23/01/17 A 25/08/22 1977 1304 2036 25/08/22, HPLML3-UP- 25/01/19 HPLML3 - WORKS
HPLML3-UP- 225/01/19 HPLML3 - WORKS PROGRAMME - CP03
HPLML3-UP- 225/01/19.03 CP03 - UNDERGROUND LINE & STATIONS 9 to 12 / T 23/01/17 A 25/08/22 1977 1304 2036 25/08/22, HPLML3-UP- 25/01/19.03 CP03 - UNDERG

HPLML3-UP- 25/
25/01/19.03.D Site preparation / Chuaå n bò coâ ng tröôøng 23/01/17 A 16/06/19 811 138 870 16/06/19, HPLML3-UP- 25/01/19.03.D Site preparation / Chuaån bò coâ ng tröôøng

HPLML3-UP- 25/01/19.03.D.1
25 Site Setup and Site Clearance / Thieá t laäp vaø doïn deï p coâ ng tröôøng 23/01/17 A 16/06/19 811 138 870 16/06/19, HPLML3-UP- 25/01/19.03.D.1 Site Setup and Site Clearance / Thieát laäp vaø doïn deï p coâ n g tröôø ng

HPLML3-UP- 225/01/19.03.D.1.1 Station / Nhaø Ga 23/01/17 A 16/06/19 811 138 870 16/06/19, HPLML3-UP- 25/01/19.03.D.1.1 Station / Nhaø Ga

HPLML3-UP- 25/01/19.03.D.1.1.1
2 Station 9 / Nhaø Ga 9 23/01/17 A 15/01/19 A 663 0 722 15/01/19 A, HPLML3-UP- 25/01/19.03.D.1.1.1 Station 9 / Nhaø Ga 9

HPLML3-UP- 25/01/19.03.D.1.1.1.1 General Mobilization / Huy ñoä ng chung 23/03/17 A 05/07/17 A 28 0 104 05/07/17 A, HPLML3-UP- 25/01/19.03.D.1.1.1.1 General Mobilization / Huy ñoä ng chung

HPLML3-UP- 25/01/19.03.D.1.1.1.1.6 Fence Installation / Laé p ñaë t haø ng raøo


HPLML3-UP 23/03/17 A 05/07/17 A 28 0 104 05/07/17 A, HPLML3-UP- 25/01/19.03.D.1.1.1.1.6 Fence Installation / Laép ñaë t haøng raøo

03D0010082 Preparation of Drawing and PIC/MRB approval / Chuaån bò baûn veõ vaø chaá p thuaän 23/03/17 A 05/07/17 A 28 0 104 Preparation of Drawing and PIC/MRB approval / Chuaån bò baûn veõ vaø chaáp thuaän töø PIC/MRB
HPLML3-UP- 25/01/19.03.D.1.1.1.2 Traffic Diversion & Site Installation / Phaân laø n & laép ñaët 23/01/17 A 15/01/19 A 663 0 722 15/01/19 A, HPLML3-UP- 25/01/19.03.D.1.1.1.2 Traffic Diversion & Site Installation / Phaâ n laøn & laép ñaët coâ ng tröôøng

03D0010090 Preparation of Concept Drawing and Systra/MRB/Police Approval / C.bò Baû n veõ 23/01/17 A 15/02/17 A 10 0 23 Preparation of Concept Drawing and Systra/MRB/Police Approval / C.bò Baû n veõ cô sôû & Chaá p thuaä n Systra/MRB/Coân g an
03D0010100 Preparation of Shop Drawing / Chuaån bò baûn veõ thi coâ ng 16/02/17 A 27/02/17 A 10 0 11 Preparation of Shop Drawing / Chuaån bò baûn veõ thi coâ ng
03D0010110 Approval of Shop Drawing / Chaáp thuaä n baûn veõ thi coâ ng 28/02/17 A 18/06/17 A 7 0 110 Approval of Shop Drawing / Chaáp thuaä n baûn veõ thi coâ ng
03D0010120 Traffic Diversion / Phaâ n laøn giao thoân g 24/12/17 A 30/11/18 A 15 0 341 Traffic Diversion / Phaâ n laøn giao thoâng
03D0010130 Site Installation / Laép ñaë t coâ ng tröôøng 30/10/18 A 15/01/19 A 15 0 77 Site Installation / Laép ñaë t coâ ng tröôøng
HPLML3-UP- 25/01/19.03.D.1.1.2
2 Station 10 / Nhaø Ga 10 23/03/17 A 20/07/18 A 513 0 484 20/07/18 A, HPLML3-UP- 25/01/19.03.D.1.1.2 Station 10 / Nhaø Ga 10

HPLML3-UP- 25/01/19.03.D.1.1.2.1 General Mobilization / Huy ñoä ng chung 23/03/17 A 05/07/17 A 42 0 104 05/07/17 A, HPLML3-UP- 25/01/19.03.D.1.1.2.1 General Mobilization / Huy ñoä ng chung

HPLML3-UP- 25/01/19.03.D.1.1.2.1.6 Fence Installation / Laé p ñaë t haø ng raøo


HPLML3-UP 23/03/17 A 05/07/17 A 42 0 104 05/07/17 A, HPLML3-UP- 25/01/19.03.D.1.1.2.1.6 Fence Installation / Laép ñaë t haøng raøo

03D0010212 Preparation of Drawing and PIC/MRB approval / Chuaån bò baûn veõ vaø chaá p thuaän 23/03/17 A 05/07/17 A 42 0 104 Preparation of Drawing and PIC/MRB approval / Chuaån bò baûn veõ vaø chaá p thuaän töø PIC/MRB
HPLML3-UP- 25/01/19.03.D.1.1.2.2 Traffic Diversion & Site Installation / Phaân laø n & laép ñaët 23/03/17 A 20/07/18 A 513 0 484 20/07/18 A, HPLML3-UP- 25/01/19.03.D.1.1.2.2 Traffic Diversion & Site Installation / Phaâ n laøn & laép ñaë t coâ ng tröôøng

03D0010220 Preparation of Concept Drawing and Systra/MRB/Police Approval / C.bò Baû n veõ 23/03/17 A 19/05/17 A 20 0 57 Preparation of Concept Drawing and Systra/MRB/Police Approval / C.bò Baû n veõ cô sôû & Chaá p thuaä n Systra/MRB/Coâng an
03D0010230 Preparation of Shop Drawing / Chuaån bò baûn veõ thi coâ ng 12/04/17 A 21/10/17 A 20 0 192 Preparation of Shop Drawing / Chuaån bò baûn veõ thi coâ ng
03D0010240 Approval of Shop Drawing / Chaáp thuaä n baûn veõ thi coâ ng 22/10/17 A 18/12/17 A 14 0 57 Approval of Shop Drawing / Chaáp thuaä n baûn veõ thi coân g
03D0010250 Traffic Diversion / Phaâ n laøn giao thoân g 13/12/17 A 07/07/18 A 30 0 206 Traffic Diversion / Phaâ n laøn giao thoân g
03D0010260 Site Installation / Laép ñaë t coâ ng tröôøng 10/07/18 A 20/07/18 A 15 0 10 Site Installation / Laép ñaë t coâ ng tröôøn g
HPLML3-UP- 25/01/19.03.D.1.1.3
2 Station 11 / Nhaø Ga 11 23/03/17 A 16/06/19 595 138 811 16/06/19, HPLML3-UP- 25/01/19.03.D.1.1.3 Station 11 / Nhaø Ga 11

HPLML3-UP- 25/01/19.03.D.1.1.3.1 General Mobilization / Huy ñoä ng chung 23/03/17 A 05/07/17 A 42 0 104 05/07/17 A, HPLML3-UP- 25/01/19.03.D.1.1.3.1 General Mobilization / Huy ñoä ng chung

HPLML3-UP- 25/01/19.03.D.1.1.3.1.6 Fence Installation / Laé p ñaë t haø ng raøo


HPLML3-UP 23/03/17 A 05/07/17 A 42 0 104 05/07/17 A, HPLML3-UP- 25/01/19.03.D.1.1.3.1.6 Fence Installation / Laép ñaë t haøng raøo

03D0010342 Preparation of Drawing and PIC/MRB approval / Chuaån bò baûn veõ vaø chaá p thuaän 23/03/17 A 05/07/17 A 42 0 104 Preparation of Drawing and PIC/MRB approval / Chuaån bò baûn veõ vaø chaá p thuaän töø PIC/MRB
HPLML3-UP- 25/01/19.03.D.1.1.3.2 Traffic Diversion & Site Installation / Phaân laø n & laép ñaët 26/02/18 A 16/06/19 418 138 471 16/06/19, HPLML3-UP- 25/01/19.03.D.1.1.3.2 Traffic Diversion & Site Installation / Phaân laø n & laép ñaët coâ n g tröôø ng

03D0010350 Preparation of Concept Drawing and Systra/MRB/Police Approval / C.bò Baû n veõ 26/02/18 A 19/03/18 A 20 0 21 Preparation of Concept Drawing and Systra/MRB/Police Approval / C.bò Baû n veõ cô sôû & Chaá p thuaä n Systra/MRB/Coân g an
03D0010360 Preparation of Shop Drawing / Chuaån bò baûn veõ thi coâ ng 20/03/18 A 08/04/18 A 20 0 19 Preparation of Shop Drawing / Chuaån bò baûn veõ thi coâ ng
03D0010370 Approval of Shop Drawing / Chaáp thuaä n baûn veõ thi coâ ng 09/04/18 A 07/04/19 14 68 359 Approval of Shop Drawing / Chaáp thuaä n baûn veõ thi coâ ng
03D0010380 Traffic Diversion / Phaâ n laøn giao thoân g 15/04/19 01/06/19 48 48 48 Traffic Diversion / Phaâ n laøn giao thoâng
03D0010390 Site Installation / Laép ñaë t coâ ng tröôøng 02/06/19 16/06/19 15 15 15 Site Installation / Laép ñaë t coâ ng tröôøng
HPLML3-UP- 25/01/19.03.D.1.1.4
2 Station 12 / Crossover & Garage / Nhaø Ga 12/Chuyeån laø n & 23/03/17 A 03/06/19 643 125 798 03/06/19, HPLML3-UP- 25/01/19.03.D.1.1.4 Station 12 / Crossover & Garage / Nhaø Ga 12/Chuyeån laø n & Gara

HPLML3-UP- 25/01/19.03.D.1.1.4.1 General Mobilization / Huy ñoä ng chung 23/03/17 A 05/07/17 A 42 0 104 05/07/17 A, HPLML3-UP- 25/01/19.03.D.1.1.4.1 General Mobilization / Huy ñoä ng chung

HPLML3-UP- 25/01/19.03.D.1.1.4.1.7 Fence Installation / Laé p ñaë t haø ng raøo


HPLML3-UP 23/03/17 A 05/07/17 A 42 0 104 05/07/17 A, HPLML3-UP- 25/01/19.03.D.1.1.4.1.7 Fence Installation / Laép ñaë t haøng raøo

03D0010475 Preparation of Drawing and PIC/MRB approval / Chuaån bò baûn veõ vaø chaá p thuaän 23/03/17 A 05/07/17 A 42 0 104 Preparation of Drawing and PIC/MRB approval / Chuaån bò baûn veõ vaø chaá p thuaän töø PIC/MRB
HPLML3-UP- 25/01/19.03.D.1.1.4.2 Traffic Diversion & Site Installation / Phaân laø n & laép ñaët 08/06/17 A 03/06/19 643 125 721 03/06/19, HPLML3-UP- 25/01/19.03.D.1.1.4.2 Traffic Diversion & Site Installation / Phaân laø n & laé p ñaët coâ ng tröôø ng

03D0010480 Preparation of Concept Drawing and Systra/MRB/Police Approval / C.bò Baû n veõ 08/06/17 A 04/11/17 A 20 0 150 Preparation of Concept Drawing and Systra/MRB/Police Approval / C.bò Baû n veõ cô sôû & Chaá p thuaä n Systra/MRB/Coân g an
03D0010490 Preparation of Shop Drawing / Chuaån bò baûn veõ thi coâ ng 05/11/17 A 03/01/18 A 30 0 59 Preparation of Shop Drawing / Chuaån bò baûn veõ thi coâ ng
03D0010500 Approval of Shop Drawing / Chaáp thuaä n baûn veõ thi coâ ng 04/01/18 A 07/03/19 14 37 423 Approval of Shop Drawing / Chaáp thuaä n baûn veõ thi coâ ng
03D0010510 Traffic Diversion / Phaâ n laøn giao thoân g 20/04/19 19/05/19 30 30 30 Traffic Diversion / Phaâ n laøn giao thoân g
03D0010520 Site Installation / Laép ñaë t coâ ng tröôøng 20/05/19 03/06/19 15 15 15 Site Installation / Laép ñaë t coâ ng tröôøn g
HPLML3-UP- 225/01/19.03.D.1.2 Main Line / Tuyeá n chính 23/03/17 A 07/06/19 802 86 802 07/06/19, HPLML3-UP- 25/01/19.03.D.1.2 Main Line / Tuyeán chính

HPLML3-UP- 25/01/19.03.D.1.2.2
2 Ramp / Doác haï ngaàm 23/03/17 A 22/10/17 A 190 0 213 22/10/17 A, HPLML3-UP- 25/01/19.03.D.1.2.2 Ramp / Doác haï ngaàm

HPLML3-UP- 25/01/19.03.D.1.2.2.1 General Mobilization / Huy ñoä ng chung 23/03/17 A 05/07/17 A 28 0 104 05/07/17 A, HPLML3-UP- 25/01/19.03.D.1.2.2.1 General Mobilization / Huy ñoä ng chung

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 1 of 17
Project Baseline Critical Remaining Work summary
Actual Work Baseline Milestone Primary Baseline
CP03-WORKS PROGRAMME UPDATED HANOI PILOT LIGHT METRO LINE 03
SECTION NHON-HANOI RAILWAYS STATION
Cut-off Date: 25/01/19

Activity ID Activity Name Start Finish Original Remaining At 2017 2018 2019 2020 2021 2022 2023 2024
Duration Duration Completion
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
HPLML3-UP- 25/01/19.03.D.1.2.2.1.5 Fence Installation / Laé p ñaë t haø ng raøo
HPLML3-UP 23/03/17 A 05/07/17 A 28 0 104 05/07/17 A, HPLML3-UP- 25/01/19.03.D.1.2.2.1.5 Fence Installation / Laép ñaë t haøng raøo

03D0010612 Preparation of Drawing and PIC/MRB approval / Chuaån bò baûn veõ vaø chaá p thuaän 23/03/17 A 05/07/17 A 28 0 104 Preparation of Drawing and PIC/MRB approval / Chuaån bò baûn veõ vaø chaáp thuaän töø PIC/MRB
HPLML3-UP- 25/01/19.03.D.1.2.2.3 Traffic Diversion & Site Installation / Phaân laø n & laép ñaët 01/05/17 A 22/10/17 A 151 0 174 22/10/17 A, HPLML3-UP- 25/01/19.03.D.1.2.2.3 Traffic Diversion & Site Installation / Phaâ n laøn & laép ñaë t coâ ng tröôøng

03D0010620 Preparation of Concept Drawing and Systra/MRB/Police Approval / C.bò Baû n veõ 01/05/17 A 15/05/17 A 15 0 15 Preparation of Concept Drawing and Systra/MRB/Police Approval / C.bò Baû n veõ cô sôû & Chaá p thuaä n Systra/MRB/Coâng an
03D0010630 Preparation of Shop Drawing / Chuaån bò baûn veõ thi coâ ng 15/05/17 A 30/05/17 A 15 0 16 Preparation of Shop Drawing / Chuaån bò baûn veõ thi coâ ng
03D0010640 Approval of Shop Drawing / Chaáp thuaä n baûn veõ thi coâ ng 01/06/17 A 15/06/17 A 14 0 15 Approval of Shop Drawing / Chaáp thuaä n baûn veõ thi coâ n g
03D0010650 Traffic Diversion / Phaâ n laøn giao thoân g 16/06/17 A 01/07/17 A 15 0 15 Traffic Diversion / Phaâ n laøn giao thoâng
03D0010660 Site Installation / Laép ñaë t coâ ng tröôøng 02/07/17 A 22/10/17 A 15 0 112 Site Installation / Laép ñaë t coâng tröôøn g
HPLML3-UP- 25/01/19.03.D.1.2.3
2 Emergency Shaft / Loái thoaù t hieå m 04/09/17 A 07/06/19 633 86 637 07/06/19, HPLML3-UP- 25/01/19.03.D.1.2.3 Emergency Shaft / Loá i thoaùt hieå m

HPLML3-UP- 25/01/19.03.D.1.2.3.2 Traffic Diversion & Site Installation / Phaân laø n & laép ñaët 04/09/17 A 07/06/19 633 86 637 07/06/19, HPLML3-UP- 25/01/19.03.D.1.2.3.2 Traffic Diversion & Site Installation / Phaân laø n & laé p ñaët coâ ng tröôøng

03D0010740 Preparation of Concept Drawing and Systra/MRB/Police Approval / C.bò Baû n veõ 04/09/17 A 09/11/17 A 15 0 66 Preparation of Concept Drawing and Systra/MRB/Police Approval / C.bò Baû n veõ cô sôû & Chaá p thuaä n Systra/MRB/Coân g an
03D0010750 Preparation of Shop Drawing / Chuaån bò baûn veõ thi coâ ng 10/11/17 A 25/11/17 A 15 0 15 Preparation of Shop Drawing / Chuaån bò baûn veõ thi coâ ng
03D0010760 Approval of Shop Drawing / Chaáp thuaä n baûn veõ thi coâ ng 17/10/17 A 18/12/17 A 14 0 62 Approval of Shop Drawing / Chaáp thuaä n baûn veõ thi coân g
03D0010770 Traffic Diversion / Phaâ n laøn giao thoân g 14/03/19* 28/03/19 15 15 15 Traffic Diversion / Phaâ n laøn giao thoân g
03D0010780 Site Installation / Laép ñaë t coâ ng tröôøng 24/05/19* 07/06/19 15 15 15 Site Installation / Laép ñaë t coâ ng tröôøn g
HPLML3-UP- 25/
25/01/19.03.E Construction / Thi coâ ng 24/07/17 A 25/08/22 1853 1304 1854 25/08/22, HPLML3-UP- 25/01/19.03.E Construction / T

HPLML3-UP- 25
25/01/19.03.E.1 Station (Part A) / Nhaø Ga (Phaàn A) 11/07/18 A 16/07/22 1436 1264 1462 16/07/22, HPLML3-UP- 25/01/19.03.E.1 Station (Part A) /

HPLML3-UP- 225/01/19.03.E.1.1 Station 9 / Nhaø Ga 9 25/11/18 A 12/05/22 1260 1199 1260 12/05/22, HPLML3-UP- 25/01/19.03.E.1.1 Station 9 / Nhaø Ga 9

HPLML3-UP- 25/01/19.03.E.1.1.1
2 Main Box / Hoä p Ga chính 25/11/18 A 12/05/22 1260 1199 1260 12/05/22, HPLML3-UP- 25/01/19.03.E.1.1.1 Main Box / Hoä p Ga

HPLML3-UP- 25/01/19.03.E.1.1.1.1 Top Slab / Baûn ñænh 25/11/18 A 11/09/19 286 225 286 11/09/19, HPLML3-UP- 25/01/19.03.E.1.1.1.1 Top Slab / Baû n ñænh

03E01A0010 Install Guide Wall at Main Box / Laé p ñaët Töôøng daãn höôùng ôû hoäp ga chính 25/11/18 A 30/01/19 18 6 67 Install Guide Wall at Main Box / Laé p ñaët Töôøng daãn höôùng ôû hoäp ga chính
03E01A0020 Construction Diaphragm Wall at Main Box / Thi coân g töôøng vaây ôû hoäp ga chính 23/12/18 A 14/04/19 37 62 108 Construction Diaphragm Wall at Main Box / Thi coâng töôøng vaây ôû hoä p ga chính
03E01A0030 Excavation down to Intrados of Top Slab and water pumping / Ñaø o ñeá n cao ñoä m 15/04/19 14/05/19 30 30 30 Excavation down to Intrados of Top Slab and water pumping / Ñaø o ñeá n cao ñoä maët döôù i cuû a Baû n ñænh &ø bôm nöôùc
03E01A0040 Top Slab (Span 9) Slab Opening / Baû n ñænh (Nhòp 9) 15/05/19 28/06/19 45 45 45 Top Slab (Span 9) Slab Opening / Baû n ñænh (Nhòp 9)
03E01A0050 Top Slab (Span 7) / Baû n ñænh (Nhòp 7) 22/05/19 05/07/19 45 45 45 Top Slab (Span 7) / Baû n ñænh (Nhòp 7)
03E01A0060 Top Slab (Span 5) / Baû n ñænh (Nhòp 5) 29/05/19 12/07/19 45 45 45 Top Slab (Span 5) / Baû n ñænh (Nhòp 5)
03E01A0070 Top Slab (Span 3) / Baû n ñænh (Nhòp 3) 05/06/19 19/07/19 45 45 45 Top Slab (Span 3) / Baû n ñænh (Nhòp 3)
03E01A0080 Top Slab (Span 1) / Baû n ñænh (Nhòp 1) 12/06/19 26/07/19 45 45 45 Top Slab (Span 1) / Baû n ñænh (Nhòp 1)
03E01A0090 Top Slab (Span 8) / Baû n ñænh (Nhòp 8) 19/06/19 02/08/19 45 45 45 Top Slab (Span 8) / Baû n ñænh (Nhòp 8)
03E01A0100 Top Slab (Span 6) Slab Opening / Baû n ñænh (Nhòp 6) 26/06/19 09/08/19 45 45 45 Top Slab (Span 6) Slab Opening / Baû n ñænh (Nhòp 6)
03E01A0110 Top Slab (Span 4) / Baû n ñænh (Nhòp 4) 03/07/19 16/08/19 45 45 45 Top Slab (Span 4) / Baû n ñænh (Nhòp 4)
03E01A0120 Top Slab (Span 2) Slab Opening / Baû n ñænh (Nhòp 2) 10/07/19 23/08/19 45 45 45 Top Slab (Span 2) Slab Opening / Baû n ñænh (Nhòp 2)
03E01A0130 Waterproofing & Protection Con'c (Span 9) / Choáng thaám vaø beâ toâng baû o veä (Nh 27/07/19 05/08/19 10 10 10 Waterproofing & Protection Con'c (Span 9) / Choáng thaám vaø beâ toâng baû o veä (Nhòp 9)
03E01A0140 Waterproofing & Protection Con'c (Span 7) / Choáng thaám vaø beâ toâng baû o veä (Nh 30/07/19 08/08/19 10 10 10 Waterproofing & Protection Con'c (Span 7) / Choáng thaám vaø beâ toâng baû o veä (Nhòp 7)
03E01A0150 Waterproofing & Protection Con'c (Span 5) / Choáng thaám vaø beâ toâng baû o veä (Nh 02/08/19 11/08/19 10 10 10 Waterproofing & Protection Con'c (Span 5) / Choáng thaám vaø beâ toâng baû o veä (Nhòp 5)
03E01A0160 Waterproofing & Protection Con'c (Span 3) / Choáng thaám vaø beâ toâng baû o veä (Nh 05/08/19 14/08/19 10 10 10 Waterproofing & Protection Con'c (Span 3) / Choáng thaám vaø beâ toân g baû o veä (Nhòp 3)
03E01A0170 Waterproofing & Protection Con'c (Span 1) / Choáng thaám vaø beâ toâng baû o veä (Nh 08/08/19 17/08/19 10 10 10 Waterproofing & Protection Con'c (Span 1) / Choáng thaám vaø beâ toân g baû o veä (Nhòp 1)
03E01A0180 Waterproofing & Protection Con'c (Span 8) / Choáng thaám vaø beâ toâng baû o veä (Nh 11/08/19 20/08/19 10 10 10 Waterproofing & Protection Con'c (Span 8) / Choán g thaám vaø beâ toân g baû o veä (Nhòp 8)
03E01A0190 Waterproofing & Protection Con'c (Span 6) / Choáng thaám vaø beâ toâng baû o veä (Nh 14/08/19 23/08/19 10 10 10 Waterproofing & Protection Con'c (Span 6) / Choán g thaám vaø beâ toân g baû o veä (Nhòp 6)
03E01A0200 Waterproofing & Protection Con'c (Span 4) / Choáng thaám vaø beâ toâng baû o veä (Nh 17/08/19 26/08/19 10 10 10 Waterproofing & Protection Con'c (Span 4) / Choán g thaám vaø beâ toâng baû o veä (Nhòp 4)
03E01A0210 Waterproofing & Protection Con'c (Span 2) / Choáng thaám vaø beâ toâng baû o veä (Nh 20/08/19 29/08/19 10 10 10 Waterproofing & Protection Con'c (Span 2) / Choán g thaám vaø beâ toâng baûo veä (Nhòp 2)
03E01A0220 Backfill / Ñaép traû 18/08/19 11/09/19 25 25 25 Backfill / Ñaé p traû
HPLML3-UP- 25/01/19.03.E.1.1.1.2 Excavation & Strut / Coâ ng taù c ñaøo & Choáng 12/09/19 08/02/20 150 150 150 08/02/20, HPLML3-UP- 25/01/19.03.E.1.1.1.2 Excavation & Strut / Coâ ng taù c ñaøo & Choán g

