Verification Submission 

The following supporting documents to be submitted and calculated prior to onsite verification. Please submit this 
together with updated Green Mark Score Calculator sheet. 

Item  Documents needed  Calculation needed  Photos 


ETTV   Latest ETTV calculation with   Tabulate areas of   Building 
difference tabulated under  glass purchase   Building facade 
declaration form   Tabulate areas of 
 Design ETTV calculation for  glass used in design 
comparison  stage 
 POs/DOs for glass purchase 
 Please specify key changes in 
declaration form 
 Complete Appendix B2 
A/C   Complete Appendix B2   Nil   Chiller plant 
 Chiller display panel 
 CHWP nameplate  
 CWP nameplate 
 Screenshots of BMS 
 A/C schematic 
 AHUs 
 Screenshots of AHUs 
Daylighting   POs/DOs of Sensors   Nil   Nil 
Lighting   POs/DOs of lighting fixtures   Lighting calculation   Lightings in functional space 
purchase  based on as‐built   Lighting in common areas 
 Please specify key changes in  provision 
declaration form 
 
Carpark &   Nil   % of each mode of   CO sensors with value 
common  ventilation for mixed   Jet fans/exhaust system 
areas  mode ventilation 
Energy items   POs/DOs of equipment where      Lift/Escalator 
applicable   Motion sensors 
 Photosensors 
 Heat pump 
Renewable   Complete Appendix B2   Nil    PV panel 
energy   Display panel 
Water   POs/DOs of water fittings   Nil    Sub‐meters and state 
Efficiency   Cooling Tower’s cycle of  location 
concentration report (3   BMS screenshot on leak 
consecutive months)  detection 
 Complete Appendix B2   Rainwater tank 
 Water Efficient Irrigation 
System and rain sensor 
Sustainable   Concrete/cement mix   Nil    Products (if applicable) 
Construction   POs/DOs of concrete (if 
& Products   applicable) 
 POs/DOs of products with 
corresponding SGBP/SGLS 
certificates (group items in 
folder in order of table in GM 
Score Calculator) 
 Complete Appendix B2 
Greenery   POs/DOs of compost recycled   Nil   Greenery provided  
from horticulture waste 
Item  Documents needed  Calculation needed  Photos 
Public   Complete Appendix B2   Nil    Bicycle Parking Lot  
Transport    Electrical Parking Lot  
Indoor Air   POs/DOs of products with   Nil    
Pollutants  corresponding SGBP/SGLS 
  certificates 
IAQ   POs/DOs of filtration media    Nil   DP Sensor / BMS screenshot 
management    Post construction IAQ report,  for DP sensors 
including surface testing report 
(3rd party, not builder) 
HF Ballast   POs/DOs of HF Ballast   Nil   Photo of HF Ballast if 
POs/DOs not available 
Green   POs/DOs of equipment (if   Calculation of   Installation Photos of 
Features and  applicable)  performance (if  equipment (if applicable) 
Innovations  applicable)   Photo of equipment 
Verification officers will request for more documents/calculations/photos if needed. 

Photos 
Photo requirements: 

 Please ensure each photo is less than 200kb when attached in this document. You may want to use bulk 
image resizer program to facilitate that by reducing the pixel dimensions. 