Sl.
CHECKLIST REQUIREMENT
No
1 Water cement ratio As per specification
2 Surface preparation by mortar bedding Fresh mortar
3 Slump testing* As per requirement
4 Adequacy of vibration 40mm and 60mm needle required
5 Segregation of aggregates Not allowed
6 Removal of temporary spacers and ties* To be removed
7 Check for shuttering prop displacement / settlement Not Allowed
Number of cubes taken for testing with identification 3 No’s for RCC > 6m33 No’s for
8
No.: ________ Id: __________ every 5m3
9 Continuity of operations No break in between concreting
* The above checklist are valid for Reinforced Concrete works only.
Note:
All the empty space has to be filled and remarks if any shall be written in remarks
column.
Date of inspection of pre-concrete, during placement and post-concrete placement shall
be noted as these steps may not be performed on the same day.
Signature by contractor supervisor and engineer is done after each inspection.