03E01A0230 Excavation & Steel Strut Row No.1 / Coâ ng taù c ñaøo vaø laép ñaë t thanh choán g soá 1 12/09/19 06/11/19 56 56 56 Excavation & Steel Strut Row No.1 / Coâ ng taù c ñaøo vaø laép ñaë t thanh choá ng soá 1
03E01A0240 Excavation & Steel Strut Row No.2 / Coâ ng taù c ñaøo vaø laép ñaë t thanh choán g soá 2 07/11/19 31/12/19 55 55 55 Excavation & Steel Strut Row No.2 / Coâ ng taù c ñaøo vaø laép ñaë t thanh choá ng soá 2
03E01A0250 Excavate to 0.2m below Extrados level of Base Slab / Ñaø o saâ u 0.2m phía döôùi ca 01/01/20 08/02/20 39 39 39 Excavate to 0.2m below Extrados level of Base Slab / Ñaøo saâ u 0.2m phía döôùi cao ñoä maë t treâ n cuû a baûn ñaùy
HPLML3-UP- 25/01/19.03.E.1.1.1.3 Base Level / Taà ng ñaùy 09/02/20 13/06/20 126 126 126 13/06/20, HPLML3-UP- 25/01/19.03.E.1.1.1.3 Base Level / Taàn g ñaù y

03E01A0260 Base Slab (Span 9) / Baûn ñaù y (Nhòp 9) 09/02/20 14/03/20 35 35 35 Base Slab (Span 9) / Baûn ñaù y (Nhòp 9)

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 2 of 17
Project Baseline Critical Remaining Work summary
Actual Work Baseline Milestone Primary Baseline
CP03-WORKS PROGRAMME UPDATED HANOI PILOT LIGHT METRO LINE 03
SECTION NHON-HANOI RAILWAYS STATION
Cut-off Date: 25/01/19

Activity ID Activity Name Start Finish Original Remaining At 2017 2018 2019 2020 2021 2022 2023 2024
Duration Duration Completion
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
03E01A0270 Base Slab (Span 7) / Baûn ñaù y (Nhòp 7) 16/02/20 21/03/20 35 35 35 Base Slab (Span 7) / Baûn ñaù y (Nhòp 7)
03E01A0280 Base Slab (Span 5) / Baûn ñaù y (Nhòp 5) 23/02/20 28/03/20 35 35 35 Base Slab (Span 5) / Baûn ñaù y (Nhòp 5)
03E01A0290 Base Slab (Span 3) / Baûn ñaù y (Nhòp 3) 01/03/20 04/04/20 35 35 35 Base Slab (Span 3) / Baûn ñaù y (Nhòp 3)
03E01A0300 Base Slab (Span 1) / Baûn ñaù y (Nhòp 1) 08/03/20 11/04/20 35 35 35 Base Slab (Span 1) / Baûn ñaù y (Nhòp 1)
03E01A0310 Base Slab (Span 8) / Baûn ñaù y (Nhòp 8) 15/03/20 18/04/20 35 35 35 Base Slab (Span 8) / Baûn ñaù y (Nhòp 8)
03E01A0320 Base Slab (Span 6) / Baûn ñaù y (Nhòp 6) 22/03/20 25/04/20 35 35 35 Base Slab (Span 6) / Baûn ñaù y (Nhòp 6)
03E01A0330 Base Slab (Span 4) / Baûn ñaù y (Nhòp 4) 29/03/20 02/05/20 35 35 35 Base Slab (Span 4) / Baûn ñaù y (Nhòp 4)
03E01A0340 Base Slab (Span 2) / Baûn ñaù y (Nhòp 2) 05/04/20 09/05/20 35 35 35 Base Slab (Span 2) / Baûn ñaù y (Nhòp 2)
03E01A0350 Remove 2nd Strut, 1st walls & 3rd Strut installing (Span 9) / Dôõ thanh choán g 2, l 05/04/20 04/05/20 30 30 30 Remove 2nd Strut, 1st walls & 3rd Strut installing (Span 9) / Dôõ thanh choán g 2, laé p taám 1 vaø thanh choán g thöù 3
03E01A0360 Remove 2nd Strut, 1st walls & 3rd Strut installing (Span 7) / Dôõ thanh choán g 2, l 10/04/20 09/05/20 30 30 30 Remove 2nd Strut, 1st walls & 3rd Strut installing (Span 7) / Dôõ thanh choáng 2, laé p taám 1 vaø thanh choáng thöù 3
03E01A0370 Remove 2nd Strut, 1st walls & 3rd Strut installing (Span 5) / Dôõ thanh choán g 2, l 15/04/20 14/05/20 30 30 30 Remove 2nd Strut, 1st walls & 3rd Strut installing (Span 5) / Dôõ thanh choáng 2, laé p taám 1 vaø thanh choáng thöù 3
03E01A0380 Remove 2nd Strut, 1st walls & 3rd Strut installing (Span 3) / Dôõ thanh choán g 2, l 20/04/20 19/05/20 30 30 30 Remove 2nd Strut, 1st walls & 3rd Strut installing (Span 3) / Dôõ thanh choáng 2, laép taám 1 vaø thanh choáng thöù 3
03E01A0390 Remove 2nd Strut, 1st walls & 3rd Strut installing (Span 1) / Dôõ thanh choán g 2, l 25/04/20 24/05/20 30 30 30 Remove 2nd Strut, 1st walls & 3rd Strut installing (Span 1) / Dôõ thanh choán g 2, laé p taám 1 vaø thanh choán g thöù 3
03E01A0400 Remove 2nd Strut, 1st walls & 3rd Strut installing (Span 8) / Dôõ thanh choán g 2, l 30/04/20 29/05/20 30 30 30 Remove 2nd Strut, 1st walls & 3rd Strut installing (Span 8) / Dôõ thanh choán g 2, laé p taám 1 vaø thanh choán g thöù 3
03E01A0410 Remove 2nd Strut, 1st walls & 3rd Strut installing (Span 6) / Dôõ thanh choán g 2, l 05/05/20 03/06/20 30 30 30 Remove 2nd Strut, 1st walls & 3rd Strut installing (Span 6) / Dôõ thanh choán g 2, laé p taám 1 vaø thanh choáng thöù 3
03E01A0420 Remove 2nd Strut, 1st walls & 3rd Strut installing (Span 4) / Dôõ thanh choán g 2, l 10/05/20 08/06/20 30 30 30 Remove 2nd Strut, 1st walls & 3rd Strut installing (Span 4) / Dôõ thanh choáng 2, laé p taám 1 vaø thanh choáng thöù 3
03E01A0430 Remove 2nd Strut, 1st walls & 3rd Strut installing (Span 2) / Dôõ thanh choán g 2, l 15/05/20 13/06/20 30 30 30 Remove 2nd Strut, 1st walls & 3rd Strut installing (Span 2) / Dôõ thanh choáng 2, laé p taám 1 vaø thanh choáng thöù 3
HPLML3-UP- 25/01/19.03.E.1.1.1.4 Concourse Level / Taàn g trung chuyeå n 05/05/20 23/10/20 172 172 172 23/10/20, HPLML3-UP- 25/01/19.03.E.1.1.1.4 Concourse Level / Taàng trung chuyeån

03E01A0440 Concourse Slab (Span 9) / Taám baûn taà ng trung chuyeå n (nhòp 9) 05/05/20 03/07/20 60 60 60 Concourse Slab (Span 9) / Taám baûn taà ng trung chuyeå n (nhòp 9)
03E01A0450 Concourse Slab (Span 7) / Taám baûn taà ng trung chuyeå n (nhòp 7) 12/05/20 10/07/20 60 60 60 Concourse Slab (Span 7) / Taám baûn taà ng trung chuyeå n (nhòp 7)
03E01A0460 Concourse Slab (Span 5) / Taám baûn taà ng trung chuyeå n (nhòp 5) 19/05/20 17/07/20 60 60 60 Concourse Slab (Span 5) / Taám baûn taà ng trung chuyeå n (nhòp 5)
03E01A0470 Concourse Slab (Span 3) / Taám baûn taà ng trung chuyeå n (nhòp 3) 26/05/20 24/07/20 60 60 60 Concourse Slab (Span 3) / Taám baûn taà ng trung chuyeå n (nhòp 3)
03E01A0480 Concourse Slab (Span 1) / Taám baûn taà ng trung chuyeå n (nhòp 1) 02/06/20 31/07/20 60 60 60 Concourse Slab (Span 1) / Taám baûn taà ng trung chuyeå n (nhòp 1)
03E01A0490 Concourse Slab (Span 8) / Taám baûn taà ng trung chuyeå n (nhòp 8) 09/06/20 07/08/20 60 60 60 Concourse Slab (Span 8) / Taám baûn taà ng trung chuyeån (nhòp 8)
03E01A0500 Concourse Slab (Span 6) / Taám baûn taà ng trung chuyeå n (nhòp 6) 16/06/20 14/08/20 60 60 60 Concourse Slab (Span 6) / Taám baûn taà ng trung chuyeå n (nhòp 6)
03E01A0510 Concourse Slab (Span 4) / Taám baûn taà ng trung chuyeå n (nhòp 4) 23/06/20 21/08/20 60 60 60 Concourse Slab (Span 4) / Taám baûn taà ng trung chuyeå n (nhòp 4)
03E01A0520 Concourse Slab (Span 2) / Taám baûn taà ng trung chuyeå n (nhòp 2) 30/06/20 28/08/20 60 60 60 Concourse Slab (Span 2) / Taám baûn taà ng trung chuyeå n (nhòp 2)
03E01A0530 2nd Walls (Span 9) / Töôø n g thöù hai (Nhòp 9) 25/07/20 28/08/20 35 35 35 2nd Walls (Span 9) / Töôø ng thöù hai (Nhòp 9)
03E01A0540 2nd Walls (Span 7) / Töôø n g thöù hai (Nhòp 7) 01/08/20 04/09/20 35 35 35 2nd Walls (Span 7) / Töôø n g thöù hai (Nhòp 7)
03E01A0550 2nd Walls (Span 5) / Töôø n g thöù hai (Nhòp 5) 08/08/20 11/09/20 35 35 35 2nd Walls (Span 5) / Töôø n g thöù hai (Nhòp 5)
03E01A0560 2nd Walls (Span 3) / Töôø n g thöù hai (Nhòp 3) 15/08/20 18/09/20 35 35 35 2nd Walls (Span 3) / Töôø ng thöù hai (Nhòp 3)
03E01A0570 2nd Walls (Span 1) / Töôø n g thöù hai (Nhòp 1) 22/08/20 25/09/20 35 35 35 2nd Walls (Span 1) / Töôø ng thöù hai (Nhòp 1)
03E01A0580 2nd Walls (Span 8) / Töôø n g thöù hai (Nhòp 8) 29/08/20 02/10/20 35 35 35 2nd Walls (Span 8) / Töôø n g thöù hai (Nhòp 8)
03E01A0590 2nd Walls (Span 6) / Töôø n g thöù hai (Nhòp 6) 05/09/20 09/10/20 35 35 35 2nd Walls (Span 6) / Töôø n g thöù hai (Nhòp 6)
03E01A0600 2nd Walls (Span 4) / Töôø n g thöù hai (Nhòp 4) 12/09/20 16/10/20 35 35 35 2nd Walls (Span 4) / Töôø ng thöù hai (Nhòp 4)
03E01A0610 2nd Walls (Span 2) / Töôø n g thöù hai (Nhòp 2) 19/09/20 23/10/20 35 35 35 2nd Walls (Span 2) / Töôø ng thöù hai (Nhòp 2)
HPLML3-UP- 25/01/19.03.E.1.1.1.5 Platform Slab / Baûn Ke ga 22/02/22 12/05/22 80 80 80 12/05/22, HPLML3-UP- 25/01/19.03.E.1.1.1.5 Platform Slab / B

03E01A0620 Span 3 / Nhòp 3 22/02/22 02/04/22 40 40 40 Span 3 / Nhòp 3


03E01A0630 Span 2 / Nhòp 2 03/04/22 12/05/22 40 40 40 Span 2 / Nhòp 2
03E01A0640 Span 1 / Nhòp 1 14/03/22 22/04/22 40 40 40 Span 1 / Nhòp 1
HPLML3-UP- 25/01/19.03.E.1.1.2
2 Station Entrance & Ventilation / Loá i vaøo Ga & Heä thoán g th 02/05/19 28/02/21 669 669 669 28/02/21, HPLML3-UP- 25/01/19.03.E.1.1.2 Station Entrance & Ventilation / Loá i vaøo Ga & Heä thoáng t

HPLML3-UP- 25/01/19.03.E.1.1.2.1 South access to Station (Block 3) & Ventilation shaft (3,4, 02/05/19 19/01/21 629 629 629 19/01/21, HPLML3-UP- 25/01/19.03.E.1.1.2.1 South access to Station (Block 3) & Ventilation shaft (3,4,5

03E01A0650 Install Guide Wall at Staircase & Vent Duct / Laé p Töôø ng daãn, oáng thoân g gioù 02/05/19* 09/05/19 8 8 8 Install Guide Wall at Staircase & Vent Duct / Laé p Töôø ng daã n, oán g thoâng gioù
03E01A0660 Construction Diaphragm Wall at Staircase & Vent Duct. / Thi coâng töôøng vaâ y ôû h 10/05/19 08/06/19 30 30 30 Construction Diaphragm Wall at Staircase & Vent Duct. / Thi coâng töôøn g vaâ y ôû hoä p ga chính
03E01A0670 Excavation and Install Strut / Ñaø o vaø laép ñaë t thanh choá ng 24/10/20 06/11/20 14 14 14 Excavation and Install Strut / Ñaø o vaø laép ñaë t thanh choá ng
03E01A0680 South Access to the station (Block 3) - Base Slab / Loá i vaøo höôù n g Nam ñeán nhaø g 07/11/20 24/11/20 18 18 18 South Access to the station (Block 3) - Base Slab / Loá i vaøo höôù n g Nam ñeá n nhaø ga (Cuï m 3) - Baûn ñaù y
03E01A0690 South Access to the station (Block 3) - 1st Step Wall / Loái vaø o phía Nam ñeán nhaø 25/11/20 09/12/20 15 15 15 South Access to the station (Block 3) - 1st Step Wall / Loái vaø o phía Nam ñeán nhaø ga(Cuïm 3) - Töôø ng baäc thöù n
03E01A0700 South Access to station (Block 3)-2nd Step Wall & Top Slab / Loái vaø o(Nam) ñeán 10/12/20 19/01/21 41 41 41 South Access to station (Block 3)-2nd Step Wall & Top Slab / Loái vaø o(Nam) ñeán nhaø ga(Cuïm 3) Töôøng baäc

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 3 of 17
Project Baseline Critical Remaining Work summary
Actual Work Baseline Milestone Primary Baseline
CP03-WORKS PROGRAMME UPDATED HANOI PILOT LIGHT METRO LINE 03
SECTION NHON-HANOI RAILWAYS STATION
Cut-off Date: 25/01/19

Activity ID Activity Name Start Finish Original Remaining At 2017 2018 2019 2020 2021 2022 2023 2024
Duration Duration Completion
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
03E01A0710 Ventilation shaft (3, 4, 5 & 6) - Base Slab / Gieáng thoân g gioù (3, 4, 5 & 6) - Baûn ñ 07/11/20 24/11/20 18 18 18 Ventilation shaft (3, 4, 5 & 6) - Base Slab / Gieáng thoân g gioù (3, 4, 5 & 6) - Baûn ñaù y
03E01A0720 Ventilation shaft (3, 4, 5 & 6) - 1st Step Wall / Gieáng thoâ ng gioù (3, 4, 5 & 6) - Tö 25/11/20 09/12/20 15 15 15 Ventilation shaft (3, 4, 5 & 6) - 1st Step Wall / Gieáng thoâ ng gioù (3, 4, 5 & 6) - Töôø ng baäc thöù 1 & Baûn maët
03E01A0730 Ventilation shaft (3, 4, 5 & 6) - 2nd Step Wall & Top Slab / Gieáng thoâ ng gioù (3, 4 10/12/20 13/01/21 35 35 35 Ventilation shaft (3, 4, 5 & 6) - 2nd Step Wall & Top Slab / Gieán g thoâng gioù (3, 4, 5 & 6)-Töôøn g thöù 2 & Baû
HPLML3-UP- 25/01/19.03.E.1.1.2.2 Northwest access& emergency stair& Ventilation shaft ( 24/10/20 28/02/21 128 128 128 28/02/21, HPLML3-UP- 25/01/19.03.E.1.1.2.2 Northwest access& emergency stair& Ventilation shaft (

03E01A0740 Install Sheet pile / Thi coâ n g coï c cöø 24/10/20 31/10/20 8 8 8 Install Sheet pile / Thi coâ n g coï c cöø
03E01A0750 Excavation and Install Strut / Ñaø o vaø laép ñaë t thanh choá ng 01/11/20 08/11/20 8 8 8 Excavation and Install Strut / Ñaø o vaø laép ñaë t thanh choá ng
03E01A0760 Northwest access & emergency stair & Ventilation shaft (Block 1,2)-Base Slab/ 09/11/20 27/11/20 19 19 19 Northwest access & emergency stair & Ventilation shaft (Block 1,2)-Base Slab/ Loái Taâ y Baéc, t.hieå m & t.gioù- Baû
03E01A0770 Northwest access & emergency stair & Ventilation shaft (Block 1,2)-1st Step / L 28/11/20 12/12/20 15 15 15 Northwest access & emergency stair & Ventilation shaft (Block 1,2)-1st Step / Loái Taây Baé c, t.hieå m & t.gioù- Baä
03E01A0780 Northwest access & emergency stair & Ventilation shaft (Block 1,2) - 2nd Step / 13/12/20 24/01/21 43 43 43 Northwest access & emergency stair & Ventilation shaft (Block 1,2) - 2nd Step / Loái Taây Baé c, t.hieå m & t.g
03E01A0790 Northwest access & emergency stair & Ventilation shaft(Block 1,2)-Stair Slab/L 25/01/21 28/02/21 35 35 35 Northwest access & emergency stair & Ventilation shaft(Block 1,2)-Stair Slab/Loá i Taâ y Baéc & thoaù t hieå
03E01A0800 Northeast access & Ventilation shaft (Block 4) - Base Slab / Loá i Taâ y Baéc & Gieán 09/11/20 05/12/20 27 27 27 Northeast access & Ventilation shaft (Block 4) - Base Slab / Loá i Taâ y Baéc & Gieáng thoâng gioù (Cuïm 4) - Baû n ñaù y
03E01A0810 Northeast access & Ventilation shaft (Block 4) - 1st Step Wall / Loá i Taâ y Baéc & G 06/12/20 23/12/20 18 18 18 Northeast access & Ventilation shaft (Block 4) - 1st Step Wall / Loá i Taâ y Baéc & Gieáng th.gioù (Cuï m 4)-Töôø ng b
03E01A0820 Northeast access & Ventilation shaft (Block 4)-2nd Step Wall & Top Slab/Loá i Taâ 24/12/20 06/02/21 45 45 45 Northeast access & Ventilation shaft (Block 4)-2nd Step Wall & Top Slab/Loá i Taâ y Baéc & t.gioù -Töôø ng baäc
HPLML3-UP- 225/01/19.03.E.1.2 Station 10 / Nhaø Ga 10 11/07/18 A 21/06/22 1411 1226 1437 21/06/22, HPLML3-UP- 25/01/19.03.E.1.2 Station 10 / Nhaø G

HPLML3-UP- 25/01/19.03.E.1.2.1
2 Main Box / Hoä p Ga chính 11/07/18 A 21/06/22 1411 1226 1437 21/06/22, HPLML3-UP- 25/01/19.03.E.1.2.1 Main Box / Hoä p

HPLML3-UP- 25/01/19.03.E.1.2.1.1 Top Slab / Baûn ñænh 11/07/18 A 17/01/20 525 340 551 17/01/20, HPLML3-UP- 25/01/19.03.E.1.2.1.1 Top Slab / Baû n ñænh

HPLML3-UP- 25/01/19.03.E.1.2.1.1.1 North / Höôùn g Baé c


HPLML3-UP 11/07/18 A 29/06/19 323 138 349 29/06/19, HPLML3-UP- 25/01/19.03.E.1.2.1.1.1 North / Höôù ng Baéc

03E01B0010 Install Guide Wall at Main Box (North) / Laé p ñaët Töôøn g daã n höôùn g ôû hoäp ga chí 11/07/18 A 12/08/18 A 9 0 32 Install Guide Wall at Main Box (North) / Laé p ñaët Töôøng daã n höôùng ôû hoäp ga chính (höôùn g Baéc)
03E01B0020 Construction Diaphragm Wall at Main Box (North) / Thi coâng töôøn g vaâ y ôû hoä p g 11/10/18 A 27/01/19 A 16 0 108 Construction Diaphragm Wall at Main Box (North) / Thi coân g töôøn g vaâ y ôû hoä p ga chính (höôù ng Baéc)
03E01B0030 Install Sheet Pile (Center of the Road) / Thi coân g coï c cöø (Tim ñöôøng) 12/02/19* 27/02/19 16 16 16 Install Sheet Pile (Center of the Road) / Thi coân g coï c cöø (Tim ñöôøng)
03E01B0040 Excavation down to Intrados of Top Slab and water pumping / Ñaø o ñeá n cao ñoä m 28/02/19* 13/03/19 14 14 14 Excavation down to Intrados of Top Slab and water pumping / Ñaø o ñeá n cao ñoä maë t döôùi cuûa Baû n ñænh vaø bôm nöôù c
03E01B0050 Top Slab (Span 4) / Baû n ñænh (Nhòp 4) 14/03/19 12/04/19 30 30 30 Top Slab (Span 4) / Baû n ñænh (Nhòp 4)
03E01B0060 Top Slab (Span 5) / Baû n ñænh (Nhòp 5) 21/03/19 19/04/19 30 30 30 Top Slab (Span 5) / Baû n ñænh (Nhòp 5)
03E01B0070 Top Slab (Span 6) Slab Opening / Baû n ñænh (Nhòp 6) 28/03/19 26/04/19 30 30 30 Top Slab (Span 6) Slab Opening / Baû n ñænh (Nhòp 6)
03E01B0080 Top Slab (Span 7) / Baû n ñænh (Nhòp 7) 04/04/19 03/05/19 30 30 30 Top Slab (Span 7) / Baû n ñænh (Nhòp 7)
03E01B0090 Top Slab (Span 1) / Baû n ñænh (Nhòp 1) 11/04/19 10/05/19 30 30 30 Top Slab (Span 1) / Baû n ñænh (Nhòp 1)
03E01B0100 Top Slab (Span 3) / Baû n ñænh (Nhòp 3) 18/04/19 17/05/19 30 30 30 Top Slab (Span 3) / Baû n ñænh (Nhòp 3)
03E01B0110 Top Slab (Span 2) Slab Opening / Baû n ñænh (Nhòp 2) 25/04/19 24/05/19 30 30 30 Top Slab (Span 2) Slab Opening / Baû n ñænh (Nhòp 2)
03E01B0120 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 4) / Choáng thaám 04/05/19 23/05/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 4) / Choáng thaám , beâ toâng baûo veä vaø töôøn g taïm
03E01B0130 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 5) / Choáng thaám 07/05/19 26/05/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 5) / Choáng thaám , beâ toâng baûo veä vaø töôø n g taïm
03E01B0140 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 6) / Choáng thaám 10/05/19 29/05/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 6) / Choáng thaám , beâ toân g baûo veä vaø töôø n g taïm
03E01B0150 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 7) / Choáng thaám 13/05/19 01/06/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 7) / Choáng thaám , beâ toân g baûo veä vaø töôø n g taïm
03E01B0160 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 1) / Choáng thaám 16/05/19 04/06/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 1) / Choán g thaám , beâ toân g baûo veä vaø töôø ng taïm
03E01B0170 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 3) / Choáng thaám 19/05/19 07/06/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 3) / Choán g thaám , beâ toân g baûo veä vaø töôø ng taïm
03E01B0180 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 2) / Choáng thaám 25/05/19 13/06/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 2) / Choán g thaám , beâ toâng baûo veä vaø töôø ng taïm
03E01B0190 Backfill / Ñaép traû 05/06/19 29/06/19 25 25 25 Backfill / Ñaé p traû
HPLML3-UP- 25/01/19.03.E.1.2.1.1.2 South / Höôùng Nam
HPLML3-UP 14/08/19 17/01/20 157 157 157 17/01/20, HPLML3-UP- 25/01/19.03.E.1.2.1.1.2 South / Höôù ng Nam

03E01B0200 Traffic Diversion & Site Installation at the South of Station / Phaân laø n &ø laép ñaë t 14/08/19 18/08/19 5 5 5 Traffic Diversion & Site Installation at the South of Station / Phaân laø n &ø laép ñaë t coâ ng tröôøn g phía Nam nhaø Ga
03E01B0210 Install Guide Wall at Main Box / Laé p ñaët Töôøng daãn höôùng ôû hoäp ga chính 19/08/19 28/08/19 10 10 10 Install Guide Wall at Main Box / Laé p ñaët Töôøng daãn höôùng ôû hoäp ga chính
03E01B0220 Construction Diaphragm Wall at Main Box / Thi coân g töôøng vaây ôû hoäp ga chính 27/08/19 11/09/19 16 16 16 Construction Diaphragm Wall at Main Box / Thi coâng töôøn g vaây ôû hoä p ga chính
03E01B0230 Excavation down to Intrados of Top Slab(Opening) and water pumping / Ñaøo ñeá n 12/09/19 23/09/19 12 12 12 Excavation down to Intrados of Top Slab(Opening) and water pumping / Ñaøo ñeá n maët döôù i Baûn ñænh(môû ) & bôm nöôùc
03E01B0240 Removal of Sheet pile(Center of Road) / Thaù o dôõ coï c cöø (Tim ñöôøng) 24/09/19 01/10/19 8 8 8 Removal of Sheet pile(Center of Road) / Thaù o dôõ coï c cöø (Tim ñöôøng)
03E01B0250 Top Slab (Span 4) / Baû n ñænh (Nhòp 4) 02/10/19 31/10/19 30 30 30 Top Slab (Span 4) / Baû n ñænh (Nhòp 4)
03E01B0260 Top Slab (Span 5) / Baû n ñænh (Nhòp 5) 09/10/19 07/11/19 30 30 30 Top Slab (Span 5) / Baû n ñænh (Nhòp 5)
03E01B0270 Top Slab (Span 6) / Baû n ñænh (Nhòp 6) 16/10/19 14/11/19 30 30 30 Top Slab (Span 6) / Baûn ñænh (Nhòp 6)
03E01B0280 Top Slab (Span 7) / Baû n ñænh (Nhòp 7) 23/10/19 21/11/19 30 30 30 Top Slab (Span 7) / Baû n ñænh (Nhòp 7)
03E01B0290 Top Slab (Span 1) / Baû n ñænh (Nhòp 1) 30/10/19 28/11/19 30 30 30 Top Slab (Span 1) / Baû n ñænh (Nhòp 1)
03E01B0300 Top Slab (Span 3) / Baû n ñænh (Nhòp 3) 06/11/19 05/12/19 30 30 30 Top Slab (Span 3) / Baû n ñænh (Nhòp 3)

