1. A multiphase-fluid flow regime characterized by a series of liquid plugs separated


by a relatively large gas pockets. In vertical flow, the bubble is an axially
symmetrical bullet shape that occupies almost the entire cross-sectional area of the
tubing. The resulting flow alternates between high-liquid and high-gas
composition. What is the name of the flow regime?
Answer : Slug flow (Slb Glossary)
2. What is it? Reservoirs with permeability so low (generally less than 0.1 millidarcy)
that horizontal hydraulically fractured stimulated wells or other advanced
completion techniques must be utilized to extract hydrocarbons at commercial
rates.
Answer : Unconventional reservoirs
3. What is it?
Quantities of oil and gas estimated to exist in naturally occurring accumulations.
A portion of the Quantities of oil and gas may be estimated to be recoverable, and
another portion may be considered to be unrecoverable. These Quantities of oil
and gas include both discovered and undiscovered accumulations.
Answer : Resources (conoco glossary)
4. A multi rate test designed as a series of drawdown and buildup sequences at
different drawdown flow rates, with each drawdown and buildup of the same
duration. This test overcomes the limitation of the isochronal test, which requires
long shut-in times to reach the average reservoir pressure. In this test, the shut-in
periods are of equal duration, as are the flowing periods. This multirate test is
known as...
Answer : Modified Isochronal Test (PETROBOWL QUESTIONS BANK,
Petrofest 2014)
FINAL ROUND
TOSS-UP

5. What is the name of these pictures ( Number 1 – 5)?

4
5

Answer :
1. Conductor Pipe,
2. Surface Casing,
3. Intermediate Casing,
4. Production Casing,
5. Perforation
6. This fluid is a solid free liquid used to complete an oil or gas well. It is placed in
the well to facilitate final operations prior to initiation of production, such as setting
screens production liners, packers or shooting perforations into the producing
zones. What is it ?
Answer : Completion Fluid
7. Name the type of well test on the geothermal well!
Answer :
Water loss test, permeability total, heat test, production test, transient test.
8. A log that has been corrected for the effect of mud and mudcake by using two or
more detectors at different spacings from the source. Main property obtained is
bulk density. What is the name of the log ……
Answer : Compensated Density Log
FINAL ROUND
TOSS-UP

9. These are chips and small fragments of rocks as the result of drilling that are
brought to the surface by the flow of drilling mud as it is circulated. These are
important to geologist, who examines them for information concerning the type of
rock being drilled. What are these?
Answer : Cuttings
10. A non-permeable layer, which is on top of a reservoir and a barrier fluid reservoir
to keep it out of the reservoir, serves as an insulating fluid reservoir and including
the terms into one of the petroleum system
Answer : Cap rock
11. Mention 4 types of geophysical surveys on geothemal exploraton!
Answer :
Resistivity, gravity, magnetic, Micro earth quake (MEQ), heat flow, self potential.
12. Sedimentary structures caused by the sedimentation process or by processes that
occur shortly after sedimentation, or before or at the time of diagenesis is ?
Answer : Primary Sedimentary Structures
13. A non-catalyzed process of thermal decomposition of hydrocarbons (cracking),
performed at very high temperatures, 750 - 900 °C, at approximately normal
pressure is known as…
Answer : Pyrolysis (steam cracking)
14.Who am i? I was born in June 10, 1803, Dijon, France, and many people know
me as the founder of Darcy Equation, Who is my full name?
Answer : Henry Philibert Gaspard Darcy
15. The pressure at which a vapor and a liquid are in equilibrium, often used
interchangeably with “bubble-point pressure” and “dew-point pressure.” What is
it? (API Glossary)
Answer : Saturation Pressure
FINAL ROUND
TOSS-UP

SOAL CADANGAN
1. Estimated remaining quantities of oil and gas and related substances anticipated to
be economically producible, as of a given date, by application of development
projects to known accumulations. In addition, there must exist, or there must be a
reasonable expectation that there will exist, the legal right to produce or a revenue
interest in production, installed means of delivering oil and gas or related
substances to market and all permits and financing required to implement the
project. What is it? (conoco glossary)
Answer : Reserve
2. What it is? A mechanical device that keeps casing from contacting the wellbore
wall. A continuous 360-degree annular space around casing allows cement to
completely seal the casing to the borehole wall.
Answer : Casing Centralizer
3. List the two most common pressure transient analysis!
Answer : Pressure Build Up and Pressure Drawdown
4. In their natural state, LPG (Propane and Butane) and Natural Gas (Methane) are all
odorless gases. The distinctive smell that people associate with these gases is
actually added to them as a safety measure. What odorant is added to LPG to detect
leakage?
Answer : Ethyl Mercaptant / Mercaptant
5. The condition in which cement flows in a channel only on some sides of the casing
or borehole annulus, and thus does not provide adequate hydraulic isolation in all
radial azimuths. What it is?
Answer : Channeling