Block C1 & C2

SL NO. LOCATION
Common

Kitchen Area
Bed Room
Bed Room

Block C1- Ground Floor -01


SL NO. LOCATION

Balcony

Balcony

Balcony
Balcony

Study Room

Master Bed Room


Bathroom

Bed Room-2

Kitchen

Utility Balcony

Block C1- Ground Floor -02


SL NO. LOCATION

Study Room

Master Bed Room


Bathroom
Bed Room-2
Toilet

Kitchen

Utility

Block C1- Ground Floor -03


SL NO. LOCATION

Hall

Study Room

Master Bed Room

Toilet

Bed Room

Bathroom

Kitchen

Utility

Block C1- Ground Floor -04


SL NO. LOCATION

Hall
Study Room
Bed Room
Bathroom

Block C1- First Floor


First Floor -01
SL NO. LOCATION
Hall

Study Room

Master Bed Room


Toilet

Bed Room

Toilet

Kitchen

Utility

Block C1- First Floor


First Floor -02
SL NO. LOCATION

Hall
Balcony

Study Room

Bed Room
Toilet-1

Master Bed Room

Toilet

Kitchen

Utility

Block C2- Ground Floor


Ground Floor -1
SL NO. LOCATION

Hall

Balcony

Study Room

Lobby Area

Master Bed Room-1


Bathroom

Bed Room

Bathroom

Kitchen

Utility

Block C2- Ground Floor


Ground Floor -2
SL NO. LOCATION
Hall

Study Room

Master Bed Room-1


Bathroom

Bed Room

Toilet

Block C2- Ground Floor


Ground Floor
SL NO. LOCATION

Kitchen

Utility

Study Room

Toilet
Bed Room

Toilet-2

Block C2- Second Floor


Second Floor -01
SL NO. LOCATION
Hall

Balcony

Study Room
Master Bed Room

Toilet-1

Bed Room-1
Toilet-2

Kitchen
Utility

Block C2- Second Floor


Second Floor -03
SL NO. LOCATION
Hall

Balcony
Study Room
Master Bed Room

Bed Room

Block C2- Second Floor


Second Floor -04
SL NO. LOCATION
Hall

Balcony
Study Room
Master Bed Room

Bathroom
Toilet

Bed Room

Bathroom

Kitchen

Block C2- First Floor


First Floor -04
SL NO. LOCATION
Hall

Balcony

Study Room

Master Bed Room

Bed Room

Bathroom
Kitchen

Utility

Block C2- First Floor


First Floor -03
SL NO. LOCATION
Hall

Study Room

Bed Room-1

Bathroom

Bed Room-2

Toilet

Block C2- First Floor


First Floor -03
SL NO. LOCATION
Hall

Study Room

Bed Room-1
Bathroom

Bed Room-2

Toilet
C1 & C2
SNAG POINTS STATUS
UPVC Cleaning & Refixing
Toilet Tile Grove Filling
Replace Broken Tile
Panting Touch up @ Electrical
Toilet Single Grouting/ Grove Filling
MS Grill Touch Up
UPVC Window Cleaning by Air Blower
Common Area & Stair Case Cleaning
GI line Clamping & Painting
Raceway Cover Removal
Aluminum Portion Sealent Filling
Common Area Beam Touch Up & Reparing
Stair Case Hand Rail Cleaning
Handle Cleaning in all Floors
Ciling Paint C-2 (03 Room)
Kitchen Wall Tile (Near Sink ) (2 Tile ) Flooring 1 Tile ) Room 1
Door Danarge in C-2
Skrting Repair work
Floor Tile Repair 3 Nos
Toilet Window Corner reparing & Touch Up

