Sei sulla pagina 1di 3
IR - INSPECTION REQUEST WEST QURNAI~ SECTIONAL Contractor No.: AWQ0109 ExxonMobil Peorace le gta ae eeareeera ECe Produced Water Treatment M109 LOCATION: 05-6 NO: RNOCEOO36 | WRISSUE DATE: 10 February 2037 DISCIPLINE: ci susie | wines INSPECTION REQUIRED DATE: February 2027 | rmEsg0 TF. SPECFICATON: {QW F-NSPOS-0. 040501 REV EARTHWORK [Re peawines: [QQQ-CEIO0-LDP.07-0001 REV. 057 PLOT PLAN | RFE, ITP: a 1QWQ-CE1092-CPQAC-00-0001CIVIL REV. C INSPECTION AND TEST PLAN OTHERS REF. ee TATTACHMENT [CHECK UST FA | NAME oF conTRAGTOn/sunconRACTOR:[cPECCIAnDAR™ Seen ‘Our request the inspection of the following works for cortficate/witness that all Kems has been properly executed In accordance with approved procedures, specifications, drawings and all tems has been coordinated with future works. DISCRIPTION OF WORK TO BE WITNESS: ‘Sampling the first layer for compaction degree test . Request witness | COMMENTS: Elaccerteo Glaccerren wir comments resecreo Clworkisnot ready Clunacesptabie inspection resut \See comments Cex THis Box iF “NO” EMIL / SOC andif it isa “WITNESS” as per ITP, (by ticking this box means CPECC needs to produce all the related documents and sign / close this IR) SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT ‘SUBCONTRACTOR ‘ePECC. COMPANY ‘OTHERS PRINT NAME: PRINT NAME: PRINT NAME PRINT NAME’ Ammor Gakkir] shizerg 720 pomeed Me SIGNATURE: SIGNATURE: eT pare tf D- 30) _ | oA “iF 2=2olF DATE: 1/2/2217 | DATE: AL FAO COMPANY. FOR ENGINEERING TESTING Po enlist) Guwrias) Guagrel NO: 1011 Date: 13/02/2017 Fao Code:770/17 To\China Petroleum Engineering & Construction Corporation Sub\ Test Report (Re-Compaction of Soil) Information requested test : No, @ Date of test request Area Location (CE-C0036@ 10 -02-2017 Ds-6 CPECC/MFCO Test date : 12-02-2017 Result: No. | Moisture content (%) | Dry Density (gm/em’) 1 15 1.802 104 2 n 1.693 98 Max dry density (gm /cm’) 1.729 ‘Optimum moisture content (%) | 7 Notes: ‘The test for M.D.D done according to(ASTM D 1557-002), and for soil test according to (D2937-07). = The result represents sample tested only. ‘The Sample brought and received by Mr. ( nan ae Ablam Almansor FP13-04 heeam Pagel ExxonMobil West Qumna | Form No. F70102Q Contract:AWQ0109 Rev. 0 Project Location: Basra, Iraq Serial No. QUALITY CHECKSHEET - FIELD COMPACTION TEST RECORD Tag Description Tag No. Dsk Contract No. Aunties ‘System No. Contractor Open. ‘Sub-System No. Dsb- AeT 68 losp Drawing Reference Location Drawing No,, Heap Specification No. Tac H- a pos=bocoet| Tos Date 2017, 2-13 petit Bachpall ing Lif Thickness _ yom Min. Compaction Reaured: __ 95% Laboratory Standard: Toren Dee 29.21} Man Density _ 1-729 9"/3_ Optimum Moisture TK Field Test Bauip jem SN Comection Factor Location Sketch © ae eee L 1s | 4902] fo. 2 22_| 24971 _ 99 —L Comments: Contractor/Construction Rep. Contractor/Quality Rep. ‘Company Rep. ‘| nave noi weed = [sme Ma Gn ane Signature: SRL | Some OP Signature oe QO 2-14 [om dogg Dae “PL/1*

Potrebbero piacerti anche