 0 0 BOULDER MIX SOIL 0.715 7.15
0 0 0 BOULDER MIX SOIL 1.093 10.925
0 0 0 BOULDER MIX SOIL 1.1 11
0 0 0 BOULDER MIX SOIL 1.085 10.85
0 0 0 BOULDER MIX SOIL 1.09 10.9
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 1.077 10.775
0 0 0 BOULDER MIX SOIL 1.055 10.55
0 0 0 BOULDER MIX SOIL 0.683 6.825
0 0 0 BOULDER MIX SOIL 0.475 4.75
0 0 0 BOULDER MIX SOIL 0.56 5.6
0 0 0 BOULDER MIX SOIL 0.545 5.45
0 0 0 BOULDER MIX SOIL 0.54 5.4
0 0 0 BOULDER MIX SOIL 0.7 7
0 0 0 BOULDER MIX SOIL 1.093 10.925
0 0 0 BOULDER MIX SOIL 0.955 9.55
0 0 0 BOULDER MIX SOIL 1.085 10.85
0 0 0 BOULDER MIX SOIL 1.08 10.8
0 0 0 BOULDER MIX SOIL 0.93 9.3
0 0 0 BOULDER MIX SOIL 0.788 7.875
0 0 0 BOULDER MIX SOIL 0.17 1.7
0 0 0 BOULDER MIX SOIL 0.488 4.875
0 0 0 BOULDER MIX SOIL 0.428 4.275
0 0 0 BOULDER MIX SOIL 0.383 3.825
0 0 0 BOULDER MIX SOIL 0.475 4.75
0 0 0 BOULDER MIX SOIL 0.413 4.125
0 0 0 BOULDER MIX SOIL 0.898 8.975
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 1.125 11.25
0 0 0 BOULDER MIX SOIL 1.095 10.95
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 1.13 11.3
0 0 0 BOULDER MIX SOIL 0.538 5.375
0 0 0 BOULDER MIX SOIL 0.545 5.45
0 0 0 BOULDER MIX SOIL 0.563 5.625
0 0 0 BOULDER MIX SOIL 0.458 4.575
0 0 0 BOULDER MIX SOIL 1.013 10.125
0 0 0 BOULDER MIX SOIL 0.598 5.975
0 0 0 BOULDER MIX SOIL 0.665 6.65
0 0 0 BOULDER MIX SOIL 0.183 1.825
0 0 0 BOULDER MIX SOIL 0.13 1.3
0 0 0 BOULDER MIX SOIL 0.278 2.775
0 0 0 BOULDER MIX SOIL 0.315 3.15
0 0 0 BOULDER MIX SOIL 0.673 6.725
0 0 0 BOULDER MIX SOIL 0.788 7.875
0 0 0 BOULDER MIX SOIL 0.99 9.9
0 0 0 BOULDER MIX SOIL 1.048 10.475
0 0 0 BOULDER MIX SOIL 0.65 6.5
0 0 0 BOULDER MIX SOIL 1.018 10.175
0 0 0 BOULDER MIX SOIL 1.08 10.8
0 0 0 BOULDER MIX SOIL 1.105 11.05
0 0 0 BOULDER MIX SOIL 1.105 11.05
0 0 0 BOULDER MIX SOIL 1.105 11.05
0 0 0 BOULDER MIX SOIL 1.118 11.175
0 0 0 BOULDER MIX SOIL 1.103 11.025
0 0 0 BOULDER MIX SOIL 0.548 5.475
0 0 0 BOULDER MIX SOIL 1.08 10.8
0 0 0 BOULDER MIX SOIL 1.13 11.3
0 0 0 BOULDER MIX SOIL 0.563 5.625
0 0 0 BOULDER MIX SOIL 0.558 5.575
0 0 0 BOULDER MIX SOIL 0.56 5.6
0 0 0 BOULDER MIX SOIL 1.1 11
0 0 0 BOULDER MIX SOIL 1.135 11.35
0 0 0 BOULDER MIX SOIL 1.063 10.625
0 0 0 BOULDER MIX SOIL 1.125 11.25
0 0 0 BOULDER MIX SOIL 1.09 10.9
0 0 0 BOULDER MIX SOIL 1.115 11.15
0 0 0 BOULDER MIX SOIL 1.09 10.9
0 0 0 BOULDER MIX SOIL 1.11 11.1
0 0 0 BOULDER MIX SOIL 1.095 10.95
0 0 0 BOULDER MIX SOIL 0.25 2.5
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0 0
0 0 0 BOULDER MIX SOIL 0.433 4.325
0 0 0 BOULDER MIX SOIL 0.563 5.625
0 0 0 BOULDER MIX SOIL 0.363 3.625
0 0 0 BOULDER MIX SOIL 0.048 0.475
0 0 0 BOULDER MIX SOIL 0.073 0.725
0 0 0 BOULDER MIX SOIL 0.56 5.6
0 0 0 BOULDER MIX SOIL 0.407 4.075
0 153.075 91.475 BOULDER MIX SOIL 0.49 4.9
0 196.5 116.875 BOULDER MIX SOIL 0.895 8.95
0 0 0 BOULDER MIX SOIL 1.095 10.95
0 0 0 BOULDER MIX SOIL 0 0
0 14.475 1.375 BOULDER MIX SOIL 0.08 0.8
0 27.55 4.2 BOULDER MIX SOIL 0.347 3.475
0 0 0 BOULDER MIX SOIL 0.435 4.35
0 55.775 17.55 BOULDER MIX SOIL 0.548 5.475
0 45.475 10.425 BOULDER MIX SOIL 0.512 5.125
0 12.6 0.7 BOULDER MIX SOIL 0.545 5.45
0 76.75 28.175 BOULDER MIX SOIL 0.545 5.45
0 0 0 BOULDER MIX SOIL 0.545 5.45
0 0 0 BOULDER MIX SOIL 1.12 11.2
0 0 0 BOULDER MIX SOIL 1.053 10.525
0 0 0 BOULDER MIX SOIL 0.78 7.8
0 0 0 BOULDER MIX SOIL 0.553 5.525
0 0 0 BOULDER MIX SOIL 0.813 8.125
0 0 0 BOULDER MIX SOIL 1.113 11.125
0 0 0 BOULDER MIX SOIL 0.605 6.05
0 0 0 BOULDER MIX SOIL 0.56 5.6
0 215.425 125.8 BOULDER MIX SOIL 0.488 4.875
0 258.2 157.225 BOULDER MIX SOIL 0.47 4.7
0 199.925 121.075 BOULDER MIX SOIL 0.478 4.775
0 188.375 114.975 BOULDER MIX SOIL 0.49 4.9
0 202.575 124.65 BOULDER MIX SOIL 0.488 4.875
0 198.775 128.775 BOULDER MIX SOIL 0.488 4.875
0 56.55 19.625 BOULDER MIX SOIL 0.565 5.65
0 0 0 BOULDER MIX SOIL 0.56 5.6
0 0 0 BOULDER MIX SOIL 0.563 4.393
0 0 0 BOULDER MIX SOIL 0.55 1.546
6974.425 3484.25 668.095 6664.757
DRAIN QUANTITY
Chainage Drain Leng Left Right
Dr.Type Area(m2) Volume(m3Dr.Type Area(m2) Volume(m3)
0 5 Tick Type 0.412 2.06 Tick type 0.412 2.06
10 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
20 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
30 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
40 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
50 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
60 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
70 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
80 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
90 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
100 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
110 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
120 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
130 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
140 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
150 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
160 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
170 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
180 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
190 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
200 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
210 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
220 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
230 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
240 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
250 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
260 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
270 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
280 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
290 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
300 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
310 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
320 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
330 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
340 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
350 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
360 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
370 10 Tick type 0.412 4.12
380 10 Tick type 0.412 4.12
390 10 Tick type 0.412 4.12
400 10 Tick type 0.412 4.12
410 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
420 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
430 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
440 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
450 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
460 10 Tick type 0.412 4.12
470 10 Tick type 0.412 4.12
480 10 Tick type 0.412 4.12
490 10 Tick type 0.412 4.12
500 10 Tick type 0.412 4.12
510 10 Tick type 0.412 4.12
520 10 Tick type 0.412 4.12
530 10 Tick type 0.412 4.12
540 10 Tick type 0.412 4.12
550 10 Tick type 0.412 4.12
560 10 Tick type 0.412 4.12
570 10 Tick type 0.412 4.12
580 10 Tick type 0.412 4.12
590 10 Tick type 0.412 4.12
600 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
610 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
620 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
630 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
640 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
650 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
660 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
670 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
680 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
690 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
