. a Ovality adjustment prior measurement 100% Inspection Shall Not more Manual p W RW Field observation.
to welding report than ± 10% of Weld log
wall thickness
Page 1 of 2
c Temperature of hot Visual & Approved 210 ± 10° C. P W RW Measurement to be
plate measurements 100% welding Manual made with
procedure Weld Log calibrated digital
& and M/c pyrometer
data log
sheet
d Welding parameters for Trail welding Weld Log P W RW Both manual and
heating time, soaking Approved log sheet & data logged
time, mirror removal Visual & 100% welding Inspection reports.
time, ramp time, cooling verification procedure report and
time. M/c data
log sheet
4. Compilation of data verification 100% Approved trail Approved trail Weld P V V Review of records.
logger reports and welding welding report
manually Recorded procedure procedure
reports of welding
parameters
5. Finished bead Bead width, height, Visual Random As per the Pipe Inspection P w w
quality (Inside) work manship measurements welds manufacturers report
recommendatio
ns& approval
trail welding
procedures
6. Hydro test of Proto Pressure test at 3 Bar 2 Proto Hydro test No leakage Hydro test P H H
type as per the gauge pressure with visual type procedure Report
sketch attached, as water samples
decided in MOM , one
dated 5th Dec 2011 for each
season
Page 2 of 2