IR — INSPECTION REQUEST
WEST QUANA I~ SECTION-1
Contractor No.: AWQ0109
fo ee eemeeeeeeeeceeeee —
Project Title: ect
Produced Water Treatment M109
sunecr | wapecton [msrecnonREQUREDOATEs arch 20:7 | THMEI30
REF.SPECIFICATIOI 1QWA-FT-NSPDS-00-040101 REV.0 CONCRETE DESIGN AND CONSTRUCTION
1QWQ-CE1091-CDFNO-D7-0013 REV.1 FOUNDATION FOR SHELTER IQD7-
eeciestaeneeett Hie PBE6B1051A/B & IQD7-PBE6B1052A/8 PLAN SECTION & DETAILS, |
ie [awe:ce1022-cP0nC00-001 RED CMILINSPECTION AND TEST FLAN
amarere?
ATTACHMENT PEEKS IFA
NAME OF CONTRACTOR/SUBCONTRACTOR | CPECOIMRCD
| Our request the inspection of the following works for certficate/witness that all tems has been properly executed in
accordance with approved procedures, specifications, drawings and all tems has been coordinated with future works.
DISCRIPTION OF WORK TO BE INSPECTED:
Inspection quality of the re-bars for the foundation of the shelter (1D7-PBEG81051A/8 & IQD7-PBE681052A/8) in
os7
COMMENTS:
Claccepreo Ziaccerreo with COMMENTS Giresecteo -
- und. works not ready
wi) unacceptable inspection result
| Cisee comments
D1 Tick THIs 80x 1F “NO” EMIL / SOC and if tis a “WITNESS” as per ITP,
(by ticking this box means CPECC needs to produce all the related documents and sign / close this IR)
SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT
SUBCONTRACTOR cPECC ‘COMPANY ] OTHERS
| PRINT NAME: PRINT NAME: PRINT NAME PRINT NAME
Khalid wale ShHIRITHO | Abe Musa —
se) sana | senaToRe gman:
Cx ' Wi, 4
| AR
vate: 26.2.7 F| oat: 16-3 20/F [pate 27 May /F | oar: |West Qurna |
Contract: AWQ0109
Project .ocation: Basra, Iraq.
Form No. F71002Q
Rev. 0
Serial No.
QUALITY CHECKSHEET - CONCRETE INSPECTION RECORD
STELTERFOUNDATION 7
Mi (PBEESINSIA/B & PBEGS oszam_| TA NO. DS7/M109 7
Conwat AWQOI09 Stem No
Contactor cvece Sub Sytem No
Drawing Rater [GEO CBINDT Location [ps7
Location coordinates):
NOTE: Verity Delivery Ticket before wnloadng and atach to this form
Description Contractor hye l
Veri'y form work, Construction and Control Joints
Verily rebar and covering, consolidation
MPN
3. Verily grounding/earthing
4. Verily embedments in place i. pipes, conduits
3. Verily anchor bolts fixed, measured and greased - taped off
Material certificates checked, if applicable
6. Verify template (vessels, columns)
7. Verify weather protection
8. Verify curing duration and finish
9. Verify design mix
10. Verify test cube taken. Amount
11, Patching Pointing
12, Saw cut joints, Install joint sealant
13. Application if hardeners or dust proofing
14, Pourdate
15. Formwork remove date
16, Pouraccepted
Contractor/Construetion Rep. Contractor/Quality Rep.
Company Rep.
wane Khalid yo ood
W-3-Ww!}
None ¢Ufzorgy Tao =
Due: 2 ie [ Bae Date:
a7 Aw
*PL/1*ONnMODI dece
‘West Quima | Form No. F71001Q
Contract: AWQ0109 Rev. 0
Project Location: Basra, Iraq Serial No.
PRE-CONCRETE INSPECTION CHECKLIST.
Tag Deserpton (rauatitsiame pabsbiosamy | TN se)
Contract No. AWQ0109 ‘System No,
Contactor crnce Sub-St No _
Oring Reference TO CETON COND. Locsion I
Conse Sicscsn_DSTAIOD EqipmenSicl St Dein No.
fete ins: _JQWG-CETOD-GDFND.O7SnOTIa 1G Herel aig No
Cons Retr Em Ding No. LUG Mahar Dring No
1 Forms 3. Saf anatn SM,
Savy Chcted ls —
—oFimaon cammetian tous
Lecwion(Cand)——__Cleminess swt Reged
Sin any ing Ase
rasa —ladig Layer perth
Tem Antoied ean sere Specinen
ane versa & Beet tr Wear Pracion
sh Les Pb Eabments sons
Adequate Brung _—_Anchr Bolts Diameter, Length, Typ) cil Placing Equip. Required (Tremies, Pumps,
> Restle Anchor Bots (Location, Praection) Per Survey Book Form Vibrators Sere)
Grate Anchor Bol Sleeves Leakage Systm In Poe
Z Sine Aneto Holt Grounding nish Slope
Zspless rin Poet
Spacing ___Weld Pads
Crane ae to
Z2oranies aes
TZrdegate suppor pes,
cont
Ground WiretEaching
Water Stop
‘6. Onder Conerate To The Foloning Specteatons?
Mix Dsign unis Deter Pe Hour
Ma Asp Sie No OF Tet Cynder
sun No Sets Reyes
Adisues —
ema
ContractoriConstruetion Rep. Contractor/Quality Rep. Company Rep.
hie Khelil wlabaed ane Sido Too ame
oe: OK 2. Date rw! yal) [owe ZF) ne |
“PL/i*