MECHANICAL ACTIVITIES

PLUMING:
1

Sanitary drainage installation at building C#7 & C#8 working is ongoing.

Drainage system installation & testing is ongoing at Medical clinic building.


MECHANICAL ACTIVITIES
3

Portable water pipe line installation & testing ongoing near chiller plant.

HVAC
1

Installation of A/C duct at building C#7 is ongoing.


MECHANICAL ACTIVITIES

FIREFIGHTING
1

Installation of firefighting system is ongoing at building C#7.

CHILLED WATER PIPELINE


1

Installation and welding of chilled water line is ongoing at corridor in between FBC & GSRC.

Installation and welding of chilled water line is ongoing at corridor near chiller plant.