Team No. 1 Audit Team Leader: Gerardo A.Laguador Report Date: March 28, 2019
Code of Findings NEED FOLLOW UP COMPLETED
Process CIU-P12 Operational procedure manual was presented completely. / Legal basis and forms should be in hard copy. / Ciu-P18 Addition of one step in the OPM Test questions are not in the area of / specialization Legal basis and forms should be in / hard copy. Some forms were not available. / CIU-P19 Steps in the management of SPA / students` performance are in sequence. Legal basis should be complied. / There will be a compilation of certificates of training, seminar and / his/her accomplishment related to SPA All forms should be in ISO template. / All communication should be in hard / copy
CIU-P11 Operational procedure manual was
already completely. / Lesson plan, LAC Plan, Smiley face / icon were presented as evidence for the implementation of Project Smile Criteria for giving emoticon should be in a template/ or in hard copy / There was only emoticon that / represents the 12 school character traits The documents were kept for three / years in the archive room CIU-P08 Reading materials for every year / grade level were available. There is legal basis for the / implementation of reading program Results of pre test and post test were presented. / / Procedure in conducting reading process was demonstrated and interpreted properly / Certificate of the reading coordinators were available. / Organizational chart should be included in the OPM Function of pertinent personnel / must be included and clearly stated in OPM Certificates of the subject teachers / who act reading teachers were not available. Forms needed in the reading process / should be in ISO template There was a need to review the / Operating procedure Manual / No reading room There was appointment/designation / as reading coordinator / No reading teacher / No storage cabinet Provide a hard copy of the other / intervention activity PLU-PO1 Revisit OPM (PLU-P01 can be / combined with PLU-PO3) There were legal basis presented but / it should be in hard copy and / complied All forms should be in ISO template and in hard copy. / Deeds of acceptance should be in written form. / PLU-PO3 All forms should be in ISO template / and in hard copy. There should be a narrative report of / the new donated project Certificates of recognition should be given during the turn over / Cabinet will be needed for the / storage of document Log book is need for the record of / donation All document must be compiled and properly documented / CIU-PO4 Legal basis is well presented and / readily available. Document were presented well. / (Transmittal report) Remark column in the QSAC must be / signed/filled out by the teacher as proof that the QA and TOS were completely done and submitted to the planning office. LRCU-PO8 Operational procedure manual was already completely. / Steps in the Operation manual are in / sequence LRCU-P09 Operational procedure manual was already completely. / Legal basis is available. / New donated books that covered the process had the spine label. / All references used in cataloguing / are available. All forms should be in the ISO template / The steps in learning resource management are in sequence. / There is card catalogue. / Insufficient manpower was observed The staff who will assign in the library will have the knowledge about the / mechanical and technical processes / in the learning resource management. Fire extinguisher is expired. / Almost half of the number of the books are obsolete but these are not covered by the process. / Books are arranged according Filipina and General Reference / Section
LRCU-P07 Operational procedure manual was
already completely. / Procedure in borrowing of books was demonstrated properly. / Borrower`s card of the students were issued at the beginning of the school year / / Log book for records CIU-P18 Legal basis was presented but it need / to compile. Revisit the OPM / All forms must be in ISO template / Attachment in the OPM should be completed / Clarify the organizational chart / Compile the certificates of training and seminar attended by the / teachers and coordinator under this program There is a storage room for equipment but there is a need to / remove materials that are not belong to sport. CIU-P19 Revisit the OPM for the alignment of / students` skill to respective sport area Legal basis was presented but it / needs to compile. Attachment in the OPM should be completed / Forms should be in ISO template /