User Manual
Version 1.2
Fields to Fill:
• Project Name
• Project description
Fill out and hit O.k Note: Once unit of measurement for a project has been chosen, all analytical
calculations for all schedules will be based on those measurements.
Page 2 of 45
1.2 Adding New Schedules to project
Select Primavera P5 or P6 to load. Single Schedule Analysis will initiate which may last for a few
moments based on the size of your project and machine specifications. Once the analysis for the single
schedule completes, it will be available in the schedule pane as one of the schedules that can be analyzed
through a single click to switch it into focus:
Page 3 of 45
1.3 Comparing Schedules
Home – Compare
Fields to Fill:
• Base Schedule
• Revised Schedule
Once base and revised schedules have been selected, hit the compare button. Schedule comparative
Analysis will initiate which may last for a few moments based on the size of your project and machine
specifications. Once it completes, all results of the comparison may be access through a click on the
compare pair in the comparison pane below the schedule pane:
Page 4 of 45
2. Switching Analytical Frameworks
Select Single Schedule (if different from current) - Analyze & Compare – Project Explorer
2.2 Trend
Trends – Trend
Used for trending multiple project performance (It is recommended to load at least 3 schedule revision
before invoking this option.
Select Single Schedule (if different from current) - Schedule Viewer – Schedule Viewer (button)
Used for browsing a single schedule's contents with the ability to filter and group activities based on user
specified criteria.
Page 5 of 45
3. Analyzing Single Schedules
Once a project schedule has been loaded, Schedule cracker conducts full computation of all metrics
available to a single project revision. Once completed all applicable metrics and visualization options
become available for user browsing. All loaded schedules will be available for browsing in the left side
pane. Please note that when assigning schedules to specific projects, only schedules for the selected
project will be displayed. The currently analyzed schedule will be highlighted in red in the loaded
schedule pane.
Select Single Schedule (if different from current)- Analyze & Compare – Dashboard
The Pareto chart displays a summary level view of all issues/observations determined for a
particular schedule revision and orders them by most to least count. Clicking on any single bar
within the Pareto chart will drill down to display the detailed activity list and information for that
rule. Clicking on 'Back to Pareto Analysis' will bring back the Pareto Chart view.
Pie Charts display a summary level view of two essential project assessment metrics: Criticality,
and Status for a particular schedule revision. Clicking on any a pie 'slice' will drill down to
display the detailed activity list and information for that activity categorization. Clicking on
'Back to Pie Chart' will bring back the Pie Chart view.
Page 6 of 45
3.2 Characteristics
Select Single Schedule (if different from current) - Analyze & Compare – Characteristics
3.3 Criticality
Select Single Schedule (if different from current) - Analyze & Compare – Criticality
3.4 Status
Page 7 of 45
Select Single Schedule (if different from current) - Analyze & Compare – Status
3.5 Risk
Select Single Schedule (if different from current) - Analyze & Compare – Risk
Page 8 of 45
3.6 Ahead
Select Single Schedule (if different from current) - Analyze & Compare – Ahead
3.7 Slippage
Select Single Schedule (if different from current) - Analyze & Compare – Slippage
Page 9 of 45
3.8 DCMA
Select Single Schedule (if different from current) - Analyze & Compare – DCMA
Page 10 of 45
3.9 GAO
Select Single Schedule (if different from current) - Analyze & Compare – GAO
Page 11 of 45
3.10 Project Cost
Select Single Schedule (if different from current) - Analyze & Compare – Project Cost
3.11 Observations
Select Single Schedule (if different from current) - Analyze & Compare – Observations
3.12 Concerns
Select Single Schedule (if different from current) - Analyze & Compare – Concerns
Page 12 of 45
3.13 Alerts
Select Single Schedule (if different from current) - Analyze & Compare – Alerts
Single Load Alerts use a severity score computed for each activity. The computation is based on the
number of rules any particular activity violated in the schedule and the category of the violated rule.
