JOB SAFETY ANALYSIS

JSA Number No : HEC-GSC-JSA-001 Revision : C


Revision date : 17/03/2019 Prepared by : Mohammad Naushad
Type of Job being analyzed : INSTALLATION OF INSPECTION PLUG

Department / Section Originating JSA :INSULATION Job Performers :

Normal Approvals Name Signature Date GENERAL JOB REQUIREMENT


CM/Representative 1. Permit to Work.
Construction 2. HSE ARAMCO Induction for all.
3. PPE as per Project Standard.
Safety Manager 4. Gas Testing Equipment.
5. Daily TBT before starting the daily activities.
Construction 6. Adequate supervision and HSSE coverage.
Superintendent 7. Valid SAG Licenses for drivers and operators.
8. Strictly no smoking. Smoking only in designated area.
9. For Emergency – First Aiders at Site, Ambulance Standby
in lay down with Male nurse. Emergency Number
JSA Members Name Signature Date Displayed.
HANWHA 10. Welfare - Drinking Water, Food & Rest & Smoking
Construction Shelter, Porta Toilet & Transport available.
Supervisor 11. SAUDI ARAMCO REQUIREMENT
 GI 2.100 Work Permit System
HANWHA HSE
 GI 6.012 Isolation, Lock-Out and use of Hold Tags
supervisor
 GI 8.005 Protective (Safety) Footwear
Sub-con Construction  GI 2.714 Environmental Protection Policy Implementation
Manager  GI 430.001 Waste Management
 GI 8.001 (Safety Requirement for Scaffold)
Sub-con supervisor  Saudi Aramco Safety Handbook
 SA Construction Safety Manual
Sub-con Safety
- All work activities shall comply with the requirements of all applicable SA General Instructions.
Page 1 of 8
JOB SAFETY ANALYSIS

- Contractor ensure that all work are in full compliance with the requirement of Saudi Aramco Construction Safety Manual (CSM) and
with the provision of Saudi Aramco certification applicable.

Changing Conditions and Emergency Procedures: Stop Work, Switch off all equipments, Supervisors must direct all personnel to the
nearest Emergency Exit and Assembly point.

Name of Procedure or Operation: INSULATION WORK

Job Number: 500042 Location :EPC-14

Written by: MOHD. NAUSHAD Subcontractor Name (if applicable): GLOBAL SUHAIMI COMPANY

Reviewed by: MOHD. IBRAHIM Date Created/Last Reviewed: 15-10-2018

Tools/Equipment Required Materials Required Personal Protective Equipment


 Cutter  Hard hat  Fire Retardant
 Scissor  Insulation material  Steel toed boots Outerwear
 Tightening belt  Jacketing material  Safety glasses
 Drill machine  Sealant  High visibility vest
 Work Gloves

JOB STEPS/LIST OF RESPONSIBLE


S# POTENTIAL HAZARDS HAZARDS CONTROL
ACTIVITIES PARTY
 Obtain work permit.
 Construction
 Unauthorized personnel in the  The foreman/Supervisor will give Manager
working area. briefing for all his workers prior
 PTW Receiver
1. Preparation  Unfamiliar to the job activity. to start the job (Toolbox Talk)
 Safety Officer
 Unsafe condition of the  JSA to be made available at the
 Scaffolding
equipment site and Job Specific Hazards
Supervisor
and control measures to be

Page 2 of 8
JOB SAFETY ANALYSIS

communicated to all personnel


involved in the job.
 Obtain PTW prior to the
 Failure to obtain approved commencement of the work and
work permit can result in hard cop to be kept at the work
Obtain Permit to
2. serious incidents site  Permit Receiver
Work  PTW violation  Do not start any work
preparation until signed permit is
in the hand
 Entry restricted under the insulation
installation and work piece will be
secure by strip wire prior to final fit
up. sAll loose materials i.e tools
 Reference and standards ,equipment must be in several
position to prevent fall from height,
 Work piece falling on personal
 Safety glasses to be worn at all time
(prior to final fit up) due to on site.
instability. A full face shield with safety glasses
 Foreign bodies entering the or goggles is to be worn when
eye during self-tapping cutting steel with a
process Cutting wheel.  Site supervisor or
3. Insulation work  Fire as a result of an ignition  Hot source to be done where Foreman
source from the performance possible away  Safety Supervisor
of hot work from the potential source
 Hearing loss due to excessive  Wear gloves to protect hand
from excess heat during hot
noise from sheet bolting
weather. this precaution will
 Electric shock from use of take into account the exact
electrical equipment. nature of the work and assess
heat generated vs. required
dexterity during the operation
 Ear protection shall be worn in
all areas where noise exposure
is likely to be in excess of 85dB
Page 3 of 8
JOB SAFETY ANALYSIS