SNAG POINTS STATUS


Cleaning of Handle of Wire mesh Shutter & Door, Chowkat
Cleaning of Granite
Painting of Chowkat
12mm Gap In Flash Door to be Retified
Hall Cleaning
Proper Finishing arround Switch Board
Perforated Cover for Ground Floor Rainwater Chamber
Pointing Work to be Retified
Grouting for window Jamb & Cill Stone
Skrting Repair for Tiles
Cleaning of L- Stone
Cleaning of S.S. Railing
Proper Finishing near Chowkat area
Opening for Mesh Door Should be rectified

10mm Gap for Grill Should be Rectified


Window Cleaning
Grill Painting
Cleaning for Flooring & Skrting Repair Work
Andulation Should be Rectified for Ceiling
Uneven Tiles Should be Rectified, Andulation for slab to retified
Grill Painting
Window Jamb finishing Should be Proper
Cleaning of wall Tiles
Ventilator Plaster & Painting
Window jamb Cleaning
Flooring Tiles Repair
Andulation Should be Rectified for Slab
Cleaning , Gril Paint, Repair, Window Cleaning
Cleaning
Grill Painting
Window Cleaning
Gap of thickness & Grill mess than 10mm
Fan Cap Filling
Uneven Surface of Tile
Repair of bathroom Tiles
Window Cleaning & Finishing of Bathroom
Flooring Tiles Repair
AC Point Finishing
Wash Basin Fixing
Gate Opening leveling & Finishing & Cornor repair
Granite Not instted in wall
Proper Cleaning of Handle of Modular Kitchen & Skrting
Wall Dado top Finishing
Wall Dado , two tiles replace above sink
UPVC Fixing Gap Not Maintaning (15mm)
Wire Mesh Door Fixing not Proper
Cleaning of Door Window
L- Stone Dameged (Mirror Craked
Coping Stone Finishing
Grill Painting to be Rectified
Grill Seems to be Weak
Proper Fixing of Skrting
CR Stone Cleaning
Aluminium Door Cleaning
Door Painting

SNAG POINTS STATUS


Living Room
Door Cleaning (Al Drop Handle
Mesh Door Repairing
Latch of Mesh door Repair
Al Drop & Latch Finishing 7 Cleaning
Skrting Finishing
Tiles Colour Not Matching
Grill Paint, UPVC Window Cleaning
Skrting Repairing
Andulation for Slab Should be Rectified
Wall Dado tile Should be replaced -Two
Andulations fo Slab
Junction Box Should be Properley Finished
Seepage In Toilet
Flooring Tiles to be changed (Two) Wall Tile (One)
Wall Dado should be cleaned
Handle Should be Cleaned for Kitchen ward rob
Mesh Door Should be cleaned & Rectified
Shaft Should be Cleaned
Painting for GI Pipe
UPVC Gap For Kitchen Door Should be Rectified
Grill For Utility Should be Rectified
Flooring Tile Should be Changed (One)
Slope Correction for Tiles should be Rectified
Stone & Coping Should be Cleaned
Near Door Area Finishing Should be Done

SNAG POINTS STATUS


Cleaning for Mesh Door, Handle & Aldrop Should be Cleaned
2 Tiles Should be Changed
UPVC Window Cleaning
2 Tiles Should be Changed
Grill Should be Painted
uneven Tiles Should be Rectified
UPVC Cleaning
Cleaning for Flooring
Painting not Done
UPVC Cleaning & Finishing

Andulations of Slab to be Rectified


Cleaning of Window, Finishing of Window
Grill Should be Rectified
Tile for Flooring Should be Changed (One)
Cleaning of Handle
Grouting for wall Mixer
Dado Finishing
Painting for Walls
Modular Kitchen Should be Cleaned
Grouting for Sanitory Work
Mesh Should be Changed Due to Rusting
Door White Painting Should be Done
Fixing of UPVC window Should be Replace
Cleaning of CR Stone Should be Done
Coping Stone Should be Cleaned

