SUMMARY OF TECHNICAL SPECIFICATIONS IN THE CONTRACT

No. TYPE OF WORK


STANDARD PROCEDURE / WORK
STANDARD DESIGN
INSTRUCTION
SUMMARY OF TECHNICAL SPECIFICATIONS IN THE CONTRACT
No. TYPE OF WORK
STANDARD PROCEDURE / WORK
STANDARD DESIGN
INSTRUCTION
IX. MAIN DAM
9.5. Embankment Zone 2 1. Submit work request 1. The filters shall consist of a non-plastic
mixture of rock fragments in which the
individual particles are hard and durable,
free from clay, silt and organic material

2. Before and during compaction, the material 2. Filter materials for embankment zone 2 shall
in each layer of Zones 2 and 3 shall be test the materials in accordance with ASTM
thoroughly wetted and the moisture content C535-65 and ASTM C88-63. The material
shall be uniform throughout the layer may be rejected if:
a. At 500 revolution the loss, using grading A
in the Los Angeles abrasion test, exceeds
45% by mass;
b. When subjected to 5 cycles of the sodium
sulphate test for soundness the weighted
loss by mass is more than 14%.

3. Provide the necessary plant for processing 3. The representative tests shall be performed
the filters as at least 1 (one) test per 500m3 by the
Contractor

4. Water shall be applied as required by 4. Before compaction, filter material shall be


spraying on the dam embankment. Each placed and spread to an approximately
layer of Zone 2 material shall be compacted horizontal surface in such a way as to
concurrently with the adjacent layer of Zone prevent segregation of particles or the
3 material formation of large voids.

5. Each layer of Zone 2 material shall be 5. The thickness of Zone 2 and Zone 3 layer
compacted by 1 pass of a vibrating roller shall be not more than 300 mm and 600 mm
conforming to the requirements for vibrating respectively after require compaction
rollers for rock-fill