Sei sulla pagina 1di 7

Expenditures

A. Gabriel Inciong
I.
February 24-28, 2019 CODES & PROTO - (GAS, TOLL, FARE & COMPONENTS)
 ₱ 335 + ₱ 176 = 511 Bayad ng bawat isa
 ₱ 511(6) = ₱ 3,066 (total Na nagastos Ni Gaibe)
Paul Erik Chester Gea Nica
- ₱ 150 None - ₱ 519 -75 (USB None
(Vermiscast) (Nagastos ni Cable)
Chester nung
lumuwas
kasama si
Gaibe )
- ₱ 40 (Fare) None None None None
511 -150-40 ------------------ 511 -519 511- 75 -----------------
---- -----
Total : ₱ 321 Total: ₱ 511 Total : ₱ 8 Total : ₱ 436 Total : ₱ 511
Total : 321 + 511 – 8 + 436 + 511 = ₱ 1,711 ( Bayad na, nakatago muna sakin (Paul ))

II.

February 28, 2019 (Megawatts – Wiring para sa exhaust fan, air con at water pump)
 ₱ 382.50 (total Na nagastos Ni Gaibe)
 ₱ 382.50/ 6 = 64 (bayad ng bawat isa)
Paul Erik Chester Gea Nica
64 64 64 64 64
Total : 64 + 64 + 64 +64 +64 = ₱ 320

III.

March 11, 2019 (Insulation 12 meters)


 ₱ 500 (total Na nagastos Ni Gaibe)
 ₱ 500/6 = ₱ 83.3 (bayad ng bawat isa)
Paul Erik Chester Gea Nica
84 84 84 84 84
Total : 84 + 84 + 84+84 +84 = ₱ 420
IV.
March 18, 2019 (PVC blue pipe, PVC Elbow, PVC T , Additional Wire and push button
switch)
₱ 318 + ₱ 255 = ₱ 573
₱ 573 (total Na nagastos Ni Gaibe)
₱ 573 / 6 = ₱ 95.5 (bayad ng bawat isa)
Paul Erik Chester Gea Nica
95.5 95.5 95.5 95.5 95.5
Total 95.5+ 95.5+ 95.5+95.5 +95.5 = ₱ 477.5

V.
March 1-19, 2019 (PVC blue pipe size 1(Lipa Palenke), water hose (New Star), Air
Dock and Aluminum Tape (Robinson Lipa)
 ₱ 1,771 (Nakatagong bayad kay Gaibe nung Feb 24-28)
 ₱ 1,771 - ₱ 100 (Bawas sa Fare ni Gaibe nung pauwe (March 20, 2019)) =₱ 1,671
 ₱ 1,671 (total Na nagastos Ni Gaibe)
 ₱ 1,671 / 6 = ₱ 278.5 (bayad ng bawat isa)
Paul Erik Chester Gea Nica
278.5 278.5 278.5 278.5 278.5
Total :278.5 + 278.5 + 278.5 +278.5 +278.5 = ₱ 1,392

VI.
March 19, 2019 (Food kina Arvin at Arnel)
 ₱ 210 (total Na nagastos Ni Gaibe)
 ₱ 210/6 = ₱ 35 (bayad ng bawat isa)
Paul Erik Chester Gea Nica
35 35 35 35 35
Total : 35 + 35 + 35 +35 +35= ₱ 175

Refund: ₱ 320 + ₱ 420 + ₱ 477.5 + ₱ 1,392 + ₱ 175 = ₱ 2,784


₱ 2, 784 – ₱ 346 (Paul – Insulation, Food & Staple wire) – ₱ 95.5 ( Gea – transpo ,
Lock , electric tape & alena )
Total = ₱ 2,342.5
Reimburse kay Gaibe: ₱ 2,343
B. Paul Quiban

I.

March 19, 2019 (Meryenda kina Arvin at Arnel )


 ₱ 68 (total Na nagastos Ni Paul)
 ₱ 68 / 6 = ₱ 11 (bayad ng bawat isa)
Gaibe Erik Chester Gea Nica
11 11 11 11 11
Total : 11 + 11 + 11 +11 +11= ₱ 55

II.
March 19, 2019 (Insulation (50 meters) , Staple Wire & Gas)

 ₱ 1710 + ₱ 300 = ₱ 2010 (total Na nagastos Ni Paul)


 ₱ 2010/6 = ₱ 335 (bayad ng bawat isa)
Gaibe Erik Chester Gea Nica
335 335 335 335 335
Total : 335 + 335 + 335 +335 +335= ₱ 1,675

Refund: ₱ 55 + ₱ 1675 = ₱ 1,730

 ₱ 1,730 - ₱ 95.5 (Gea) - ₱ 556.8 (Gaibe) = ₱ 1,077

 Reimburse kay Paul = ₱ 1,077


C. Gea Andre Riosa

March 11, 2019 (Insulation (12 meter), Transportation Tricycle, Lock, Electric
tape and fee kay Alena)

₱ 503 + ₱ 70 = ₱ 573
₱ 573 (total Na nagastos Ni Gea)
₱ 573/6 = ₱ 95.5 (bayad ng bawat isa)
Gaibe Erik Chester Paul Nica
96 96 96 96 96
Total : 96 + 95.5 + 96 +96 +96= ₱ 480

 Return: ₱ 477.4 - ₱ 346 (Paul) - ₱ 557(Gaibe) = ₱ -426


Compensation to Paul = ₱ 250
Compensation to Gaibe = ₱ 461
Amount Payable:

o Chester Cantos

Gaibe ₱ 557
Gea ₱ 96
Paul ₱ 346
Total ₱ 999

o Nica Marzan

Gaibe ₱ 557
Gea ₱ 96
Paul ₱ 346
Total ₱ 999

o Eric Sto.Domingo

Gaibe ₱ 557
Gea ₱ 96
Paul ₱ 346
Total ₱ 999

Paul Quiban

Gaibe ₱ 211
Total ₱ 211

Gea Riosa

Gaibe ₱ 461
Paul ₱ 250
Total ₱ 711
Receipts:
Guys pasensya wala yung ibang resibo nawala yung iba ,nasa chamber
yung iba nakadikit p siguro sa mga supot or napasama sa basura at
napatapon.makikita nyo naman yung mga items at components na
nakaindicate dito nakalagay at install lahat sa chamber natin thankyou
guys.

Potrebbero piacerti anche