SNAG POINTS STATUS


Mesh Door Aldrop not properly fixed
Screws are not fully fixed in Hangers
Handle & Aldrop to Cleaned
2 Tiles Should be Changed
Grill Paint Should be Cleaned
Cleaning for UPVC Window with Blower
Bolcony Door Gap is big
Bolcony Skirting to be grouted
Window Jamb to Grouted
L- Stone should be Cleaned
Buffing Should be done for S.S. Railing
UPVC Cleaning & GAP
Seepage
Wall Dado -01
Flooring -03
Pointing Should be Finished Properly

SNAG POINTS STATUS


UPVC Window not Properly Fitted
Tile should be Changed due to various shader
Cleaning of UPVC Window
Door Handle is not fixed properly
Tiles Should be changed due to different Shadow
Dado Tiles should be changed -02
Edge Molding for washbasin
Seepage for walls
UPVC Should be Cleaned
Painting Pending for Door
Grill Gap Should be Maintained
Dado Tile should be Changed -04
Floor Tile should be changed -02
Andulations in Slab
Dado tiles to be changed -02
Floor Tile should be changed -01
UPVC Window not Properly Fitted
Finishing of Stone Work not Proper
Grill not Fixed properly
Gap Of Door Should be Rectified

SNAG POINTS STATUS


Mesh Door Gap Should be Maintained
Mesh Door to be Changed due to wood Defective
Door Handle & Aldrop to be rectified
Floor 04 tiles should be replaced
Stone should be cleaned
Bolcony mesh door should be changed
02 Tiles should be changed
Door in not properly Closed
UPVC window bo be changed
UPVC window Silicon Selant Not Fixed
2 Skirting to be Changed
2 Tiles to be changed
UPVC Window to be Cleaned, Silicon Selant Pending
04 Dado tiles to be Changed
Edge Moulding for wash basin
Floor tile 01 to be changed
wash basin template missing
Skirting Grouting
01 Tile to be changed, Painting to be checked Grill Painting
Seepage
Edge moulding to be rectified
Grouting for wall Mixer
Cleaning for Grill
02 Flooring Tiles
02 Wall dadoing
Andulation for ceiling to be rectified
wall painting to be rectified
Kitchen window (Glass to be changed)
Gap Should be maintained as per specification
Grouting for L-Stone Should be Done
Shaft wall Finishing
Shaft Aluminium Door to be fixed properly
GI Pipe Painting in Shaft areas
CI Pipe Painting

SNAG POINTS STATUS


Flush Door Repair & Cleaning & Mesh Door also Granite Cleaning
4 Tiles to be Changed ( Due to different Colour )
Grill Painting
UPVC window cleaning & handle to be checked
wire mesh door to be Repaired or changed
L- Stone Cleaning, L- Stone Reparing
Skirting Repairing
S.S. Railing Repair & buffing
Pointing for CR Stone
Proper Grouting for Window Ashlar stone
Perforated Cover should be provide at Balcony area handle to
Linter Projected Beyond L- Stone
No of Screw are incomplete in Flash door area
01 Tile to be replaced
UPVC window cleaning
Ashlar Stone Cleaning
Grill Painting
Fixture getting rusted & should be rectified
1 Tile to Replaced
Granite to be rectified
03 Tiles to be Rectified
Ceiling to be Rectified & Wall to be rectified
Skirting Point to be Cleaned
Ashlar Stone to be Rectified
Handle & Aldrop to Cleaned
Edge moulding to be Rectified
Plumbing Points to be Rectified (Fixture)
UPVC Flim to Fixed for Bathroom
Paint to be Done
Ventilator jali to be Fixed
Electrical Pipe Exposed
Painting to be Rectified
Ceiling Andulation to be rectified
Wash Basin area to be Rectified
Silicon Selant to be Rectified
Grouting for tiles
Wall paint to be done
Painting to be Done
Modular Kitchen to be Checked with Gas Cylinder
Granite not Inserted in walls
Modular Kitchen Load test to be Checked
Ground Foor Kitchen Sink area to be Discussed or changed
04 tiles to be Rectified
Chowkat to be Rectified
Flash Door Hole Missing
Big Cock Missing
Aluminium Shaft to be Rectified
Grill to Rectified, Coping Stone Broken
Grill Painting
L- Stone Grouting to be done
Shaft Gap to be Rectified
Painting for GI
Proper Paint to be done near CR Face Area

