Plant: Faurecia - F.A.S San Luis Potosí Frames, Mexico ressources
MIFD ACTUAL MVS2G - San Luis Potosí Frames - September 2017 Authors: Tristan DUPONT (FES)
Latest Update: 30/09/2017
Updated by: Sofía DAVILA (PC&L Manager), Alexis MAALEM (PC&L), Moisés HERNANDEZ (UAP Manager Audi Cushions), Othon LOPEZ (UAP Manager Audi Backframes), FES Engineers (M. CUISNIER, L. DURVEL, U.
FLORES)
PIC – Plan Industriel & Commercial
Master Schedulers
1/M, 3rd Thursday
(M-5)
Sales & Operation
plan volumes &
calendar
Validated by: Mauricio ESPINOSA (Plant Manager), Juan POMBO (FES Manager), Sofía DAVILA (PC&L Manager), Moisés HERNANDEZ (UAP Manager Audi Cushions), Othon LOPEZ (UAP Manager Audi Backframes) BOP – Stock Level
Monitoring Stock level
1/day
Material planners
Treatment –
program/line
Thursdays
Master Schedulers
Weeekly program /
Manifest / truck
line
eKanban List
Receiving
board
90% Loading CP
117837 Port of 4 operators
PRAEZ. ROHRE
Consolidation Puerto de SWT: 78min
Transport time Transport time Bremen Transport time Transport time 70%
GMBH CO
1 day Center 1 day 22 days Altamira 12 hours }
}
}
90% Backframe Power: 171s Backframe Power: 62s C/O: 5min C/O: 5min Others, 4 refs C/O: 0min Type: WIP Buffer
SIPS: 0 SIPS: 4 SIPS: 1 SIPS: 1 SIPS: 1 Type: FG
Nrefs: 2
Backframes: 13 operators + 1 waterspider
134122 Cushions: 27 operators + 1 waterspider Backframe Manual: 171s Backframe Manual: 62s TRS: 65% TRS: 65%
If
MOD: 1 Nrefs: 2
Backframe Discontinuous: 171s Backframe Discontinuous: 62s Type: BOP SIPS: 0 SIPS: 4 SIPS: 2 Type: WIP Buffer
Suppliers Canada
METRICAN Backframe Sportwire: 212s Backframe Sportwire: 62s
Nrefs: 2 Sportwire SPR-102-
P Nrefs: 2
Transport time } 4 refs
AUB
} } 1/W, TUE 1/W, TUE
128606
128557
WHITESELL CANADA
BROSE CANADA INC ESTAMPADOS 1 hour Backframe Crossmember: 182s Backframe Crossmember: 70s SWT: 41s } } } } } } } } } } } }
134428 METRICAN STAMPING CO. 14:00 14:00
Cushion MS4: 416s Cushion MS4: 73s C/O: 0min
137221
164897
127544
LISI AUTOMOTIVE SAS
L AND P AUTOMOTIVE GROUP LONDON
RITZ PLASTICS INC.
1–4–1 Cushion ES6/ES8: 452s Cushion ES6/ES8: 45s
PBR-201-
AUB A ASM-202-
AUB A CRM-203-
AUB A ASM-204-
AUB A ECK-205-
AUB A EOL A Empaque A (W-18) (W-2)
TRS: 65%
200742 NASG TENNESSEE NORTH 2 1 Waterspider If }
SWT: 53s SWT: 48s SWT: PBR-201 SWT: 50s SWT: ASM-204 SWT: 56s SWT: 38s
137201 GUELPH TOOL INC
Cushion MS8: 448s Cushion MS8: 34s SIPS: 2 Loading Pool
128557 BROSE CANADA INC DDP
APL-101- BCK-005- Sportwire 1 togger
P P W 1 operator
90%
Type: BOP DCP
Nrefs: 9
AUB AUB
4 refs
EOL } } } } } }