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 4 of 17
Project Baseline Critical Remaining Work summary
Actual Work Baseline Milestone Primary Baseline
CP03-WORKS PROGRAMME UPDATED HANOI PILOT LIGHT METRO LINE 03
SECTION NHON-HANOI RAILWAYS STATION
Cut-off Date: 25/01/19

Activity ID Activity Name Start Finish Original Remaining At 2017 2018 2019 2020 2021 2022 2023 2024
Duration Duration Completion
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
03E01B0310 Top Slab (Span 2) / Baû n ñænh (Nhòp 2) 13/11/19 12/12/19 30 30 30 Top Slab (Span 2) / Baû n ñænh (Nhòp 2)
03E01B0320 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 4) / Choáng thaám 22/11/19 11/12/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 4) / Choán g thaám , beâ toân g baûo veä vaø töôø ng taïm
03E01B0330 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 5) / Choáng thaám 25/11/19 14/12/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 5) / Choán g thaám , beâ toâng baûo veä vaø töôø ng taïm
03E01B0340 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 6) / Choáng thaám 28/11/19 17/12/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 6) / Choáng thaám , beâ toâng baûo veä vaø töôø ng taïm
03E01B0350 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 7) / Choáng thaám 01/12/19 20/12/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 7) / Choáng thaám , beâ toâng baûo veä vaø töôøn g taïm
03E01B0360 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 1) / Choáng thaám 04/12/19 23/12/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 1) / Choáng thaám , beâ toâng baûo veä vaø töôø n g taïm
03E01B0370 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 3) / Choáng thaám 07/12/19 26/12/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 3) / Choáng thaám , beâ toân g baûo veä vaø töôø n g taïm
03E01B0380 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 2) / Choáng thaám 13/12/19 01/01/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 2) / Choán g thaám , beâ toân g baûo veä vaø töôø n g taïm
03E01B0390 Backfill / Ñaép traû 24/12/19 17/01/20 25 25 25 Backfill / Ñaé p traû
HPLML3-UP- 25/01/19.03.E.1.2.1.2 Excavation & Strut / Coâ ng taù c ñaøo & Choáng 18/01/20 03/07/20 168 168 168 03/07/20, HPLML3-UP- 25/01/19.03.E.1.2.1.2 Excavation & Strut / Coâ ng taù c ñaøo & Choáng

03E01B0400 Excavation & Steel Strut Row No.1 / Coâ ng taù c ñaøo vaø laép ñaë t thanh choán g soá 1 18/01/20 06/04/20 80 80 80 Excavation & Steel Strut Row No.1 / Coâ ng taù c ñaøo vaø laép ñaë t thanh choá n g soá 1
03E01B0410 Excavation & Steel Strut Row No.2 / Coâ ng taù c ñaøo vaø laép ñaë t thanh choán g soá 2 07/04/20 11/06/20 66 66 66 Excavation & Steel Strut Row No.2 / Coâ ng taù c ñaøo vaø laép ñaët thanh choá ng soá 2
03E01B0420 Excavate to 0.2m below Extrados level of Base Slab / Ñaø o saâ u 0.2m phía döôùi ca 12/06/20 03/07/20 22 22 22 Excavate to 0.2m below Extrados level of Base Slab / Ñaø o saâ u 0.2m phía döôùi cao ñoä maët treâ n cuû a baû n ñaùy
HPLML3-UP- 25/01/19.03.E.1.2.1.3 Base Level / Taà ng ñaùy 04/07/20 13/03/22 618 618 618 13/03/22, HPLML3-UP- 25/01/19.03.E.1.2.1.3 Base Level / Taàn g ñaù y

03E01B0430 Base Slab (Span 4 / Step 1) / Baû n ñaùy (Nhòp 4 / Laàn 1) 04/07/20 28/07/20 25 25 25 Base Slab (Span 4 / Step 1) / Baû n ñaùy (Nhòp 4 / Laàn 1)
03E01B0440 Base Slab (Span 4 / Step 2) / Baû n ñaùy (Nhòp 4 / Laàn 2) 29/07/20 07/08/20 10 10 10 Base Slab (Span 4 / Step 2) / Baû n ñaùy (Nhòp 4 / Laàn 2)
03E01B0450 Base Slab (Span 5 / Step 1) / Baû n ñaùy (Nhòp 5 / Laàn 1) 11/07/20 04/08/20 25 25 25 Base Slab (Span 5 / Step 1) / Baû n ñaùy (Nhòp 5 / Laàn 1)
03E01B0460 Base Slab (Span 5 / Step 2) / Baû n ñaùy (Nhòp 5 / Laàn 2) 05/08/20 14/08/20 10 10 10 Base Slab (Span 5 / Step 2) / Baû n ñaùy (Nhòp 5 / Laàn 2)
03E01B0470 Base Slab (Span 3 / Step 1) / Baû n ñaùy (Nhòp 3 / Laàn 1) 18/07/20 11/08/20 25 25 25 Base Slab (Span 3 / Step 1) / Baû n ñaùy (Nhòp 3 / Laàn 1)
03E01B0480 Base Slab (Span 3 / Step 2) / Baû n ñaùy (Nhòp 3 / Laàn 2) 12/08/20 21/08/20 10 10 10 Base Slab (Span 3 / Step 2) / Baû n ñaùy (Nhòp 3 / Laàn 2)
03E01B0490 Base Slab (Span 7 / Step 1) / Baû n ñaùy (Nhòp 7 / Laàn 1) 25/07/20 13/08/20 20 20 20 Base Slab (Span 7 / Step 1) / Baû n ñaùy (Nhòp 7 / Laàn 1)
03E01B0500 Base Slab (Span 7 / Step 2) (After TBM Drive) / Baû n ñaùy (Nhòp 7 / Laàn 2) (Sau k 22/02/22 03/03/22 10 10 10 Base Slab (Span 7 / Step 2) (After TBM Drive) / Baû n ñaùy (Nhòp 7 / Laàn
03E01B0510 Base Slab (Span 7 / Step 3) (After TBM Drive) / Baû n ñaùy (Nhòp 7 / Laàn 3) (Sau k 04/03/22 13/03/22 10 10 10 Base Slab (Span 7 / Step 3) (After TBM Drive) / Baû n ñaùy (Nhòp 7 / Laà
03E01B0520 Base Slab (Span 1 / Step 1) / Baû n ñaùy (Nhòp 1 / Laàn 1) 01/08/20 20/08/20 20 20 20 Base Slab (Span 1 / Step 1) / Baû n ñaùy (Nhòp 1 / Laàn 1)
03E01B0530 Base Slab (Span 1 / Step 2) (After TBM Drive) / Baû n ñaùy (Nhòp 1 / Laàn 2) (Sau k 22/02/22 03/03/22 10 10 10 Base Slab (Span 1 / Step 2) (After TBM Drive) / Baû n ñaùy (Nhòp 1 / Laàn
03E01B0540 Base Slab (Span 1 / Step 3) (After TBM Drive) / Baû n ñaùy (Nhòp 1 / Laàn 3) (Sau k 04/03/22 13/03/22 10 10 10 Base Slab (Span 1 / Step 3) (After TBM Drive) / Baû n ñaùy (Nhòp 1 / Laà
03E01B0550 Base Slab (Span 6 / Step 1) / Baû n ñaùy (Nhòp 6 / Laàn 1) 08/08/20 01/09/20 25 25 25 Base Slab (Span 6 / Step 1) / Baûn ñaùy (Nhòp 6 / Laàn 1)
03E01B0560 Base Slab (Span 6 / Step 2) / Baû n ñaùy (Nhòp 6 / Laàn 2) 02/09/20 11/09/20 10 10 10 Base Slab (Span 6 / Step 2) / Baû n ñaùy (Nhòp 6 / Laàn 2)
03E01B0570 Base Slab (Span 2 / Step 1) / Baû n ñaùy (Nhòp 2 / Laàn 1) 15/08/20 08/09/20 25 25 25 Base Slab (Span 2 / Step 1) / Baû n ñaùy (Nhòp 2 / Laàn 1)
03E01B0580 Base Slab (Span 2 / Step 2) / Baû n ñaùy (Nhòp 2 / Laàn 2) 09/09/20 18/09/20 10 10 10 Base Slab (Span 2 / Step 2) / Baû n ñaùy (Nhòp 2 / Laàn 2)
03E01B0590 Removal of Strut No.2(Span3,4,5) / Thaù o dôõ thanh choá ng soá 2 (Nhòp 3, 4, 5) 19/09/20 23/09/20 5 5 5 Removal of Strut No.2(Span3,4,5) / Thaù o dôõ thanh choá ng soá 2 (Nhòp 3, 4, 5)
03E01B0600 Removal of Strut No.2(Span 2,6) / Thaùo dôõ thanh choá n g soá 2 (Nhòp 2, 6) 24/09/20 28/09/20 5 5 5 Removal of Strut No.2(Span 2,6) / Thaù o dôõ thanh choá n g soá 2 (Nhòp 2, 6)
03E01B0610 Removal of Strut No.2(Span 1,7) / Thaùo dôõ thanh choá n g soá 2 (Nhòp 1, 7) 29/09/20 03/10/20 5 5 5 Removal of Strut No.2(Span 1,7) / Thaù o dôõ thanh choá n g soá 2 (Nhòp 1, 7)
03E01B0620 1st Walls & 3rd Strut Installing (Span 4) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng 24/09/20 23/10/20 30 30 30 1st Walls & 3rd Strut Installing (Span 4) / Laé p ñaët töôøng thöù nhaát & thanh choá n g thöù 3 (Nhòp 4)
03E01B0630 1st Walls & 3rd Strut Installing (Span 5) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng 01/10/20 30/10/20 30 30 30 1st Walls & 3rd Strut Installing (Span 5) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng thöù 3 (Nhòp 5)
03E01B0640 1st Walls & 3rd Strut Installing (Span 3) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng 08/10/20 06/11/20 30 30 30 1st Walls & 3rd Strut Installing (Span 3) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng thöù 3 (Nhòp 3)
03E01B0650 1st Walls & 3rd Strut Installing (Span 6) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng 15/10/20 13/11/20 30 30 30 1st Walls & 3rd Strut Installing (Span 6) / Laé p ñaët töôø ng thöù nhaát & thanh choá n g thöù 3 (Nhòp 6)
03E01B0660 1st Walls & 3rd Strut Installing (Span 2) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng 22/10/20 20/11/20 30 30 30 1st Walls & 3rd Strut Installing (Span 2) / Laé p ñaët töôøng thöù nhaát & thanh choá n g thöù 3 (Nhòp 2)
03E01B0670 1st Walls & 3rd Strut Installing (Span 7) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng 29/10/20 27/11/20 30 30 30 1st Walls & 3rd Strut Installing (Span 7) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng thöù 3 (Nhòp 7)
03E01B0680 1st Walls & 3rd Strut Installing (Span 1) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng 29/10/20 27/11/20 30 30 30 1st Walls & 3rd Strut Installing (Span 1) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng thöù 3 (Nhòp 1)
HPLML3-UP- 25/01/19.03.E.1.2.1.4 Concourse Level / Taàn g trung chuyeå n 07/11/20 08/04/21 153 153 153 08/04/21, HPLML3-UP- 25/01/19.03.E.1.2.1.4 Concourse Level / Taàng trung chuyeån

03E01B0690 Concourse Slab (Span 1) / Taám baûn taà ng trung chuyeå n (nhòp 1) 07/11/20 31/12/20 55 55 55 Concourse Slab (Span 1) / Taám baûn taà ng trung chuyeå n (nhòp 1)
03E01B0700 Concourse Slab (Span 3) / Taám baûn taà ng trung chuyeå n (nhòp 3) 14/11/20 07/01/21 55 55 55 Concourse Slab (Span 3) / Taám baûn taà ng trung chuyeå n (nhòp 3)
03E01B0710 Concourse Slab (Span 2) / Taám baûn taà ng trung chuyeå n (nhòp 2) 21/11/20 14/01/21 55 55 55 Concourse Slab (Span 2) / Taám baûn taà ng trung chuyeån (nhòp 2)
03E01B0720 Concourse Slab (Span 4) / Taám baûn taà ng trung chuyeå n (nhòp 4) 28/11/20 21/01/21 55 55 55 Concourse Slab (Span 4) / Taám baûn taà ng trung chuyeå n (nhòp 4)
03E01B0730 Concourse Slab (Span 6) / Taám baûn taà ng trung chuyeå n (nhòp 6) 05/12/20 28/01/21 55 55 55 Concourse Slab (Span 6) / Taám baûn taà ng trung chuyeå n (nhòp 6)
03E01B0740 Concourse Slab (Span 5) / Taám baûn taà ng trung chuyeå n (nhòp 5) 12/12/20 04/02/21 55 55 55 Concourse Slab (Span 5) / Taám baûn taà ng trung chuyeå n (nhòp 5)
03E01B0750 Concourse Slab (Span 7) / Taám baûn taà ng trung chuyeå n (nhòp 7) 19/12/20 11/02/21 55 55 55 Concourse Slab (Span 7) / Taám baûn taà ng trung chuyeån (nhòp 7)

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 5 of 17
Project Baseline Critical Remaining Work summary
Actual Work Baseline Milestone Primary Baseline
CP03-WORKS PROGRAMME UPDATED HANOI PILOT LIGHT METRO LINE 03
SECTION NHON-HANOI RAILWAYS STATION
Cut-off Date: 25/01/19

Activity ID Activity Name Start Finish Original Remaining At 2017 2018 2019 2020 2021 2022 2023 2024
Duration Duration Completion
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
03E01B0760 2nd Walls (Span 1) / Töôø n g thöù hai (Nhòp 1) 22/01/21 25/02/21 35 35 35 2nd Walls (Span 1) / Töôø ng thöù hai (Nhòp 1)
03E01B0770 2nd Walls (Span 3) / Töôø n g thöù hai (Nhòp 3) 29/01/21 04/03/21 35 35 35 2nd Walls (Span 3) / Töôø ng thöù hai (Nhòp 3)
03E01B0780 2nd Walls (Span 2) / Töôø n g thöù hai (Nhòp 2) 05/02/21 11/03/21 35 35 35 2nd Walls (Span 2) / Töôø n g thöù hai (Nhòp 2)
03E01B0790 2nd Walls (Span 4) / Töôø n g thöù hai (Nhòp 4) 12/02/21 18/03/21 35 35 35 2nd Walls (Span 4) / Töôø ng thöù hai (Nhòp 4)
03E01B0800 2nd Walls (Span 6) / Töôø n g thöù hai (Nhòp 6) 19/02/21 25/03/21 35 35 35 2nd Walls (Span 6) / Töôø ng thöù hai (Nhòp 6)
03E01B0810 2nd Walls (Span 5) / Töôø n g thöù hai (Nhòp 5) 26/02/21 01/04/21 35 35 35 2nd Walls (Span 5) / Töôøn g thöù hai (Nhòp 5)
03E01B0820 2nd Walls (Span 7) / Töôø n g thöù hai (Nhòp 7) 05/03/21 08/04/21 35 35 35 2nd Walls (Span 7) / Töôø n g thöù hai (Nhòp 7)
HPLML3-UP- 25/01/19.03.E.1.2.1.5 Platform Slab / Baûn Ke ga 14/03/22 21/06/22 100 100 100 21/06/22, HPLML3-UP- 25/01/19.03.E.1.2.1.5 Platform Slab

03E01B0830 Span 3 / Nhòp 3 14/03/22 12/05/22 60 60 60 Span 3 / Nhòp 3


03E01B0840 Span 1 / Nhòp 1 03/04/22 01/06/22 60 60 60 Span 1 / Nhòp 1
03E01B0850 Span 2 / Nhòp 2 23/04/22 21/06/22 60 60 60 Span 2 / Nhòp 2
HPLML3-UP- 25/01/19.03.E.1.2.2
2 Station Entrance & Ventilation / Loá i vaøo Ga & Heä thoán g th 19/09/20 06/09/21 353 353 353 06/09/21, HPLML3-UP- 25/01/19.03.E.1.2.2 Station Entrance & Ventilation / Loá i vaøo

HPLML3-UP- 25/01/19.03.E.1.2.2.1 South access(3,4) & emergency stair(1) & Ventilation sha 19/09/20 28/01/21 132 132 132 28/01/21, HPLML3-UP- 25/01/19.03.E.1.2.2.1 South access(3,4) & emergency stair(1) & Ventilation shaf

03E01B0860 Install Guide Wall at South Access / Laép ñaë t Töôø ng daã n höôùn g ôû loái ñi phía Nam 19/09/20 26/09/20 8 8 8 Install Guide Wall at South Access / Laép ñaë t Töôø ng daã n höôùng ôû loái ñi phía Nam
03E01B0870 Construction Diaphragm Wall at South Access / Thi coâ ng töôø ng vaâ y taïi loãi ñi phí 27/09/20 13/10/20 17 17 17 Construction Diaphragm Wall at South Access / Thi coâ ng töôø ng vaâ y taïi loãi ñi phía Nam
03E01B0880 Excavation and Install Strut / Ñaø o vaø laép ñaë t thanh choá ng 14/10/20 31/10/20 18 18 18 Excavation and Install Strut / Ñaø o vaø laép ñaë t thanh choá ng
03E01B0890 South emergency stair (1) / Caàu thang thoaùt hieå m phía Nam (1) 01/11/20 20/12/20 50 50 50 South emergency stair (1) / Caàu thang thoaùt hieå m phía Nam (1)
03E01B0900 South Ventilation shaft (4 & 5) - 1st Step / Gieá ng thoâ ng gioù phía Nam (4,5) - Taá m 01/11/20 05/12/20 35 35 35 South Ventilation shaft (4 & 5) - 1st Step / Gieá ng thoâ n g gioù phía Nam (4,5) - Taá m baä c thang thöù nhaát
03E01B0910 South Ventilation shaft (4 & 5) - 2nd Step / Gieáng thoân g gioù phía Nam (4,5) - Taá 06/12/20 19/01/21 45 45 45 South Ventilation shaft (4 & 5) - 2nd Step / Gieáng thoân g gioù phía Nam (4,5) - Taám baäc thang thöù hai
03E01B0920 South Access (3 & 4) - Base Slab / Loái ñi phía Nam (3&4) - Baû n ñaùy 01/11/20 26/11/20 26 26 26 South Access (3 & 4) - Base Slab / Loái ñi phía Nam (3&4) - Baû n ñaùy
03E01B0930 South Access (3 & 4) - 1st Step Wall / Loá i ñi phía Nam (3&4) - Töôøn g baä c thöù nh 27/11/20 14/12/20 18 18 18 South Access (3 & 4) - 1st Step Wall / Loá i ñi phía Nam (3&4) - Töôøng baä c thöù nhaá t
03E01B0940 South Access (3 & 4) - 2nd Step Wall & Top Slab / Loá i ñi phía Nam (3&4) - Töôø 15/12/20 28/01/21 45 45 45 South Access (3 & 4) - 2nd Step Wall & Top Slab / Loái ñi phía Nam (3&4) - Töôø ng baä c & Baû n ñænh thöù 2
HPLML3-UP- 25/01/19.03.E.1.2.2.2 North access(1,2)& emergency stair(2)& Ventilation shaf 09/04/21 06/09/21 151 151 151 06/09/21, HPLML3-UP- 25/01/19.03.E.1.2.2.2 North access(1,2)& emergency stair(2)&

03E01B0950 Install Sheet pile / Thi coâ n g coï c cöø 09/04/21 24/04/21 16 16 16 Install Sheet pile / Thi coâ ng coï c cöø
03E01B0960 Excavation and Install Strut / Ñaø o vaø laép ñaë t thanh choá ng 25/04/21 11/05/21 17 17 17 Excavation and Install Strut / Ñaø o vaø laép ñaë t thanh choá ng
03E01B0970 Removal of Sheet pile / Thaù o dôõ coï c cöø 12/05/21 19/05/21 8 8 8 Removal of Sheet pile / Thaù o dôõ coï c cöø
03E01B0980 North emergency stair (2) / Caà u thang thoaùt hieå m phía Baéc (2) 20/05/21 08/07/21 50 50 50 North emergency stair (2) / Caàu thang thoaùt hieå m phía Baéc (2)
03E01B0990 North Ventilation shaft (1,2,3) - 1st Step / Gieán g thoâ ng gioù phía Baéc (1,2,3) - Taá m 20/05/21 08/07/21 50 50 50 North Ventilation shaft (1,2,3) - 1st Step / Gieáng thoâ ng gioù phía Baéc (1,2,3) - Taá m baäc thang
03E01B1000 North Ventilation shaft (1,2,3) - 2nd Step / Gieá n g thoân g gioù phía Baé c (1,2,3) - Taá 09/07/21 06/09/21 60 60 60 North Ventilation shaft (1,2,3) - 2nd Step / Gieá n g thoâng gioù phía Baé c (1,2,3) - Taá m baä c
03E01B1010 North Access (1 & 2) - Base Slab / Loái ñi phía Baéc (1&2) - Baûn maët 20/05/21 15/06/21 27 27 27 North Access (1 & 2) - Base Slab / Loái ñi phía Baéc (1&2) - Baûn maët
03E01B1020 North Access (1 & 2) - 1st Step Wall / Loái ñi phía Baéc (1&2) - Töôø ng baä c thöù nha 16/06/21 03/07/21 18 18 18 North Access (1 & 2) - 1st Step Wall / Loái ñi phía Baéc (1&2) - Töôø ng baä c thöù nhaát
03E01B1030 North Access (1 & 2) - 2nd Step Wall & Top Slab / Loái ñi phía Baéc (1&2) - Töôø n 04/07/21 17/08/21 45 45 45 North Access (1 & 2) - 2nd Step Wall & Top Slab / Loái ñi phía Baéc (1&2) - Töôø n g baäc &
HPLML3-UP- 225/01/19.03.E.1.3 Station 11 / Nhaø Ga 11 17/06/19 21/06/22 1101 1101 1101 21/06/22, HPLML3-UP- 25/01/19.03.E.1.3 Station 11 / Nhaø G

HPLML3-UP- 25/01/19.03.E.1.3.1
2 Main Box / Hoä p Ga chính 17/06/19 21/06/22 1101 1101 1101 21/06/22, HPLML3-UP- 25/01/19.03.E.1.3.1 Main Box / Hoä p

HPLML3-UP- 25/01/19.03.E.1.3.1.1 Top Slab / Baûn ñænh 17/06/19 08/06/20 358 358 358 08/06/20, HPLML3-UP- 25/01/19.03.E.1.3.1.1 Top Slab / Baû n ñænh

HPLML3-UP- 25/01/19.03.E.1.3.1.1.1 North / Höôùn g Baé c


HPLML3-UP 17/06/19 08/11/19 145 145 145 08/11/19, HPLML3-UP- 25/01/19.03.E.1.3.1.1.1 North / Höôù ng Baéc

03E01C0010 Install Guide Wall at Main Box (North) / Laé p ñaët Töôøn g daã n höôùn g ôû hoäp ga chí 17/06/19 25/06/19 9 9 9 Install Guide Wall at Main Box (North) / Laé p ñaët Töôøng daã n höôùng ôû hoäp ga chính (höôùn g Baéc)
03E01C0020 Construction Diaphragm Wall at Main Box (North) / Thi coâng töôøn g vaâ y ôû hoä p g 22/06/19 07/07/19 16 16 16 Construction Diaphragm Wall at Main Box (North) / Thi coâng töôøn g vaâ y ôû hoä p ga chính (höôù ng Baéc)
03E01C0030 Install Sheet Pile (Center of the Road) / Thi coân g coï c cöø (Tim ñöôøng) 08/07/19 23/07/19 16 16 16 Install Sheet Pile (Center of the Road) / Thi coâng coï c cöø (Tim ñöôøn g)
03E01C0040 Excavation down to Intrados of Top Slab and water pumping / Ñaø o ñeá n cao ñoä m 08/07/19 21/07/19 14 14 14 Excavation down to Intrados of Top Slab and water pumping / Ñaø o ñeá n cao ñoä maët döôù i cuû a Baû n ñænh vaø bôm nöôùc
03E01C0050 Top Slab (Span 1) / Baû n ñænh (Nhòp 1) 24/07/19 22/08/19 30 30 30 Top Slab (Span 1) / Baû n ñænh (Nhòp 1)
03E01C0060 Top Slab (Span 3) / Baû n ñænh (Nhòp 3) 31/07/19 29/08/19 30 30 30 Top Slab (Span 3) / Baû n ñænh (Nhòp 3)
03E01C0070 Top Slab (Span 5) / Baû n ñænh (Nhòp 5) 07/08/19 05/09/19 30 30 30 Top Slab (Span 5) / Baû n ñænh (Nhòp 5)
03E01C0080 Top Slab (Span 7) / Baû n ñænh (Nhòp 7) 14/08/19 12/09/19 30 30 30 Top Slab (Span 7) / Baû n ñænh (Nhòp 7)
03E01C0090 Top Slab (Span 2) Slab Opening / Baû n ñænh (Nhòp 2) 21/08/19 19/09/19 30 30 30 Top Slab (Span 2) Slab Opening / Baû n ñænh (Nhòp 2)
03E01C0100 Top Slab (Span 4) / Baû n ñænh (Nhòp 4) 28/08/19 26/09/19 30 30 30 Top Slab (Span 4) / Baû n ñænh (Nhòp 4)
03E01C0110 Top Slab (Span 6) Slab Opening / Baû n ñænh (Nhòp 6) 04/09/19 03/10/19 30 30 30 Top Slab (Span 6) Slab Opening / Baû n ñænh (Nhòp 6)
03E01C0120 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 1) / Choáng thaám 13/09/19 02/10/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 1) / Choáng thaám , beâ toâng baûo veä vaø töôøn g taïm