SNAG POINTS STATUS


Mesh Door Cleaning & Mesh Door Repairing
Reporting & Cleaning of Flash Door
Wall painting to be rectified
04 Tiles Different Colour to be Changed
Grill Painting
UPVC window cleaning
Ashlar stone cleaning & Grouting
01 Tile to be replaced
Door Cleaning
Painting for Walls
Ashlar stone cleaning & Grouting
Grill Painting
UPVC window cleaning
05 Tiles to be rectified
Grill Painting
UPVC window cleaning
Ashlar stone cleaning & Grouting
Rectification of Painting in walls & Ceiling
Cleaning of UPVC Ventilator
Finishing of Ashlar Stone
Wash Basin & Mirror Fixing
Door not Proper Closed
Skirting Repair work- 03
01 Different Shade - 01 Tile Broken
Grill Painting
UPVC window
Wall & Ceiling Andulation
Wash Basin Fixing
Ashlar Stone Fixing
UPVC Window Seepage

SNAG POINTS STATUS


04 Different Slide & Skirting Grauting
Kitchen Sticker Removing For Kitchen
Grill Gap more than 12mm
Sink Granite to be changed
Modular box to be closed
Proper Finishing for CR Stone
Flush Door Gap to be Rectified
Shaft Door to be Rectified
01 Tileto be changed
Wall Painting & Ceiling Pain
Grill Painting
Grill , Wall & Ceiling Painting
Flooring Tile -01
Grill , Wall & Ceiling Painting
Wall Tile -02
Grill , Wall & Ceiling Painting

SNAG POINTS STATUS


Mesh Door Andulation
Door Gap
Andulationof Tiles to be Changed
01 Skriting to be Changed
Grill , Wall & Ceiling Painting
Flash & Mesh Door Problem
Pointing work to be rectified
Grouting For Tiles
Grill , Wall & Ceiling Painting
UPVC Window Rectification
03 Tiles to be rectified
Grill , Wall & Ceiling Painting
Wall Tile-6
Grill , Wall & Ceiling Painting
Grill , Wall & Ceiling Painting
Edge Moulding for Wash basin tile to be changed flooring
wall Painting
Sink Grouting
05 Tiles
Shaft Stiker to Removed
Flash Door Gap

SNAG POINTS STATUS


01 Tile to be Changed
Ceiling Andulation, Grill, Painting
Skriting Grouting
Grill , Wall & Ceiling Painting
02 Tiles to be changed
wall Ceiling & Grill Painting
01 Tile to be Rectified
Painting, Andulation
Grill , Wall & Ceiling Painting

SNAG POINTS STATUS


Grill , Wall & Ceiling Painting
05 Tiles Andulation
Mesh Door to be Replaced
Grill , Wall & Ceiling Painting
02 Tiles to be changed
Seepage to be Rectified
Grill , Wall & Ceiling Painting
Painting to be Done
WallTile-1
Grill , Wall & Ceiling Painting
Grill , Wall & Ceiling Painting
01 Tile to be Changed
02 Wall Tiles to changed
Angle Valve to be properly ficed )S-02 Floor Tiles to be changed
02 Floor tiles to be changed
Granite to be replaced @ Near Mesh Door
Grill , Wall & Ceiling Painting
Granite to be replaced at Sink area
01 tile to be Replace (Andulation)
SNAG POINTS STATUS
01 Different Tile
09 Tiles Undulated Ceiling, Wall,Grill Painting
Skriting Reparing
Fasterner Should be CUT
Undulated Tiles to be rectified
Grill Painting
Window Cleaning
Ashlar Stone Cleaning
Different Shade Tile to be changed
Wall Ceiling & Grill to be changed
Door Rectification
3 Undulated Tiles to be Changed
Flush Door to be Changed
Wall & Ceiling Painting
05 Tiles to be Rectified wall
Mesh Door Rectification
04 Tiles to be Rectification
Junction Box