700 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
710 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
720 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
730 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
740 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
750 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
760 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
770 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
780 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
790 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
800 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
810 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
820 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
830 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
840 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
850 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
860 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
870 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
880 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
890 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
900 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
910 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
920 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
930 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
940 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
950 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
960 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
970 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
980 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
990 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1000 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1010 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1020 10 Tick Type Tick type 0.412 4.12
1030 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1040 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1050 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1060 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1070 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1080 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1090 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1100 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1110 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1120 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1130 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1140 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1150 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1160 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1170 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1180 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1190 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1200 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1210 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1220 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1230 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1240 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1250 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1260 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1270 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1280 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1290 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1300 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1310 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1320 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1330 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1340 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1350 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1360 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1370 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1380 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1390 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1400 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1410 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1420 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1430 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1440 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1450 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1460 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1470 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1480 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1490 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1500 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1510 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1520 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1530 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1540 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1550 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1560 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1570 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1580 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1590 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1600 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1610 10 Tick Type 0.412 4.12
1620 10 Tick Type 0.412 4.12
1630 10 Tick Type 0.412 4.12
1640 10 Tick Type 0.412 4.12
1650 10 Tick Type 0.412 4.12
1660 10 Tick Type 0.412 4.12
1670 10 Tick Type 0.412 4.12
1680 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1690 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1700 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1710 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1720 10 Tick type 0.412 4.12
1730 10 Tick type 0.412 4.12
1740 10 Tick type 0.412 4.12
1750 10 Tick type 0.412 4.12
1760 10 Tick type 0.412 4.12
1770 10 Tick type 0.412 4.12
1780 10 Tick type 0.412 4.12
1790 10 Tick type 0.412 4.12
1800 10 Tick type 0.412 4.12
1810 10 Tick type 0.412 4.12
1820 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1830 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1840 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1850 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1860 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1870 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1880 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1890 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1900 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1910 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1920 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1930 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1940 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1950 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1960 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
1970 10 Tick Type 0.412 4.12
1980 10 Tick Type 0.412 4.12
1990 10 Tick Type 0.412 4.12
2000 10 Tick Type 0.412 4.12
2010 10 Tick Type 0.412 4.12
2020 10 Tick Type 0.412 4.12
2030 10 Tick Type 0.412 4.12
2040 10 Tick Type 0.412 4.12
2050 10 Tick Type 0.412 4.12
2060 10 Tick Type 0.412 4.12
2070 10 Tick Type 0.412 4.12
2080 10 Tick Type 0.412 4.12
2090 10 Tick Type 0.412 4.12
2100 10 Tick Type 0.412 4.12
2110 10 Tick Type 0.412 4.12
2120 10 Tick Type 0.412 4.12
2130 10 Tick Type 0.412 4.12
2140 10 Tick Type 0.412 4.12
2150 10 Tick Type 0.412 4.12
2160 10 Tick Type 0.412 4.12
2170 10 Tick Type 0.412 4.12