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 6 of 17
Project Baseline Critical Remaining Work summary
Actual Work Baseline Milestone Primary Baseline
CP03-WORKS PROGRAMME UPDATED HANOI PILOT LIGHT METRO LINE 03
SECTION NHON-HANOI RAILWAYS STATION
Cut-off Date: 25/01/19

Activity ID Activity Name Start Finish Original Remaining At 2017 2018 2019 2020 2021 2022 2023 2024
Duration Duration Completion
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
03E01C0130 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 3) / Choáng thaám 16/09/19 05/10/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 3) / Choáng thaám , beâ toâng baûo veä vaø töôø n g taïm
03E01C0140 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 5) / Choáng thaám 19/09/19 08/10/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 5) / Choáng thaám , beâ toân g baûo veä vaø töôø n g taïm
03E01C0150 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 7) / Choáng thaám 22/09/19 11/10/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 7) / Choáng thaám , beâ toân g baûo veä vaø töôø n g taïm
03E01C0160 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 2) / Choáng thaám 25/09/19 14/10/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 2) / Choán g thaám , beâ toân g baûo veä vaø töôø n g taïm
03E01C0170 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 4) / Choáng thaám 28/09/19 17/10/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 4) / Choán g thaám , beâ toân g baûo veä vaø töôø ng taïm
03E01C0180 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 6) / Choáng thaám 04/10/19 23/10/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 6) / Choán g thaám , beâ toâng baûo veä vaø töôø ng taïm
03E01C0190 Backfill / Ñaép traû 15/10/19 08/11/19 25 25 25 Backfill / Ñaé p traû
HPLML3-UP- 25/01/19.03.E.1.3.1.1.2 South / Höôùng Nam
HPLML3-UP 30/12/19 08/06/20 162 162 162 08/06/20, HPLML3-UP- 25/01/19.03.E.1.3.1.1.2 South / Höôù n g Nam

03E01C0200 Traffic Diversion & Site Installation at the South of Station / Phaân laø n & laé p ñaët 30/12/19 04/01/20 6 6 6 Traffic Diversion & Site Installation at the South of Station / Phaân laø n & laép ñaët coân g tröôø ng phía Nam nhaø Ga
03E01C0210 Install Guide Wall at Main Box(South) / Laép ñaët Töôøn g daãn höôù ng ôû hoäp ga chín 05/01/20 14/01/20 10 10 10 Install Guide Wall at Main Box(South) / Laé p ñaët Töôøn g daãn höôù ng ôû hoä p ga chính (höôùng Nam)
03E01C0220 Construction Diaphragm Wall at Main Box (South) / Thi coâng töôøn g vaâ y ôû hoä p g 13/01/20 28/01/20 16 16 16 Construction Diaphragm Wall at Main Box (South) / Thi coân g töôøng vaâ y ôû hoä p ga chính (höôùng Nam
03E01C0230 Excavation down to Intrados of Top Slab and water pumping / Ñaø o ñeá n cao ñoä m 29/01/20 11/02/20 14 14 14 Excavation down to Intrados of Top Slab and water pumping / Ñaø o ñeá n cao ñoä maë t döôùi cuûa Baû n ñænh vaø bôm nöôù c
03E01C0240 Removal of Sheet Pile (Center of the Road) / Thaù o dôõ coïc cöø (Tim ñöôø ng) 12/02/20 21/02/20 10 10 10 Removal of Sheet Pile (Center of the Road) / Thaù o dôõ coïc cöø (Tim ñöôø ng)
03E01C0250 Top Slab (Span 1) / Baû n ñænh (Nhòp 1) 22/02/20 22/03/20 30 30 30 Top Slab (Span 1) / Baû n ñænh (Nhòp 1)
03E01C0260 Top Slab (Span 3) / Baû n ñænh (Nhòp 3) 29/02/20 29/03/20 30 30 30 Top Slab (Span 3) / Baû n ñænh (Nhòp 3)
03E01C0270 Top Slab (Span 5) / Baû n ñænh (Nhòp 5) 07/03/20 05/04/20 30 30 30 Top Slab (Span 5) / Baû n ñænh (Nhòp 5)
03E01C0280 Top Slab (Span 7) / Baû n ñænh (Nhòp 7) 14/03/20 12/04/20 30 30 30 Top Slab (Span 7) / Baû n ñænh (Nhòp 7)
03E01C0290 Top Slab (Span 2) / Baû n ñænh (Nhòp 2) 21/03/20 19/04/20 30 30 30 Top Slab (Span 2) / Baû n ñænh (Nhòp 2)
03E01C0300 Top Slab (Span 4) / Baû n ñænh (Nhòp 4) 28/03/20 26/04/20 30 30 30 Top Slab (Span 4) / Baû n ñænh (Nhòp 4)
03E01C0310 Top Slab (Span 6) / Baû n ñænh (Nhòp 6) 04/04/20 03/05/20 30 30 30 Top Slab (Span 6) / Baû n ñænh (Nhòp 6)
03E01C0320 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 1) / Choáng thaám 13/04/20 02/05/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 1) / Choáng thaám , beâ toâng baûo veä vaø töôøn g taïm
03E01C0330 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 3) / Choáng thaám 16/04/20 05/05/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 3) / Choáng thaám , beâ toâng baûo veä vaø töôø n g taïm
03E01C0340 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 5) / Choáng thaám 19/04/20 08/05/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 5) / Choáng thaám , beâ toân g baûo veä vaø töôø n g taïm
03E01C0350 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 7) / Choáng thaám 22/04/20 11/05/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 7) / Choán g thaám , beâ toân g baûo veä vaø töôø n g taïm
03E01C0360 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 2) / Choáng thaám 25/04/20 14/05/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 2) / Choán g thaám , beâ toân g baûo veä vaø töôø ng taïm
03E01C0370 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 4) / Choáng thaám 28/04/20 17/05/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 4) / Choán g thaám , beâ toân g baûo veä vaø töôø ng taïm
03E01C0380 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 6) / Choáng thaám 04/05/20 23/05/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span 6) / Choán g thaám , beâ toâng baûo veä vaø töôø ng taïm
03E01C0390 Backfill / Ñaép traû 15/05/20 08/06/20 25 25 25 Backfill / Ñaé p traû
HPLML3-UP- 25/01/19.03.E.1.3.1.2 Excavation & Strut / Coâ ng taù c ñaøo & Choáng 30/07/20 11/01/21 166 166 166 11/01/21, HPLML3-UP- 25/01/19.03.E.1.3.1.2 Excavation & Strut / Coâ ng taù c ñaøo & Choán g

03E01C0400 Excavation & Steel Strut Row No.1 / Coâ ng taù c ñaøo vaø laép ñaë t thanh choán g soá 1 30/07/20 12/10/20 75 75 75 Excavation & Steel Strut Row No.1 / Coâ ng taù c ñaøo vaø laép ñaë t thanh choá n g soá 1
03E01C0410 Excavation & Steel Strut Row No.2 / Coâ ng taù c ñaøo vaø laép ñaë t thanh choán g soá 2 13/10/20 20/12/20 69 69 69 Excavation & Steel Strut Row No.2 / Coâ ng taù c ñaøo vaø laép ñaë t thanh choán g soá 2
03E01C0420 Excavate to 0.2m below Extrados level of Base Slab / Ñaø o saâ u 0.2m phía döôùi ca 21/12/20 11/01/21 22 22 22 Excavate to 0.2m below Extrados level of Base Slab / Ñaø o saâ u 0.2m phía döôùi cao ñoä maët treâ n cuû a baû n ñaùy
HPLML3-UP- 25/01/19.03.E.1.3.1.3 Base Level / Taà ng ñaùy 12/01/21 13/03/22 426 426 426 13/03/22, HPLML3-UP- 25/01/19.03.E.1.3.1.3 Base Level / Taàn g ñaù y

03E01C0430 Span 1 (Step 1) / Nhòp 1 (Laà n 1) 12/01/21 31/01/21 20 20 20 Span 1 (Step 1) / Nhòp 1 (Laà n 1)
03E01C0440 Span 1 (Step 2) (After TBM Drive) / Nhòp 1 (Laà n 2) (Sau khi TBM chaï y) 22/02/22 03/03/22 10 10 10 Span 1 (Step 2) (After TBM Drive) / Nhòp 1 (Laà n 2) (Sau khi TBM chaï
03E01C0450 Span 1 (Step 3) (After TBM Drive) / Nhòp 1 (Laà n 3) (Sau khi TBM chaï y) 04/03/22 13/03/22 10 10 10 Span 1 (Step 3) (After TBM Drive) / Nhòp 1 (Laà n 3) (Sau khi TBM cha
03E01C0460 Span 3 (Step 1) / Nhòp 3 (Laà n 1) 19/01/21 12/02/21 25 25 25 Span 3 (Step 1) / Nhòp 3 (Laà n 1)
03E01C0470 Span 3 (Step 2) / Nhòp 3 (Laà n 2) 13/02/21 22/02/21 10 10 10 Span 3 (Step 2) / Nhòp 3 (Laà n 2)
03E01C0480 Span 5 (Step 1) / Nhòp 5 (Laà n 1) 26/01/21 19/02/21 25 25 25 Span 5 (Step 1) / Nhòp 5 (Laà n 1)
03E01C0490 Span 5 (Step 2) / Nhòp 5 (Laà n 2) 20/02/21 01/03/21 10 10 10 Span 5 (Step 2) / Nhòp 5 (Laà n 2)
03E01C0500 Span 7 (Step 1) / Nhòp 7 (Laà n 1) 02/02/21 21/02/21 20 20 20 Span 7 (Step 1) / Nhòp 7 (Laà n 1)
03E01C0510 Span 7 (Step 2) (After TBM Drive) / Nhòp 7 (Laà n 2) (Sau khi TBM chaï y) 22/02/22 03/03/22 10 10 10 Span 7 (Step 2) (After TBM Drive) / Nhòp 7 (Laà n 2) (Sau khi TBM chaï
03E01C0520 Span 7 (Step 3) (After TBM Drive) / Nhòp 7 (Laà n 3) (Sau khi TBM chaï y) 04/03/22 13/03/22 10 10 10 Span 7 (Step 3) (After TBM Drive) / Nhòp 7 (Laà n 3) (Sau khi TBM cha
03E01C0530 Span 2 (Step 1) / Nhòp 2 (Laà n 1) 09/02/21 05/03/21 25 25 25 Span 2 (Step 1) / Nhòp 2 (Laà n 1)
03E01C0540 Span 2 (Step 2) / Nhòp 2 (Laà n 2) 06/03/21 15/03/21 10 10 10 Span 2 (Step 2) / Nhòp 2 (Laà n 2)
03E01C0550 Span 4 (Step 1) / Nhòp 4 (Laà n 1) 16/02/21 12/03/21 25 25 25 Span 4 (Step 1) / Nhòp 4 (Laà n 1)
03E01C0560 Span 4 (Step 2) / Nhòp 4 (Laà n 2) 13/03/21 22/03/21 10 10 10 Span 4 (Step 2) / Nhòp 4 (Laà n 2)
03E01C0570 Span 6 (Step 1) / Nhòp 6 (Laà n 1) 23/02/21 19/03/21 25 25 25 Span 6 (Step 1) / Nhòp 6 (Laà n 1)

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 7 of 17
Project Baseline Critical Remaining Work summary
Actual Work Baseline Milestone Primary Baseline
CP03-WORKS PROGRAMME UPDATED HANOI PILOT LIGHT METRO LINE 03
SECTION NHON-HANOI RAILWAYS STATION
Cut-off Date: 25/01/19

Activity ID Activity Name Start Finish Original Remaining At 2017 2018 2019 2020 2021 2022 2023 2024
Duration Duration Completion
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
03E01C0580 Span 6 (Step 2) / Nhòp 6 (Laà n 2) 20/03/21 29/03/21 10 10 10 Span 6 (Step 2) / Nhòp 6 (Laà n 2)
03E01C0590 Removal of Strut No.2(Span 1,2,3) / Thaù o dôõ thanh choán g soá 2 (Nhòp 1, 2, 3) 30/03/21 06/04/21 8 8 8 Removal of Strut No.2(Span 1,2,3) / Thaù o dôõ thanh choán g soá 2 (Nhòp 1, 2, 3)
03E01C0600 Removal of Strut No.2(Span 4,5) / Thaùo dôõ thanh choá n g soá 2 (Nhòp 4,5) 07/04/21 11/04/21 5 5 5 Removal of Strut No.2(Span 4,5) / Thaù o dôõ thanh choá ng soá 2 (Nhòp 4,5)
03E01C0610 Removal of Strut No.2(Span 6,7) / Thaùo dôõ thanh choá n g soá 2 (Nhòp 6,7) 12/04/21 16/04/21 5 5 5 Removal of Strut No.2(Span 6,7) / Thaù o dôõ thanh choá ng soá 2 (Nhòp 6,7)
03E01C0620 1st Walls & 3rd Strut Installing (Span 4) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng 17/04/21 16/05/21 30 30 30 1st Walls & 3rd Strut Installing (Span 4) / Laép ñaët töôø ng thöù nhaát & thanh choán g thöù 3 (Nhòp 4)
03E01C0630 1st Walls & 3rd Strut Installing (Span 2) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng 24/04/21 23/05/21 30 30 30 1st Walls & 3rd Strut Installing (Span 2) / Laé p ñaët töôøng thöù nhaát & thanh choá n g thöù 3 (Nhòp 2)
03E01C0640 1st Walls & 3rd Strut Installing (Span 6) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng 01/05/21 30/05/21 30 30 30 1st Walls & 3rd Strut Installing (Span 6) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng thöù 3 (Nhòp 6)
03E01C0650 1st Walls & 3rd Strut Installing (Span 3) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng 08/05/21 06/06/21 30 30 30 1st Walls & 3rd Strut Installing (Span 3) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng thöù 3 (Nhòp 3)
03E01C0660 1st Walls & 3rd Strut Installing (Span 5) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng 15/05/21 13/06/21 30 30 30 1st Walls & 3rd Strut Installing (Span 5) / Laép ñaët töôø ng thöù nhaát & thanh choán g thöù 3 (Nhòp 5)
03E01C0670 1st Walls & 3rd Strut Installing (Span 1) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng 22/05/21 20/06/21 30 30 30 1st Walls & 3rd Strut Installing (Span 1) / Laé p ñaët töôøng thöù nhaát & thanh choá n g thöù 3 (Nhòp 1
03E01C0680 1st Walls & 3rd Strut Installing (Span 7) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng 29/05/21 27/06/21 30 30 30 1st Walls & 3rd Strut Installing (Span 7) / Laé p ñaët töôø ng thöù nhaát & thanh choá ng thöù 3 (Nhòp
HPLML3-UP- 25/01/19.03.E.1.3.1.4 Concourse Level / Taàn g trung chuyeå n 07/06/21 06/11/21 153 153 153 06/11/21, HPLML3-UP- 25/01/19.03.E.1.3.1.4 Concourse Level / Taàng trung chu

03E01C0690 Concourse Slab (Span 4) / Taám baûn taà ng trung chuyeå n (nhòp 4) 07/06/21 31/07/21 55 55 55 Concourse Slab (Span 4) / Taám baûn taà ng trung chuyeå n (nhòp 4)
03E01C0700 Concourse Slab (Span 2) / Taám baûn taà ng trung chuyeå n (nhòp 2) 14/06/21 07/08/21 55 55 55 Concourse Slab (Span 2) / Taám baûn taà ng trung chuyeå n (nhòp 2)
03E01C0710 Concourse Slab (Span 6) / Taám baûn taà ng trung chuyeå n (nhòp 6) 21/06/21 14/08/21 55 55 55 Concourse Slab (Span 6) / Taám baûn taà ng trung chuyeån (nhòp 6)
03E01C0720 Concourse Slab (Span 3) / Taám baûn taà ng trung chuyeå n (nhòp 3) 28/06/21 21/08/21 55 55 55 Concourse Slab (Span 3) / Taám baûn taà ng trung chuyeå n (nhòp 3)
03E01C0730 Concourse Slab (Span 5) / Taám baûn taà ng trung chuyeå n (nhòp 5) 05/07/21 28/08/21 55 55 55 Concourse Slab (Span 5) / Taám baûn taà ng trung chuyeå n (nhòp 5)
03E01C0740 Concourse Slab (Span 1) / Taám baûn taà ng trung chuyeå n (nhòp 1) 12/07/21 04/09/21 55 55 55 Concourse Slab (Span 1) / Taám baûn taà ng trung chuyeå n (nhòp 1)
03E01C0750 Concourse Slab (Span 7) / Taám baûn taà ng trung chuyeå n (nhòp 7) 19/07/21 11/09/21 55 55 55 Concourse Slab (Span 7) / Taám baûn taà ng trung chuyeån (nhòp 7)
03E01C0760 2nd Walls (Span 4) / Töôø n g thöù hai (Nhòp 4) 22/08/21 25/09/21 35 35 35 2nd Walls (Span 4) / Töôø ng thöù hai (Nhòp 4)
03E01C0770 2nd Walls (Span 2) / Töôø n g thöù hai (Nhòp 2) 29/08/21 02/10/21 35 35 35 2nd Walls (Span 2) / Töôø ng thöù hai (Nhòp 2)
03E01C0780 2nd Walls (Span 6) / Töôø n g thöù hai (Nhòp 6) 05/09/21 09/10/21 35 35 35 2nd Walls (Span 6) / Töôø n g thöù hai (Nhòp 6)
03E01C0790 2nd Walls (Span 3) / Töôø n g thöù hai (Nhòp 3) 12/09/21 16/10/21 35 35 35 2nd Walls (Span 3) / Töôø ng thöù hai (Nhòp 3)
03E01C0800 2nd Walls (Span 5) / Töôø n g thöù hai (Nhòp 5) 19/09/21 23/10/21 35 35 35 2nd Walls (Span 5) / Töôø ng thöù hai (Nhòp 5)
03E01C0810 2nd Walls (Span 1) / Töôø n g thöù hai (Nhòp 1) 26/09/21 30/10/21 35 35 35 2nd Walls (Span 1) / Töôø ng thöù hai (Nhòp 1)
03E01C0820 2nd Walls (Span 7) / Töôø n g thöù hai (Nhòp 7) 03/10/21 06/11/21 35 35 35 2nd Walls (Span 7) / Töôø n g thöù hai (Nhòp 7)
HPLML3-UP- 25/01/19.03.E.1.3.1.5 Platform Slab / Baûn Ke ga 14/03/22 21/06/22 100 100 100 21/06/22, HPLML3-UP- 25/01/19.03.E.1.3.1.5 Platform Slab

03E01C0830 Span 3 / Nhòp 3 14/03/22 12/05/22 60 60 60 Span 3 / Nhòp 3


03E01C0840 Span 1 / Nhòp 1 03/04/22 01/06/22 60 60 60 Span 1 / Nhòp 1
03E01C0850 Span 2 / Nhòp 2 23/04/22 21/06/22 60 60 60 Span 2 / Nhòp 2
HPLML3-UP- 25/01/19.03.E.1.3.2
2 Station Entrance & Ventilation / Loã i vaøo nhaø Ga & Gieáng t 30/03/21 06/09/21 161 161 161 06/09/21, HPLML3-UP- 25/01/19.03.E.1.3.2 Station Entrance & Ventilation / Loãi vaø o

HPLML3-UP- 25/01/19.03.E.1.3.2.1 South access(2)& emergency stair(1,2)& Ventilation shaf 30/03/21 06/09/21 161 161 161 06/09/21, HPLML3-UP- 25/01/19.03.E.1.3.2.1 South access(2)& emergency stair(1,2)&

03E01C0860 Install Guide Wall at South Access / Laép ñaë t Töôø ng daã n höôùn g ôû loái ñi phía Nam 30/03/21 06/04/21 8 8 8 Install Guide Wall at South Access / Laép ñaë t Töôø ng daã n höôùn g ôû loái ñi phía Nam
03E01C0870 Construction Diaphragm Wall at South Access / Thi coâ ng töôø ng vaâ y taïi loãi ñi phí 07/04/21 06/05/21 30 30 30 Construction Diaphragm Wall at South Access / Thi coâ ng töôø ng vaâ y taïi loãi ñi phía Nam
03E01C0880 Excavation and Install Strut / Ñaø o vaø laép ñaë t thanh choá ng 07/05/21 24/05/21 18 18 18 Excavation and Install Strut / Ñaø o vaø laép ñaë t thanh choá ng
03E01C0890 South emergency stair (1,2) / Caàu thang thoaùt hieå m phía Nam (1,2) 19/06/21 07/08/21 50 50 50 South emergency stair (1,2) / Caàu thang thoaùt hieå m phía Nam (1,2)
03E01C0900 South Ventilation shaft (2,3,4,5,6) - Step1 / Gieá ngthoâ ng gioù phía Nam (2,3,4,5,6 19/06/21 18/07/21 30 30 30 South Ventilation shaft (2,3,4,5,6) - Step1 / Gieá ngthoâ ng gioù phía Nam (2,3,4,5,6) - Laà n 1
03E01C0910 South Ventilation shaft (2,3,4,5,6) - Step2 / Gieá ng thoâ ng gioù phía Nam (2,3,4,5,6 19/07/21 06/09/21 50 50 50 South Ventilation shaft (2,3,4,5,6) - Step2 / Gieá ng thoâ ng gioù phía Nam (2,3,4,5,6) - Laà n
03E01C0920 South Access (2) - Base Slab / Loá i ñi phía Nam (2) - Baû n ñaùy 25/05/21 18/06/21 25 25 25 South Access (2) - Base Slab / Loá i ñi phía Nam (2) - Baû n ñaùy
03E01C0930 South Access (2) - 1st Step Wall / Loái ñi phía Nam (2) - Töôøn g baäc thöù nhaát 19/06/21 05/07/21 17 17 17 South Access (2) - 1st Step Wall / Loái ñi phía Nam (2) - Töôøn g baäc thöù nhaát
03E01C0940 South Access (2) - 2nd Step Wall & Top Slab / Loãi ñi phía Nam (2) - Töôøng baäc v 06/07/21 14/08/21 40 40 40 South Access (2) - 2nd Step Wall & Top Slab / Loãi ñi phía Nam (2) - Töôøn g baäc vaø Baûn ñ
HPLML3-UP- 25/01/19.03.E.1.3.2.2 North access(1) & cooling tower & Ventilation shaft (1)/L 07/04/21 25/08/21 141 141 141 25/08/21, HPLML3-UP- 25/01/19.03.E.1.3.2.2 North access(1) & cooling tower & Vent

03E01C0950 Install Guide Wall at North Access / Laép ñaë t Töôø ng daã n höôùn g taïi loái ñi phía Baéc 07/04/21 14/04/21 8 8 8 Install Guide Wall at North Access / Laép ñaë t Töôø ng daãn höôùn g taïi loái ñi phía Baéc
03E01C0960 Construction Diaphragm Wall at North Access / Thi coâng töôø ng vaâ y taïi loái ñi höôù 15/04/21 07/05/21 23 23 23 Construction Diaphragm Wall at North Access / Thi coâng töôø ng vaâ y taïi loái ñi höôùn g Baéc
03E01C0970 Excavation and Install Strut / Ñaø o vaø laép ñaë t thanh choá ng 08/05/21 23/05/21 16 16 16 Excavation and Install Strut / Ñaø o vaø laép ñaë t thanh choá ng
03E01C0980 North Ventilation shaft (1) - Base Slab / Gieán g thoâng gioù phía Baéc (1) - Baûn ñaù y 24/05/21 09/06/21 17 17 17 North Ventilation shaft (1) - Base Slab / Gieáng thoân g gioù phía Baéc (1) - Baûn ñaù y
03E01C0990 North Ventilation shaft (1) - 1st Step Wall / Gieáng thoâ ng gioù phía Baéc (1) - Töôø n 10/06/21 26/06/21 17 17 17 North Ventilation shaft (1) - 1st Step Wall / Gieáng thoâ ng gioù phía Baéc (1) - Töôø n g baäc thöù nhaá
03E01C1000 North Ventilation shaft (1) - 2nd Step Wall & Top Slab / Gieán g thoâ ng gioù phía B 27/06/21 25/08/21 60 60 60 North Ventilation shaft (1) - 2nd Step Wall & Top Slab / Gieáng thoâ ng gioù phía Baéc (1)-T

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 8 of 17
Project Baseline Critical Remaining Work summary
Actual Work Baseline Milestone Primary Baseline
CP03-WORKS PROGRAMME UPDATED HANOI PILOT LIGHT METRO LINE 03
SECTION NHON-HANOI RAILWAYS STATION
Cut-off Date: 25/01/19

Activity ID Activity Name Start Finish Original Remaining At 2017 2018 2019 2020 2021 2022 2023 2024
Duration Duration Completion
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
03E01C1010 North Access (1) & Cooling Tower - Base Slab / Loái phía Baéc (1) & Thaùp laø m m 24/05/21 18/06/21 26 26 26 North Access (1) & Cooling Tower - Base Slab / Loái phía Baéc (1) & Thaùp laø m maùt - Baû n ñaùy
03E01C1020 North Access (1) & Cooling Tower - 1st Step Wall / Loái ñi phía Baéc (2) - Thaùp laø 19/06/21 06/07/21 18 18 18 North Access (1) & Cooling Tower - 1st Step Wall / Loái ñi phía Baéc (2) - Thaùp laø m maét - Taá
03E01C1030 North Access (1) & Cooling Tower - 2nd Step Wall & Top Slab/ Loái phía Baéc(1) 07/07/21 20/08/21 45 45 45 North Access (1) & Cooling Tower - 2nd Step Wall & Top Slab/ Loái phía Baéc(1)-Thaù p laø
HPLML3-UP- 225/01/19.03.E.1.4 Station 12 / Crossover & Garage / Nhaø Ga 12/Chuyeå n laøn & G 04/06/19 16/07/22 1139 1139 1139 16/07/22, HPLML3-UP- 25/01/19.03.E.1.4 Station 12 / Cro