Based on the score, activities requiring the most attention are surface to the top of the stack. Clicking on
any activity displays the activity details and the rules violated.
Page 13 of 45
3.14 Earned Value
3.14.1 Indexes
3.14.2 Forecast
Page 14 of 45
3.14.3 Cost
3.14.4 Variances
Page 15 of 45
3.14.5 Cost Overrun
Select Single Schedule (if different from current) - EVM – Cost Overrun
Select Single Schedule (if different from current) - EVM - Cost Under-run
Page 16 of 45
3.14.7 Full Analysis
Select Single Schedule (if different from current) - EVM - Full Analysis
Select Single Schedule (if different from current) - Analyze & Compare – Full Analysis
This displays a comprehensive listing of all analysis executed for a single schedule, organized in color
coded categories. Clicking the + sign next to any category name expands the list to show all the
applicable rules.
Page 17 of 45
4. Comparing Two Schedules
Once a project schedule has been loaded, Schedule cracker conducts full computation of all metrics
available to a single project revision. Once completed all applicable metrics and visualization options
become available for user browsing. All loaded schedules will be available for browsing in the left side
pane. Please note that when assigning schedules to specific projects, only schedules for the selected
project will be displayed. The currently analyzed schedule will be highlighted in red in the loaded
schedule pane.
Select Compared Pair (if different from current) – Analyze & Compare – Dashboard
The Pareto chart displays a summary level view of all issues/observations determined for the
differences between the selected base and revised schedule comparison and orders them by most
to least count. Clicking on any single bar within the Pareto chart will drill down to display the
detailed activity list and information for that rule. Clicking on 'Back to Pareto Analysis' will bring
back the Pareto Chart view.
Critical activities and Activity status are displayed side by side for the compared base and revised
schedules.
Page 18 of 45
4.2 Characteristics
Select Compared Pair (if different from current) - Analyze & Compare – Characteristics
4.3 Criticality
Select Compared Pair (if different from current) - Analyze & Compare – Criticality
Page 19 of 45
4.4 Changes
Select Compared Pair (if different from current) - Analyze & Compare – Changes
4.5 Ahead
Select Compared Pair (if different from current) - Analyze & Compare – Ahead
Page 20 of 45
4.6 Slippage
Select Compared Pair (if different from current) - Analyze & Compare – Slippage
4.7 Resources
Select Compared Pair (if different from current) - Analyze & Compare – Resources
Page 21 of 45
4.8 Activities Cost
Select Compared Pair (if different from current) - Analyze & Compare – Activities Cost
4.9 Observations
Select Compared Pair (if different from current) - Analyze & Compare – Observations
Page 22 of 45
4.10 Concerns
Select Compared Pair (if different from current) - Analyze & Compare – Concerns
4.11 Alerts
Select Compared Pair (if different from current) - Analyze & Compare – Alerts
Page 23 of 45
4.12 Earned Value
4.12.1 Indexes
4.12.2 Forecast
Page 24 of 45
4.12.3 Cost
4.12.4 Variances
Select Compared Pair (if different from current) – EVM – Cost Overrun
Page 25 of 45
4.12.6 Cost Under-run
Select Compared Pair (if different from current) – EVM – Cost Under-run
Select Compared Pair (if different from current) – EVM – Full Analysis
Page 26 of 45
4.14 Full Analysis
Select Compared Pair (if different from current) – Analyze & Compare – Full Analysis
This displays a comprehensive listing of all analysis executed for base to revised schedule compare,
organized in color coded categories. Clicking the + sign next to any category name expands the list to
show all the applicable rules.
Page 27 of 45
5. Trends
Projects can be trended once a minimum of two revisions have been loaded into schedule cracker. The more
data points are available, the more accurate the trend line will be and any subsequent forecast analysis using the
fitted trend line. A library of metrics that can be trended is listed on the left hand side lower pane. Schedules that
are included in the trend are displayed on the upper left hand side. If a particular schedule represents an outlier
value, it can be excluded from the trend through a single click on the schedule entry. Forecast date can be set to
specific date, to the end of the project, or turned off completely. If turned on, forecasted range will be marked in
blue. While the non blue sections will represent actual data points.