SNAG POINTS STATUS


Flush Door to be Rectified
05 Tiles Undulation
Gap to be checked & Adjusted
Grill , Wall & Ceiling Painting
Grill , Wall & Ceiling Painting
02 Tiles to be changed
05 Tiles Undulation
Grill , Wall & Ceiling Painting
01 wall Dadoing, Flush Door to be rectified
Flush Door to be Rectified
Edge Moulding
02 Tiles to be changed
Grill , Wall & Ceiling Painting
Floor Tiles-3, Wall Tile -1
Grill , Wall & Ceiling Painting

SNAG POINTS STATUS


Flush Door to be Rectified
05 Tiles Undulation
Gap to be checked & Adjusted
Grill , Wall & Ceiling Painting
Grill , Wall & Ceiling Painting
02 Tiles to be changed
05 Tiles Undulation
Grill , Wall & Ceiling Painting
01 wall Dadoing, Flush Door to be rectified
Flush Door to be Rectified
Edge Moulding
02 Tiles to be changed
Grill , Wall & Ceiling Painting
Floor Tiles-3, Wall Tile -1
Grill , Wall & Ceiling Painting
Block C7- Second Floor - 4 FLAT

Second Floor
SL NO. LOCATION SNAG POINTS
Hall Cleaning for Mesh DoorC452
Mesh Door is not Fixed Properly
Cleaning for Flooring
Flash Door Sliding bolt to be repaired
10 Tiles to be Removed dut to Undulated
Grill Painting
UPVC Window Cleaning
Ashlar Stone Cleaning
Balcony Flash Door Shutter to be removed due to scratch
Mess Door Shutter cleaned properly
03 Tiles to be Removed
Grouting for Tiles
S.S. Handrail Cleaning & buffing
Study Room Grill Painting
UPVC Window Cleaning , Grouting for Ashlar Tiles
Tiles grouting for Skirting Also
Master Bed Room 03 Different Colour tiles & 3 Damaged Tiles
to be Replaced
Grill Painting
Proper Welding of Grill to be Done
Window Ashlar Stone Cleaning & Grouting
Undulation of Ceiling to be Rectified
Bathroom Proper finishing of Window ashlar Stone
UPVC Cleaning, Grill Painting Should be done properly
Mirror to be fixed
Wash basin fixing is not proper
Tiles grouting to be done
02 Floor Tiles to Removed
Bed Room Cleaning of Flush Door
01 Different Colour Tile
02 Undulated tiles are to be replaced
Proper Grouting & Skirting to be done
Grill Painting
UPVC Window & ashlar Stone Cleaning
Proper Cleaning & Grating to be done
Bathroom 02 Tiles are properly fixed
02 Tiles Broken
Electrical Hole to be Packed
Broken Threshold to be replaced
Kitchen 02 Tiles to be Removed
Grill Painting
UPVC Window & ashlar Stone Cleaning
Aldrop & Handle Cleaning
Utility 02 Broken tiles to be replaced
Proper Cleaning of Stone
Coping stone Should be Cleaned
Grill Painting & Proper Fixing to be Done
Toilet Deep Cleaning to be Done
Block C7- Ground Floor

