Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
á
r
á
>>R
>>
>> ĺKnitting DistributorĺKnitting FloorĺKnitting
InspectionĺKnitting Distribution
>>
ĺLinking DistributorĺLinking FloorĺLinking
InspectionĺLinking Distributor
>>
>>
>>ĺMending Inspection
>>ĺWashĺDriedĺIron
>>
R
che production of sweater starts from the store section. Yarns and
accessories such as main label,size label,flug label, gatze,zipper,hand tag,price
tag,poly,cartoon etc. are stored first in the store. From the store yarns are taken to winding
section.
½
n the winding section there are six winding machines. Their minimum
winding capability is 2000-2500 cones per day. There are five workers and a supervisor to
run the section. When the cones are ready they are taken to the knitting section.
Ô R
R
0
½
n the finishing process all kind of labels are sewed with sewing
threads. The next process is PQC(Primary Quality Control) and then the final refinery. Then
the garment is re-ironed for giving a fixed shape. Then it is taken to the measurement table
where the whole measurement is checked.The garment is then packed in a poly bag and
those packed garments is then kept in a cartoon. The cartoons are sealed and are made
ready for shipment.