1 togger
} }
15min route
C/O: 5min C/O: 5min C/O: 5min C/O: 5min C/O: 5min C/O: 0min C/O: 0min
SWT: 14min
100%
100% P 100%
US CUSTOMS 154209 }
SWT: 62s
C/O: 5min
SWT: 59s
C/O: 5min Others, 4 refs
SWT: 50s
C/O: 0min
15min route } } } } } } } } } PINTURA
SWT: 132min
} } } } } } } } } } MOD: 0.5
SIPS: 0
MOD: 1
SIPS: 1
MOD: 0.5
SIPS: 1
MOD: 0.5
SIPS: 1
MOD: 0.5
SIPS: 1
MOD: 1
SIPS: 1
MOD: 1
SIPS: 1
METAL SYSTEMS
Type: WIP Buffer
Type: FG } } } } LEAR
Laredo, TX TRS: 65% TRS: 65% MOD: 1 C/O: 0min } } } } } } } } Nrefs: 6
Nrefs: 13
Loading Transport time Unloading Loading Unloading Loading Transport time Unloading Loading TPA Transport time
Suppliers USA OF MEXICO
Transport time
10 hours
SIPS: 0 SIPS: 4 SIPS: 2 Type: WIP Buffer
Nrefs: 2 } } } 34 min 20min 34 min 2 min
TRS: 75%
2min 34 min 20min 40 min 1 operator 8.5 hours
Huamantla
137309 LEGGETT PLATT, INCORPORATED SIPS: 0 Type: WIP Buffer
Type: WIP Buffer 2 operators 1 operator Type: WIP Buffer 1 operator 1 operator 1 operator 2 operators Type: WIP Shopstock
128599
121755
188447
BAIER AND MICHELS USA INC
FLEXOLATORS, L P
ALL RITE INDUSTRIES
5–5–1 Type: BOP
Nrefs: 2 Nrefs: 23 1 – 24 – 8 Nrefs: 23 Nrefs: 23 1 – 24 – 8 Nrefs: 23 Type: FG Poolstock
SWT: 14min 1–3–3
122408 METRICAN STAMPING LLC 1 P/box: 12
Waterspider LT: P/box: 12 / 56 P/box: 12 / 56 Nrefs: 25 3 TPAs Daily carsets: 801
134510 SAINT-GOBAIN PERFORMANCE PLA 39min LT: 112min LT: 30min P/box: 12
134629 ATLANTA PRECISION METAL FORMING SWT 1min
P/box: 10 Max 1 day Vehicle: Q5
213760 HELLERMANN TYTON S DE RL DE CV Qmax: 576 Qmax: 420
Opening time: 6 days, 3 shifts
191085
216803
CAMACO LORAIN MANUFACTURING
HATCH STAMPING COMPANY 100% LT: 799min LT: 9.7h
200742
APL-401-
137210 IGUS P MC APO 4 P EOL W TT: 83.2s 32 references: 24 backframes + 8 cushions
141867 CALSONIC KANSEI } AUB TT: 83.2s
137270 TPI POWDER METALLURGY Type: BOP DCP INCOTERM EXW SAN LUIS POTOSI
158860 DAIEI AMERICA INC
SWT: 62s SWT: 59s SWT: 50s }
Nrefs: ? Customer MPM 6MR = 6873
NASG TENNESSEE C/O: 5min C/O: 5min C/O: 0min If Pool is empty
Transport time
TRS: 65% TRS: 65% MOD: 1
NORTH 2 1 day 1 Waterspider
5–1–2
Type: BOP
Nrefs: 2
SIPS: 0 SIPS: 4 SIPS: 2 Type: WIP Buffer
Nrefs: 12 MOD Work Content PBR-101-
AUB A ASM-102-
AUB A CRM-103-
AUB A ASM-104-
AUB A ECK-105-
AUB A EOL A Empaque A
} Backframes: 132min/12pz
Shopstock: 2 operators SWT: 53s SWT: 48s SWT: PBR-101 SWT: 50s SWT: ASM-104 SWT: 56s SWT: 38s
Suppliers Germany Cushions: 132min/12pz
Paint: 2 operators C/O: 5min C/O: 5min C/O: 5min C/O: 5min C/O: 5min C/O: 0min C/O: 0min
