1.

___________________________is the expansion of ISO


2. Prevention cost is _______________cost
a.Conformance cost b.internal failure cost c.External failure cost d.none of the above
3.What is RPN IN FMEA?
a. Rejections process number b.Risk process number c. Risk priority number d. None of the
above
4. Control charts are one of the 7 TQM quality tools
a. True b. False
5. The Japanese term poka yoke means__________________
a. Mistake proofing b.Fool proof c.None of the above d. Both A & B
6.What does PDCA mean?
a. Plan-do-check-act b.prepare-do-cost-act c.Plan-do-control-action
7.Concurrent Engineering is also called simultaneous engineering
a. True b. False
8.QFD is the step by step technique for ensuring the voice of customer so that final product
fully meets customer requirements
a.True b.False
9. What is quality assurance?
a. Quality assurance deals with activities which prove that products and services meet the
required quality standard
b. Quality assurance deals with activities which aim at customers satisfaction
c. Quality assurance deals with controlling the quality of products by inspection
d. All of the above

10. The degree of closeness of measured value of certain quantity with its true value is
known as
a.Accuracy b.Precision c.Standard d.Sensitivity

11. Error of measurement=


a. True value-Measured value b.Precision-True value c. Measured value-precision d.None
of the above
12. One yard=_________inch
a.36 b.38 c. 40 d.42
13. __________ is equal to difference of two limits of size of part
a. Tolerance b. Low limit c. High limit d. Design size
14.Straightness is a ________________control
a.Form b.Location c.Orientation d.Profile
15.___________________is a standard for dimensioning and tolerancing
a. ASME Y14.5 b. DIN C. JIS d. ISO
16. Basic dimension is the theoretically exact size of a component
a.Yes b.No
17. The expansion of PLC and SCADA is__________________

18. What type of program is used in PLC?


a. C++ b.Java c.Python d. Ladder logic
19. Flow rate in a pipe is calculated using the formula area of cross section of pipe X
velocity
a.True b. False
20. The expansion of DCV is ____________________
21. Which system has the capacity to carry heavy loads?
a.Hydraulic b.Pneumatic
22. The expansion of FRL unit is __________________
23. What type of motor drive is used in CNC Machines_________________
a. Stepper b. Servo c.AC d. DC
24. G-code is a language in which people tell computerized machine tools
a. instructions on where to move b. how fast to move c. what path to move d.All of the
above
25. CNC G-Codes G00 and G01 is used for____________________
26. CNC M-codes MO5,M06 and M30 is used for_________________________
27. The operation of smoothing and squaring the surface around the hole is called
a. Counter-sinking b. Counter-boring c. Trepanning d. Spot facing
28. The increase in depth of cut and feed rate _________ surface finish.
a. Improves b. Deteriorates c. Does not effect d. None of these

29. A coarse grained grinding wheel is used to grind


a. Hard and brittle materials b. Soft and ductile materials c. Hard and ductile materials d.
Soft and brittle materials
30. The binding material used in cemented carbide tools is
a. Tungsten b. Chromium c. Silicon d. Cobalt
31. High speed steel tools retain their hardness up to a temperature of
a. 250°C b. 350°C c. 500°C d. 900°C
32. The operation of making a cone-shaped enlargement of the end of a hole is known as
a. Counter-sinking b. Counter-boring c. Trepanning d. Spot facing
33. A drill mainly used in drilling brass, copper or softer materials, is
a. Flat drill b. Straight fluted drill c. Parallel shank twist drill d. Tapered shank twist drill
34. The process of removing metal by a cutter which is rotated in the same direction of
travel of workpiece, is called
a. Up milling b. Down milling c. Face milling d. End milling
35. Which of the following is not a part of Five M’s?
a. Material b. Machine c. Motion d. Method
36. The correct sequence of operations in production planning and control is
a. Routing-Scheduling-Dispatching-Follow up
b. Scheduling-Routing- Dispatching-Follow up
c. Dispatching-Routing-Scheduling- Follow up
d.Routing-Scheduling-Follow up-Dispatching
37. Which of the following is true for ‘Routing’?
a.It is flow of work in the plant
b.Route sheets include list of machine tools that are to be followed
c.It depends upon material handling facilities
d.All of the above
38. Loading may be defined as
a.Sending the raw material to the machine
b.Sending the finished material to the store
c.Assign the work to the facilities
d.Uploading a software in machine control panel
39. The bill of material does not consists of
a. Part number
b. Specifications of part
c. Name of the part
d. Price of the part
40. Procurement cycle time is time consumed for
a.Receiving of raw material
b.Inspection of various raw materials
c.Inspection of purchased components parts
d.All of the above
41. The transit time consist of
a.Time taken by raw material from machine to machine
b.Time consumed in moving the work between various departments
c.Time taken by a worker to machine a component
d.None of the above
42. Which of the following chart is drawn Machine vs time?
a.Man machine chart
b.The load chart
c.The progress chart
d.Curve chart
43. Gantt chart is mostly used for
a.Routing
b.Scheduling
c.Follow up
d.Inspection and quality control
44.Material handling in automobile industries is done by
a. overhesd crane b.trolly c.belt conveyor d.all of the above
45.Work study is concerned with
a. improving present methods and finding standard time
b.motivation of workers
c. improving production capacity
d. all of the above

46.Basic tool in work study is


a.Graph paper b. Process chart c. Planning chart d. Stop watch
47.ABC analysis deals with
a.Analysis of process chart
b.Flow of material
c.ordering schedule of job
d.Controlling inventory costs
48.Stastical Quality control techniques are based on theory of
a.Quality
b.Statistics c.Probability d.all the above

49. Under apprenticeship act


a. all industries have to necessarily train the apprentices
b. industries have to train the apprentices according to requirement
c. Only companies employing more than 500 workers have to recruit apprentices
d.None of the above
Answer key
1.International organisation for standards
2.internal failure cost
3. Risk priority number
4.true
5.both a&b
6. Plan-do-check-act
7.true
8.true
9.a
10.Accuracy
11. . True value-Measured value
12.36
13.tolerance
14. form
15.ASME Y 14.5
16.yes
17 programmable logic control, supervisory control and data acquisition
18. d. Ladder logic
19.true
20.direction control valve
21.hydraulic
22.FILTER REGUATION LUBRICATION
23.servo
24.d
25. Rapid positionin and linear interpolation
26.spindle off, tool change,program end
27. d. Spot facing
28. b. Deteriorates
29. b. Soft and ductile materials
30. d. Cobalt
31.d.900
32. a. Counter-sinking
33. b. Straight fluted drill
34. b. Down milling
35. c. Motion
36. a. Routing-Scheduling-Dispatching-Follow up
37. d.All of the above
38. c.Assign the work to the facilities
39. Price of the part
40. d.All of the above
41. b.Time consumed in moving the work between various departments
42. b.The load chart
43. b.Scheduling
44. a. overhesd crane
45. a. improving present methods and finding standard time
46. d. Stop watch
47. d.Controlling inventory costs
48. c.Probability
49. c. Only companies employing more than 500 workers have to recruit apprentices
50. Monte carlo solutions in queuing theory are extremely useful in queing problems
a.that can’t be analysed mathematically
b. to verify mathematical results
c. inventory problems
d. None of the above