Page 28 of 45
The following options are available to control the trend display:
• Trend Rule Selection (By selecting a rule in the lower left side rule list)
• Trend Schedule Inclusion/Exclusion (By selecting a schedule in the upper left side schedule list)
Page 29 of 45
6. Schedule Explorer
After a schedule is loaded, it can be navigated independent of the analysis rules by using the schedule explorer.
This view provides a list of all activities in the project. Any highlighted activity will come in focus in the
bottom pane as a green activity bar. Predecessor and successor activities will be displayed as orange bars. Bar
lengths and are proportional to activity durations. Internal bars within an activity represent progress of the
activity towards completion.
By right clicking on the column list, the list of activities attributes can be customized
Page 30 of 45
From the same right click menu (or filter button), a filter editor that can use any attributes and any logical
operators to build a custom activity filter:
Page 31 of 45
7. Reports
In general, reports can be printed through two methods in Schedule Cracker: 1.Within the context of the report,
meaning that a reportable object is currently highlighted in the application. If it’s a chart then to export to a
report, right click and hit ‘Print and Export’
Similarly, if hovering over a result list of activities that met a certain criteria, a single click will invoke a report:
Page 32 of 45
The other option to generate reports is through the Report Hub tab: Reports.
The Following groupings of rules are available. Invoking any of them will generate a report for the rules within
that category.
Changes
Concerns
Observations
Full Analysis
Alert reporting level selection (Print out top n Activities based on severity score)
Activity Report (Will open for the activity that is currently selected in any of the analytical modules of
Schedule Cracker)
Rule Report (Will open for the rule that is currently selected in any of the analytical modules of
Schedule Cracker)
Page 33 of 45
8. Options
8.1 Backup
Options - Backup
Schedule Cracker uses and internal database engine to store project files and analysis results for rapid
access at any point in time. Even though these stored files can be rebuilt quickly, it is advisable to
backup the existing repository so that restoration becomes a very expedient process should a file deletion
occur.
8.2 Restore
Options – Restore
Restores that last backup and overwrite current database (Be sure when using this option that restore is
really desired since it will purge any file/analysis data loaded since the last backup)
8.3 Feedback
Options – Feedback
8.4 Support
Options Support
Page 34 of 45
Appendix I: Drill Down
Dashboards in Schedule Cracker are highly interactive. With a click of a button on any bar chart, pie chart, or
hyperlink, the context immediately shifts to a more detailed view of the selected metric. This allows the
Schedule Cracker user to instantaneously navigate between high-level analyses of the project to deep inspection
of any identified problem areas.