for a period of greater than 8 hrs

 Injury to personal due to  Safety induction to new  Site Supervisor/ or


slippage of load during transit. employees specialized training Foreman
4. Metal jacketing
 Material handling equipment to cladders mandatory use of  Site Safety
injury to personal PPE’s Supervisor

 Wear safety glass, safety mask,


coverall, safety hand gloves.
  Copies of MSDS must be
Irritation of eyes and skin, over  Site Supervisor or
exposure to vapor cause eyes, present in there location 1. Site
Foreman
Application of joint office 2. GSC safety office 3.
5. throat and noise.  Site Safety
sealant Chemical storage area
 Workers not aware of chemical Supervisor
that they are using  Supervisor/Forman should  Hole Watchman
discuss about the MSDS and
must be fully understand by the
workers.
 Barricading is to be erected
when there is risk of falling from
height, around fall protection
systems are to be in where
personal are exposed to fall
 Working at height where it is hazard that is assessed as
reasonably that a person having the potential to cause  Safety Supervisor
6. Working at height would be injured in a fall/falling injury.  Site Supervisor or
object. each person who could fall from Foreman
more than 1.8 meter (6ft) shall
be protected from falling for a fall
protection system
 Personal shall use only
green/yellow tag scaffold
working platform.
Page 4 of 8
JOB SAFETY ANALYSIS

 Use full body harness where


required
 Chin strap must be used &
properly where by all workers.
 All hand tools will be kept in
good repair and used only for the
intended purpose. provide rope
for securing
 .any damaged of faulty
equipment must be removed
from site immediately
 All power tools and extension
cords shall be inspect and color
 Damaged tools
coded for the month
 Inspection and color coding
 All guards and protective devices
 Missing guards shall be remain attached and in  PTW Receiver
Hand tools and
7.  Electric shock when using proper working order.  Site Supervisor or
power tools
electrical equipment  All cords shall be protected from Foreman
 Homemade tools damage and elevated to prevent
trip hazards.
 Tools storage
 Power to electrical equipment
shall be run through earth
leakage detection circuits
(GFCI).
 And shall be providing for all out
lets to protect employees from
electrical shock and 110 V
 Never use homemade or
makeshift tools and never modify

Page 5 of 8
JOB SAFETY ANALYSIS

or alter a tool.
 Tools must always be in good
condition ,and tools shall be
properly stored when not in use
 Trigger lock must be disabled.
 Minimum requirements shall
be Hardhat, safety
glasses/face shield, steel
shoe and gloves and dust
mask or cartridge type.
8. PPE’s Minimum requirements  Additional PPE may use  All
depending on the work to
be performed and the area
work is being performed.
 Safety glasses to be worn
at all times on site
 House keeping shall be done on
 Slip, trip and fall regular intervals  Safety Supervisor
9 House Keeping  Site Supervisor or
 Good house keeping preventing Foreman
the work area/site hazards free.

Page 6 of 8
JOB SAFETY ANALYSIS

 Clean up all expired packaging,


wrap up in plastic bag/suck up
Disposal of mineral  Environment pollution and  Safety supervisor
10 any loose material with vaccum
wool waste health problems  Site supervisor
cleaner ,dispose of residue in
sealed plastic bag

Page 7 of 8
JOB SAFETY ANALYSIS

 Serious injury ,illness  Contact emergency response


Emergency  Equipment accident team/clinic/doctor
 fire  Identify exact type of
emergency/name/location/nat
ure of accident or injury
 Do not move injured
person/vehicle or equipment
 Perform first aid (if you are
11.
qualified)
 Use fire extinguisher, if safe
to control
 Witness stay at scene
 Fit out appropriate report with
site safety department
immediately
 Always know where your
people at all time

 PTW Receiver
Closing of Work  Failure to close the work permit  Work permit shall be in
12  Site Supervisor or
permit which is a violation for GI 2.100 compliance with GI 2.100.
Foreman