HPLML3-UP- 25/01/19.03.E.1.4.1
2 Main Box and Crossover/Garage (Part 1)_Top slab only / H 04/06/19 16/07/22 1139 1139 1139 16/07/22, HPLML3-UP- 25/01/19.03.E.1.4.1 Main Box and

HPLML3-UP- 25/01/19.03.E.1.4.1.1 Top Slab / Baûn ñænh 04/06/19 01/09/20 456 456 456 01/09/20, HPLML3-UP- 25/01/19.03.E.1.4.1.1 Top Slab / Baû n ñænh

HPLML3-UP- 25/01/19.03.E.1.4.1.1.1 North / Höôùn g Baé c


HPLML3-UP 04/06/19 02/12/19 182 182 182 02/12/19, HPLML3-UP- 25/01/19.03.E.1.4.1.1.1 North / Höôùng Baéc

03E01D0010 Install Guide Wall at Main Box / Laé p ñaët Töôøng daãn höôùng ôû hoäp ga chính 04/06/19 16/06/19 13 13 13 Install Guide Wall at Main Box / Laé p ñaët Töôøn g daãn höôùng ôû hoäp ga chính
03E01D0020 Construction Diaphragm Wall at Main Box / Thi coân g töôøng vaây ôû hoäp ga chính 17/06/19 11/07/19 25 25 25 Construction Diaphragm Wall at Main Box / Thi coân g töôøn g vaây ôû hoä p ga chính
03E01D0030 Install Sheet pile(Center of Road) / Thi coâ ng coï c cöø (Tim ñöôøng) 12/07/19 11/08/19 31 31 31 Install Sheet pile(Center of Road) / Thi coâ ng coï c cöø (Tim ñöôøn g)
03E01D0040 Excavation down to the Intrados of the Top Slab and water pumping / Ñaøo ñeán m 12/08/19 05/09/19 25 25 25 Excavation down to the Intrados of the Top Slab and water pumping / Ñaøo ñeán maët döôù i Baûn ñænh &ø bôm nöôù c
03E01D0050 Top Slab (Span ST-6) / Baû n ñænh (Nhòp ST-6) 06/09/19 30/09/19 25 25 25 Top Slab (Span ST-6) / Baû n ñænh (Nhòp ST-6)
03E01D0060 Top Slab (Span ST-4) / Baû n ñænh (Nhòp ST-4) 13/09/19 07/10/19 25 25 25 Top Slab (Span ST-4) / Baû n ñænh (Nhòp ST-4)
03E01D0070 Top Slab (Span ST-2) / Baû n ñænh (Nhòp ST-2) 20/09/19 14/10/19 25 25 25 Top Slab (Span ST-2) / Baû n ñænh (Nhòp ST-2)
03E01D0080 Top Slab (Span ST-5) Slab Opening / Baû n ñænh (Nhòp ST-5) 27/09/19 21/10/19 25 25 25 Top Slab (Span ST-5) Slab Opening / Baû n ñænh (Nhòp ST-5)
03E01D0090 Top Slab (Span ST-3) / Baû n ñænh (Nhòp ST-3) 04/10/19 28/10/19 25 25 25 Top Slab (Span ST-3) / Baû n ñænh (Nhòp ST-3)
03E01D0100 Top Slab (Span ST-1) Slab Opening / Baû n ñænh (Nhòp ST-1) 11/10/19 04/11/19 25 25 25 Top Slab (Span ST-1) Slab Opening / Baû n ñænh (Nhòp ST-1)
03E01D0110 Top Slab (Span C/G-1) Slab Opening / Baûn ñænh (Nhòp C/G-1) 06/09/19 30/09/19 25 25 25 Top Slab (Span C/G-1) Slab Opening / Baûn ñænh (Nhòp C/G-1)
03E01D0120 Top Slab (Span C/G-3) / Baûn ñænh (Nhòp C/G-3) 13/09/19 07/10/19 25 25 25 Top Slab (Span C/G-3) / Baûn ñænh (Nhòp C/G-3)
03E01D0130 Top Slab (Span C/G-5) Slab Opening / Baûn ñænh (Nhòp C/G-5) 20/09/19 14/10/19 25 25 25 Top Slab (Span C/G-5) Slab Opening / Baûn ñænh (Nhòp C/G-5)
03E01D0140 Top Slab (Span C/G-2) / Baûn ñænh (Nhòp C/G-2) 27/09/19 21/10/19 25 25 25 Top Slab (Span C/G-2) / Baûn ñænh (Nhòp C/G-2)
03E01D0150 Top Slab (Span C/G-4) / Baûn ñænh (Nhòp C/G-4) 04/10/19 28/10/19 25 25 25 Top Slab (Span C/G-4) / Baûn ñænh (Nhòp C/G-4)
03E01D0160 Top Slab (Span C/G-6) / Baûn ñænh (Nhòp C/G-6) 11/10/19 04/11/19 25 25 25 Top Slab (Span C/G-6) / Baûn ñænh (Nhòp C/G-6)
03E01D0170 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-6) / Choán g t 15/10/19 03/11/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-6) / Choán g thaám, beâ toâng baûo veä vaø töôø ng taï m
03E01D0180 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-4) / Choán g t 18/10/19 06/11/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-4) / Choáng thaám, beâ toâng baûo veä vaø töôø ng taï m
03E01D0190 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-2) / Choán g t 21/10/19 09/11/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-2) / Choáng thaám, beâ toâng baûo veä vaø töôø ng taï m
03E01D0200 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-5) / Choán g t 24/10/19 12/11/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-5) / Choáng thaám, beâ toâng baûo veä vaø töôø ng taï m
03E01D0210 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-3) / Choán g t 27/10/19 15/11/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-3) / Choáng thaám, beâ toân g baûo veä vaø töôø ng taï m
03E01D0220 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-1) / Choán g t 30/10/19 18/11/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-1) / Choáng thaám, beâ toân g baûo veä vaø töôø ng taï m
03E01D0230 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-1) / Choá ng 08/10/19 27/10/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-1) / Choá ng thaá m, beâ toâ ng baû o veä vaø töôøn g taïm
03E01D0240 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-3) / Choá ng 11/10/19 30/10/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-3) / Choá ng thaá m, beâ toâ ng baû o veä vaø töôøn g taïm
03E01D0250 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-5) / Choá ng 14/10/19 02/11/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-5) / Choá ng thaá m, beâ toâ ng baû o veä vaø töôøn g taïm
03E01D0260 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-2) / Choá ng 17/10/19 05/11/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-2) / Choán g thaá m, beâ toâ ng baû o veä vaø töôøn g taïm
03E01D0270 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-4) / Choá ng 20/10/19 08/11/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-4) / Choán g thaá m, beâ toâ ng baû o veä vaø töôøn g taïm
03E01D0280 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-6) / Choá ng 23/10/19 11/11/19 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-6) / Choá n g thaá m, beâ toâ ng baû o veä vaø töôøng taïm
03E01D0290 Backfill / Ñaép traû 13/11/19 02/12/19 20 20 20 Backfill / Ñaé p traû
HPLML3-UP- 25/01/19.03.E.1.4.1.1.2 South / Höôùng Nam
HPLML3-UP 15/02/20 01/09/20 200 200 200 01/09/20, HPLML3-UP- 25/01/19.03.E.1.4.1.1.2 South / Höôù n g Nam

03E01D0300 Traffic Diversion & Site Installation at the South of Station / Phaân laø n & laé p ñaët 15/02/20 22/02/20 8 8 8 Traffic Diversion & Site Installation at the South of Station / Phaân laø n & laé p ñaët coân g tröôø ng phía Nam nhaø Ga
03E01D0310 Install Guide Wall at Main Box / Laé p ñaët Töôøng daãn höôùng ôû hoäp ga chính 23/02/20 08/03/20 15 15 15 Install Guide Wall at Main Box / Laé p ñaët Töôøn g daãn höôùng ôû hoäp ga chính
03E01D0320 Construction Diaphragm Wall at Main Box / Thi coân g töôøng vaây ôû hoäp ga chính 09/03/20 03/04/20 26 26 26 Construction Diaphragm Wall at Main Box / Thi coân g töôøn g vaây ôû hoä p ga chính
03E01D0330 Excavation down to Intrados of Top Slab(with Opening) and water pumping / Ñaø 04/04/20 24/04/20 21 21 21 Excavation down to Intrados of Top Slab(with Opening) and water pumping / Ñaø o ñeá n maë t döôùi b.maët (môû) &ø bôm nöôùc
03E01D0340 Removal of Sheet pile(Center of Road) / Thaù o coï c cöø (Tim ñöôøng) 25/04/20 08/05/20 14 14 14 Removal of Sheet pile(Center of Road) / Thaù o coï c cöø (Tim ñöôøng)
03E01D0350 Top Slab (Span ST-6) / Baû n ñænh (Nhòp ST-6) 09/05/20 02/06/20 25 25 25 Top Slab (Span ST-6) / Baû n ñænh (Nhòp ST-6)
03E01D0360 Top Slab (Span ST-4) / Baû n ñænh (Nhòp ST-4) 16/05/20 09/06/20 25 25 25 Top Slab (Span ST-4) / Baû n ñænh (Nhòp ST-4)
03E01D0370 Top Slab (Span ST-2) / Baû n ñænh (Nhòp ST-2) 23/05/20 16/06/20 25 25 25 Top Slab (Span ST-2) / Baû n ñænh (Nhòp ST-2)
03E01D0380 Top Slab (Span ST-5) / Baû n ñænh (Nhòp ST-5) 30/05/20 23/06/20 25 25 25 Top Slab (Span ST-5) / Baû n ñænh (Nhòp ST-5)
03E01D0390 Top Slab (Span ST-3) / Baû n ñænh (Nhòp ST-3) 06/06/20 30/06/20 25 25 25 Top Slab (Span ST-3) / Baû n ñænh (Nhòp ST-3)
03E01D0400 Top Slab (Span ST-1) / Baû n ñænh (Nhòp ST-1) 13/06/20 07/07/20 25 25 25 Top Slab (Span ST-1) / Baû n ñænh (Nhòp ST-1)

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 9 of 17
Project Baseline Critical Remaining Work summary
Actual Work Baseline Milestone Primary Baseline
CP03-WORKS PROGRAMME UPDATED HANOI PILOT LIGHT METRO LINE 03
SECTION NHON-HANOI RAILWAYS STATION
Cut-off Date: 25/01/19

Activity ID Activity Name Start Finish Original Remaining At 2017 2018 2019 2020 2021 2022 2023 2024
Duration Duration Completion
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
03E01D0410 Top Slab (Span C/G-1) / Baûn ñænh (Nhòp C/G-1) 09/05/20 02/06/20 25 25 25 Top Slab (Span C/G-1) / Baûn ñænh (Nhòp C/G-1)
03E01D0420 Top Slab (Span C/G-3) / Baûn ñænh (Nhòp C/G-3) 16/05/20 09/06/20 25 25 25 Top Slab (Span C/G-3) / Baûn ñænh (Nhòp C/G-3)
03E01D0430 Top Slab (Span C/G-5) / Baûn ñænh (Nhòp C/G-5) 23/05/20 16/06/20 25 25 25 Top Slab (Span C/G-5) / Baûn ñænh (Nhòp C/G-5)
03E01D0440 Top Slab (Span C/G-2) / Baûn ñænh (Nhòp C/G-2) 30/05/20 23/06/20 25 25 25 Top Slab (Span C/G-2) / Baûn ñænh (Nhòp C/G-2)
03E01D0450 Top Slab (Span C/G-4) / Baûn ñænh (Nhòp C/G-4) 06/06/20 30/06/20 25 25 25 Top Slab (Span C/G-4) / Baûn ñænh (Nhòp C/G-4)
03E01D0460 Top Slab (Span C/G-6) / Baûn ñænh (Nhòp C/G-6) 13/06/20 07/07/20 25 25 25 Top Slab (Span C/G-6) / Baûn ñænh (Nhòp C/G-6)
03E01D0470 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-6) / Choán g t 17/06/20 06/07/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-6) / Choáng thaám, beâ toâng baûo veä vaø töôøng taï m
03E01D0480 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-4) / Choán g t 20/06/20 09/07/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-4) / Choáng thaám, beâ toâng baûo veä vaø töôø ng taï m
03E01D0490 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-2) / Choán g t 23/06/20 12/07/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-2) / Choáng thaám, beâ toân g baûo veä vaø töôø ng taï m
03E01D0500 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-5) / Choán g t 26/06/20 15/07/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-5) / Choán g thaám, beâ toân g baûo veä vaø töôø ng taï m
03E01D0510 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-3) / Choán g t 29/06/20 18/07/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-3) / Choán g thaám, beâ toân g baûo veä vaø töôø ng taï m
03E01D0520 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-1) / Choán g t 02/07/20 21/07/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span ST-1) / Choán g thaám, beâ toâng baûo veä vaø töôø ng taï m
03E01D0530 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-1) / Choá ng 17/06/20 06/07/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-1) / Choá n g thaá m, beâ toâ ng baû o veä vaø töôøng taïm
03E01D0540 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-3) / Choá ng 20/06/20 09/07/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-3) / Choá n g thaá m, beâ toâ ng baû o veä vaø töôøng taïm
03E01D0550 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-5) / Choá ng 23/06/20 12/07/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-5) / Choá n g thaám, beâ toâ ng baû o veä vaø töôøng taïm
03E01D0560 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-2) / Choá ng 26/06/20 15/07/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-2) / Choá ng thaá m, beâ toâ ng baû o veä vaø töôøng taïm
03E01D0570 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-4) / Choá ng 29/06/20 18/07/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-4) / Choá ng thaá m, beâ toâ ng baû o veä vaø töôøng taïm
03E01D0580 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-6) / Choá ng 19/07/20 07/08/20 20 20 20 Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-6) / Choá n g thaá m, beâ toâ ng baû o veä vaø töôøng taïm
03E01D0590 Backfill / Ñaép traû 19/07/20 07/08/20 20 20 20 Backfill / Ñaé p traû
03E01D0600 Traffic Diversion / Phaâ n laøn giao thoân g 28/08/20 01/09/20 5 5 5 Traffic Diversion / Phaâ n laøn giao thoâng
HPLML3-UP- 25/01/19.03.E.1.4.1.2 Excavation & Strut / Coâ ng taù c ñaøo & Choáng 02/09/20 16/03/21 196 196 196 16/03/21, HPLML3-UP- 25/01/19.03.E.1.4.1.2 Excavation & Strut / Coâ ng taù c ñaøo & Choáng

03E01D0610 Excavation & Steel Strut Row No.1(Station) / Coân g taùc ñaøo vaø thanh choá ng ngan 02/09/20 27/10/20 56 56 56 Excavation & Steel Strut Row No.1(Station) / Coân g taùc ñaøo vaø thanh choá ng ngang thöù nhaá t (nhaø Ga)
03E01D0620 Excavation & Steel Strut Row No.2(Station) / Coân g taùc ñaøo vaø thanh choá ng ngan 28/10/20 20/12/20 54 54 54 Excavation & Steel Strut Row No.2(Station) / Coân g taùc ñaøo vaø thanh choá ng ngang thöù hai (nhaø Ga)
03E01D0630 Excavation & Steel Strut Row No.3(Station) / Coân g taùc ñaøo vaø thanh choá ng ngan 21/12/20 18/02/21 60 60 60 Excavation & Steel Strut Row No.3(Station) / Coâng taùc ñaøo vaø thanh choá ng ngang thöù ba (nhaø Ga)
03E01D0640 Excavate to 0.2m below Extrados level of Base Slab(Station) / Ñaø o 0.2m döôùi ca 19/02/21 16/03/21 26 26 26 Excavate to 0.2m below Extrados level of Base Slab(Station) / Ñaø o 0.2m döôùi cao ñoä maë t treâ n cuûa baûn
HPLML3-UP- 25/01/19.03.E.1.4.1.3 Station Base Level / Taà ng ñaùy nhaø Ga 17/03/21 17/05/22 427 427 427 17/05/22, HPLML3-UP- 25/01/19.03.E.1.4.1.3 Station Base Lev

03E01D0650 Span ST-1 (Step 1) / Nhòp ST-1 (Laàn 1) 17/03/21 10/04/21 25 25 25 Span ST-1 (Step 1) / Nhòp ST-1 (Laàn 1)
03E01D0660 Span ST-1 (Step 2) (After TBM Machine Dismantle) / Nhòp ST-1 (Laà n 2) (Sau kh 23/04/22 07/05/22 15 15 15 Span ST-1 (Step 2) (After TBM Machine Dismantle) / Nhòp ST-1
03E01D0670 Span ST-1 (Step 3) (After TBM Machine Dismantle) / Nhòp ST-1 (Laà n 3) (Sau kh 08/05/22 17/05/22 10 10 10 Span ST-1 (Step 3) (After TBM Machine Dismantle) / Nhòp ST-1
03E01D0680 Span ST-3 (Step 1) / Nhòp ST-3 (Laàn 1) 24/03/21 17/04/21 25 25 25 Span ST-3 (Step 1) / Nhòp ST-3 (Laàn 1)
03E01D0690 Span ST-3 (Step 2) / Nhòp ST-3 (Laàn 2) 18/04/21 02/05/21 15 15 15 Span ST-3 (Step 2) / Nhòp ST-3 (Laàn 2)
03E01D0700 Span ST-3 (Step 3) / Nhòp ST-3 (Laàn 3) 03/05/21 12/05/21 10 10 10 Span ST-3 (Step 3) / Nhòp ST-3 (Laàn 3)
03E01D0710 Span ST-5 (Step 1) / Nhòp ST-5 (Laàn 1) 24/03/21 17/04/21 25 25 25 Span ST-5 (Step 1) / Nhòp ST-5 (Laàn 1)
03E01D0720 Span ST-5 (Step 2) / Nhòp ST-5 (Laàn 2) 18/04/21 02/05/21 15 15 15 Span ST-5 (Step 2) / Nhòp ST-5 (Laàn 2)
03E01D0730 Span ST-5 (Step 3) / Nhòp ST-5 (Laàn 3) 03/05/21 12/05/21 10 10 10 Span ST-5 (Step 3) / Nhòp ST-5 (Laàn 3)
03E01D0740 Span ST-2 (Step 1) / Nhòp ST-2 (Laàn 1) 31/03/21 24/04/21 25 25 25 Span ST-2 (Step 1) / Nhòp ST-2 (Laàn 1)
03E01D0750 Span ST-2 (Step 2) / Nhòp ST-2 (Laàn 2) 25/04/21 09/05/21 15 15 15 Span ST-2 (Step 2) / Nhòp ST-2 (Laàn 2)
03E01D0760 Span ST-2 (Step 3) / Nhòp ST-2 (Laàn 3) 10/05/21 19/05/21 10 10 10 Span ST-2 (Step 3) / Nhòp ST-2 (Laàn 3)
03E01D0770 Span ST-4 (Step 1) / Nhòp ST-4 (Laàn 1) 07/04/21 01/05/21 25 25 25 Span ST-4 (Step 1) / Nhòp ST-4 (Laàn 1)
03E01D0780 Span ST-4 (Step 2) / Nhòp ST-4 (Laàn 2) 02/05/21 16/05/21 15 15 15 Span ST-4 (Step 2) / Nhòp ST-4 (Laàn 2)
03E01D0790 Span ST-4 (Step 3) / Nhòp ST-4 (Laàn 3) 17/05/21 26/05/21 10 10 10 Span ST-4 (Step 3) / Nhòp ST-4 (Laàn 3)
03E01D0800 Span ST-6 (Step 1) / Nhòp ST-6 (Laàn 1) 07/04/21 01/05/21 25 25 25 Span ST-6 (Step 1) / Nhòp ST-6 (Laàn 1)
03E01D0810 Span ST-6 (Step 2) / Nhòp ST-6 (Laàn 2) 02/05/21 16/05/21 15 15 15 Span ST-6 (Step 2) / Nhòp ST-6 (Laàn 2)
03E01D0820 Span ST-6 (Step 3) / Nhòp ST-6 (Laàn 3) 17/05/21 26/05/21 10 10 10 Span ST-6 (Step 3) / Nhòp ST-6 (Laàn 3)
03E01D0830 Removal of Strut No.3(Span ST-1, 3, 5) / Thaùo dôõ thanh choán g soá 3 (Nhòp ST-1, 27/05/21 10/06/21 15 15 15 Removal of Strut No.3(Span ST-1, 3, 5) / Thaùo dôõ thanh choáng soá 3 (Nhòp ST-1, 3, 5)
03E01D0840 Removal of Strut No.3(Span ST-2, 4, 6) / Thaùo dôõ thanh choán g soá 3 (Nhòp ST-2, 11/06/21 25/06/21 15 15 15 Removal of Strut No.3(Span ST-2, 4, 6) / Thaùo dôõ thanh choán g soá 3 (Nhòp ST-2, 4, 6)
03E01D0850 1st Wall (Span ST-Wall 1) / Töôøn g thöù nhaá t (Nhòp ST-Töôø n g 1) 26/06/21 30/07/21 35 35 35 1st Wall (Span ST-Wall 1) / Töôøng thöù nhaá t (Nhòp ST-Töôø ng 1)
03E01D0860 1st Wall (Span ST-Wall 3) / Töôøn g thöù nhaá t (Nhòp ST-Töôø n g 3) 03/07/21 06/08/21 35 35 35 1st Wall (Span ST-Wall 3) / Töôøng thöù nhaá t (Nhòp ST-Töôø ng 3)

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 10 of 17
Project Baseline Critical Remaining Work summary
Actual Work Baseline Milestone Primary Baseline
CP03-WORKS PROGRAMME UPDATED HANOI PILOT LIGHT METRO LINE 03
SECTION NHON-HANOI RAILWAYS STATION
Cut-off Date: 25/01/19

Activity ID Activity Name Start Finish Original Remaining At 2017 2018 2019 2020 2021 2022 2023 2024
Duration Duration Completion
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
03E01D0870 1st Wall (Span ST-Wall 5) / Töôøn g thöù nhaá t (Nhòp ST-Töôø n g 5) 10/07/21 13/08/21 35 35 35 1st Wall (Span ST-Wall 5) / Töôøn g thöù nhaá t (Nhòp ST-Töôø n g 5)
03E01D0880 1st Wall (Span ST-Wall 2) / Töôøn g thöù nhaá t (Nhòp ST-Töôø n g 2) 17/07/21 20/08/21 35 35 35 1st Wall (Span ST-Wall 2) / Töôøn g thöù nhaá t (Nhòp ST-Töôø ng 2)
03E01D0890 1st Wall (Span ST-Wall 4) / Töôøn g thöù nhaá t (Nhòp ST-Töôø n g 4) 24/07/21 27/08/21 35 35 35 1st Wall (Span ST-Wall 4) / Töôøng thöù nhaá t (Nhòp ST-Töôø ng 4)
03E01D0900 1st Wall (Span ST-Wall 6) / Töôøn g thöù nhaá t (Nhòp ST-Töôø n g 6) 31/07/21 03/09/21 35 35 35 1st Wall (Span ST-Wall 6) / Töôøng thöù nhaá t (Nhòp ST-Töôøn g 6)
HPLML3-UP- 25/01/19.03.E.1.4.1.4 Station Mezzanine Level / Taàn g löû ng nhaø ga 14/08/21 11/11/21 90 90 90 11/11/21, HPLML3-UP- 25/01/19.03.E.1.4.1.4 Station Mezzanine Level / Taà ng l

03E01D0910 Span ST-1 / Nhòp ST-1 14/08/21 07/10/21 55 55 55 Span ST-1 / Nhòp ST-1
03E01D0920 Span ST-3 / Nhòp ST-3 21/08/21 14/10/21 55 55 55 Span ST-3 / Nhòp ST-3
03E01D0930 Span ST-5 / Nhòp ST-5 28/08/21 21/10/21 55 55 55 Span ST-5 / Nhòp ST-5
03E01D0940 Span ST-2 / Nhòp ST-2 04/09/21 28/10/21 55 55 55 Span ST-2 / Nhòp ST-2
03E01D0950 Span ST-4 / Nhòp ST-4 11/09/21 04/11/21 55 55 55 Span ST-4 / Nhòp ST-4
03E01D0960 Span ST-6 / Nhòp ST-6 18/09/21 11/11/21 55 55 55 Span ST-6 / Nhòp ST-6
HPLML3-UP- 25/01/19.03.E.1.4.1.5 Station Concourse Level / Taà ng trung chuyeå n nhaø Ga 22/10/21 30/03/22 160 160 160 30/03/22, HPLML3-UP- 25/01/19.03.E.1.4.1.5 Station Concourse Le