Page 35 of 45
Appendix II: Rules and Their Descriptions
Rule Id Rule Name Rule Description
1 Project ID Project ID (given short name) of the project's schedule
11 Lowest total Float Lowest value of the total float of activities in the project's schedule
12 Missing Actual Start Started activities with missing actual start date in the project's schedule
Completed activities with missing actual finish date in the project's
13 Missing Actual Finish schedule
Added activities that have not started yet in the project's schedule when
14 Added Planned Activities comparing it to the base project's schedule
Added in Progress Added activities that are stated as in-progress in the project's schedule
16 Activities when comparing it to the base project's schedule
Deleted activities that were not started yet in the project's schedule when
17 Deleted Planned Activities comparing it to the base project's schedule
Deleted in Progress Deleted activities that were stated as in-progress in the project's schedule
19 Activities when comparing it to the base project's schedule
Changed Remaining Activities with altered remaining duration in the project's schedule when
22 Duration comparing it to the base project's schedule
Fractional Days Activities with day fractions in the original (planned) duration in the
23 Scheduled project's schedule
Page 36 of 45
Activities with altered activity type in the project's schedule when
24 Changed Activity Type comparing it to the base project's schedule
Changed Activity Activities with altered activity calendar in the project's schedule when
25 Calendar comparing it to the base project's schedule
Changed Percent Activities with altered percent complete type in the project's schedule
26 Complete Type when comparing it to the base project's schedule
Changed Percent
Complete From Activities where the percent complete is different from the percent
Remaining Duration complete calculated based on the remaining duration in the project's
27 Estimate schedule
Changed Percent Activities with altered percent complete in the project's schedule when
28 Complete comparing it to the base project's schedule
Project's Percent
29 Complete Calculated percent complete of the project based on the project schedule
Changed Total Float
Exceeds the Update Activities in the project's schedule where the total float is more than the
30 Period period between the project's schedule and the base project's schedule
Changed Activity Activities with altered description in the project's schedule when
31 Description comparing it to the base project's schedule
Added Actual Start Dated
Before The Base Data Activities where the added actual start date in the project's schedule
32 Date precedes the data date of the base project's schedule
Added Actual Finish
Dated Before The Base Activities where the added finish date in the project's schedule, precedes
33 Data Date the data date of the base project's schedule
Added Actual Start Dated Activities where the added actual start date in the project's schedule
34 After The Data Date succeeds the data date of the project's schedule
Added Actual Finish
Dated After The Data Activities where the added finish start date in the project's schedule
35 Date succeeds the data date of the project's schedule
Activities where the added actual start date in the project's schedule
Added New Actual Start precedes the data date of the project's schedule and succeeds the data
36 During Update Period date of the base schedule
Activities where the added actual finish date in the project's schedule
Added New Actual Finish precedes the data date of the project's schedule and succeeds the data
37 During Update Period date of the base schedule
Changed Actual Start Activities with altered actual start date in the project's schedule when
38 Date comparing it to the base project's schedule
Changed Actual Finish Activities with altered actual finish date in the project's schedule when
39 Date comparing it to the base project's schedule
Started Activities with Activities that are stated as in-progress but have a zero percent complete
40 Zero Percent Complete in the project's schedule
Reduced Percent
Complete due to Activities with reduced percent complete in the project's schedule based
Increased Remaining on increase in their remaining duration when comparing it to the base
41 Duration project's schedule
Page 37 of 45
Changes in Suspended Activities with altered suspension status (from/to suspended ) in the
42 Activities' Status project's schedule when comparing it to the base project's schedule
Changes in Resumed Activities with altered resumed status (from/to resumed ) in the project's
43 Activities' Status schedule when comparing it to the base project's schedule
Changes in Suspended Activities with altered suspension date in the project's schedule when
44 Activities' Date comparing it to the base project's schedule
Changes in Resumed Activities with altered resumed date in the project's schedule when
45 Activities' Date comparing it to the base project's schedule
Activities with Suspended Activities with added suspension date that succeeds the data date of the
46 Date After Data Date project's schedule
Activities with Resumed Activities with Added resumed date that succeeds the data date of the
47 Date After Data Date project's schedule
