Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
0v
TABLE OF CONTENTS
Q1. What system settings are required for installation of PreDCR / AutoDCR? ....................... 3
Q2. How to ‘Mark Margin’ in PreDCR drawing? .................................................................... 17
Q.3. How to mark green strip in PreDCR drawing? ............................................................... 19
Q.4. How to write main road text in PreDCR drawing ? ........................................................ 22
Q.5. How to draw section line in site plan in PreDCR drawing? ............................................. 23
Q.6. How to mark drawing reference points in PreCR drawing? ............................................ 26
Q.7. How to mark mortgage area for total BUA in PreDCR drawing?..................................... 28
Q.8. How to mark ‘Room’ entity in PreDCR drawing? ........................................................... 30
Q.9.. How to Insert ‘Ventilation’ entity in PreDCR drawing? ................................................. 34
Q.10. How To Select Road Widening Concession ? ............................................................... 36
Caseno. 1:-To Select road widening concession as “Grant of TDR” ....................................................... 36
Case no. 2:-To Select road widening concession as “RW Setback Concession” ..................................... 38
Case no. 3:-To Select road widening concession as “Additional Floors” ................................................ 39
Case no. 4:-To Select road widening concession as “All (includes Grant of TDR, RW Setback Concession
and Additional Floor)” ............................................................................................................................. 40
Q.11. How To Mark Special_Use_BUA ? ............................................................................... 41
Case no. 1:- To mark BUA for special use building e.g. Proposed church building................................. 41
Q.12. How To Mark ‘Ramp” in PreDCR drawing ? ................................................................. 45
Q.13. How To Mark ‘Ventilation Shaft’ in PreDCR drawing ? ................................................. 49
Q.14. How To Mark ‘Splay’ in PreDCR drawing ? .................................................................. 52
Q.15. How To Mark ‘BUA Outline’ in PreDCR drawing ?........................................................ 55
Q.16. How To Mark ‘Balcony’ in PreDCR drawing ?............................................................... 58
Q.17. How To Mark ‘Parking’ in PreDCR drawing ? ............................................................... 60
Q.18. How To Mark ‘Existing Structure’ in PreDCR drawing ? ................................................ 64
General instructions: ........................................................................................................... 67
Step 6:- Open start menu, then type “Regedit” and hit enter as shown in below screenshot.
Step 1:- Click on second tab ‘mark margin’ command of PreDCR Toolbar.
Step 2:- Draw Green strip closed poly line in the drawing.
Step 1:- Select ‘Main road’ layer, write text using MText command.
Step2:- Insert the direction reference circles inside the proposed work in the plot.
Step 5:- After copying the direction reference circles in all plans (including Terrace floor plan)
then PreDCR verification can be done.
Step 2:- Select “RW setback concession” and Click on ‘OK’ button.
Step 2:- Select ‘Additional floors’ option, enter road widening floor no. and click on ‘OK’ button.
Step 2:- Select “ALL” option, Enter ‘Road widening Floor No & TDR Area’ and click on ‘OK’
button.
Case no.1: To mark BUA for special use building e.g. proposed church building
Step 1:- Select Plot Use ‘ Assembly’.
Step 2:- Select, plot sub use , Religious (since propsed building is a church).
Step 4:- The specific layer for Assembly—religious—building will therefore be created in
PreDCR.
Step 6:-Then Mark Special use BUA polyline, under PreDCR drop down toolbar,
Step 3:-To assign name for Ramp follow the path, under PreDCR drop down as follows:
Step 5:-Enter the ramp’s dimensions in ‘Assign Name dialog’ box and click ‘OK’.
‘SpecialUseBUAOutline’ --> For other than residential, commercial and industrial buildings i:e
educational buildings, religious buildings .
Step 2:- Draw ‘Existing Structure’ using closed Polyline command in site plan.
1) Check parameters - land use, sub landuse while running the drawing
2) Check layer properties - line colour, line weight, and line type must be in ‘By layer’.
PreDCR layers must not contain any line entity.
3) Plot layer: Avoid more than one entity in plot layer.
Assign text in the same layer as that of entity by using ‘Mtext’ command
4) Road widening: Text of road widening should not be edited once the marking is done.
5) Accessory uses: Septic tank must be minimum 1m away from plot boundary in front
setback.
6) Net plot: Net plot should not be drawn manually. It would automatically be created
while marking margin.
7) Print additional details: Must give text for each entity by using Mtext command.
Extract of master plan must be in Autocad drawing. Image format will not be accepted
to create PDF.
8) Section should not be marked in Print additional detail layer.
9) Elevations, location plan, extract of master plan are the entities to be marked in this
layer.
10) Margin: The front side margin will automatically be taken by PreDCR. Select the side 1 or
side 2 or rear margin.
11) All poly line entities should be closed
12) Site Plan contains plot ploy line, (net area ploy line and margin line are generated by
program), proposed work (building line), road (existing /road widening), green strip,
RWHS, Amenities/sub structure.
★★★