2180 10 Tick Type 0.412 4.12
2190 10 Tick Type 0.412 4.12
2200 10 Tick Type 0.412 4.12
2210 10 Tick Type 0.412 4.12
2220 10 Tick Type 0.412 4.12
2230 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
2240 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
2250 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
2260 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
2270 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
2280 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
2290 10 Tick Type 0.412 4.12
2300 10 Tick Type 0.412 4.12
2310 10 Tick Type 0.412 4.12
2320 10 Tick Type 0.412 4.12
2330 10 Tick Type 0.412 4.12
2340 10 Tick Type 0.412 4.12
2350 10 Tick Type 0.412 4.12
2360 10 Tick Type 0.412 4.12
2370 10 Tick Type 0.412 4.12
2380 10 Tick Type 0.412 4.12
2390 10 Tick Type 0.412 4.12
2400 10 Tick Type 0.412 4.12
2410 10 Tick Type 0.412 4.12
2420 10 Tick Type 0.412 4.12
2430 10 Tick Type 0.412 4.12
2440 10 Tick Type 0.412 4.12
2450 10 Tick Type 0.412 4.12
2460 10 Tick Type 0.412 4.12
2470 10 Tick Type 0.412 4.12
2480 10 Tick Type 0.412 4.12
2490 10 Tick Type 0.412 4.12
2500 10 Tick Type 0.412 4.12
2510 10 Tick Type 0.412 4.12
2520 10 Tick Type 0.412 4.12
2530 10 Tick Type 0.412 4.12
2540 10 Tick Type 0.412 4.12
2550 10 Tick Type 0.412 4.12
2560 10 Tick Type 0.412 4.12
2570 10 Tick Type 0.412 4.12
2580 10 Tick Type 0.412 4.12
2590 10 Tick Type 0.412 4.12
2600 10 Tick Type 0.412 4.12
2610 10 Tick Type 0.412 4.12
2620 10 Tick Type 0.412 4.12
2630 10 Tick Type 0.412 4.12
2640 10 Tick Type 0.412 4.12
2650 10 Tick Type 0.412 4.12
2660 10 Tick Type 0.412 4.12
2670 10 Tick Type 0.412 4.12
2680 10 Tick Type 0.412 4.12
2690 10 Tick Type 0.412 4.12
2700 10 Tick Type 0.412 4.12
2710 10 Tick Type 0.412 4.12
2720 10 Tick Type 0.412 4.12
2730 10 Tick Type 0.412 4.12
2740 10 Tick Type 0.412 4.12
2750 10 Tick Type 0.412 4.12
2760 10 Tick Type 0.412 4.12
2770 10 Tick Type 0.412 4.12
2780 10 Tick Type 0.412 4.12
2790 10 Tick Type 0.412 4.12
2800 10 Tick Type 0.412 4.12
2810 10 Tick Type 0.412 4.12
2820 10 Tick Type 0.412 4.12
2830 10 Tick Type 0.412 4.12
2840 10 Tick Type 0.412 4.12
2850 10 Tick Type 0.412 4.12
2860 10 Tick Type 0.412 4.12
2870 10 Tick Type 0.412 4.12
2880 10 Tick Type 0.412 4.12
2890 10 Tick Type 0.412 4.12
2900 10 Tick Type 0.412 4.12
2910 10 Tick Type 0.412 4.12
2920 10 Tick Type 0.412 4.12
2930 10 Tick Type 0.412 4.12
2940 10 Tick Type 0.412 4.12
2950 10 Tick Type 0.412 4.12
2960 10 Tick Type 0.412 4.12
2970 10 Tick Type 0.412 4.12
2980 10 Tick Type 0.412 4.12
2990 10 Tick Type 0.412 4.12
3000 10 Tick Type 0.412 4.12
3010 10 Tick Type 0.412 4.12
3020 10 Tick Type 0.412 4.12
3030 10 Tick Type 0.412 4.12
3040 10 Tick Type 0.412 4.12
3050 10 Tick Type 0.412 4.12
3060 10 Tick Type 0.412 4.12
3070 10 Tick Type 0.412 4.12
3080 10 Tick Type 0.412 4.12
3090 10 Tick Type 0.412 4.12
3100 10 Tick Type 0.412 4.12
3110 10 Tick Type 0.412 4.12
3120 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3130 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3140 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3150 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3160 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3170 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3180 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3190 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3200 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3210 10 Tick Type 0.412 4.12
3220 10 Tick Type 0.412 4.12
3230 10 Tick Type 0.412 4.12
3240 10 Tick Type 0.412 4.12
3250 10 Tick Type 0.412 4.12
3260 10 Tick Type 0.412 4.12
3270 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3280 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3290 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3300 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3310 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3320 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3330 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3340 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3350 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3360 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3370 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3380 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3390 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3400 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3410 10 Tick Type 0.412 4.12 Tick type 0.412 4.12
3420 10 Tick Type 0.412 4.12
3430 10 Tick Type 0.412 4.12
3440 10 Tick Type 0.412 4.12
3450 10 Tick Type 0.412 4.12
3460 10 Tick Type 0.412 4.12
3470 10 Tick Type 0.412 4.12
3480 10 Tick Type 0.412 4.12
3490 10 Tick Type 0.412 4.12
3500 10 Tick Type 0.412 4.12
3510 10 Tick Type 0.412 4.12
3520 10 Tick Type 0.412 4.12
3530 10 Tick Type 0.412 4.12
3540 10 Tick Type 0.412 4.12
3550 10 Tick Type 0.412 4.12
3560 10 Tick Type 0.412 4.12
3570 10 Tick Type 0.412 4.12
3580 9.56 Tick Type 0.412 3.93872 Tick type 0.412 3.93872
3589.12 4.56 Tick Type 0.412 1.87872 Tick type 0.412 1.87872
3725.2 2.4 Tick Type 0.412 0.9888 Tick type 0.412 0.9888
3730 7.4 Tick Type 0.412 3.0488 Tick type 0.412 3.0488
3740 10 Tick Type 0.412 4.125
3750 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
3760 10 Tick Type 0.412 4.125
3770 10 Tick Type 0.412 4.125
3780 10 Tick Type 0.412 4.125
3790 10 Tick Type 0.412 4.125
3800 10 Tick Type 0.412 4.125
3810 10 Tick Type 0.412 4.125
3820 10 Tick Type 0.412 4.125
3830 10 Tick Type 0.412 4.125
3840 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
3850 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
3860 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
3870 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
3880 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
3890 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
3900 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
3910 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
3920 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
3930 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
3940 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
3950 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
3960 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
3970 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
3980 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
3990 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4000 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4010 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4020 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4030 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4040 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4050 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4060 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4070 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4080 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4090 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4100 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4110 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4120 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4130 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4140 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4150 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4160 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4170 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4180 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4190 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4200 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4210 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4220 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4230 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4240 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4250 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4260 10 Tick Type 0.412 4.125