117852 EBERLE RIEDEN GMBH Tubes: 132min/56pz
126539 POLPLAST POLSKA SP. Z.O.O.
85% MOD: 0.5 MOD: 1 MOD: 0.5 MOD: 0.5 MOD: 0.5 MOD: 1 MOD: 1
102868 NEDSCHROEF ALTENA GMBH
1342000000 FAURECIA WALBRZYCH S.A.
1343000000 FAURECIA WALBRZYCH S.A.
213125 Type: WIP Buffer
SIPS: 0 SIPS: 1 SIPS: 1 SIPS: 1 SIPS: 1 SIPS: 1 SIPS: 1
} }
115808 BAIER UND MICHELS GMBH CO. KG
Type: BOP DCP
APL-201-
P MC APO 2 P EOL W Type: FG
Supervisor
110885 ZAKLADY METALOWE POSTEP S.A.
116643 GESIPA-BLINDNIETTECHNIK GMBH MEPEPSA, S.A Nrefs: 9
AUB Nrefs: 6 Nrefs: 13
137667 SCHUKRA BERNDORF GESMBH
164976 FACIL CIE SAARLOUIS
115975 BROSE FAHRZEUGTEILE GMBH CO.KG
Consolidation Transport time }
SWT: 62s SWT: 70s SWT: 50s Checks TPA and
117202 JOHNSON CONTROLS COMP (USE 216582)
DE CV 4 hours C/O: 5min C/O: 5min C/O: 0min
communicates the
164925 BAUMGAREN GMBH
131266 WILLIAM HUGHES LTD Center 5–3–2 TRS: 65% TRS: 65% MOD: 1
Port of 90%
128850 MCGA CZECH S.R.O
Puerto de FAURECIA C/O: 5min C/O: 5min C/O: 5min C/O: 5min C/O: 0min
MOD: 1 MOD: 0.5 MOD: 0.5 MOD: 1 MOD: 1 } }
Shanghai + Planta Type: FG
1/W, TUE 1/W, TUE
Altamira PRP-101-
P P P P GEN-107-
P
Type: WIP Buffer
Nrefs: 6
SIPS: 0 SIPS: 1 SIPS: 1 SIPS: 1 SIPS: 1
Nrefs: 14
14:00 14:00
Customs Mecanismos SLP1
Transport time
1 hour
AUC
SWT: 26s
Retrabajo 1
SWT: 30s
RIV-203-AUC
SWT: 18s
RIV-204-AUC
SWT: 34s
AUC
SWT: 33s
(W-18) (W-2)