03E01D0970 Concourse Slab & 2nd Walls, Removal of Strut Row No.1(Span ST-1) / Baû n taàng 22/10/21 30/12/21 70 70 70 Concourse Slab & 2nd Walls, Removal of Strut Row No.1(Span ST-1) / Baû n
03E01D0980 Concourse Slab & 2nd Walls, Removal of Strut Row No.1(Span ST-3) / Baû n taàng 01/11/21 09/01/22 70 70 70 Concourse Slab & 2nd Walls, Removal of Strut Row No.1(Span ST-3) / Baû n
03E01D0990 Concourse Slab & 2nd Walls, Removal of Strut Row No.1(Span ST-5) / Baû n taàng 11/11/21 19/01/22 70 70 70 Concourse Slab & 2nd Walls, Removal of Strut Row No.1(Span ST-5) / Baû
03E01D1000 Concourse Slab & 2nd Walls, Removal of Strut Row No.1(Span ST-2) / Baû n taàng 21/11/21 29/01/22 70 70 70 Concourse Slab & 2nd Walls, Removal of Strut Row No.1(Span ST-2) / Ba
03E01D1010 Concourse Slab & 2nd Walls, Removal of Strut Row No.1(Span ST-4) / Baû n taàng 01/12/21 08/02/22 70 70 70 Concourse Slab & 2nd Walls, Removal of Strut Row No.1(Span ST-4) / B
03E01D1020 Concourse Slab & 2nd Walls, Removal of Strut Row No.1(Span ST-6) / Baû n taàng 11/12/21 18/02/22 70 70 70 Concourse Slab & 2nd Walls, Removal of Strut Row No.1(Span ST-6) / B
03E01D1030 Station 3rd Walls (Span ST-1) / Töôø ng thöù ba nhaø ga (Nhòp ST-1) 20/01/22 23/02/22 35 35 35 Station 3rd Walls (Span ST-1) / Töôøng thöù ba nhaø ga (Nhòp ST-1)
03E01D1040 Station 3rd Walls (Span ST-3) / Töôø ng thöù ba nhaø ga (Nhòp ST-3) 27/01/22 02/03/22 35 35 35 Station 3rd Walls (Span ST-3) / Töôø ng thöù ba nhaø ga (Nhòp ST-3)
03E01D1050 Station 3rd Walls (Span ST-5) / Töôø ng thöù ba nhaø ga (Nhòp ST-5) 03/02/22 09/03/22 35 35 35 Station 3rd Walls (Span ST-5) / Töôø ng thöù ba nhaø ga (Nhòp ST-5)
03E01D1060 Station 3rd Walls (Span ST-2) / Töôø ng thöù ba nhaø ga (Nhòp ST-2) 10/02/22 16/03/22 35 35 35 Station 3rd Walls (Span ST-2) / Töôø ng thöù ba nhaø ga (Nhòp ST-2)
03E01D1070 Station 3rd Walls (Span ST-4) / Töôø ng thöù ba nhaø ga (Nhòp ST-4) 17/02/22 23/03/22 35 35 35 Station 3rd Walls (Span ST-4) / Töôøng thöù ba nhaø ga (Nhòp ST-4)
03E01D1080 Station 3rd Walls (Span ST-6) / Töôø ng thöù ba nhaø ga (Nhòp ST-6) 24/02/22 30/03/22 35 35 35 Station 3rd Walls (Span ST-6) / Töôø ng thöù ba nhaø ga (Nhòp ST-6)
HPLML3-UP- 25/01/19.03.E.1.4.1.6 Station Platform Slab / Taá m Ke ga nhaø Ga 22/02/22 16/07/22 145 145 145 16/07/22, HPLML3-UP- 25/01/19.03.E.1.4.1.6 Station Plat

03E01D1090 Span 2 / Nhòp 2 22/02/22 22/04/22 60 60 60 Span 2 / Nhòp 2


03E01D1100 Span 3 / Nhòp 3 14/03/22 12/05/22 60 60 60 Span 3 / Nhòp 3
03E01D1110 Span 1 / Nhòp 1 18/05/22 16/07/22 60 60 60 Span 1 / Nhòp 1
HPLML3-UP- 25/01/19.03.E.1.4.2
2 Crossover / Garage (Part 1)_Except Top slab/Chuyeån laø n/G 02/09/20 07/07/21 309 309 309 07/07/21, HPLML3-UP- 25/01/19.03.E.1.4.2 Crossover / Garage (Part 1)_Except Top slab/C

HPLML3-UP- 25/01/19.03.E.1.4.2.1 Concourse Level / Taàn g trung chuyeå n 02/09/20 03/12/20 93 93 93 03/12/20, HPLML3-UP- 25/01/19.03.E.1.4.2.1 Concourse Level / Taàn g trung chuyeån

03E01D1120 Excavation up to Concourse Slab / Ñaø o ñeán taá m baû n taàng trung chuyeå n 02/09/20 29/09/20 28 28 28 Excavation up to Concourse Slab / Ñaø o ñeán taá m baû n taàng trung chuyeå n
03E01D1130 Span C/G-1 / Nhòp C/G-1 30/09/20 29/10/20 30 30 30 Span C/G-1 / Nhòp C/G-1
03E01D1140 Span C/G-3 / Nhòp C/G-3 07/10/20 05/11/20 30 30 30 Span C/G-3 / Nhòp C/G-3
03E01D1150 Span C/G-5 / Nhòp C/G-5 14/10/20 12/11/20 30 30 30 Span C/G-5 / Nhòp C/G-5
03E01D1160 Span C/G-2 / Nhòp C/G-2 21/10/20 19/11/20 30 30 30 Span C/G-2 / Nhòp C/G-2
03E01D1170 Span C/G-4 / Nhòp C/G-4 28/10/20 26/11/20 30 30 30 Span C/G-4 / Nhòp C/G-4
03E01D1180 Span C/G-6 / Nhòp C/G-6 04/11/20 03/12/20 30 30 30 Span C/G-6 / Nhòp C/G-6
HPLML3-UP- 25/01/19.03.E.1.4.2.2 Mezzanine Level / Taàn g löû ng 04/12/20 28/02/21 87 87 87 28/02/21, HPLML3-UP- 25/01/19.03.E.1.4.2.2 Mezzanine Level / Taàng löû ng

03E01D1190 Excavation up to Mezzanine Slab / Ñaøo ñeá n baûn taà n g löûn g 04/12/20 25/12/20 22 22 22 Excavation up to Mezzanine Slab / Ñaøo ñeá n baûn taà n g löûng
03E01D1200 Span C/G-1 / Nhòp C/G-1 26/12/20 24/01/21 30 30 30 Span C/G-1 / Nhòp C/G-1
03E01D1210 Span C/G-3 / Nhòp C/G-3 02/01/21 31/01/21 30 30 30 Span C/G-3 / Nhòp C/G-3
03E01D1220 Span C/G-5 / Nhòp C/G-5 09/01/21 07/02/21 30 30 30 Span C/G-5 / Nhòp C/G-5
03E01D1230 Span C/G-2 / Nhòp C/G-2 16/01/21 14/02/21 30 30 30 Span C/G-2 / Nhòp C/G-2
03E01D1240 Span C/G-4 / Nhòp C/G-4 23/01/21 21/02/21 30 30 30 Span C/G-4 / Nhòp C/G-4
03E01D1250 Span C/G-6 / Nhòp C/G-6 30/01/21 28/02/21 30 30 30 Span C/G-6 / Nhòp C/G-6
HPLML3-UP- 25/01/19.03.E.1.4.2.3 Base Level / Taà ng ñaùy 01/03/21 07/07/21 129 129 129 07/07/21, HPLML3-UP- 25/01/19.03.E.1.4.2.3 Base Level / Taàng ñaù y

03E01D1260 Excavation up to 1st Strut / Ñaøo ñeán thanh choán g soá 1 01/03/21 16/03/21 16 16 16 Excavation up to 1st Strut / Ñaøo ñeán thanh choáng soá 1
03E01D1270 Steel Strut Row No.1 (Span C / G-1 ~ C / G-6) / Haø n g thanh choá ng baè ng theù p soá 17/03/21 31/03/21 15 15 15 Steel Strut Row No.1 (Span C / G-1 ~ C / G-6) / Haø ng thanh choá ng baè ng theù p soá 1 (Nhòp C / G-1 ~ Nh

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 11 of 17
Project Baseline Critical Remaining Work summary
Actual Work Baseline Milestone Primary Baseline
CP03-WORKS PROGRAMME UPDATED HANOI PILOT LIGHT METRO LINE 03
SECTION NHON-HANOI RAILWAYS STATION
Cut-off Date: 25/01/19

Activity ID Activity Name Start Finish Original Remaining At 2017 2018 2019 2020 2021 2022 2023 2024
Duration Duration Completion
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
03E01D1280 Excavate to 0.2m below Extrados level of Base Slab / Ñaø o saâ u 0.2m phía döôùi ca 01/04/21 18/04/21 18 18 18 Excavate to 0.2m below Extrados level of Base Slab / Ñaø o saâ u 0.2m phía döôùi cao ñoä maët treâ n cuû a
03E01D1290 Span C/G-1 / Nhòp C/G-1 19/04/21 28/05/21 40 40 40 Span C/G-1 / Nhòp C/G-1
03E01D1300 Span C/G-3 / Nhòp C/G-3 26/04/21 04/06/21 40 40 40 Span C/G-3 / Nhòp C/G-3
03E01D1310 Span C/G-5 / Nhòp C/G-5 03/05/21 11/06/21 40 40 40 Span C/G-5 / Nhòp C/G-5
03E01D1320 Span C/G-2 / Nhòp C/G-2 10/05/21 18/06/21 40 40 40 Span C/G-2 / Nhòp C/G-2
03E01D1330 Span C/G-4 / Nhòp C/G-4 17/05/21 25/06/21 40 40 40 Span C/G-4 / Nhòp C/G-4
03E01D1340 Span C/G-6 / Nhòp C/G-6 24/05/21 02/07/21 40 40 40 Span C/G-6 / Nhòp C/G-6
03E01D1350 Removal of Strut No.1 (Span C/G-1 ~ C/G-6) / Dôøi thanh choáng soá 1 (Nhòp C/G- 03/07/21 07/07/21 5 5 5 Removal of Strut No.1 (Span C/G-1 ~ C/G-6) / Dôøi thanh choáng soá 1 (Nhòp C/G-1 ~ Nhòp C/G
HPLML3-UP- 225/01/19.03.E.1.4.3 Crossover / Garage (Part 2) / Chuyeå n laøn / Gara(phaàn 2) 02/09/20 01/07/22 668 668 668 01/07/22, HPLML3-UP- 25/01/19.03.E.1.4.3 Crossover / Ga

HPLML3-UP- 25/01/19.03.E.1.4.3.1 Top Slab / Baûn ñænh 02/09/20 16/07/21 318 318 318 16/07/21, HPLML3-UP- 25/01/19.03.E.1.4.3.1 Top Slab / Baû n ñænh

HPLML3-UP- 25/01/19.03.E.1.4.3.1.1 South / Höôùng Nam


HPLML3-UP 02/09/20 31/01/21 152 152 152 31/01/21, HPLML3-UP- 25/01/19.03.E.1.4.3.1.1 South / Höôù n g Nam

03E01D1360 Site Installation / Laép ñaë t coâ ng tröôøng 02/09/20 13/09/20 12 12 12 Site Installation / Laép ñaë t coâ ng tröôøng
03E01D1370 Install Guide Wall at Main Box / Laé p ñaët Töôøng daãn höôùng ôû hoäp ga chính 14/09/20 21/09/20 8 8 8 Install Guide Wall at Main Box / Laé p ñaët Töôøng daãn höôùn g ôû hoäp ga chính
03E01D1380 Construction Diaphragm Wall at Main Box / Thi coân g töôøng vaây ôû hoäp ga chính 22/09/20 05/10/20 14 14 14 Construction Diaphragm Wall at Main Box / Thi coân g töôøn g vaây ôû hoä p ga chính
03E01D1390 Install Sheet pile(Center of Road) / Thi coâ ng coï c cöø (Tim ñöôøng) 06/10/20 20/10/20 15 15 15 Install Sheet pile(Center of Road) / Thi coâ n g coï c cöø (Tim ñöôøn g)
03E01D1400 Excavation down to the Intrados of Top Slab and water pumping / Ñaøo ñeá n cao ñ 21/10/20 03/11/20 14 14 14 Excavation down to the Intrados of Top Slab and water pumping / Ñaøo ñeá n cao ñoä maët döôù i cuû a Baû n ñænh & bôm n
03E01D1410 Top Slab (Span C/G-13) / Baû n ñænh (Nhòp C/G-13) 04/11/20 28/11/20 25 25 25 Top Slab (Span C/G-13) / Baû n ñænh (Nhòp C/G-13)
03E01D1420 Top Slab (Span C/G-11) / Baû n ñænh (Nhòp C/G-11) 11/11/20 05/12/20 25 25 25 Top Slab (Span C/G-11) / Baû n ñænh (Nhòp C/G-11)
03E01D1430 Top Slab (Span C/G-9) / Baûn ñænh (Nhòp C/G-9) 18/11/20 12/12/20 25 25 25 Top Slab (Span C/G-9) / Baûn ñænh (Nhòp C/G-9)
03E01D1440 Top Slab (Span C/G-7) / Baûn ñænh (Nhòp C/G-7) 25/11/20 19/12/20 25 25 25 Top Slab (Span C/G-7) / Baûn ñænh (Nhòp C/G-7)
03E01D1450 Top Slab (Span C/G-12) / Baû n ñænh (Nhòp C/G-12) 02/12/20 26/12/20 25 25 25 Top Slab (Span C/G-12) / Baû n ñænh (Nhòp C/G-12)
03E01D1460 Top Slab (Span C/G-10) / Baû n ñænh (Nhòp C/G-10) 09/12/20 02/01/21 25 25 25 Top Slab (Span C/G-10) / Baû n ñænh (Nhòp C/G-10)
03E01D1470 Top Slab (Span C/G-8) / Baûn ñænh (Nhòp C/G-8) 16/12/20 09/01/21 25 25 25 Top Slab (Span C/G-8) / Baûn ñænh (Nhòp C/G-8)
03E01D1480 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-13 13/12/20 01/01/21 20 20 20 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-13) / Choán g thaám, BT baû o veä
03E01D1490 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C / G-1 16/12/20 04/01/21 20 20 20 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C / G-11) / Choá ng thaá m, BT baûo veä
03E01D1500 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-9 19/12/20 07/01/21 20 20 20 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-9) / Choá n g thaá m, BT baûo veä &
03E01D1510 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-7 22/12/20 10/01/21 20 20 20 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall (Span C/G-7) / Choá n g thaám, BT baûo veä
03E01D1520 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-12 25/12/20 13/01/21 20 20 20 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-12) / Choáng thaám, BT baû o veä
03E01D1530 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-10 28/12/20 16/01/21 20 20 20 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-10) / Choáng thaám, BT baû o veä
03E01D1540 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-8) 31/12/20 19/01/21 20 20 20 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-8) / Choá ng thaám , BT baûo veä
03E01D1550 Top Slab Backfill & Compaction / Ñaé p traû vaø neùn chaë t Baûn ñænh 17/01/21 31/01/21 15 15 15 Top Slab Backfill & Compaction / Ñaép traû vaø neùn chaë t Baûn ñænh
HPLML3-UP- 25/01/19.03.E.1.4.3.1.2 North / Höôùn g Baé c
HPLML3-UP 21/02/21 16/07/21 146 146 146 16/07/21, HPLML3-UP- 25/01/19.03.E.1.4.3.1.2 North / Höôù ng Baéc

03E01D1560 Traffic Diversion & Site Installation at the North of Station / Phaân laø n & laép ñaë t 21/02/21 02/03/21 10 10 10 Traffic Diversion & Site Installation at the North of Station / Phaân laø n & laép ñaë t Coâ ng tröôø ng phía Baéc n
03E01D1570 Install Guide Wall at Main Box / Laé p ñaët Töôøng daãn höôùng ôû hoäp ga chính 03/03/21 11/03/21 9 9 9 Install Guide Wall at Main Box / Laé p ñaët Töôøng daãn höôùng ôû hoäp ga chính
03E01D1580 Construction Diaphragm Wall at Main Box / Thi coân g töôøng vaây ôû hoäp ga chính 12/03/21 26/03/21 15 15 15 Construction Diaphragm Wall at Main Box / Thi coâng töôøng vaây ôû hoä p ga chính
03E01D1590 Excavation down to the Intrados of the Top Slab(with Opening) and water pumpi 27/03/21 10/04/21 15 15 15 Excavation down to the Intrados of the Top Slab(with Opening) and water pumping / Ñaø o ñeán maët d
03E01D1600 Removal of Sheet pile(Center of Road) / Thaù o dôõ coïc cöø (Tim ñöôø ng) 11/04/21 18/04/21 8 8 8 Removal of Sheet pile(Center of Road) / Thaù o dôõ coïc cöø (Tim ñöôø ng)
03E01D1610 Top Slab (Span C/G-13) / Baû n ñænh (Nhòp C/G-13) 19/04/21 13/05/21 25 25 25 Top Slab (Span C/G-13) / Baû n ñænh (Nhòp C/G-13)
03E01D1620 Top Slab (Span C/G-11) / Baû n ñænh (Nhòp C/G-11) 26/04/21 20/05/21 25 25 25 Top Slab (Span C/G-11) / Baû n ñænh (Nhòp C/G-11)
03E01D1630 Top Slab (Span C/G-9) / Baûn ñænh (Nhòp C/G-9) 03/05/21 27/05/21 25 25 25 Top Slab (Span C/G-9) / Baûn ñænh (Nhòp C/G-9)
03E01D1640 Top Slab (Span C/G-7) / Baûn ñænh (Nhòp C/G-7) 10/05/21 03/06/21 25 25 25 Top Slab (Span C/G-7) / Baûn ñænh (Nhòp C/G-7)
03E01D1650 Top Slab (Span C/G-12) / Baû n ñænh (Nhòp C/G-12) 17/05/21 10/06/21 25 25 25 Top Slab (Span C/G-12) / Baû n ñænh (Nhòp C/G-12)
03E01D1660 Top Slab (Span C/G-10) / Baû n ñænh (Nhòp C/G-10) 24/05/21 17/06/21 25 25 25 Top Slab (Span C/G-10) / Baû n ñænh (Nhòp C/G-10)
03E01D1670 Top Slab (Span C/G-8) / Baûn ñænh (Nhòp C/G-8) 31/05/21 24/06/21 25 25 25 Top Slab (Span C/G-8) / Baûn ñænh (Nhòp C/G-8)
03E01D1680 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-13 28/05/21 16/06/21 20 20 20 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-13) / Choáng thaá
03E01D1690 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-11 31/05/21 19/06/21 20 20 20 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-11) / Choáng thaá
03E01D1700 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-9) 03/06/21 22/06/21 20 20 20 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-9) / Choá ng thaám
03E01D1710 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-7) 06/06/21 25/06/21 20 20 20 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-7) / Choá ng thaám

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 12 of 17
Project Baseline Critical Remaining Work summary
Actual Work Baseline Milestone Primary Baseline
CP03-WORKS PROGRAMME UPDATED HANOI PILOT LIGHT METRO LINE 03
SECTION NHON-HANOI RAILWAYS STATION
Cut-off Date: 25/01/19

Activity ID Activity Name Start Finish Original Remaining At 2017 2018 2019 2020 2021 2022 2023 2024
Duration Duration Completion
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
03E01D1720 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-12 09/06/21 28/06/21 20 20 20 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-12) / Choáng th
03E01D1730 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-10 12/06/21 01/07/21 20 20 20 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-10) / Choán g th
03E01D1740 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-8) 15/06/21 04/07/21 20 20 20 Top Slab Waterproofing, Protection Con'c & Temp. Retaining Wall(Span C/G-8) / Choá ng thaá
03E01D1750 Top Slab Backfill & Compaction / Ñaé p traû vaø neùn chaë t Baûn ñænh 02/07/21 16/07/21 15 15 15 Top Slab Backfill & Compaction / Ñaé p traû vaø neùn chaë t Baûn ñænh
HPLML3-UP- 25/01/19.03.E.1.4.3.2 Concourse Level / Taàn g trung chuyeå n 06/08/21 13/11/21 100 100 100 13/11/21, HPLML3-UP- 25/01/19.03.E.1.4.3.2 Concourse Level / Taàn g trung ch

03E01D1760 Excavation up to Concourse Slab / Ñaø o ñeán taá m baû n taàng trung chuyeå n 06/08/21 02/09/21 28 28 28 Excavation up to Concourse Slab / Ñaø o ñeán taá m baû n taàn g trung chuyeå n
03E01D1770 Span C/G-7 / Nhòp C/G-7 03/09/21 02/10/21 30 30 30 Span C/G-7 / Nhòp C/G-7
03E01D1780 Span C/G-9 / Nhòp C/G-9 10/09/21 09/10/21 30 30 30 Span C/G-9 / Nhòp C/G-9
03E01D1790 Span C/G-11 / Nhòp C/G-11 17/09/21 16/10/21 30 30 30 Span C/G-11 / Nhòp C/G-11
03E01D1800 Span C/G-13 / Nhòp C/G-13 24/09/21 23/10/21 30 30 30 Span C/G-13 / Nhòp C/G-13
03E01D1810 Span C/G-8 / Nhòp C/G-8 01/10/21 30/10/21 30 30 30 Span C/G-8 / Nhòp C/G-8
03E01D1820 Span C/G-10 / Nhòp C/G-10 08/10/21 06/11/21 30 30 30 Span C/G-10 / Nhòp C/G-10
03E01D1830 Span C/G-12 / Nhòp C/G-12 15/10/21 13/11/21 30 30 30 Span C/G-12 / Nhòp C/G-12
HPLML3-UP- 25/01/19.03.E.1.4.3.3 Mezzanine Level / Taàn g löû ng 14/11/21 15/02/22 94 94 94 15/02/22, HPLML3-UP- 25/01/19.03.E.1.4.3.3 Mezzanine Level / Taàn g

03E01D1840 Excavation up to Mezzanine Slab / Ñaøo ñeá n baûn taà n g löûn g 14/11/21 05/12/21 22 22 22 Excavation up to Mezzanine Slab / Ñaøo ñeá n baûn taà n g löûng
03E01D1850 Span C/G-7 / Nhòp C/G-7 06/12/21 04/01/22 30 30 30 Span C/G-7 / Nhòp C/G-7
03E01D1860 Span C/G-9 / Nhòp C/G-9 13/12/21 11/01/22 30 30 30 Span C/G-9 / Nhòp C/G-9
03E01D1870 Span C/G-11 / Nhòp C/G-11 20/12/21 18/01/22 30 30 30 Span C/G-11 / Nhòp C/G-11
03E01D1880 Span C/G-13 / Nhòp C/G-13 27/12/21 25/01/22 30 30 30 Span C/G-13 / Nhòp C/G-13
03E01D1890 Span C/G-8 / Nhòp C/G-8 03/01/22 01/02/22 30 30 30 Span C/G-8 / Nhòp C/G-8
03E01D1900 Span C/G-10 / Nhòp C/G-10 10/01/22 08/02/22 30 30 30 Span C/G-10 / Nhòp C/G-10
03E01D1910 Span C/G-12 / Nhòp C/G-12 17/01/22 15/02/22 30 30 30 Span C/G-12 / Nhòp C/G-12
HPLML3-UP- 25/01/19.03.E.1.4.3.4 Base Level / Taà ng ñaùy 16/02/22 01/07/22 136 136 136 01/07/22, HPLML3-UP- 25/01/19.03.E.1.4.3.4 Base Level /

03E01D1920 Excavation up to 1st Strut / Ñaøo ñeán thanh choán g soá 1 16/02/22 03/03/22 16 16 16 Excavation up to 1st Strut / Ñaøo ñeán thanh choáng soá 1
03E01D1930 Steel Strut Row No.1 (Span C/G-1 ~ C/G-6) / Haø ng thanh choáng baè ng theù p soá 1 ( 04/03/22 18/03/22 15 15 15 Steel Strut Row No.1 (Span C/G-1 ~ C/G-6) / Haø ng thanh choáng baè ng
03E01D1940 Excavate to 0.2m below Extrados level of Base Slab / Ñaø o saâ u 0.2m phía döôùi ca 19/03/22 05/04/22 18 18 18 Excavate to 0.2m below Extrados level of Base Slab / Ñaø o saâ u 0.2m
03E01D1950 Span C/G-7 / Nhòp C/G-7 06/04/22 15/05/22 40 40 40 Span C/G-7 / Nhòp C/G-7
03E01D1960 Span C/G-9 / Nhòp C/G-9 13/04/22 22/05/22 40 40 40 Span C/G-9 / Nhòp C/G-9
03E01D1970 Span C/G-11 / Nhòp C/G-11 20/04/22 29/05/22 40 40 40 Span C/G-11 / Nhòp C/G-11
03E01D1980 Span C/G-13 / Nhòp C/G-13 27/04/22 05/06/22 40 40 40 Span C/G-13 / Nhòp C/G-13
03E01D1990 Span C/G-8 / Nhòp C/G-8 04/05/22 12/06/22 40 40 40 Span C/G-8 / Nhòp C/G-8
03E01D2000 Span C/G-10 / Nhòp C/G-10 11/05/22 19/06/22 40 40 40 Span C/G-10 / Nhòp C/G-10
03E01D2010 Span C/G-12 / Nhòp C/G-12 18/05/22 26/06/22 40 40 40 Span C/G-12 / Nhòp C/G-12
03E01D2020 Removal of Strut No.1 (Span C/G-7 ~ C/G-13) / Dôø i thanh choán g soá 1 (Nhòp C/G 27/06/22 01/07/22 5 5 5 Removal of Strut No.1 (Span C/G-7 ~ C/G-13) / Dôø i thanh ch
HPLML3-UP- 25/01/19.03.E.1.4.4
2 Station Entrance & Emergency Stair & Ventilation/Loá i vaøo 27/05/21 06/11/21 164 164 164 06/11/21, HPLML3-UP- 25/01/19.03.E.1.4.4 Station Entrance & Emergency Stai

HPLML3-UP- 25/01/19.03.E.1.4.4.1 Station Entrance (1),(3),(5) / Loá i vaøo Ga (1), (3), (5) 27/05/21 18/09/21 115 115 115 18/09/21, HPLML3-UP- 25/01/19.03.E.1.4.4.1 Station Entrance (1),(3),(5) / Loá i vaøo G