4270 10 Tick Type 0.412 4.125
4280 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4290 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4300 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4310 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4320 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4330 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4340 10 Tick Type 0.412 4.125
4350 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4360 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4370 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4380 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4390 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4400 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4410 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4420 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4430 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4440 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4450 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4460 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4470 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4480 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4490 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4500 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4510 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4520 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4530 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4540 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4550 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4560 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4570 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4580 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4590 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4600 10 Tick Type 0.412 4.125
4610 10 Tick Type 0.412 4.125
4620 10 Tick Type 0.412 4.125
4630 10 Tick Type 0.412 4.125
4640 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4650 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4660 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4670 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4680 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4690 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4700 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4710 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4720 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4730 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4740 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4750 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4760 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4770 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4780 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4790 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4800 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4810 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4820 10 Tick Type 0.412 4.125
4830 10 Tick Type 0.412 4.125
4840 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4850 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4860 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4870 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4880 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4890 10 Tick Type 0.412 4.125
4900 10 Tick Type 0.412 4.125
4910 10 Tick Type 0.412 4.125
4920 10 Tick Type 0.412 4.125
4930 10 Tick Type 0.412 4.125
4940 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4950 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4960 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4970 10 Tick Type 0.412 4.125
4980 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
4990 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5000 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5010 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5020 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5030 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5040 10 Tick Type 0.412 4.125
5050 10 Tick Type 0.412 4.125
5060 10 Tick Type 0.412 4.125
5070 10 Tick Type 0.412 4.125
5080 10 Tick Type 0.412 4.125
5090 10 Tick Type 0.412 4.125
5100 10 Tick Type 0.412 4.125
5110 10 Tick Type 0.412 4.125
5120 10 Tick Type 0.412 4.125
5130 10 Tick Type 0.412 4.125
5140 10 Tick Type 0.412 4.125
5150 10 Tick Type 0.412 4.125
5160 10 Tick Type 0.412 4.125
5170 10 Tick Type 0.412 4.125
5180 10 Tick Type 0.412 4.125
5190 10 Tick Type 0.412 4.125
5200 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5210 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5220 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5230 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5240 10 Tick Type 0.412 4.125
5250 10 Tick Type 0.412 4.125
5260 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5270 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5280 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5290 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5300 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5310 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5320 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5330 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5340 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5350 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5360 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5370 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5380 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5390 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5400 10 Tick type 0.412 4.125
5410 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5420 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5430 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5440 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5450 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5460 10 Tick type 0.412 4.125
5470 10 Tick type 0.412 4.125
5480 10 Tick type 0.412 4.125
5490 10 Tick type 0.412 4.125
5500 10 Tick type 0.412 4.125
5510 10 Tick type 0.412 4.125
5520 10 Tick type 0.412 4.125
5530 10 Tick type 0.412 4.125
5540 10 Tick type 0.412 4.125
5550 10 Tick type 0.412 4.125
5560 10 Tick type 0.412 4.125
5570 10 Tick type 0.412 4.125
5580 10 Tick type 0.412 4.125
5590 10 Tick type 0.412 4.125
5600 10 Tick type 0.412 4.125
5610 10 Tick type 0.412 4.125
5620 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5630 10 Tick type 0.412 4.125
5640 10 Tick type 0.412 4.125
5650 10 Tick type 0.412 4.125
5660 10 Tick type 0.412 4.125
5670 10 Tick type 0.412 4.125
5680 10 Tick type 0.412 4.125
5690 10 Tick type 0.412 4.125
5700 10 Tick type 0.412 4.125
5710 10 Tick type 0.412 4.125
5720 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5730 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5740 10 Tick type 0.412 4.125
5750 10 Tick type 0.412 4.125