Suspended Activities with
Change in Percent Suspended Activities with altered percent complete in the project's
48 Complete schedule when comparing it to the base project's schedule
49 Suspended Activities Suspended activities in the project's schedule
Activities that have deleted steps in the project's schedule when comparing
50 Deleted Activity Steps it to the base project's schedule
Activities that have added steps in the project's schedule when comparing
51 Added Activity Steps it to the base project's schedule
Changed Activity Step Activities with altered step weights in the project's schedule when
52 Weights comparing it to the base project's schedule
FS Relationship
53 Percentage Activities with Finish to Start Relationships
Changed Activity Step Activities with altered step percent complete in the project's schedule when
54 Percent Complete comparing it to the base project's schedule
Critical Activities (Were Activities that became critical in the project's schedule when comparing it
55 Not Critical Before) to the base project's schedule
Non-Critical Activities Activities that became non-critical in the project's schedule when
56 (Were Critical Before) comparing it to the base project's schedule
57 Critical Activities Critical activities in the project's schedule
58 Near Critical Activities Near critical activities in the project's schedule
Deleted As-Built Activities with deleted relationships in the project's schedule given that
Relationships for Existing their linked activities were completed and still exist when comparing it to
66 Activities the base project's schedule
Activities with deleted relationships in the project's schedule given that
Deleted Relationships due their linked successor activities are deleted when comparing it to the base
67 to Deleted Successor project's schedule
Deleted Critical Activities with deleted relationships in the project's schedule given that
Relationships for Existing their linked activities were critical and still exist when comparing it to the
68 Activities base project's schedule
Activities with added relationships in the project's schedule given that their
Added Relationships for linked activities were existing when comparing it to the base project's
69 Existing Activities schedule
Added As-Built Activities with added relationships in the project's schedule given that their
Relationships for Existing linked activities were completed and still exist when comparing it to the
70 Activities base project's schedule
Activities with added relationships in the project's schedule given that their
Added Relationships - linked successor activities are added as well when comparing it to the
71 Added Successor base project's schedule
Invalid Relationships Activities that have more than one relationship type linking them in the
72 between activities project's schedule
Activities with No
73 Successor Activities that have no successors in the project's schedule
Activities with No
74 Predecessor Activities that have no predecessors in the project's schedule
Changed Relationship Activities with altered relationships in the project's schedule when
75 Type comparing it to the base project's schedule
Deleted Constraints for Activities with deleted constraints in the project's schedule given that these
77 Existing Activities activities are still existing when comparing it to the base project's schedule
Deleted As-Built
Constraints for Existing Activities with deleted constraints in the project's schedule given that these
78 Activities activities were completed when comparing it to the base project's schedule
Activities with deleted constraints in the project's schedule given that
Deleted Constraints due these activities are deleted when comparing it to the base project's
79 to Deleted Activities schedule
80 Activities Constraints Activities that have constraints in the project's schedule
Added Constraints for Activities with added constraints in the project's schedule given that these
81 Existing Activities activities are still existing when comparing it to the base project's schedule
Added As-Built
Constraints for Existing Activities with added constraints in the project's schedule given that these
82 Activities activities were completed when comparing it to the base project's schedule
Page 39 of 45
Activities with added constraints in the project's schedule given that these
Added Constraints due to activities have been added when comparing it to the base project's
83 Added Activities schedule
Activities with altered constraints in the project's schedule when comparing
84 Changed Constraints it to the base project's schedule
Changed Expected Finish Activities with altered expected finish date in the project's schedule when
85 Date comparing it to the base project's schedule
Added Expected Finish Activities with added expected finish date in the project's schedule when
86 Date comparing it to the base project's schedule
Activities with Deleted Activities with deleted budgeted cost in the project's schedule when
87 Budgeted Cost comparing it to the base project's schedule
Activities with Added Activities with added budgeted cost in the project's schedule when
88 Budgeted Cost comparing it to the base project's schedule
Activities with Changed Activities with altered budgeted cost in the project's schedule when