03E01D2030 Install Sheet pile / Thi coâ n g coï c cöø 27/05/21 12/06/21 17 17 17 Install Sheet pile / Thi coâ ng coï c cöø
03E01D2040 Excavatation & Strut Installation / Ñaøo vaø laé p ñaët thanh choáng 13/06/21 23/06/21 11 11 11 Excavatation & Strut Installation / Ñaøo vaø laé p ñaët thanh choáng
03E01D2050 Leveling & Compaction, Lean Con'c and Water Proofing / San neàn vaø neùn chaët, 24/06/21 01/07/21 8 8 8 Leveling & Compaction, Lean Con'c and Water Proofing / San neàn vaø neùn chaët, beâ toâ ng loùt v
03E01D2060 Base Slab / Baûn ñaù y 02/07/21 17/07/21 16 16 16 Base Slab / Baûn ñaù y
03E01D2070 Wall / Töôøn g 18/07/21 08/08/21 22 22 22 Wall / Töôøng
03E01D2080 Stair & Top Slab / Caà u thang vaø Baû n ñænh 09/08/21 28/08/21 20 20 20 Stair & Top Slab / Caà u thang vaø Baû n ñænh
03E01D2090 Water Proofing & Backfill / Choán g thaám vaø Ñaé p traû 29/08/21 07/09/21 10 10 10 Water Proofing & Backfill / Choán g thaá m vaø Ñaé p traû
03E01D2100 Removal Sheet Pile / Thaù o dôõ coïc cöø 08/09/21 18/09/21 11 11 11 Removal Sheet Pile / Thaù o dôõ coïc cöø
HPLML3-UP- 25/01/19.03.E.1.4.4.2 Station Ventilation Shaft (4),(5),(6) / Gieán g thoâ ng gioù nhaø 13/06/21 03/10/21 113 113 113 03/10/21, HPLML3-UP- 25/01/19.03.E.1.4.4.2 Station Ventilation Shaft (4),(5),(6) /

03E01D2110 Install Guide Wall / Laép ñaë t Töôø ng daãn höôù ng 13/06/21 23/06/21 11 11 11 Install Guide Wall / Laép ñaë t Töôø n g daãn höôù ng
03E01D2120 Construction Diaphragm Wall / Thi coâ ng töôø ng vaây 24/06/21 10/07/21 17 17 17 Construction Diaphragm Wall / Thi coâ ng töôøn g vaây
03E01D2130 Excavation and Install Strut / Ñaø o vaø laép ñaë t thanh choá ng 11/07/21 03/08/21 24 24 24 Excavation and Install Strut / Ñaø o vaø laép ñaë t thanh choá ng

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 13 of 17
Project Baseline Critical Remaining Work summary
Actual Work Baseline Milestone Primary Baseline
CP03-WORKS PROGRAMME UPDATED HANOI PILOT LIGHT METRO LINE 03
SECTION NHON-HANOI RAILWAYS STATION
Cut-off Date: 25/01/19

Activity ID Activity Name Start Finish Original Remaining At 2017 2018 2019 2020 2021 2022 2023 2024
Duration Duration Completion
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
03E01D2140 Con'c Works & Removal Strut & Waterproofing / Coâng taù c beâ toâ ng, Dôøi thanh ch 04/08/21 22/09/21 50 50 50 Con'c Works & Removal Strut & Waterproofing / Coân g taù c beâ toâ ng, Dôøi thanh choáng
03E01D2150 Backfill & Compaction / Ñaé p traû vaø neùn chaë t 23/09/21 03/10/21 11 11 11 Backfill & Compaction / Ñaé p traû vaø neùn chaë t
HPLML3-UP- 25/01/19.03.E.1.4.4.3 Station Block(1)& Ventilation Shaft(2),(3)& Emergency S 24/06/21 06/11/21 136 136 136 06/11/21, HPLML3-UP- 25/01/19.03.E.1.4.4.3 Station Block(1)& Ventilation Sha

03E01D2160 Install Guide Wall / Laép ñaë t Töôø ng daãn höôù ng 24/06/21 09/07/21 16 16 16 Install Guide Wall / Laép ñaë t Töôøn g daãn höôù ng
03E01D2170 Construction Diaphragm Wall / Thi coâ ng töôø ng vaây 10/07/21 03/08/21 25 25 25 Construction Diaphragm Wall / Thi coâ ng töôø ng vaây
03E01D2180 Excavation and Install Strut / Ñaø o vaø laép ñaë t thanh choá ng 04/08/21 27/08/21 24 24 24 Excavation and Install Strut / Ñaø o vaø laép ñaë t thanh choá ng
03E01D2190 Con'c Works & Removal Strut & Waterproofing / Coâng taù c beâ toâ ng, Dôøi thanh ch 28/08/21 26/10/21 60 60 60 Con'c Works & Removal Strut & Waterproofing / Coâng taù c beâ toâ ng, Dôøi thanh choá
03E01D2200 Backfill & Compaction / Ñaé p traû vaø neùn chaë t 27/10/21 06/11/21 11 11 11 Backfill & Compaction / Ñaé p traû vaø neùn chaë t
HPLML3-UP- 25
25/01/19.03.E.2 Main Line / Tuyeán chính 24/07/17 A 25/08/22 1853 1272 1854 25/08/22, HPLML3-UP- 25/01/19.03.E.2 Main Line / T

HPLML3-UP- 225/01/19.03.E.2.5 Tunneling (Part B) / Coân g taùc ñaø o haàm (Phaàn B) 18/11/20 25/08/22 646 646 646 25/08/22, HPLML3-UP- 25/01/19.03.E.2.5 Tunneling (

HPLML3-UP- 25/01/19.03.E.2.5.1
2 TBM 1 / Maùy khoan haà m TBM soá 1 18/11/20 20/07/22 610 610 610 20/07/22, HPLML3-UP- 25/01/19.03.E.2.5.1 TBM 1 / Maùy

HPLML3-UP- 25/01/19.03.E.2.5.1.1 Tunneling / Coâ ng taù c ñaøo haàm 18/11/20 20/07/22 610 610 610 20/07/22, HPLML3-UP- 25/01/19.03.E.2.5.1.1 Tunneling /

03E02A0010 TBM Launching frame & assembly / Khung phoùn g maùy TBM vaø laép raùp TBM 18/11/20 15/02/21 90 90 90 TBM Launching frame & assembly / Khung phoùn g maùy TBM vaø laép raùp TBM
03E02A0020 Station 9 ~ Station 10 : Initial Drive(L=240m) / Nhaø ga 9 ~ Nhaø ga 10: Khoan ba 27/03/21 11/05/21 46 46 46 Station 9 ~ Station 10 : Initial Drive(L=240m) / Nhaø ga 9 ~ Nhaø ga 10: Khoan ban ñaàu (L=240m)
03E02A0030 Station 9 ~ Station 10 : Main Drive(L=1,105m) / Nhaø ga 9 ~ Nhaø ga 10: Khoan c 12/05/21 02/08/21 83 83 83 Station 9 ~ Station 10 : Main Drive(L=1,105m) / Nhaø ga 9 ~ Nhaø ga 10: Khoan chính (L=1
03E02A0040 TBM Translation into Station 10 and Restart(L=170m) / Dôø i TBM vaøo nhaø ga soá 03/08/21 26/08/21 24 24 24 TBM Translation into Station 10 and Restart(L=170m) / Dôø i TBM vaøo nhaø ga soá 10 vaø k
03E02A0050 Station 10 ~ Station 11 : Main Drive(L=699m) / Nhaø ga 10 ~ Nhaø ga 11: Khoan c 27/08/21 02/11/21 68 68 68 Station 10 ~ Station 11 : Main Drive(L=699m) / Nhaø ga 10 ~ Nhaø ga 11: Khoan ch
03E02A0060 TBM Translation into Station 11 and Restart(L=171m) / Dôø i TBM vaøo nhaø ga soá 03/11/21 26/11/21 24 24 24 TBM Translation into Station 11 and Restart(L=171m) / Dôø i TBM vaøo nhaø ga so
03E02A0070 Station 11 ~ Station 12 : Main Drive(L=536m) / Nhaø ga 11 ~ Nhaø ga 12: Khoan c 27/11/21 14/01/22 49 49 49 Station 11 ~ Station 12 : Main Drive(L=536m) / Nhaø ga 11 ~ Nhaø ga 12: Kh
03E02A0080 TBM No.1 Dismantling / Thaùo dôõ TBM soá 1 15/01/22 15/03/22 60 60 60 TBM No.1 Dismantling / Thaùo dôõ TBM soá 1
03E02A0090 Invert Concrete & Finishing / Beâ toâ ng voõn g & Hoaøn thieä n 20/05/22 20/07/22 62 62 62 Invert Concrete & Finishing / Beâ toâ ng voõng & Hoaøn thieä n
03E02A0100 Cross Passage CP ES1 / Ñöôø ng noái hai haà m CP ES1 16/03/22 14/05/22 60 60 60 Cross Passage CP ES1 / Ñöôø ng noái hai haà m CP ES1
HPLML3-UP- 25/01/19.03.E.2.5.1.2 Lower Point - Sumps / Ñieåm döôù i - Gieáng ngaàm 16/03/22 19/05/22 65 65 65 19/05/22, HPLML3-UP- 25/01/19.03.E.2.5.1.2 Lower Point - Su

03E02A0110 Sump Tunnel No.1 between Station 9 & 10 / Beå ngaàm soá 1 giöõ a nhaø ga soá 9 & 10 30/04/22 19/05/22 20 20 20 Sump Tunnel No.1 between Station 9 & 10 / Beå ngaàm soá 1 giöõ a
03E02A0120 Sump Tunnel No.1 between Station 10 & 11 / Beå ngaà m soá 1 giöõ a nhaø ga soá 10 & 10/04/22 29/04/22 20 20 20 Sump Tunnel No.1 between Station 10 & 11 / Beå ngaà m soá 1 giöõ a
03E02A0130 Sump Tunnel No.1 between Station 11 & 12 / Beå ngaà m soá 1 giöõ a nhaø ga soá 11 & 16/03/22 09/04/22 25 25 25 Sump Tunnel No.1 between Station 11 & 12 / Beå ngaà m soá 1 giöõ a nh
HPLML3-UP- 25/01/19.03.E.2.5.2
2 TBM 2 / Maùy khoan haà m TBM soá 2 16/02/21 25/08/22 556 556 556 25/08/22, HPLML3-UP- 25/01/19.03.E.2.5.2 TBM 2 / M

HPLML3-UP- 25/01/19.03.E.2.5.2.1 Tunneling / Coâ ng taù c ñaøo haàm 16/02/21 25/08/22 556 556 556 25/08/22, HPLML3-UP- 25/01/19.03.E.2.5.2.1 Tunneli

03E02A0140 TBM Launching frame & assembly / Khung phoùn g maùy TBM vaø laép raùp TBM 16/02/21 16/05/21 90 90 90 TBM Launching frame & assembly / Khung phoùng maùy TBM vaø laép raùp TBM
03E02A0150 Station 9 ~ Station 10 : Initial Drive(L=240m) / Nhaø ga 9 ~ Nhaø ga 10: Khoan ba 17/05/21 01/07/21 46 46 46 Station 9 ~ Station 10 : Initial Drive(L=240m) / Nhaø ga 9 ~ Nhaø ga 10: Khoan ban ñaàu (L=24
03E02A0160 Station 9 ~ Station 10 : Main Drive(L=1,105m) / Nhaø ga 9 ~ Nhaø ga 10: Khoan c 02/07/21 22/09/21 83 83 83 Station 9 ~ Station 10 : Main Drive(L=1,105m) / Nhaø ga 9 ~ Nhaø ga 10: Khoan chính
03E02A0170 TBM Translation into Station 10 and Restart(L=170m) / Dôø i TBM vaøo nhaø ga soá 23/09/21 16/10/21 24 24 24 TBM Translation into Station 10 and Restart(L=170m) / Dôøi TBM vaøo nhaø ga soá 10
03E02A0180 Station 10 ~ Station 11 : Main Drive(L=699m) / Nhaø ga 10 ~ Nhaø ga 11: Khoan c 17/10/21 10/12/21 55 55 55 Station 10 ~ Station 11 : Main Drive(L=699m) / Nhaø ga 10 ~ Nhaø ga 11: Khoa
03E02A0190 TBM Translation into Station 11 and Restart(L=171m) / Dôø i TBM vaøo nhaø ga soá 11/12/21 03/01/22 24 24 24 TBM Translation into Station 11 and Restart(L=171m) / Dôøi TBM vaøo nhaø g
03E02A0200 Station 11 ~ Station 12 : Main Drive(L=536m) / Nhaø ga 11 ~ Nhaø ga 12: Khoan c 04/01/22 21/02/22 49 49 49 Station 11 ~ Station 12 : Main Drive(L=536m) / Nhaø ga 11 ~ Nhaø ga 12:
03E02A0210 TBM No.2 Dismantling / Thaùo dôõ TBM soá 2 22/02/22 22/04/22 60 60 60 TBM No.2 Dismantling / Thaùo dôõ TBM soá 2
03E02A0220 Invert Concrete & Finishing / Beâ toâ ng voõn g & Hoaøn thieä n 27/06/22 25/08/22 60 60 60 Invert Concrete & Finishing / Beâ toâ ng voõn g & Hoaøn thi
03E02A0230 Cross Passage CP ES1 / Ñöôø ng noái hai haà m CP ES1 23/04/22 21/06/22 60 60 60 Cross Passage CP ES1 / Ñöôø ng noái hai haàm CP ES1
HPLML3-UP- 25/01/19.03.E.2.5.2.2 Lower Point - Sumps / Ñieåm döôù i - Gieáng ngaàm 23/04/22 26/06/22 65 65 65 26/06/22, HPLML3-UP- 25/01/19.03.E.2.5.2.2 Lower Point -

03E02A0240 Sump Tunnel No.2 between Station 9 & 10 / Beå ngaàm soá 2 giöõ a nhaø ga soá 9 & 10 07/06/22 26/06/22 20 20 20 Sump Tunnel No.2 between Station 9 & 10 / Beå ngaàm soá 2 g
03E02A0250 Sump Tunnel No.2 between Station 10 & 11 / Beå ngaà m soá 2 giöõ a nhaø ga soá 10 & 18/05/22 06/06/22 20 20 20 Sump Tunnel No.2 between Station 10 & 11 / Beå ngaà m soá 2 gi
03E02A0260 Sump Tunnel No.2 between Station 11 & 12 / Beå ngaà m soá 2 giöõ a nhaø ga soá 11 & 23/04/22 17/05/22 25 25 25 Sump Tunnel No.2 between Station 11 & 12 / Beå ngaà m soá 2 giöõ
HPLML3-UP- 225/01/19.03.E.2.3 Ramp / Doá c haï ngaà m 24/07/17 A 28/12/20 1248 667 1249 28/12/20, HPLML3-UP- 25/01/19.03.E.2.3 Ramp / Doác haï ngaà m

HPLML3-UP- 25/01/19.03.E.2.3.1
2 Structure / Keát caá u 24/07/17 A 28/12/20 1248 667 1249 28/12/20, HPLML3-UP- 25/01/19.03.E.2.3.1 Structure / Keát caá u

HPLML3-UP- 25/01/19.03.E.2.3.1.1 Zone A & B(U-Frame, Trench, Cut & Cover) / Khu vöï c A 24/07/17 A 07/12/19 861 280 862 07/12/19, HPLML3-UP- 25/01/19.03.E.2.3.1.1 Zone A & B(U-Frame, Trench, Cut & Cover) / Khu vöï c A & B ( Khung U, Raõ n h, Ñaøo môû )

HPLML3-UP- 25/01/19.03.E.2.3.1.1.1 Zone B / Khu vöï c B


HPLML3-UP 08/08/17 A 02/09/19 641 155 751 02/09/19, HPLML3-UP- 25/01/19.03.E.2.3.1.1.1 Zone B / Khu vöï c B

HPLML3-UP- 25/01/19.03.E.2.3.1.1.1.1 Pile & Excavation / Coïc vaø coâ ng taùc ñaø o
HPLML3-UP 08/08/17 A 30/04/19 516 30 626 30/04/19, HPLML3-UP- 25/01/19.03.E.2.3.1.1.1.1 Pile & Excavation / Coïc vaø coâng taùc ñaø o

03E02B0010 Utilities Check / Kieå m tra caù c C.trình ngaà m noå i 08/08/17 A 20/12/17 A 15 0 134 Utilities Check / Kieå m tra caù c C.trình ngaà m noå i

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 14 of 17
Project Baseline Critical Remaining Work summary
Actual Work Baseline Milestone Primary Baseline
CP03-WORKS PROGRAMME UPDATED HANOI PILOT LIGHT METRO LINE 03
SECTION NHON-HANOI RAILWAYS STATION
Cut-off Date: 25/01/19

Activity ID Activity Name Start Finish Original Remaining At 2017 2018 2019 2020 2021 2022 2023 2024
Duration Duration Completion
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
03E02B0050 Excavation Down to the Base Slab / Ñaøo saâu ñeán baû n ñaùy 01/04/19* 15/04/19 15 15 15 Excavation Down to the Base Slab / Ñaøo saâu ñeán baû n ñaùy
03E02B0060 Steel Wale & Strut No.1,2 / Theù p giaè n g vaø thanh choán g soá 1, 2 16/04/19 30/04/19 15 15 15 Steel Wale & Strut No.1,2 / Theù p giaè ng vaø thanh choáng soá 1, 2
HPLML3-UP- 25/01/19.03.E.2.3.1.1.1.2 Base Slab Works / Coâ ng taù c taám baûn ñaùy
HPLML3-UP 01/05/19 04/06/19 35 35 35 04/06/19, HPLML3-UP- 25/01/19.03.E.2.3.1.1.1.2 Base Slab Works / Coâ ng taù c taám baûn ñaù y

03E02B0070 Span 9 / Nhòp 9 01/05/19 25/05/19 25 25 25 Span 9 / Nhòp 9


03E02B0080 Span 7 / Nhòp 7 11/05/19 04/06/19 25 25 25 Span 7 / Nhòp 7
03E02B0090 Span 8 / Nhòp 8 01/05/19 25/05/19 25 25 25 Span 8 / Nhòp 8
HPLML3-UP- 25/01/19.03.E.2.3.1.1.1.3 Wall & Top Slab Works / Coâng taùc Töôø ng vaø Baûn ñæ
HPLML3-UP 26/05/19 02/09/19 100 100 100 02/09/19, HPLML3-UP- 25/01/19.03.E.2.3.1.1.1.3 Wall & Top Slab Works / Coâ ng taù c Töôø n g vaø Baûn ñænh

03E02B0100 Span 9 / Nhòp 9 26/05/19 23/08/19 90 90 90 Span 9 / Nhòp 9


03E02B0110 Span 7 / Nhòp 7 05/06/19 02/09/19 90 90 90 Span 7 / Nhòp 7
03E02B0120 Span 8 / Nhòp 8 26/05/19 23/08/19 90 90 90 Span 8 / Nhòp 8
HPLML3-UP- 25/01/19.03.E.2.3.1.1.2 Zone A / Khu vöïc A
HPLML3-UP 24/07/17 A 07/12/19 861 280 862 07/12/19, HPLML3-UP- 25/01/19.03.E.2.3.1.1.2 Zone A / Khu vöïc A

HPLML3-UP- 25/01/19.03.E.2.3.1.1.2.1 Pile & Excavation / Coïc vaø coâ ng taùc ñaø o
HPLML3-UP 24/07/17 A 26/03/19 605 24 606 26/03/19, HPLML3-UP- 25/01/19.03.E.2.3.1.1.2.1 Pile & Excavation / Coïc vaø coân g taùc ñaøo

03E02B0130 Utilities Check / Kieå m tra caù c C.trình ngaà m noå i 24/07/17 A 07/08/17 A 8 0 14 Utilities Check / Kieå m tra caù c C.trình ngaà m noå i
03E02B0160 Excavation Down to the Base Slab / Ñaøo saâu ñeán baû n ñaùy 03/03/19* 13/03/19 11 11 11 Excavation Down to the Base Slab / Ñaøo saâu ñeán baû n ñaùy
03E02B0170 Steel Wale & Strut No.1 / Theù p giaè ng vaø thanh choán g soá 1 14/03/19 26/03/19 13 13 13 Steel Wale & Strut No.1 / Theù p giaè ng vaø thanh choán g soá 1
HPLML3-UP- 25/01/19.03.E.2.3.1.1.2.2 Base Slab Works / Coâ ng taù c taám baûn ñaùy
HPLML3-UP 01/05/19 14/06/19 45 45 45 14/06/19, HPLML3-UP- 25/01/19.03.E.2.3.1.1.2.2 Base Slab Works / Coâ ng taù c taám baûn ñaù y

03E02B0190 Span 5 / Nhòp 5 01/05/19 25/05/19 25 25 25 Span 5 / Nhòp 5


03E02B0200 Span 6 / Nhòp 6 01/05/19 25/05/19 25 25 25 Span 6 / Nhòp 6
03E02B0210 Span 3 / Nhòp 3 11/05/19 04/06/19 25 25 25 Span 3 / Nhòp 3
03E02B0220 Span 1 / Nhòp 1 11/05/19 04/06/19 25 25 25 Span 1 / Nhòp 1
03E02B0230 Span 4 / Nhòp 4 11/05/19 04/06/19 25 25 25 Span 4 / Nhòp 4
03E02B0240 Span 2 / Nhòp 2 21/05/19 14/06/19 25 25 25 Span 2 / Nhòp 2
HPLML3-UP- 25/01/19.03.E.2.3.1.1.2.3 Wall & Top Slab Works / Coâng taùc Töôø ng vaø Baûn ñæ
HPLML3-UP 26/05/19 07/12/19 196 196 196 07/12/19, HPLML3-UP- 25/01/19.03.E.2.3.1.1.2.3 Wall & Top Slab Works / Coâ ng taù c Töôø ng vaø Baûn ñænh

03E02B0250 Span 5 / Nhòp 5 08/11/19 07/12/19 30 30 30 Span 5 / Nhòp 5


03E02B0260 Span 3 / Nhòp 3 26/05/19 24/06/19 30 30 30 Span 3 / Nhòp 3
03E02B0270 Span 1 / Nhòp 1 05/06/19 04/07/19 30 30 30 Span 1 / Nhòp 1
03E02B0280 Span 6 / Nhòp 6 05/06/19 04/07/19 30 30 30 Span 6 / Nhòp 6
03E02B0290 Span 4 / Nhòp 4 05/06/19 04/07/19 30 30 30 Span 4 / Nhòp 4
03E02B0300 Span 2 / Nhòp 2 15/06/19 14/07/19 30 30 30 Span 2 / Nhòp 2
03E02B0310 Remove Sheet Pile / Thaù o dôõ coï c cöø 15/07/19 03/08/19 20 20 20 Remove Sheet Pile / Thaù o dôõ coï c cöø
HPLML3-UP- 25/01/19.03.E.2.3.1.2 Zone C (Cut & Cover) / Khu vöïc C (Ñaø o môû ) 01/05/19 06/12/19 220 220 220 06/12/19, HPLML3-UP- 25/01/19.03.E.2.3.1.2 Zone C (Cut & Cover) / Khu vöïc C (Ñaø o môû)

HPLML3-UP- 25/01/19.03.E.2.3.1.2.1 Pile & Excavation / Coï c vaø coân g taùc ñaø o
HPLML3-UP 01/05/19 29/07/19 90 90 90 29/07/19, HPLML3-UP- 25/01/19.03.E.2.3.1.2.1 Pile & Excavation / Coïc vaø coân g taùc ñaø o

03E02B0320 Utilities Check / Kieå m tra caù c C.trình ngaà m noå i 01/05/19* 10/05/19 10 10 10 Utilities Check / Kieåm tra caù c C.trình ngaà m noå i
03E02B0340 Excavation Down to the Base Slab / Ñaøo saâu ñeán baû n ñaùy 21/05/19 29/06/19 40 40 40 Excavation Down to the Base Slab / Ñaøo saâu ñeán baû n ñaùy
03E02B0350 Steel Wale & Strut No.1,2,3 / Theù p giaè n g vaø thanh choáng soá 1,2,3 30/06/19 29/07/19 30 30 30 Steel Wale & Strut No.1,2,3 / Theù p giaè ng vaø thanh choáng soá 1,2,3
HPLML3-UP- 25/01/19.03.E.2.3.1.2.2 Base Slab Works / Coâng taùc taám baû n ñaù y
HPLML3-UP 30/07/19 28/08/19 30 30 30 28/08/19, HPLML3-UP- 25/01/19.03.E.2.3.1.2.2 Base Slab Works / Coâng taù c taám baûn ñaù y

03E02B0360 Base Slab Con'c Work / Coâ ng taù c beâ toâ n g baûn ñaù y 30/07/19 28/08/19 30 30 30 Base Slab Con'c Work / Coâng taù c beâ toân g baûn ñaù y
HPLML3-UP- 25/01/19.03.E.2.3.1.2.3 Wall & Top Slab Works / Coân g taùc Töôøng vaø Baûn ñænh
HPLML3-UP 29/08/19 06/12/19 100 100 100 06/12/19, HPLML3-UP- 25/01/19.03.E.2.3.1.2.3 Wall & Top Slab Works / Coâ ng taù c Töôø ng vaø Baû n ñænh

03E02B0370 Wall & Top Slab Con'c Work / Coâ n g taùc beâ toân g töôøng vaø Baû n ñænh 29/08/19 26/11/19 90 90 90 Wall & Top Slab Con'c Work / Coâ n g taùc beâ toân g töôøng vaø Baû n ñænh
03E02B0380 Remove Sheet pile / Thaù o dôõ coïc cöø 27/11/19 06/12/19 10 10 10 Remove Sheet pile / Thaù o dôõ coïc cöø
HPLML3-UP- 25/01/19.03.E.2.3.1.3 Zone E (Cut & Cover) / Khu vöï c E (Ñaø o môû) 14/11/18 A 28/12/20 510 510 771 28/12/20, HPLML3-UP- 25/01/19.03.E.2.3.1.3 Zone E (Cut & Cover) / Khu vöïc E (Ñaøo môû )

HPLML3-UP- 25/01/19.03.E.2.3.1.3.1 Pile & Excavation / Coï c vaø coân g taùc ñaø o
HPLML3-UP 14/11/18 A 17/12/18 A 45 0 33 17/12/18 A, HPLML3-UP- 25/01/19.03.E.2.3.1.3.1 Pile & Excavation / Coï c vaø coâ ng taù c ñaøo