Ground Floor-1
SL NO. LOCATION SNAG POINTS
Hall Deep Cleaning to be Done
Status of Tiles cannot to checked due to Deep Cleaning work not
done
Undulation of Ceiling to be Rectified
UPVC window cleaning
Grill painting Rectification
Cleaning of Ashlar Stone
Bolcony RWP area clamp missing near UPVC pipe
L stone Crack to be Replaced
Pointing Work to be rectified
Study Room UPVC Window Cleaning
Window Ashlar Stone Cleaning & Grouting
Grill Painting & Proper Fixing to be Done
Master Bed Room Ceiling Undulation
Ashlar Stone Painting
Grill Painting
Undulation of Painting for walls
Electrical Junction box to be repaired
Bed Room Undulation of Ceiling to be Rectified
Grouting of Window
UPVC window Cleaning
UPVC Proper Fixing not done @ handle area
Bathroom Seepage
Painting for Walls
White cement to be fixed for one Tile
Undulation In Ceiling
Utility MS Grill Not in Proper should be changed
Pointing to be done for window stone
Bathroom Painting to be done
02 Dado tiles to be changed
Chowkat to be checked & rectified
Kitchen Wall & Ceiling Painting
01 wall tile
Sink top to be changed
Mesh door jali to be rectified
Block C7- Ground Floor

Ground Floor-2
SL NO. LOCATION SNAG POINTS
Hall Deep Cleaning to be Done
Tile is not checked due to deep cleaning
Upvc Cleaning
Grill Painting
Balcony Mesh door to be rectified
Defective wood work & Mesh door
Pointing to be done properly
Buffing to be done for S.S.
Clamp Missing PVC area
Preforated Cover Missing
Study Room Painting to be done
UPVC window cleaning
Ashlar Stone Cleaning
Master Bed Room Undulation in Slab to be rectified
Wall & Ceiling Painting
Grill Painting
UPVC window cleaning
handle to be rectified
Ashlar Stone Cleaning
Bed Room Wall Painting to be done
Painting of Grill
Proper fixing of Grill
UPVC window cleaning
Ashlar stone to be rectified
UPVC window not functionery properly
Undulation in ceiling
Bathroom Mirror to be Placed
UPVC window cleaning , Grill painting
Window Ashlar Stone Cleaning & Grouting
Leakage of wash basin area to be rectified
Chowkat to be checked & rectified
Below wash basin wall dada to be rectified
Bathroom 05 wall dado to be changed
Gril paint upvc cleaning
Grating for wall dado
Kitchen Wall dado to be changed 05
ceiling painting to be rectified
Wall Painting to be done
stone door frame to be Repy

Block C7- Ground Floor

Ground Floor-3
SL NO. LOCATION SNAG POINTS
Hall Deep Cleaning to be Done
Mesh door to be rectified
ceiling painting to be rectified
Kitchen Dado Tiles to be Changed
wall& Ceiling Painting to be done
Mesh door to be rectified
Flush door to be rectified
Utility Big Cock Missing
ceiling painting to be rectified
Proper fixing of MS Grill & Painting
Painting for Walls
Painting for CR
Flush door area painting shall be rectified
Master Bed Room Wall, Ceiling, Grill Painting
Undulation to be rectified
Bathroom 02 wall Dado
Painting for wall, ceiling to be done
Study Room UPVC window cleaning, Grill Painting
Broken Ashlar Stone to be removed
Bed Room Ceiling Undulation to rectified
Grill Painting UPVC Window Cleaning
Bathroom Tiles Grouting
03 tiles to be rectified dado
Grill Painting
UPVC Window cleaning
Ashlar Stone Cleaning

Block C7- Ground Floor

Ground Floor-4
SL NO. LOCATION SNAG POINTS
Hall UPVC Window to be rectified
Grill Paint
Ashlar Stone Cleaning
Balcony Mesh Door Shutter to be replaced
Study Room Painting for wall, Ceiling & Grill to be done
Proper Dscing of Grill
Ashlar Stone Cleaning & Grouting
Master Bed Room Flush door to be rectified
Chowkat to be checked & rectified
UPVC Window need Cleaning & Reparing
Ceiling Undulation
Bed Room Grill, Ashlar stone ,Paint, UPVC Window not Properly
Bathroom 02 wall Dado
Grill, UPVC, Cleaning & Painting
Kitchen Cleaning of Grill & Painting
Ashlar Stone Cleaning
Utility CR to be Changed
Grill Proper Fixing
Proper Oblignment of MS Grill to be done
Grouting of L stone to be done
Shaft door to be rectified
Pointng of CR to Rectified