5760 10 Tick type 0.412 4.125
5770 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5780 10 Tick type 0.412 4.125
5790 10 Tick type 0.412 4.125
5800 10 Tick type 0.412 4.125
5810 10 Tick type 0.412 4.125
5820 10 Tick type 0.412 4.125
5830 10 Tick type 0.412 4.125
5840 10 Tick type 0.412 4.125
5850 10 Tick type 0.412 4.125
5860 10 Tick type 0.412 4.125
5870 10 Tick type 0.412 4.125
5880 10 Tick type 0.412 4.125
5890 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5900 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
5910 10 Tick type 0.412 4.125
5920 10 Tick type 0.412 4.125
5930 10 Tick type 0.412 4.125
5940 10 Tick type 0.412 4.125
5950 10 Tick type 0.412 4.125
5960 10 Tick type 0.412 4.125
5970 10 Tick type 0.412 4.125
5980 10 Tick type 0.412 4.125
5990 10 Tick type 0.412 4.125
6000 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6010 10 Tick type 0.412 4.125
6020 10 Tick type 0.412 4.125
6030 10 Tick type 0.412 4.125
6040 10 Tick type 0.412 4.125
6050 10 Tick type 0.412 4.125
6060 10 Tick type 0.412 4.125
6070 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6080 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6090 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6100 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6110 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6120 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6130 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6140 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6150 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6160 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6170 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6180 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6190 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6200 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6210 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6220 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6230 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6240 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6250 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6260 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6270 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6280 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6290 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6300 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6310 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6320 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6330 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6340 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6350 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6360 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6370 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6380 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6390 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6400 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6410 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6420 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6430 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6440 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6450 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6460 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6470 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6480 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6490 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6500 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6510 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6520 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6530 10 Tick type 0.412 4.125
6540 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6550 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6560 10 Tick type 0.412 4.125
6570 10 Tick type 0.412 4.125
6580 10 Tick type 0.412 4.125
6590 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6600 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6610 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6620 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6630 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6640 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6650 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6660 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6670 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6680 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6690 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6700 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6710 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6720 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6730 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6740 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6750 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6760 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6770 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6780 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6790 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6800 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6810 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6820 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6830 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6840 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6850 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6860 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6870 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6880 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6890 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6900 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6910 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6920 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6930 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6940 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6950 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6960 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6970 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6980 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
6990 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7000 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7010 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7020 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7030 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7040 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7050 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7060 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7070 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7080 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7090 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7100 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7110 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7120 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7130 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7140 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7150 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7160 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7170 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7180 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7190 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7200 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7210 10 Tick Type 0.412 4.125