89 Budgeted Cost comparing it to the base project's schedule
Project's Total Budget
90 Cost (PV) Total budget cost of the project's schedule
Progressed activities with
no increase in Earned
91 Value Progressed activities with no increase in Earned Value
Activities with Earned
Value Greater Than Activities with earned value that exceeds their budget cost in the project's
92 Budgeted schedule
Activities with Reduction Activities with decreased earned value in the project's schedule when
93 of Earned Value comparing it to the base project's schedule
Project's Total Earned
94 Value (EV) Total earned value of the project's schedule
95 Negative Actual Cost Activities with a negative actual cost in the project's schedule
Cost Overrun (Actual Cost Activities with cost overrun (actual cost exceeding the budget cost) in the
96 Greater Than Budgeted) project's schedule
Changes in Actual Cost Activities with altered actual cost in the project's schedule without changing
100 without Earned Value their earned value when comparing it to the base project's schedule
Changes of Earned Value Activities with altered earned value in the project's schedule without
101 without Actual Cost changing their actual cost when comparing to the base project's schedule
Slipped Activities (based
on schedule performance Activities that have slipped (their schedule performance index is less than
102 index) 1.0) in the project's schedule
Project's Cost Variance Total cost variance ( earned value minus the actual cost) of the project's
103 (CV) schedule
Page 40 of 45
Project's Cost Cost performance index (project's earned value divided by its actual cost)
104 Performance index (CPI) of the project schedule
Project's Schedule Schedule variance (project's earned value minus its budgeted cost) of the
105 Variance (SV) project schedule
Project's Schedule Schedule performance index (project's earned value divided by its
106 Performance Index (SPI) budgeted cost) of the project schedule
Project's Estimate at
Completion (EAC)(CPI Estimated cost at completion (project's budgeted cost divided by its cost
107 Method) performance index) of the project schedule
Project's Estimate to Estimated cost to complete (project's estimated at completion cost minus
108 Complete (ETC) its actual cost) the project schedule
Project's Variance at Variance in cost at completion (project's budgeted cost its estimate at
109 Completion (VAC) completion cost) of the project schedule
Activities with added resources in the project's schedule when comparing it
110 Added Resources to the base project's schedule
Activities with deleted resources in the project's schedule when comparing
111 Deleted Resources it to the base project's schedule
Changed Resource Activities with altered resources in the project's schedule when comparing
112 Budget it to the base project's schedule
Changed Remaining
Resources' Percent Activities with altered percentage of their remaining resources in the
113 Complete project's schedule when comparing it to the base project's schedule
Added Activity Notebook Activities with added memos in the project's schedule when comparing it to
114 (Memo) the base project's schedule
Deleted Activity Notebook Activities with deleted memos in the project's schedule when comparing it
115 (Memo) to the base project's schedule
Activities with deleted relationships in the project's schedule given that
Deleted Relationships due their linked predecessor activities are deleted when comparing it to the
116 to Deleted Predecessor base project's schedule
Activities with added relationships in the project's schedule given that their
Added Relationships - linked predecessor activities are added as well when comparing it to the
120 Added Predecessor base project's schedule
SF Relationship
121 Percentage Activities with Start to Finish Relationships
122 Calculated Finish Date Calculated finish date of the project's schedule
Project's Mandatory
123 Finish Date The project's required finish date by the contract documents.
Changed Actual Project Project with altered actual start date in the project's schedule when
124 Start Date comparing it to the base project's schedule
Changed Calendar's Project with altered actual start date in the project's schedule when
125 Update Date comparing it to the base project's schedule
Changed Calculated Project with altered calculated finish date in the project's schedule when
126 Finish Date comparing it to the base project's schedule
Changed Number of Project with altered number of activities in the project's schedule when
127 Activities comparing it to the base project's schedule
Project with non altered data date in the project's schedule when
128 Same Data Dates comparing it to the base project's schedule
Page 41 of 45
Changed Lowest total Project with altered lowest total float in the project's schedule when
129 Float comparing it to the base project's schedule
Changed No. of Project with altered number of relationships in the project's schedule when
130 Relationships comparing it to the base project's schedule
Changed Project's Total Project with altered total budget cost in the project's schedule when
131 Budget Cost (PV) comparing it to the base project's schedule
Changed Project's Total Project with altered total earned value in the project's schedule when
