Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
PROJECT TEAM
HISTORY
Megan Kirk Evan Pignatelli Laura Kirk
CONTENTS: Team Manager and Graphics Designer Design Engineer Design Engineer
Time - Constraints
Gantt Chart
Scope - Understand our Boundaries
Project Management Triangle
Resources - Control Expenditure
Budget
Weekly Agendas
RE
E
Management Collaboration:
S
OP
OU
QUALITY
SC
RC
&
ES
PRODUCTIVITY
3
TEAM MANAGEMENT
Maintain Team Productivity Identify Personal Limitations
Challenges and Opportunities:
Ensure effective team communication
Maintain team productivity
Identify personal limitations.
Motion Racing
Matrix System
Communication Tools
Gmail:
Facebook:
‘Completion’ List
Motion Racing
Motion Racing
4
TEAM IDENTITY
5
MARKETING
Promote Interest in our Team Promote our Message to the Community
Challenges and Opportunities:
Increase our online presence Newsletters Sutherland Business Education Network (B.E.N)
Motion Racing
Promote interest in our team
Promote our message to the
community.
Motion
Racing
Social Network
Marketing Evaluation:
Scan the QR Code for details on
our sponsors.
6
BRAND IDENTITY
Achieve an Informative and Dynamic Pit Area Entice Spectators to our Pit Area
Challenges and Opportunities:
Achieve bold car graphics Pit Area Touch Screen
Achieve an informative and dynamic pit
area
Entice spectators to our pit area
Collaborate with an expert to develop
design skills.
LED Lights
7
SPONSORS/COLLABORATORS
Rotary,
Challenges and Opportunities:
Acknowledge and thank our sponsors Compumod
Attract new sponsors
Encourage previous sponsors to stay Women In Engineering
with us. Compumod.
Maltacourt
Acknowledge and Thank our Sponsors CSIRO
Sponsorship
Motion Racing
Helensburgh Car Services Captivations
Symscape
Sutherland Business Education
Sponsors Network
Impression Markings
Adept Turnkey
Department of Defence
Materiel Organisation
National Sponsor
Southside Restorations
Bilby CNC
8
MEDIA
‘Real’ Formula One Car Media Coverage Promote Sponsors and Supporters
Challenges and Opportunities:
Achieve wide media exposure
Speak on national television
Promote sponsors and supporters.
Motion Racing We
Media Evaluation:
Motion Racing
The team with the NSW Minister for Education, Adrian Piccoli
9
ENGINEERING MANAGEMENT
Car breaks during Weak points in car design and/or Medium Extensive testing E.g. FEA analysis. Change design to remove
racing components. weak points.
No organisation Lack of a naming convention to High Create a template to order all design elements and document
to show design manage design developments in the the testing processes.
evolution car.
Engineering Collaboration:
Extract from the Engineering Templates
10
CAR DEVELOPMENT
Incremental Changes
Stage 2 - Incremental Changes
11
CAR COMPONENTS
12
WHEELS
Optimise Rotational Moment of Inertia Improve Strength and Reliability of the Wheel
Challenges and Opportunities:
Concept 2: Variable Moment of Inertia (VMI) Wheels Assembly
Concept 3: Spinning Axle Wheel Assembly
PICTURE
Conclusion:
Wheels Evaluation:
13
TESTING - VIRTUAL
Evaluate Conformance to Rule T4.6
Challenges and Opportunities:
Wall Thickness Analysis
Material Description Tensile Strength PICTURE Calculations to Inform Design, Development and
Manufacturing
Inertia Tool
PICTURE
14
AERODYNAMICS
Caedium
Challenges and Opportunities:
Develop an Understanding of CFD the canister and rear skirt and improved velocity underneath the
canister housing.
Pheonics
XFlow
Aerodynamics Collaboration:
Aerodynamics Evaluation:
15
TESTING - PHYSICAL
shows minimal bucking of rear wheels. Blue line tracks forward motion
to calculate acceleration.
Conclusion:
This was used to test the independent wheel assembly and spinning
axle wheel assembly.
16
MANUFACTURING - BODY
Maximum Use of the Standard Balsa Block Apply Innovation to Solve Problems
Challenges and Opportunities:
Side Pod Slot
Manufacturing Collaboration:
17
MANUFACTURING - WHEELS AND COMPONENTS
Car Assembly
Challenges and Opportunities:
Manufacturing Evaluation:
18
FINAL CAR DESIGN
19
ORTHOGONAL
20