Proposal/Calculation
Date : 26-Mar-19
Project Name : Integrated Totem Exit/CCTV Sign Post for MRT Stations
Office : No. 20 Harbour Drive #06-06/08 PSA Vista Singapore 117612 Tel:(65)777 7887 Fax:(65)777 3057
Hilti Centres : 113 Jalan Besar Tel: 6377-0777, Blk 52 Ubi Ave 3 Frontier Bldg #01-43 Tel: 6547-5477
Crimsign Graphics Pte Ltd
1.1. The Calculations shown are Proposals only and should be finally checked and
approved by the Architect or Engineer responsible for the Project.
1.2. PE Endorsement where necessary, to certify safe anchoring loading design at the
discretion and expenses of others.
1.5. Propose all openings to be filled up with HILTI Sealant and Firestop system
1.0 Data / Information (Drawing) [Provided]
Z
X
Y
2
Gravity g = 10.0 m/s [Assumed]
4.1.2 PROFIS Check Result for X-Direction (Design Overview And Load Analysis)
6.1 Check