Block C7- First Floor


First Floor
SL NO. LOCATION SNAG POINTS
Hall Hole missing @ sliding bolt
Undulation in ceiling to be rectified
UPVC window cleaning
Deep Cleaning to be Done
Balcony Mesh Door Shutter to be rectified
Pointing to be done on CR
Cleaning of S.S.
PVC Clamp Missing
Study Room Window total points
Bathroom Seepage
Painting to be done
Window 05 Points to be rectified
Master Bed Room Painting to be done
Window 05 Points to be rectified
Bathroom Common Points
Kitchen 05 Points common
Shaft not Properly Fixed
Mesh Door Shutter not Proper closed
Grill To be Rectified
Proper Pointing & Grouting

Block C7- First Floor-2

First Floor-02
SL NO. LOCATION SNAG POINTS
03 Mesh Door not Properly
Flush Door Sliding bolt to be checked
UPVC Window Should be Rectified
Balcony Flush door to be Checked
Cleaning of S.S. Railing
UPVC 05 Points
Growting of Chowkat
L- Stone to removed
Clamp Missing PVC area
Study Room 05 points window
Master Bed Room 05 points window
Bathroom 05 points window
Proper FInishing near Exhaust Fan to be rectified
Bed Room 05 points window
Utility Grill To be Rectified
Shaft to be rectified
Kitchen 02 tiles to be rectified

Block C7-First Floor-2

First Floor-02
SL NO. LOCATION SNAG POINTS
Hall Flush door to be rectified
05 points of window
Balcony Flush door to be rectified
Cleaning of CR
Ashlar stone to be rectified
Cleaning of SS
L- Stone Cleaning
Mesh door shutter to be removed due to edge moulding not good
Study Room 05 points of window
Master Bed Room 05 points of window
Ceiling Undulation to be rectified
Bathroom 01 Tile dado change
05 points of window
Junction hole to be closed
Bed Room Ceiling Undulation to be rectified
Bathroom not Checked 05 Points to be rectifie
Flush doorto be rectified
Kitchen 05 points of window
2 wall Dado
Mesh door to be rectified
Utility Fastener to be changed
Pointing of CR & Cleaning

Block C7-First Floor-4

First Floor-04
SL NO. LOCATION SNAG POINTS
Flush door to be rectified
05 points of window
Undulation in Slab
Balcony Grating for Mesh Door Gap
Pointing of CR & Cleaning
Clamp for PVC
Study Room 05 points of window & Stone
Shaved to removed
Handle Screaw Missing
Bed Room GAP of Flash Door
Chowkat was to be changed due to broken
Undulation in Slab
05 points of window + Gap
Bathroom Seepage
05 points of window
02 Dado tiles to be changed
Junction hole to be Rectified
Bed Room 05 points of window
Bathroom 02 Wall tiles to be changed
Kitchen Mesh Door to be Checked
Utility Shaft Door to be Checked
05 points of window
Block C7-Second Floor

Second Floor-1
SL NO. LOCATION SNAG POINTS
Hall Mesh door to be rectified
Flush Door to be rectified Gap
05 points of window
Undulation in Slab
Balcony Mesh door to be rectified (Crack)
S.S. Cleaning
PVC Clamp
Pointing of CR & Cleaning
Ashlar stone to be Removed
Study Room 05 Tiles for different shade
05 points of window
Bed Room 05 points of window of Different
Undulation in ceiling
Bathroom 05 points of window
Seepage
01 dado to be changed
Bed Room Undulation in ceiling
05 points of window
Grouting in Walls
Seepage in Walls
01 Different shade Tile
Kitchen 05 points of window
Utility Handle Should be rectified
Grill to be checked
Aluminum Shaft Missing
STATUS
STATUS

STATUS
STATUS
STATUS
STATUS

STATUS

STATUS
STATUS
STATUS

Potrebbero piacerti anche