132 Earned Value (EV) comparing it to the base project's schedule
Changed Project's Total Project with altered total actual cost in the project's schedule when
133 Actual Cost (AC) comparing it to the base project's schedule
Changed Project's Cost Project with altered cost variance in the project's schedule when
134 Variance (CV) comparing it to the base project's schedule
Changed Project's Cost Project with altered cost performance index in the project's schedule when
135 Performance index (CPI) comparing it to the base project's schedule
Changed Project's Project with altered schedule variance in the project's schedule when
136 Schedule Variance (SV) comparing it to the base project's schedule
Changed Project's
Schedule Performance Project with altered schedule performance index in the project's schedule
137 index (SPI) when comparing it to the base project's schedule
Changed Project's
Estimate at Completion Project with altered estimate at completion in the project's schedule when
138 (EAC) comparing it to the base project's schedule
Changed Project's
Estimate to Complete Project with altered estimate to complete in the project's schedule when
139 (ETC) comparing it to the base project's schedule
Changed Variance at Project with altered variance at completion in the project's schedule when
140 Completion (VAC) comparing it to the base project's schedule
Changed Project's Project with altered percent complete in the project's schedule when
141 Percent Complete comparing it to the base project's schedule
Changed Project's Project with altered mandatory finish date in the project's schedule when
142 Mandatory Finish Date comparing it to the base project's schedule
Activities with altered total float in the project's schedule given that it is less
Changed Total Float less than the duration between the data date of the and base schedules when
143 than Updated Period comparing it to the base project's schedule
144 Non-Critical Activities Non critical activities in the project's schedule
Activities with early start date scheduled to be before the data date of the
Activities that Missed project's schedule given that it was not started when comparing it to the
145 Planned ES base project's schedule
Activities with late start date scheduled to be before the data date of the
Activities that Missed project's schedule given that it was not started when comparing it to the
146 Planned LS base project's schedule
Activities with early finish date scheduled to be before the data date of the
Activities that Missed project's schedule given that it was not started when comparing it to the
147 Planned EF base project's schedule
Page 42 of 45
Activities with late finish date scheduled to be before the data date of the
Activities that Missed project's schedule given that it was not started when comparing it to the
148 Planned LF base project's schedule
Activities with altered WBS in the project's schedule when comparing it to
150 Changed WBS the base project's schedule
Out of Sequence Activities that are out of sequence in the project's schedule when
151 Activities comparing it to the base project's schedule
Changed Project's Critical Project with altered critical path type in the project's schedule when
154 Path Type comparing it to the base project's schedule
186 Not Started Activities Number of activities that have not started in the project's schedule
Project's Estimate at
Completion (EAC) Estimated cost at completion (cost and schedule combination method) of
187 (Cost/Schedule Method) the project schedule
Project's EAC (Cost & Estimated cost at completion (combined weighted method of the cost
Schedule Weighted performance index and schedule performance index) of the project
188 Factor Method) schedule
Changed To-Complete Changes in work remaining divided by money remaining based upon the
Cost Performance Index total estimate at completion assuming the project efficiency remains
based on Estimate at unchanged from the current efficiency in the project's schedule when
196 Completion TCPI (EAC) comparing it to the base project's schedule
Changed To-Complete Changes in work remaining divided by money remaining based upon the
Cost Performance Index total estimate at completion assuming the project efficiency remains
based on Budget at unchanged from the current efficiency in the project's schedule when
197 Completion TCPI (BAC) comparing it to the base project's schedule.
Changed Project's To-
Complete Cost
Performance Index to Changed Ratio between Project's To-Complete Cost Performance Index
Cost Performance Index based on Estimate at Completion to Cost Performance Index when
198 TCPI (EAC)/CPI comparing the base schedule to the revised schedule.
Changed Spent Budget
199 Percent (AC/PV) Changed Actual cost spend to date with respect to budgeted cost
Changed Consumed Percent of days from beginning of the project up to date divided by the
200 Schedule Percent total project duration
Cost Under-run (Actual
Cost Less Than Activities with cost saving (budget cost exceeds actual cost) in the project's
201 Budgeted) schedule
Cost Under-run (based on Activities with cost saving (cost performance index is more than 1.0) in the
202 Cost Performance Index) project's schedule
No. of "Total Task"
203 Activities Number of Non Milestone and Non Zero Duration Activities