Sei sulla pagina 1di 3

SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)

SATIP No. APPROVED DATE DISCIPLINE:


SAUDI ARAMCO TYPICAL INSPECTION PLAN
Building Drain, Waste and Vent (DWV) PIPE SATIP-S-060-06 18-May-05 PLUMBING
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

See See
1.1 Brazing Procedures See SATIP-S-060-08 Copper Piping
Remarks Remarks

See See
1.2 Brazer Qualifications See SATIP-S-060-08 Copper Piping
Remarks Remarks

RTR & Thermoplastic Piping Installers See See


1.3 See SATIP-S-070-03 Thermoplastic and RTR Piping
Qualifications Remarks Remarks

2.0 MATERIAL RECEIVING

See SATIP-S-070-03 Thermoplastic and RTR Piping


See See SATIP-S-060-08 Copper Piping
2.1 Piping
Remarks Remarks and SATIP-L-350-07 Cement lined Carbon Steel
as applicable

Hangers and Supports SAIC SAIC Saudi Aramco to be notified on receipt of initial shipment
2.2
Receiving Inspection S-4017 S-4017
W1 W2 by type or manufacturer

Hangers and Supports SAIC SAIC


2.3
Handling, Storage, and Preservation S-4017 S-4017
W1 W2 Contractor QA/QC to perform Weekly Inspection

3.0 INSTALLATION

Drainage System Piping Lay-out SAIC SAIC


3.1
Inspection S-4040 S-4040
H1 W1

Hangers and Support SAIC SAIC


3.2
Inspection S-4019 S-4019
H1 W1

Vent Piping SAIC SAIC


3.3
Inspection S-4041 S-4041
W1 S

Trap SAIC SAIC


3.4
Inspection S-4042 S-4042
W1 S

Page 1 of 3
SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Building Drain, Waste and Vent (DWV) PIPE SATIP-S-060-06 18-May-05 PLUMBING
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

SAIC SAIC
3.5 Indirect Waste Piping
S-4043 S-4043
W1 S

See SATIP-S-070-03 Thermoplastic and RTR Piping


See See SATIP-S-060-08 Copper Piping
3.6 Piping
Remarks Remarks and SATIP-L-350-07 Cement lined Carbon Steel
as applicable

See SATIP-H-002-06 APCS-113 Epoxy Coating


See See SATIP-H-002-02 FBE Coating of Carbon Steel
3.7 Coating
Remarks Remarks SATIP-H-100-01 Paint Application of Liquid Coating
Systems for Industrial Facilities as applicable

Application of Safety Color Coding &


See See See SATIP-H-100-01 paint Application of Liquid Coating
3.8 Stenciling of Equipment/Piping
Remarks Remarks System for Industrial Facilities
Identification

Building Drainage and Vent Piping SATR SATR


3.9
hydrotest S-4003 S-4003
H1 H1

4.0 PRE-COMMISSIONING

4.1 Not applicable

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1 levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4 attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

Page 2 of 3
SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Building Drain, Waste and Vent (DWV) PIPE SATIP-S-060-06 18-May-05 PLUMBING
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

LEGEND
W1 100% Witness Inspection/Test H2 Sample Hold Point for QC Inspection or Test RH1 100% Review and Approval of Documents
W2 Sample Witness Inspection/Test R1 100% Review of Documents RH2 Sample Review and Approval of Documents
H1 100% Hold Point for QC Inspection or Test R2 sample Review of Documents S Surveillance

Page 3 of 3