7220 10 Tick Type 0.412 4.125
7230 10 Tick Type 0.412 4.125
7240 10 Tick Type 0.412 4.125
7250 10 Tick Type 0.412 4.125
7260 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7270 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7280 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7290 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7300 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7310 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7320 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7330 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7340 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7350 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7360 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7370 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7380 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7390 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7400 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7410 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7420 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7430 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7440 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7450 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7460 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7470 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7480 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7490 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7500 10 Tick Type 0.412 4.125
7510 10 Tick Type 0.412 4.125
7520 10 Tick Type 0.412 4.125
7530 10 Tick Type 0.412 4.125
7540 10 Tick Type 0.412 4.125
7550 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7560 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7570 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7580 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7590 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7600 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7610 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7620 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7630 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7640 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7650 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7660 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7670 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7680 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7690 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7700 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7710 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7720 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7730 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7740 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7750 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7760 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7770 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7780 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7790 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7800 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7810 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7820 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7830 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7840 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7850 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7860 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7870 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7880 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7890 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7900 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7910 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7920 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7930 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7940 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7950 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7960 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7970 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7980 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
7990 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8000 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8010 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8020 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8030 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8040 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8050 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8060 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8070 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8080 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8090 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8100 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8110 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8120 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8130 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8140 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8150 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8160 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8170 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8180 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8190 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8200 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8210 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8220 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8230 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8240 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8250 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8260 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8270 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8280 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8290 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8300 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8310 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8320 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8330 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8340 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8350 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8360 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8370 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8380 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8390 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8400 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8410 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8420 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8430 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8440 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8450 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8460 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8470 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8480 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8490 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8500 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8510 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8520 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8530 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8540 