Suppliers France Loading Pool
130096 S.A.NJO CORTE FINO
164844 BONIONI SA 5–5–1 C/O: 5min C/O: 0min Door side C/O: 0min C/O: 0min C/O: 0min 1 operator
101215 STEVA FOREZ
1182000000 FAURECIA SIEGES D'AUTOMOBILE S.A. TRS: 54% TRS: 54% TRS: 52% TRS: 52% TRS: 52% SWT: 14min
100%
108022 AGRATI GIE
Consolidation
131197 NEDSCHROEF FASTENERS SA
102794 SOMICA SIPS: 0 SIPS: 2 SIPS: 0 SIPS: 10 SIPS: 20 Door side RH
Tunnel A A A MAGNA
NEDSCHROEF FASTENERS SPAI TTK-110-AUC TSP-120-AUC EOL
130096 SANJO FINE BLANKING BARCELONA
WMM-102-
P } } } }
side AUC
Center
158752 ARCONIC FASTENING SYSTEMS RINGS
205580 DRAHTZUG STEIN CUSSET SWT: 116s SWT: 55s SWT: 65s
Tunnel side RH Loading TPA Transport time
127990 MCGA PORTUGAL UNIPESSOAL, LDA
116996 INCOMPOL INDUSTRIA DE COMPONENTES
193180 ITS PORTUGAL
SWT: 28s
C/O: 8min
C/O: 5min C/O: 5min C/O: 0min 1 operator 4 days
Chattanooga
1353000000 FAURECIA - ASSENTOS DE AUTOMOVEL, Tunnel side LH MOD: 1 MOD: 1 MOD: 1 SWT: 14min
158752 ALCOA FASTENING SYSTEMS
108081 IP3 VENDEE TRS: 65%
Type: FG
Type: FG Poolstock 1–3–3
144463 C.V.B. S.R.L.
214469 STEVA ORLEANS Tunnel SIPS: 8 Type: WIP Shopstock Type: WIP Buffer
SIPS: 0 SIPS: 1 SIPS: 1 Nrefs: X 2 TPAs Daily carsets: 393
Nrefs: 1
Type: BOP Type: WIP Safety PRP-114- CBX-116- Nrefs: 1 P/box: 10 Vehicle: CrossBlue
100856 CGR SAINT YORRE SAS
Nrefs: 4
side Nrefs: 4 Door side LH Nrefs: 4 AUC W RIV-115-AUC W AUC W EOL W Qmax: Y
Max 1 day
PRP-201-
P Retrabajo 2 P RIV-103-AUC P RIV-104-AUC P GEN-105-
P LT: Z
Opening time: 5 days, 3 shifts
AUC AUC SWT: 35s SWT: 35s SWT: 48s SWT: 80s
10 references: 6 backframes + 4 cushions
SWT: 27s SWT: 24s SWT: 18s SWT: 34s SWT: 33s C/O: 0min C/O: 0min C/O: 0min C/O: 0min INCOTERM EXW SAN LUIS POTOSI
C/O: 2min C/O: 0min Door side C/O: 0min C/O: 0min C/O: 0min MOD: 0,5 MOD: 0,5 MOD: 0,5 MOD: 0,5 Customer MPM 6MR = 0
Suppliers China TRS: 54% TRS: 54% TRS: 52% TRS: 52% TRS: 52% SIPS: 0 SIPS: 30 SIPS: 30 SIPS: 1 Type: WIP Buffer SBO-312- If Pool is empty
164951 SUZHOU HONGLI AUTOMOTIVE PARTS CO., Nrefs: 1
ASL-102-AUC A ASL-103-AUC A ASL-104-AUC A ASL-105-AUC A AUC A EOL A EMPAQUE A
SIPS: 0 SIPS: 2 SIPS: 0 SIPS: 10 SIPS: 20
Puerto de
137108 YUYAO LIFT AUTO PARTS CO, LTD
SWT: 49s SWT: 46s SWT: 49s SWT: 53s SWT: 156s SWT: 53s SWT: 42s
Consolidation Port +
109710 LISI AUTOMOTIVE (SHANGHAI) CO LTD
134524 ZHEJIANG SHENGHUABO ELECTRIC
164855 SHANGHAN PHOENIX IMP. & EXP CO. LTD
127674 IMI INDUSTRIES (SUZHOU) CO., LTD.
C/O: 5min C/O: 5min C/O: 5min C/O: 5min ES6/ES8 C/O: 5min ES6/ES8 C/O: 0min C/O: 0min
P
Center Customs FRT-116-AUC
167619 NINGBO SHUANGLIN AUTO PARTS
MOD: 1 MOD: 1 MOD: 1 MOD: 1 MOD: 1 MOD: 1 MOD: 1
116712 GUANGDONG ZHAOQING L V CO.,LTD
1037000000 FAURECIA (WUXI) SEATING COMPONENTS
211259 EVA PRECISION INDUSTRIAL
158313 SHANGHAI FST AUTOMOTIVE PARTS CO.,L
Manzanillo SWT: 76s
Type: WIP Buffer
SIPS: 1 SIPS: 1 SIPS: 1 SIPS: 1 SIPS: 4 SIPS: 1 SIPS: 1
Type: FG
212980 LUCKY HARVEST CO., LTD C/O: 15min
193535 ZHEJIANG MEILI HIGH TECHNOLOGY CO
Nrefs: 6 Nrefs: 8
122454 SHANGHAI RIHAN PRECISION MACHINERY
TRS: 61%
MS8
CBX-211- MS8/ES8
SIPS: 0 W EOL W CLA CLIP 1 P
}
AUC
PLASTIC HFR-101-
} }
SWT: 50s
SWT: 65s SWT: 73s
BRIDGE A AUC A Supervisor
C/O: 3min C/O: 0min SWT: 53s SWT: 57s C/O: No
