Name of the Project/ (Province/ TEC (Rs. Mn)/ Source the Project/
Duration/ Economic and Social Benefits Agency/
Programme District/ DS of Funding Programme
Start Date and Department
Division) (%)
End Date
Improve the quality of the life,
Provide Loan facility
Enhance micro enterprises and
of Rs. 40,000/- with 7%
"Ratama Eliyai - Andura Efficent use of Electricity
interest rate and 72 Ceylon Electricity
1 Duralai" Jatika Viduli All Island 2015 - 2016 100%
repayment instalments Board
Sathkaraya
to get electricity
connection
Meter enclosure
10 Galigamuwa LKR Mn. 147 2017 Create more job opportunities 100% Sri Lanka Energies
Manufacturing project
System Control
Modernization - New System Sri Efficient control, data analysing Ceylon Electricity
11 LKR Mn. 2,863.4 2016 - 2018 100%
Control Centre at Sri Jayawardenapura and monitoring system Board
Jayawardanapura
Progress of the Development Projects and Programmes During 2015 - 2018
Ministry of Power & Renewable Energy
Ongoing Projects
Project/
Location Progress of
Programme Implementation
Name of the Project/ (Province/ TEC (Rs. Mn)/ Source the Project/
Duration/ Economic and Social Benefits Agency/
Programme District/ DS of Funding Programme
Start Date and Department
Division) (%)
End Date
Low electricity generation cost
by hydro power generation
LKR Mn. 15,940
compared to the Thermal power
generation.
Procument
Construction of Moragolla 31 Ulapane, Kandy Asian Development Environment friendly power Ceylon Electricity
1 2017-2021 process is in
MW Hydro Power Project District, Bank generation. Board
progress
More employment
opportunities will be created
during the project construction
period.
Since this is Renewable energy
generation there will be no cost
100 MW Semi- Dispatchable LKR Mn. 24,000
for imported fossil fuels for Technical
type Wind Farm along the Ceylon Electricity
2 Mannar 2017-2018 electricity generation. Evaluation is
Southern Coast of Mannar Board
completed
Island More employment
Asian Development
opportunities will be created in
Bank
the area for public
Procument
processs was
completed
and to get the
Cabinet
approval
Comparatively environmental Cabinet Memo
300 MW Liquidated Natural
Independent Power Friendly electricity generation was
3 Gas (LNG) Fired Combine Kerawalapitiya 2017-2019 Private Sector
Plant - BOO and capacity addition for base submitted.
Cycle Power Plant
load to meet electricity demand However,
Court case has
been filed by
one of NGO in
Supreme
Court in this
regard
Construction of New
Polpitiya-Hambantota 220kV, Mannar, Padukka
150km transmission line
Mannar - Nadukuda
Colombo
Transmission Development
Construction of Nadukuda
220/33 kV Grid Substation,
Vavunia
Augmentation at Mannar
220/33kV Grid Substation,
Construction of Mannar -
Nadukuda 220kV, 30km Horana, Ceylon Electricity
7 2017 - 2019 5%
transmission line Board
Construction of Padukka -
Horana 132kV, 25km Biyagama
transmission line
2nd cct stringing of Habarana-
Madampe
Valachcheai 132 kV Tra.line
Southern province
Construction of Colombo B
Substation
Construction of Single In &
Out Connection from
Colombo C - Kolonnawa
132kV 800mm2 Cable
Augmentation at Colombo C
and Kolonnawa Grid
Substations
Augmentation of Kotugoda
Grid Substation
Augmentation of Kolonnawa
Stanley Grid Substation
Augmentation of Padukka
Switching Station
Augmentation of Horana Grid
Substation
Augmentation of Dehiwala
Grid Substation
Augmentation of Madampe
Grid Substation
Construction of Biyagama
220/33kV GSS
Augmentation of Biyagama
Grid Substation
Construction of 33 kV
distribution Tower Lines and
Gantries
Electricity Supply Reliability All districts of the
LKR Mn. 14,040.5
Improvement Project country
Asian Development
Bank
Procument of
Procurement of material for
materials
116 RE Schemes
complete 95%
Construction of 270.5 km Nainativu, Electricity will be supplied to the
long 33kV tower lines and 13 Analitivu, Delft every households in the country
no. of 33kV 2SSBB gantries Islands and this pave the way for
enhancement of more economic
Supply and Delivery of activities by Households. Small Ceylon Electricity
8 2017 -2019
Material for rural and medium scale Industries are Board
Pannipitiya &
electrification network also benefited by the supply of
Biyagama
extended and distribution electricity leads to social and
performance monitoring economic benefits to the
country.
Construction of Hybrid
renewable energy systems in
03 small islands (Nainativu, under bidding
Analitivu, Delft) stage
System Reliability
Improvement Project
Renewable energy generated by
Renewable Energy Mini hydro power plants in
Absorption Transmission Maliboda, LKR Mn. 6,228 those areas will be absorbed to
Development Project Wewalwatta, the System. More clean and Ceylon Electricity
9 2017-2020 24%
Construction of four new Grid Nawalapitiya renewable energy. Board
Substations and related 132 Ragala
More job opportunities will be
kV Transmission Lines Agence Francise de
created during the project
Development (AFD)
construction phase.
Considerable amount of foreign
Manufacturing of Smart exchange needed to import
Ceylon Electricity
10 Meters locally and Introduce Colombo LKR Mn. 49.2 2017 - 2019 smart meters for the country 99%
Board
to Energy Sector in Sri Lanka will be saved. More