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8550 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8560 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8570 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8580 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8590 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8600 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8610 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8620 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8630 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8640 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8650 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8660 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8670 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8680 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8690 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8700 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8710 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8720 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8730 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8740 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8750 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8760 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8770 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8780 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8790 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8800 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8810 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8820 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8830 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8840 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8850 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8860 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8870 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8880 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8890 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8900 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8910 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8920 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8930 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8940 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8950 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8960 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8970 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8980 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
8990 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9000 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9010 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9020 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9030 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9040 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9050 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9060 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9070 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9080 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9090 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9100 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9110 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9120 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9130 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9140 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9150 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9160 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9170 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9180 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9190 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9200 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9210 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9220 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9230 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9240 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9250 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9260 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9270 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9280 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9290 10 Tick type 0.412 4.125
9300 10 Tick type 0.412 4.125
9310 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9320 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9330 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9340 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9350 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9360 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9370 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9380 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9390 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9400 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9410 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9420 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9430 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9440 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9450 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9460 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9470 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9480 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9490 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9500 10 Tick type 0.412 4.125
9510 10 Tick type 0.412 4.125
9520 10 Tick type 0.412 4.125
9530 10 Tick type 0.412 4.125
9540 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9550 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9560 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9570 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9580 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9590 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9600 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9610 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9620 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9630 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9640 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9650 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9660 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9670 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9680 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9690 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9700 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9710 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9720 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9730 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9740 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9750 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9760 10 Tick type 0.412 4.125
9770 10 Tick type 0.412 4.125
9780 10 Tick type 0.412 4.125