03E02B0390 Site installation / Laé p ñaët coâ ng tröôø ng 30/11/18 A 17/12/18 A 15 0 17 Site installation / Laép ñaët coâ n g tröôø ng
03E02B0400 Utilities Check / Kieå m tra caù c C.trình ngaà m noå i 14/11/18 A 20/11/18 A 30 0 6 Utilities Check / Kieå m tra caù c C.trình ngaà m noå i
HPLML3-UP- 25/01/19.03.E.2.3.1.3.2 Base Slab Works / Coâng taùc taám baû n ñaù y
HPLML3-UP 07/08/19 28/11/20 480 480 480 28/11/20, HPLML3-UP- 25/01/19.03.E.2.3.1.3.2 Base Slab Works / Coâng taù c taám baûn ñaù y

HPLML3-UP- 25/01/19.03.E.2.3.1.3.2.1 Step 1 / Böôùc 1


HPLML3-UP 07/08/19 13/03/20 220 220 220 13/03/20, HPLML3-UP- 25/01/19.03.E.2.3.1.3.2.1 Step 1 / Böôù c 1

03E02B0460 Span 1 / Nhòp 1 07/08/19 25/10/19 80 80 80 Span 1 / Nhòp 1


03E02B0470 Span 2 / Nhòp 2 17/08/19 04/11/19 80 80 80 Span 2 / Nhòp 2

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 15 of 17
Project Baseline Critical Remaining Work summary
Actual Work Baseline Milestone Primary Baseline
CP03-WORKS PROGRAMME UPDATED HANOI PILOT LIGHT METRO LINE 03
SECTION NHON-HANOI RAILWAYS STATION
Cut-off Date: 25/01/19

Activity ID Activity Name Start Finish Original Remaining At 2017 2018 2019 2020 2021 2022 2023 2024
Duration Duration Completion
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
03E02B0480 Span 3 / Nhòp 3 15/12/19 03/03/20 80 80 80 Span 3 / Nhòp 3
03E02B0490 Span 4 / Nhòp 4 25/12/19 13/03/20 80 80 80 Span 4 / Nhòp 4
HPLML3-UP- 25/01/19.03.E.2.3.1.3.2.2 Step2 / Böôùc 2
HPLML3-UP 23/04/20 28/11/20 220 220 220 28/11/20, HPLML3-UP- 25/01/19.03.E.2.3.1.3.2.2 Step2 / Böôùc 2

03E02B0500 Span 8 / Nhòp 8 23/04/20 11/07/20 80 80 80 Span 8 / Nhòp 8


03E02B0510 Span 7 / Nhòp 7 03/05/20 21/07/20 80 80 80 Span 7 / Nhòp 7
03E02B0520 Span 6 / Nhòp 6 31/08/20 18/11/20 80 80 80 Span 6 / Nhòp 6
03E02B0530 Span 5 / Nhòp 5 10/09/20 28/11/20 80 80 80 Span 5 / Nhòp 5
HPLML3-UP- 25/01/19.03.E.2.3.1.3.3 Wall & Top Slab Works / Coân g taùc Töôøng vaø Baûn ñænh
HPLML3-UP 26/10/19 28/12/20 430 430 430 28/12/20, HPLML3-UP- 25/01/19.03.E.2.3.1.3.3 Wall & Top Slab Works / Coâng taù c Töôø ng vaø Baû n ñænh

HPLML3-UP- 25/01/19.03.E.2.3.1.3.3.1 Step 1 / Böôùc 1


HPLML3-UP 26/10/19 01/06/20 220 220 220 01/06/20, HPLML3-UP- 25/01/19.03.E.2.3.1.3.3.1 Step 1 / Böôù c 1

03E02B0540 Span 1 / Nhòp 1 26/10/19 13/01/20 80 80 80 Span 1 / Nhòp 1


03E02B0550 Span 2 / Nhòp 2 05/11/19 23/01/20 80 80 80 Span 2 / Nhòp 2
03E02B0560 Span 3 / Nhòp 3 04/03/20 22/05/20 80 80 80 Span 3 / Nhòp 3
03E02B0570 Span 4 / Nhòp 4 14/03/20 01/06/20 80 80 80 Span 4 / Nhòp 4
HPLML3-UP- 25/01/19.03.E.2.3.1.3.3.2 Step2 / Böôùc 2
HPLML3-UP 12/07/20 28/12/20 170 170 170 28/12/20, HPLML3-UP- 25/01/19.03.E.2.3.1.3.3.2 Step2 / Böôùc 2

03E02B0580 Span 8 / Nhòp 8 12/07/20 29/09/20 80 80 80 Span 8 / Nhòp 8


03E02B0590 Span 7 / Nhòp 7 22/07/20 09/10/20 80 80 80 Span 7 / Nhòp 7
03E02B0600 Span 6 / Nhòp 6 30/09/20 18/12/20 80 80 80 Span 6 / Nhòp 6
03E02B0610 Span 5 / Nhòp 5 10/10/20 28/12/20 80 80 80 Span 5 / Nhòp 5
HPLML3-UP- 25/01/19.03.E.2.3.1.4 Zone D (Cut & Cover) / Khu vöïc D (Ñaøo môû) 08/12/19 20/08/20 257 257 257 20/08/20, HPLML3-UP- 25/01/19.03.E.2.3.1.4 Zone D (Cut & Cover) / Khu vöï c D (Ñaøo môû)

HPLML3-UP- 25/01/19.03.E.2.3.1.4.1 Pile & Excavation / Coï c vaø coân g taùc ñaø o
HPLML3-UP 08/12/19 15/12/19 8 8 8 15/12/19, HPLML3-UP- 25/01/19.03.E.2.3.1.4.1 Pile & Excavation / Coïc vaø coân g taùc ñaø o

03E02B0620 Site installation / Laé p ñaët coâ ng tröôø ng 08/12/19 10/12/19 3 3 3 Site installation / Laé p ñaët coâ n g tröôø ng
03E02B0630 Utilities Check / Kieå m tra caù c C.trình ngaà m noå i 11/12/19 15/12/19 5 5 5 Utilities Check / Kieå m tra caù c C.trình ngaà m noå i
HPLML3-UP- 25/01/19.03.E.2.3.1.4.2 Base Slab Works / Coâng taùc taám baû n ñaù y
HPLML3-UP 23/02/20 01/06/20 100 100 100 01/06/20, HPLML3-UP- 25/01/19.03.E.2.3.1.4.2 Base Slab Works / Coân g taù c taám baûn ñaù y

03E02B0670 Span 1 / Nhòp 1 23/02/20 12/04/20 50 50 50 Span 1 / Nhòp 1


03E02B0680 Span 2 / Nhòp 2 19/03/20 07/05/20 50 50 50 Span 2 / Nhòp 2
03E02B0690 Span 3 / Nhòp 3 13/04/20 01/06/20 50 50 50 Span 3 / Nhòp 3
HPLML3-UP- 25/01/19.03.E.2.3.1.4.3 Wall & Top Slab Works / Coân g taùc Töôøng vaø Baûn ñænh
HPLML3-UP 13/04/20 20/08/20 130 130 130 20/08/20, HPLML3-UP- 25/01/19.03.E.2.3.1.4.3 Wall & Top Slab Works / Coâ ng taù c Töôø ng vaø Baû n ñænh

03E02B0700 Span 1 / Nhòp 1 13/04/20 01/07/20 80 80 80 Span 1 / Nhòp 1


03E02B0710 Span 2 / Nhòp 2 08/05/20 26/07/20 80 80 80 Span 2 / Nhòp 2
03E02B0720 Span 3 / Nhòp 3 02/06/20 20/08/20 80 80 80 Span 3 / Nhòp 3
HPLML3-UP- 25/01/19.03.E.2.3.1.5 Zone F (Cut & Cover) / Khu vöïc F (Ñaøo môû) 11/12/19 28/12/20 384 384 384 28/12/20, HPLML3-UP- 25/01/19.03.E.2.3.1.5 Zone F (Cut & Cover) / Khu vöï c F (Ñaø o môû)

HPLML3-UP- 25/01/19.03.E.2.3.1.5.1 Pile & Excavation / Coï c vaø coân g taùc ñaø o
HPLML3-UP 11/12/19 27/03/20 108 108 108 27/03/20, HPLML3-UP- 25/01/19.03.E.2.3.1.5.1 Pile & Excavation / Coïc vaø coân g taùc ñaø o

03E02B0730 Site installation / Laé p ñaët coâ ng tröôø ng 11/12/19 15/12/19 5 5 5 Site installation / Laé p ñaët coâ ng tröôø ng
03E02B0740 Utilities Check / Kieå m tra caù c C.trình ngaà m noå i 16/12/19 20/12/19 5 5 5 Utilities Check / Kieå m tra caùc C.trình ngaà m noå i
03E02B0750 Install Guide Wall of SBP / Laé p ñaët Töôøng daãn höôù ng cuûa SBP 23/02/20 28/02/20 6 6 6 Install Guide Wall of SBP / Laé p ñaët Töôøn g daãn höôù ng cuûa SBP
03E02B0760 Con'c Pile Retaining Structure Construction(SBP) / Thi coân g coï c beâ toâ n g cuû a keá t 29/02/20 22/03/20 23 23 23 Con'c Pile Retaining Structure Construction(SBP) / Thi coâng coï c beâ toâ ng cuû a keá t caá u töôøng chaén (SBP)
03E02B0770 Cap Beam Con'c / Daàm muõ beâ toâ ng 15/03/20 27/03/20 13 13 13 Cap Beam Con'c / Daàm muõ beâ toâ ng
HPLML3-UP- 25/01/19.03.E.2.3.1.5.2 Base Slab Works / Coâng taùc taám baû n ñaù y
HPLML3-UP 21/08/20 09/10/20 50 50 50 09/10/20, HPLML3-UP- 25/01/19.03.E.2.3.1.5.2 Base Slab Works / Coân g taù c taám baûn ñaù y

03E02B0780 Span 1 / Nhòp 1 21/08/20 09/10/20 50 50 50 Span 1 / Nhòp 1


HPLML3-UP- 25/01/19.03.E.2.3.1.5.3 Wall & Top Slab Works / Coân g taùc Töôøng vaø Baûn ñænh
HPLML3-UP 10/10/20 28/12/20 80 80 80 28/12/20, HPLML3-UP- 25/01/19.03.E.2.3.1.5.3 Wall & Top Slab Works / Coâng taù c Töôø ng vaø Baû n ñænh

03E02B0790 Span 1 / Nhòp 1 10/10/20 28/12/20 80 80 80 Span 1 / Nhòp 1


HPLML3-UP- 25/01/19.03.E.2.3.4
2 The Road along the Tunnel Ramp / Thieát keá ñöôøn g doï c Doác 17/08/17 A 23/08/17 A 7 0 6 23/08/17 A, HPLML3-UP- 25/01/19.03.E.2.3.4 The Road along the Tunnel Ramp / Thieá t keá ñöôøng doï c Doá c Haï Ngaàm

HPLML3-UP- 25/01/19.03.E.2.3.4.5 Design / Thieát Keá 17/08/17 A 23/08/17 A 7 0 6 23/08/17 A, HPLML3-UP- 25/01/19.03.E.2.3.4.5 Design / Thieá t Keá

HPLML3-UP- 25/01/19.03.E.2.3.4.5.1 Construction Design / Thieát keá Thi Coân g


HPLML3-UP 17/08/17 A 23/08/17 A 7 0 6 23/08/17 A, HPLML3-UP- 25/01/19.03.E.2.3.4.5.1 Construction Design / Thieát keá Thi Coâ ng

HPLML3-UP- 25/01/19.03.E.2.3.4.5.1.1 Construction Design Preparation / Chuaån bò Thieát k 17/08/17 A


HPLML3-UP 23/08/17 A 7 0 6 23/08/17 A, HPLML3-UP- 25/01/19.03.E.2.3.4.5.1.1 Construction Design Preparation / Chuaå n bò Thieá t keá Thi coâ ng

03B003T250 Preparation of Specification (Basic design) / Chuaå n bò Tieâu chuaån (Thieát keá cô s 17/08/17 A 23/08/17 A 7 0 6 Preparation of Specification (Basic design) / Chuaå n bò Tieâu chuaån (Thieát keá cô sôû)

HPLML3-UP- 225/01/19.03.E.2.4 Shaft / Gieá ng thoâng gioù 08/06/19 08/01/21 581 581 581 08/01/21, HPLML3-UP- 25/01/19.03.E.2.4 Shaft / Gieá n g thoân g gioù

HPLML3-UP- 25/01/19.03.E.2.4.1
2 Structure / Keát caá u 08/06/19 08/01/21 581 581 581 08/01/21, HPLML3-UP- 25/01/19.03.E.2.4.1 Structure / Keát caá u

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 16 of 17
Project Baseline Critical Remaining Work summary
Actual Work Baseline Milestone Primary Baseline
CP03-WORKS PROGRAMME UPDATED HANOI PILOT LIGHT METRO LINE 03
SECTION NHON-HANOI RAILWAYS STATION
Cut-off Date: 25/01/19

Activity ID Activity Name Start Finish Original Remaining At 2017 2018 2019 2020 2021 2022 2023 2024
Duration Duration Completion
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Duration
HPLML3-UP- 25/01/19.03.E.2.4.1.1 Phase 1~6 / Giai ñoaï n 1~6 08/06/19 19/01/20 226 226 226 19/01/20, HPLML3-UP- 25/01/19.03.E.2.4.1.1 Phase 1~6 / Giai ñoaï n 1~6

03E02C0010 Phase 1 : Utilities Check / Kieåm tra caùc C.trình ngaà m noåi 08/06/19 12/06/19 5 5 5 Phase 1 : Utilities Check / Kieåm tra caùc C.trình ngaà m noåi
03E02C0020 Phase 1 : Install Guide Wall at Shaft & Shallow Box Access / Laép Töôøn g daãn ôû g 13/06/19* 24/06/19 12 12 12 Phase 1 : Install Guide Wall at Shaft & Shallow Box Access / Laép Töôøng daãn ôû gieán g & loái vaøo hoä p ga noâng
03E02C0030 Phase 1 : Construction D-Wall at Shaft & Shallow Box Access / Xaây töôø ng vaâ y G 25/06/19 16/07/19 22 22 22 Phase 1 : Construction D-Wall at Shaft & Shallow Box Access / Xaây töôø ng vaâ y Gieán g &ø loá i vaøo hoä p ga noâng
03E02C0040 Phase 1 : Grouting (Soil Treatment) / Bôm vöõ a (xöû lyù ñaát) 17/07/19* 16/08/19 31 31 31 Phase 1 : Grouting (Soil Treatment) / Bôm vöõ a (xöû lyù ñaát)
03E02C0050 Phase 2 : Sheet Pile Installation / Ñoù n g coïc cöø 17/08/19 23/08/19 7 7 7 Phase 2 : Sheet Pile Installation / Ñoù ng coïc cöø
03E02C0060 Phase 2 : Excavate to 1st propping level / Ñaø o ñeá n cao ñoä hoá moùn g thöù nhaát 24/08/19 25/08/19 2 2 2 Phase 2 : Excavate to 1st propping level / Ñaø o ñeá n cao ñoä hoá moùng thöù nhaát
03E02C0070 Phase 2 : Breaking of D-Wall to bottom of Excavation / Phaù töôø ng vaâ y vaø ñaùy cuû 26/08/19 14/09/19 20 20 20 Phase 2 : Breaking of D-Wall to bottom of Excavation / Phaù töôø ng vaâ y vaø ñaùy cuûa hoá ñaøo
03E02C0080 Phase 3 : Install Temp.1st Strut inside Shaft and Box / Laép thanh choáng taïm thöù 15/09/19 24/09/19 10 10 10 Phase 3 : Install Temp.1st Strut inside Shaft and Box / Laép thanh choáng taïm thöù nhaá t trong Gieáng vaø hoä p Ga
03E02C0090 Phase 3 : Excavate to 2nd propping level inside Shaft & Box / Ñaø o ñeá n cao ñoä h 25/09/19 04/10/19 10 10 10 Phase 3 : Excavate to 2nd propping level inside Shaft & Box / Ñaø o ñeá n cao ñoä hoá moù ng 2 trong gieáng & hoäï p Ga
03E02C0100 Phase 3 : Breaking of D-Wall to bottom of Excavation / Phaù töôø ng vaâ y vaø ñaùy cuû 05/10/19 24/10/19 20 20 20 Phase 3 : Breaking of D-Wall to bottom of Excavation / Phaù töôø ng vaâ y vaø ñaùy cuûa hoá ñaøo
03E02C0110 Phase 4 : Install Temp.2nd Strut inside Shaft and Box / Laé p thanh choá ng taï m thöù 25/10/19 03/11/19 10 10 10 Phase 4 : Install Temp.2nd Strut inside Shaft and Box / Laé p thanh choá ng taï m thöù 2 trong Gieá ng vaø hoäp Ga
03E02C0120 Phase 4 : Excavate to Base Slab level inside Shaft and Box / Ñaøo ñeá n cao ño baûn 04/11/19 08/11/19 5 5 5 Phase 4 : Excavate to Base Slab level inside Shaft and Box / Ñaøo ñeá n cao ño baûn ñaù y phía trong gieángù & hoäp Ga
03E02C0130 Phase 4 : Breaking of D-Wall to bottom of Excavation / Phaù töôø ng vaâ y vaø ñaùy cuû 09/11/19 28/11/19 20 20 20 Phase 4 : Breaking of D-Wall to bottom of Excavation / Phaù töôø ng vaâ y vaø ñaùy cuûa hoá ñaøo
03E02C0140 Phase 4 : Casting of Concrete on Space between Shaft and Shallow Box / Ñoå beâ 29/11/19 13/12/19 15 15 15 Phase 4 : Casting of Concrete on Space between Shaft and Shallow Box / Ñoå beâ toâ ng giöõ a gieá n g &ø hoä p ga noâ ng
03E02C0150 Phase 4 : To Ensure Continuity between D-Wall / Ñaû m baû o tính lieân luïc giöõ a töôø 14/12/19 18/12/19 5 5 5 Phase 4 : To Ensure Continuity between D-Wall / Ñaû m baû o tính lieân luïc giöõ a töôøng vaây
03E02C0160 Phase 5 : Construction of the Base Slab inside the Shallow Box / Thi coâng baûn ña 19/12/19 25/12/19 7 7 7 Phase 5 : Construction of the Base Slab inside the Shallow Box / Thi coân g baûn ñaù y phía trong hoä p ga noâng
03E02C0170 Phase 5: Excavate to Underside Ring Beam level inside Shaft / Ñaø o ñeá n cao ño m 26/12/19 04/01/20 10 10 10 Phase 5: Excavate to Underside Ring Beam level inside Shaft / Ñaø o ñeá n cao ño maët döôù i daàm troøn trong Gieá ng
03E02C0180 Phase 6 : Construction of the Top Ring Beam / Thi coâ n g daàâ øm troøn ñænh 05/01/20 14/01/20 10 10 10 Phase 6 : Construction of the Top Ring Beam / Thi coâ n g daàâ øm troø n ñænh
03E02C0190 Phase 6 : Excavate to Underside Base Slab level inside Shaft / Ñaøo ñeá n cao ño m 15/01/20 19/01/20 5 5 5 Phase 6 : Excavate to Underside Base Slab level inside Shaft / Ñaøo ñeá n cao ño maë t döôùi baû n ñaùy trong Gieá n gù
HPLML3-UP- 25/01/19.03.E.2.4.1.2 Phase 7 / Giai ñoaï n 7 20/01/20 17/03/20 58 58 58 17/03/20, HPLML3-UP- 25/01/19.03.E.2.4.1.2 Phase 7 / Giai ñoaïn 7

03E02C0200 Screed Concrete and Waterproofing Membrane below Shaft Base Slab / BT ñeä m 20/01/20 24/01/20 5 5 5 Screed Concrete and Waterproofing Membrane below Shaft Base Slab / BT ñeä m, choáng thaám t.löû ng döôù i ñaùy gieá n g
03E02C0210 Construction of the Base Shaft Slab / Thi coâ ng baû n ñaùy gieá ng thoâ n g gioù 25/01/20 06/02/20 13 13 13 Construction of the Base Shaft Slab / Thi coâ ng baû n ñaùy gieá ng thoâ n g gioù
03E02C0220 D-Wall Breaking to Construct the Connection Galleries(Track 1) / Phaù töôøn g vaâ y 07/02/20 21/02/20 15 15 15 D-Wall Breaking to Construct the Connection Galleries(Track 1) / Phaù töôøng vaây ñeå thi coâng haønh lang keát noái
03E02C0230 D-Wall Breaking to Construct the Connection Galleries(Track 2) / Phaù töôøn g vaâ y 07/02/20 21/02/20 15 15 15 D-Wall Breaking to Construct the Connection Galleries(Track 2) / Phaù töôøng vaây ñeå thi coâng haønh lang keát noái
03E02C0240 Waterproofing Membrane and Lining around Galleries(Track 1) / Choá ng thaá m taà 22/02/20 17/03/20 25 25 25 Waterproofing Membrane and Lining around Galleries(Track 1) / Choá ng thaá m taà ng löûng vaø taá m oá p quanh haø nh lang
03E02C0250 Waterproofing Membrane and Lining around Galleries(Track 2) / Choá ng thaá m taà 22/02/20 17/03/20 25 25 25 Waterproofing Membrane and Lining around Galleries(Track 2) / Choá ng thaá m taà ng löûng vaø taá m oá p quanh haø nh lang
HPLML3-UP- 25/01/19.03.E.2.4.1.3 Phase 8 / Giai ñoaï n 8 18/03/20 10/08/20 146 146 146 10/08/20, HPLML3-UP- 25/01/19.03.E.2.4.1.3 Phase 8 / Giai ñoaïn 8

03E02C0260 Construction of Internal Structures inside Shaft Proceeds / Thi coâ n g caùc keát caá u b 18/03/20 11/06/20 86 86 86 Construction of Internal Structures inside Shaft Proceeds / Thi coâ ng caùc keát caá u beâ n trong cuûa Gieá ng thoâng gioù
03E02C0270 Construction of Lining Wall Inside Shaft / Thi coân g taám oáp beân trong Gieá ng 12/06/20 10/08/20 60 60 60 Construction of Lining Wall Inside Shaft / Thi coân g taám oáp beân trong Gieá ng
HPLML3-UP- 25/01/19.03.E.2.4.1.4 Phase 9~11 / Giai ñoaïn 9~11 11/08/20 25/09/20 46 46 46 25/09/20, HPLML3-UP- 25/01/19.03.E.2.4.1.4 Phase 9~11 / Giai ñoaï n 9~11

03E02C0280 Phase 9 : Removal of 2nd Strut Inside Shaft / Thaùo dôõ thanh choá ng thöù hai beâ n tr 11/08/20 15/08/20 5 5 5 Phase 9 : Removal of 2nd Strut Inside Shaft / Thaùo dôõ thanh choá ng thöù hai beâ n trong Gieá ng thoâ ng gioù
03E02C0290 Phase 9 : Construction Inside Shaft and Shallow Box Continues / Thi coâ ng beân tr 16/08/20 28/08/20 13 13 13 Phase 9 : Construction Inside Shaft and Shallow Box Continues / Thi coâ ng beân trong gieáng vaø hoä p ga noâ ng
03E02C0300 Phase 10 : Construction Inside Shaft Continues / Thi coân g beâ n trong gieáng thoâ ng 29/08/20 07/09/20 10 10 10 Phase 10 : Construction Inside Shaft Continues / Thi coân g beâ n trong gieáng thoâ ng gioù
03E02C0310 Phase 10 : Construction of the Top Slab / Thi coâng Baû n ñænh 08/09/20 20/09/20 13 13 13 Phase 10 : Construction of the Top Slab / Thi coân g Baû n ñænh
03E02C0320 Phase 11 : Removal of 1st Strut Inside Shaft / Thaù o dôõ thanh choá ng thöù nhaát beân 21/09/20 25/09/20 5 5 5 Phase 11 : Removal of 1st Strut Inside Shaft / Thaù o dôõ thanh choá ng thöù nhaát beân trong Gieá ng thoân g gioù
HPLML3-UP- 25/01/19.03.E.2.4.1.5 Phase 12 / Giai ñoaïn 12 26/09/20 08/01/21 105 105 105 08/01/21, HPLML3-UP- 25/01/19.03.E.2.4.1.5 Phase 12 / Giai ñoaï n 12

03E02C0330 End of Internal Structure Construction / Hoaøn thieä n xaây döï ng keá t caáu beâ n trong 26/09/20 15/10/20 20 20 20 End of Internal Structure Construction / Hoaøn thieä n xaây döï ng keá t caáu beâ n trong
03E02C0340 Roof Slab Constructed.(with Waterproofing) / Thi coâ ng taá m lôïp maùi (coù lôù p choán 16/10/20 04/11/20 20 20 20 Roof Slab Constructed.(with Waterproofing) / Thi coâ ng taá m lôïp maùi (coù lôù p choáng thaám)
03E02C0350 Protective Concrete / Beâ toân g baû o veä 05/11/20 14/11/20 10 10 10 Protective Concrete / Beâ toâng baû o veä
03E02C0360 Breaking of Top of Shaft and Box D-Walls / Phaù töôø ng vaây cuûa gieán g vaø hoä p Ga 15/11/20 29/11/20 15 15 15 Breaking of Top of Shaft and Box D-Walls / Phaù töôøn g vaây cuûa gieán g vaø hoäp Ga
03E02C0370 Backfill / Ñaép traû 30/11/20 14/12/20 15 15 15 Backfill / Ñaé p traû
03E02C0380 End of Construction of Stairs and Permanent Walls Retaining / Hoaø n thieä n caù c caà 15/12/20 08/01/21 25 25 25 End of Construction of Stairs and Permanent Walls Retaining / Hoaø n thieä n caùc caàu thang vaø töôø ng chaé n vónh

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 17 of 17
Project Baseline Critical Remaining Work summary
Actual Work Baseline Milestone Primary Baseline

Potrebbero piacerti anche