MOD: 1 MOD: 1 C/O: 5min C/O: 5min TRS: TBD Checks TPA and
1 Waterspider
SWT 7min SIPS: 0 SIPS: 2 Type: WIP Buffer
Nrefs: 2 MOD: 1 MOD: 1 SIPS: 0 communicates the
Type: BOP Type: WIP Shopstock LH SIPS: 0 SIPS: 1 demand to the lines
Nrefs: 3 Nrefs: 3
P/box: 10
FRT-117-AUC P P/box: 72
Qmax: 600 SWT: FRT-116 Qmax: 288
LT: 218min LT: 166min }
CLA CLIP 1 P } }
C/O: 15min CBX-111- 1/W, TUE 1/W, TUE
TT: 21.8s TT: 34.5s AUC W EOL W SWT: 50s
14:00 14:00
TRS: 61%
SWT: 65s SWT: 73s C/O: No
SIPS: 0
(W-18) (W-2)
C/O: 3min C/O: 0min 2 Waterspiders TRS: TBD
CHECK
ASL-402-AUC A ASL-403-AUC A ASL-404-AUC A POSITION A EOL A EMPAQUE A
SWT: 49s SWT: 46s SWT: 49s SWT: 54s SWT: 33s SWT: 48s
C/O: 5min C/O: 5min C/O: 5min C/O: 0min C/O: 0min C/O: 0min
MOD: 1 MOD: 1 MOD: 1 MOD: 1 MOD: 1 MOD: 1
SIPS: 2 SIPS: 1 SIPS: 1 SIPS: 1 SIPS: 1 SIPS: 1 Type: FG
Type: WIP Buffer Nrefs: 4
Nrefs: 2
ASL-401-AUC A
SWT: 55s
C/O: 10min
MOD: 2
SIPS: 0
MIFD Data: LEAR Huamantla
CHECK
ASL-303-AUC A ASL-304-AUC A ASL-305-AUC A POSITION A EOL A EMPAQUE A
SWT: 49s
C/O: 5min
MOD: 1
SWT: 46s
C/O: 5min
MOD: 1
SWT: 49s
C/O: 5min
MOD: 1
SWT: 54s
C/O: 0min
MOD: 1
SWT: 33s
C/O: 0min
MOD: 1
SWT: 48s
C/O: 0min
MOD: 1
A- LEAR OPENING TIME
SIPS: 1 SIPS: 1 SIPS: 1 SIPS: 1 SIPS: 1 SIPS: 1 Type: FG
Type: WIP Buffer
Nrefs: 4
Nrefs: 2
- 1st shift: 8 hours, 6 shifts/week
ASL-302-AUC
SWT: 55s
A AUDI / MVS2G Cushion Assy - 2nd shift: 8 hours, 6 shifts/week
- 3rd shift: 8 hours, 6 shifts/week
C/O: 10min
MOD
MOD: 2
Line MS2: 3 operators Work Content Cycle Time
SIPS: 0 Conveyor 1 (ES6/ES8/MS8): 10 operators
Conveyor 2 (ES6/ES8/MS8): 10 operators
Cushion MS2: 236s
Cushion MS4: 334s
Cushion MS2: 116s
Cushion MS4: 54s
Programmed downtime per shift: 60min
Conveyor 3 (MS4): 8 operators
Conveyor 4 (MS4): 8 operators
Cushion ES6/ES8: 608s
Cushion MS8: 452s
Cushion ES6/ES8: 57s
Cushion MS8: 57s
Line availability: 21h/day, 6 days/week
+ 2 Waterspiders
Supplier In-house Transportation Transportation Port and Customs Transportation Transportation Port- Transportation Loading Water- Buffer Truck Truck Truck Buffer Paint Paint Paint Buffer Truck Truck Truck Shopstock FG End Pool Stock
processes Supplier - CC
Consolidation Center
CC - Port China China - Mexico
Port Mexico
FARGOS
Control FARGOS
FAR-SLP2
TRA Loading CP Mass Storage BOP CP BOP
platforms
Togger DCP BOP Sub-Assembly Shopstock WIP Sub-Assembly Buffer WIP
Spider WIP Load SLP2-SLP1 Unload WIP Load Process Unload WIP Load SLP1-SLP2 Unload WIP
Water-Spider WIP Buffer Assembly Process Loading Pool Stock Loading TPA TPA Transport to client
of Line FG
132min Total of Added Value:
76sec 452sec 608s 150.9min
Complete Lead-time:
2.2h 44.6 days
528h 0.3h 34min 34min 34min 40min 5min Total of Transportation:
24h / 1 day 24h / 1 day 12h 1h 1.3h / 78min 0.5h / 30min 1min 20min / 0.33h 2min 2min 20min / 0.33h 0.23h / 14min 0.23h / 14min 8.5h 603.3 hours = 25.1 days
22 days 18min 0.57h 0.57h 0.57h 0.67h 0.08h Lead-time Door-to-Door,
TRA to TPA:
218min 39min 112min 30min 799min 13min 0.18h / 24h / Total of Inventory:
72h / 3 days 48h / 2 days 24h / 1 day 3h 1h 260h 1.8h 166min / 2.8h 21min / 0.35h 9.7h 467.0 hours = 19.5 days 13.7 days
3.6h 0.65h 1.87h 0.5h 13.3h 0.22h 11min 1d