PERT uses _____ as a variable which represents the planned resource
application along with performance specification. MCQ
CPM is used to compute the earliest and latest possible _____ time for
each activity. MCQ
_____ deals with unpredictable activities MCQ
_____ is a compression technique applied to CPM, to shorten the project dura
MCQ
_____ – dimensional feasibility analysis is a vital exercise. MCQ
Project Feasibility Analysis results in a reasonably adequate formulation of
the project in terms of ______ . MCQ
Feasibility analyses are used to ______ . MCQ
The _____ feasibility refers to the ability of the process to take advantage o MCQ
The _____ feasibility involves the capability of the infrastructure of a proc MCQ
The _____ feasibility analyzes sis, the feasibility of the proposed project to MCQ
The _____ feasibility attempts to assess the capability of the project organi MCQ
The _____ feasibility deals with the compatibility of the proposed project wiMCQ
The _____ feasibility deals with the initial acceptance of the project and sus MCQ
The _____ feasibility is very much important. If the commissioning of the proj MCQ
Project initiation includes MCQ
The business case shows how the use of ______ resources are in support
of a business need. MCQ
A _____ outlines the purpose for the project and how it will be structured and executed.
MCQ
A _____ is a physical space in the office or work site where the project
manager and support staff are located during the project. MCQ
Contribution is ______ MCQ
______ costs do not alter with change with change in quantity of units manufactur MCQ
______ costs do alter with change with change in quantity of units manufactured MCQ
Page 2
Sheet2
Answer Option 1 Option 2 Option 3
1 temporary permanent perishable
2 completed on time executed within budgeted costs
3 temporary perishable fixed
3 team spirit life cycle no sequence of activities
2 performance raw materials within budget
1 all of the following expansion project modernization project
3 scope quality ignore timings
1 neighbouring site related problems owners related factors vendors related factors
4 ignoring of needs and opportunities development of propose implementation of home solu
1 Project management body of knowled Project members body o Project managing body of k
Page 3
Sheet2
Page 4
Sheet2
Option 4
unique
within prescribed quality
ignorable
unique activities
time scale
replacement project
costs
contractors related factors
terminating the project
Project managers body of knowledge
Project profit
Project profit
World bank
Planning
Resources
Page 5
Sheet2
Speed
Start
Transportation Model
Games
Reverse
Material
Material
Page 6