9790 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9800 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9810 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9820 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9830 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9840 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9850 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9860 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9870 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9880 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9890 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9900 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9910 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9920 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9930 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9940 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9950 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9960 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9970 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9980 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
9990 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
10000 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
10010 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
10020 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
10030 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
10040 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
10050 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
10060 10 Tick Type 0.412 4.125
10070 10 Tick Type 0.412 4.125
10080 10 Tick Type 0.412 4.125
10090 10 Tick Type 0.412 4.125
10100 10 Tick Type 0.412 4.125
10110 10 Tick Type 0.412 4.125
10120 10 Tick Type 0.412 4.125
10130 10 Tick Type 0.412 4.125
10140 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
10150 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
10160 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
10170 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
10180 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
10190 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
10200 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
10210 10 Tick Type 0.412 4.125 Tick type 0.412 4.125
10220 10 Tick Type 0.412 4.125
10230 10 Tick Type 0.412 4.125
10240 10 Tick Type 0.412 4.125
10250 10 Tick Type 0.412 4.125
10260 10 Tick Type 0.412 4.125
10270 10 Tick Type 0.412 4.125
10280 10 Tick Type 0.412 4.125
10290 10 Tick Type 0.412 4.125
10300 7.81 Tick Type 0.412 3.222
10305.62 2.81 Tick Type 0.412 1.159

TOTAL 10169.54 380.276 3793.156 334.544 3339.695

For PCC & Stone soling Work

Length PCC M15 Stone Soling


Drain Bed Wall Caping Base
Breadth Height Volume Breadth Height Volume Height Volume
10305.620 1 0.1 1030.562 0.25 0.05 128.8203 0.15 1545.843

Summary of Quantity for Drain

SN Description Quantity Unit Remarks


1 M15 PCC 1159.382 m3
2 MM5 Masonry 7132.851 m3
3 Stone soiling work 1545.843 m3
Structure(GWRET) QUANTITY
Left Right
Chainage Length
GWRET Height Area(m2) Volume(m3) GWRET Height Area(m2)
2950 10 GWRETC 3 4.5
3460 10 GWRETB 3 5
3470 10 GWRETB 3 5
4900 10 GWRETB 3 5
4910 10 GWRETB 3 5
4920 10 GWRETB 3 5
4930 10 GWRETB 3 5
5560 10 GWRETB 3 5 50
5570 10 GWRETB 3 5 50
5580 10 GWRETB 3 5 50
5590 10 GWRETB 3 5 50
5620 10 GWRETB 3 5 50
5670 10 GWRETB 3 5 50
5680 10 GWRETB 3 5 50
5690 10 GWRETB 3 5 50
5830 10 GWRETB 3 5 50
5850 10 GWRETF 3 5.5 55
5860 10 GWRETA 3 5 50
5870 10 GWRETA 3 5 50
5920 10 GWRETB 3 5 50
6020 10 GWRETB 3 5 50
10060 10 GWRETB 3 5
10070 10 GWRETB 3 5
10090 10 GWRETB 3 5
10100 10 GWRETB 3 5
10110 10 GWRETB 3 5
10120 10 GWRETB 3 5
10280 10 GWRETB 3 5
705
Right
Volume(m3) Geotextie
45 30
50 30
50 30
50 30
50 30
50 30
50 30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
50 30
50 30
50 30
50 30
50 30
50 30
50 30
695
Structure(MWBRT) QUANTITY
Left Right
Chainage Length
MWBRT Height Area(m2)Volume(m3) MWBRT Height Area(m2)Volume(m3)
2570 10 MWBRTB 3 3.949 39.49
2580 10 MWBRTB 3 3.949 39.49
2590 10 MWBRTB 3 3.949 39.49
2600 10 MWBRTB 3 3.949 39.49
2610 10 MWBRTB 3 3.949 39.49
2620 10 MWBRTB 3 3.949 39.49
2630 10 MWBRTB 3 3.949 39.49
2640 10 MWBRTB 3 3.949 39.49
2650 10 MWBRTB 3 3.949 39.49
2660 10 MWBRTB 3 3.949 39.49
3050 10 MWBRTB 3 3.949 39.49
3070 10 MWBRTB 3 3.949 39.49
3080 10 MWBRTB 3 3.949 39.49
3090 10 MWBRTB 3 3.949 39.49
3100 10 MWBRTB 3 3.949 39.49
3110 10 MWBRTB 3 3.949 39.49
3120 10 MWBRTB 3 3.949 39.49
3130 10 MWBRTB 3 3.949 39.49
3240 10 MWBRTB 3 3.949 39.49
3380 10 MWBRTB 3 3.949 39.49
3390 10 MWBRTB 3 3.949 39.49
3400 10 MWBRTB 3 3.949 39.49
3530 10 MWBRTB 3 3.949 39.49
3540 10 MWBRTB 3 3.949 39.49
3550 10 MWBRTB 3 3.949 39.49
3560 10 MWBRTB 3 3.949 39.49
4900 10 MWBRTB 3.5 5.182 51.816
4910 10 MWBRTB 4 6.578 65.783
4920 10 MWBRTB 3.5 5.182 51.816
4930 10 MWBRTB 3.5 5.182 51.816
4970 10 MWBRTB 3.5 5.182 51.816
4980 10 MWBRTB 3.5 5.182 51.816
4990 10 MWBRTB 3.5 5.182 51.816
5080 10 MWBRTB 3.5 5.182 51.816
5100 10 MWBRTB 3.5 5.182 51.816
5460 10 MWBRTB 3.5 5.182 51.816
5470 10 MWBRTB 3.5 5.182 51.816
5480 10 MWBRTB 3.5 5.182 51.816
5540 10 MWBRTB 2.5 2.88 28.805
5550 10 MWBRTB 2.5 2.88 28.805
5560 10 MWBRTB 2.5 2.88 28.805
5570 10 MWBRTB 2.5 2.88 28.805
5800 10 MWBRTB 3.5 5.182 51.816
5810 10 MWBRTB 3.5 5.182 51.816
5820 10 MWBRTB 3.5 5.182 51.816
10020 10 MWBRTB 3.5 5.182 51.816
10030 10 MWBRTB 3.5 5.182 51.816
10220 10 MWBRTB 3.5 5.182 51.816
10230 10 MWBRTB 3.5 5.182 51.816
10240 10 MWBRTB 3.5 5.182 51.816
10250 10 MWBRTB 3.5 5.182 51.816
10260 10 MWBRTB 3.5 5.182 51.816
10270 10 MWBRTB 3.5 5.182 51.816
1921.579 426.116
Volume(m3)
from radiusTo Radius Extrawidening
0 8 2.95
8 10 2.6
10 12.5 2.3
12.5 15 1.9
15 20 1.6
20 30 1.2
30 40 0.9
40 50 0.8
50 60 0.6
60 70 0.55
70 80 0.5
80 90 0.45
90 100 0.4
100 110 0.35
110 120 0.34
120 130 0.32
130 140 0.3
140 150 0.29
150 1000 0

Radius Extrawidening
0 0
120 0.34
60 0.6
60 0.6
120 0.34
90 0.4
20 1.2
20 1.2
25 1.2
20 1.2
45 0.8
20 1.2
40 0.8
45 0.8
60 0.6
60 0.6
60 0.6
60 0.6
60 0.6
45 0.8
60 0.6
60 0.6
60 0.6
60 0.6
90 0.45
90 0.45
120 0.34
120 0.34
120 0.34
90 0.45
120 0.34
120 0.34
60 0.6
120 0.34
120 0.34
120 0.34
120 0.34
120 0.34
90 0.45
120 0.34
90 0.45
60 0.6
60 0.6
60 0.6
30 0.9
90 0.45
90 0.45
60 0.6
90 0.45
90 0.45
60 0.6
60 0.6
45 0.8
60 0.6
60 0.6
45 0.8
60 0.6
60 0.6
60 0.6
60 0.6
60 0.6
200 0
150 0.29
60 0.6
60 0.6
90 0.45
90 0.45
60 0.6
60 0.6
45 0.8
60 0.6
60 0.6
90 0.45
75 0.5
30 1.2
25 1.2
30 1.2
120 0.34
90 0.45
90 0.45
90 0.45
120 0.34
40 0.8
120 0.34
120 0.34
120 0.34
120 0.34
120 0.34
120 0.34
120 0.34
25 1.2
20 1.2
25 1.2
60 0.6
90 0.45
120 0.34
60 0.6
90 0.45
90 0.45
55 0.6
20 1.2
0
0
50 0.6
40 0.8
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
50 0.6
100 0.4
100 0.4
100 0.4
35 0.8
35 0.8
100 0.4
50 0.6
50 0.6
50 0.6
50 0.6
100 0.4
100 0.4
50 0.6
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
50 0.6
100 0.4
50 0.6
100 0.4
20 1.2
30 1.2
25 1.2
30 1.2
30 1.2
30 1.2
20 1.2
40 0.8
30 1.2
30 1.2
80 0.45
60 0.6
60 0.6
60 0.6
30 1.2
25 1.2
25 1.2
40 0.8
20 1.2
20 1.2
30 1.2
30 1.2
20 1.2
30 1.2
20 1.2
30 1.2
100 0.4
30 1.2
60 0.6
100 0.4
150 0.29
100 0.4
50 0.6
50 0.6
20 1.2
15 1.9
100 0.4
100 0.4
100 0.4
100 0.4
50 0.6
20 1.2
100 0.4
60 0.6
50 0.6
30 1.2
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
200 0.4
100 0.4
100 0.4
50 0.6
100 0.4
100 0.4
80 0.45
100 0.4
100 0.4
100 0.4
100 0.4
150 0.29
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
50 0.6
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
40 0.8
50 0.6
100 0.4
100 0.4
100 0.4
60 0.6
60 0.6
100 0.4
100 0.4
100 0.4
50 0.6
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
50 0.6
40 0.8
40 0.8
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
80 0.45
100 0.4
50 0.6
100 0.4
100 0.4
100 0.4
100 0.4
100 0.4
40 0.8
20 1.2
100 0.4
100 0.4
25 1.2
20 1.2
25 1.2
25 1.2
30 1.2
25 1.2
100 0.4
100 0.4
60 0.6
40 0.8
0 0
100 0.4
162.04