OVERALL EQUIPMENT

EFFECTIVENESS
(OEE)

AVAILABILITY PERFORMANCE QUALITY


% % %

OPERATING TIME / ACTUAL OUTPUT / FINAL OUTPUT /


RUNNING TIME % POTENTIAL OUTPUT % ACTUAL OUTPUT %

POTENTIAL OUTPUT =
RUNNING TIME = AVAILABLE
OPERATING TIME  MACHINE
FINAL OUTPUT =
TIME – PLANNED DOWNTIME GOOD OUTPUT
SPEED

OPERATING TIME = RUNNING ACTUAL OUTPUT = AS PER


ACTUAL OUTPUT = AS PER
TIME – UNPLANNED MACHINE READING
DOWNTIME MACHINE READING

OVERALL EQUIPMENT EFFECTIVENESS


((AVAILABILITY %  PERFORMANCE %  QUALITY %))*100