Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
INSTRUCTIONS
84179360 HI-FLOW, CASE DRAIN KIT
SKID STEER LOADERS
CASE MODELS
420, 430
© 2009 CNH America LLC. All Rights Reserved. 84179282 Issued February 2009
Case is a registered trademark of CNH America LLC.
Printed in U.S.A.
INSTRUCTION
SHEET
INSTRUCTIONS FOR INSTALLING
84179360 HI-FLOW, CASE DRAIN KIT ON
420 AND 430 SKID STEER LOADERS
PARTS LIST
REF. PART NO. DESCRIPTION QTY. REF. PART NO. DESCRIPTION QTY.
2. Park the machine on a level surface. 14. Fasten the tube assemblies (40 and 41) together
using the bolts (1 and 14), twin clamp (3), two
3. Unpin the lift cylinder support strut and let rest on
clamp bars (5), lock washers (16) and the nut
the lift cylinder.
(59).
4. Raise the boom until the lift cylinder support strut
NOTE: The bolt (2) replaces the existing bolt.
is in the locked position and install the lock pin.
15. Install the unions (60) to the tube assemblies (40
WARNING: Failure to pin the cylinder support strut
and 41).
may result in injury or death.
16. Fasten the tube assemblies (52 and 53) to the
5. Turn the ignition key to the OFF position.
unions (60) as shown.
6. Turn the ignition key to the ON position.
17. Fasten the tube assemblies (52 and 53) together
7. Lower the boom down on the lift cylinder support using the bolt (11), a tube bracket (28) and a
strut. spacer (31).
8. Turn the ignition key to the OFF position. 18. Fasten the tube assemblies (52 and 53) together
using the two tube supports (25).
9. Remove the key.
19. Connect the hoses (27) to the tube assemblies
INSTALLATION (52 and 53).
See Figures 1, 2 and 3 for steps 1 through 24. 20. Connect the tube assemblies (33 and 34) to the
hoses (27) as shown.
1. Replace the double gear pump with the new
double gear pump (51). 21. Connect tube (33) to tube (35) and tube (34) to
tube (36).
2. Install 45° stem bead hose connector (54) into
double gear pump (51). 22. Fasten the tube assemblies (33 and 34) to the
LH loader arm using the last three tube brackets
3. Install 45° elbow (58) to double gear pump (51). (28), spacers (31), the plate (37), and the three
4. Remove the plug from the auxiliary inlet port of screws (39) as shown.
the control valve and install an 90° elbow (4) as 23. Install the bracket (32) as shown using the two
shown. screws (7).
5. Install a connector (10) and the 45° elbow (12) in 24. Install the female coupler (29) to the tube
the auxiliary work ports of the control valve as assembly (34) and the male coupler (30) to the
shown. tube assembly (33). Fasten both tube assemblies
6. Install straight connector (20) into combination (33 and 34) to the bracket (32) using the two lock
valve (24). nuts (21).
7. Install 90° elbow (9) into combination valve (24). 25. Connect harness from combination valve to
chassis harness breakout at (A).
8. Install long straight connector (57) into
combination valve (24). See Figure 4 for steps 26 through 39.
9. Fasten the combination valve (24) to the machine 26. Remove the 90 degree elbow located in the tank
using the two bolts (13), flat washers (22) and case drain port and install the tee (55).
square nuts (42). 27. Attach 90 degree elbow (23) to tee (55).
10. Install the tube assembly (50) between the elbow 28. Install edge guard (8) in LH tower inside diamond
(4) and the connector (20). shaped hole. This is where the hose will travel
11. Install the tube assembly (49) between the 90° through the tower.
elbow (9) and the existing tee as shown. 29. Attach the hose (18) to the 90 degree elbow (23)
12. Connect the hoses (46 and 47) to the auxiliary and route up the left hand tower as shown.
ports of the control valve as shown. 30. Secure the hose (18) to the rear auxiliary tube
13. Connect the tube assembly (40) to the hose (46) and auxiliary hoses using the hose ties (61) as
and tube assembly (41) to the hose (47). shown.
31. Connect hose (18) to tube (17).
32. Secure tube (17) to the bottom of the left boom
using the existing hardware and clamps (45).
33. Attach the tube to the inside of the LH boom 37. Attach the tube (17) to the tee (44).
using clamp (19) and screw (7).
38. Attach the cap (6) to the tee (44).
34. Attach the bracket (38) to the back side of the
39. Remove cap (6) when hydraulic coupler option is
quick disconnect mounting bracket using the
installed.
existing bulkhead lock nuts.
40. See Figure 5. Install the switch (43) in the LH
NOTE: Quick disconnect couplers need to be
A-post console. Connect to cab harness.
disconnected from the hoses and the bulkhead lock
nuts removed to be able to attach the bracket (38). 41. Replace the standard heel plate cover with the
new plate cover (48).
35. Attach the female coupler (26) to the bracket (38)
using the bulkhead lock nut (15). 42. Start engine and check for leaks.
36. Attach the tee (44) to the female coupler (26).
12
10
4
A
49
56
24
9
50
13 22 42
20
58
54
BS05F043
Figure 1
A. CONNECT TO CHASSIS HARNESS BREAKOUT
28 31 39
27
28 31 39
25
34
28 31 39 37
53
52
28 31 11 7
3 33
5 29 21
60
16
14 47
46
32 30 21
40
41 1 3 5 16 59
BS06H019
Figure 2
27
34
43
53
52
33
46 60
47
35
51 36
40
41
57
50 48
56
BS05F045
Figure 3
18
45
61
45
17
61
23
40
38
19 7
44
6
15 26
Figure 4
43
Figure 5