AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

SUMMARY OF COSTS FOR CIVIL WORKS


AMOUNT
DESCRIPTION BIRR USD
CIVIL WORKS
BILL 1: General Items

BILL 2: Construction of well field collector and ancillary buildings

Bill # 2.1:Control Room at 21 BHs (SANFBH 1-SANFBH 21)


Bill # 2.2:Construction of 21 Generator seat @well field
Bill # 2.3:Construction of 21Guard House @well field
Bill # 2.4:Construction of Toilet ,Septic tank,Soak away pit, fencing work &
demolishing existing pump & generators house @ SANFTW-3
Bill # 2.5:Collector pipe and fittings Supply & laying works
BILL 3: Construction of Collection tank and ancillary Bdg's @Tullu
Guddo
Bill # 3.1:Construction of 10,000m3 Collection Resrvoir @Tullu Guddo
Bill # 3.2:Construction of 5,000m3 Collection Resrvoir @Tullu Guddo
Bill # 3.3:Construction of operators Dewelling with toilet@Tullu Guddo
Bill # 3.4:Construction of Guard house @Tullu Guddo
Bill # 3.5:Construction of Chilorination Room @Tullu Guddo
Bill # 3.6:Construction of Toilet ,Septic tank,Soak away pit, fencing work
Bill # 3.7:Compound site work @Tullu Guddo
Bill # 3.8:Construction of control and monitoring Room @Tullu Guddo
Bill # 3.9:Construction of Generator House @Tullu Guddo
Bill # 3.10:Construction of Transformer House @Tullu Guddo
BILL 11: Acceses Road Construction
Total
VAT (15%)
Grand Total Project Cost

1/130
Summary
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Grand Total Project Cost (ETB)

2/130
Summary
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Bill 1: GENERAL ITEM FOR CIVIL WORKS

UNIT PRICE TOTAL


ITEM UNIT QTY
DESCRIPTION BIRR USD BIRR USD
Mobilization and demoblization of Manpower,
equipment , plant and construction materials and
movement off the works site on completion. Include for
all Manpower, equipment , plant and construction
1.1 materials, temporary measures, machines, tools, LS 1.00
materials, facilities for workers, water and electricity
supply etc. Accommodation, buildings, storage areas etc

Establishment of temporary testing laboratory with full


equipment and removal after completion of the project
The equipment to be used shall be appropriate to the
1.2 LS 1.00
work and as per the instruction of the Engineer
Equipment to revert to the Contractor at the end of the
works.

Provision for external laboratory for with full equipment


testing construction material ,concrete soils and rock.
1.3 PS 1.00
The equipment to be used shall be appropriate to the
work and as per the instruction of the Engineer.

Allow for international air transport economy fare for four


1.4 employer's inspectors, from Addis Ababa to place of LS 1
manufacture of supply and return.
Allow all expences for Employer's inspectors in country
1.5 of manufacture or supplier per for calendar days for four LS 1
persons

1.6 Day works LS 1

#1 General Item 1 /130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Commissioning of the equipment and training for the


1.7 LS 1
Engineers,project staff and/or maintenance staff

Establishment of Engineer's office including sanitation


facilities like telephone,internate and fax services for the
1.8 Project/Site Offices and provision and maintenance LS 1.00
cost for telephone, power, water etc. other utilities
/facilities/. as specified or as instructed by the Engineer

Provision of office equipements, stationery


1.9 LS 1.00
items,equipement for office cleaning

Establishment of storage areas for pipe and fittings and


1.10 construction of pipe sheds at each site and their remove LS 1.00
after completion of the project
Establishment of office parking and access and remove
1.11 LS 1.00
after the completion of the project

Establishment of Contractor's offices, stores, canteens


and other facilities for execution of the Works and
1.12 removal after completion of the project. Details of LS 1.00
proposed land where the Contractor will establish his
camp(s) to be submitted with the Tender.

Insurance for the works, plants, materials, equipment,


1.13 property and injury or death to the workmen as per GCC LS 1.00
clause 13 and third party insurance.

1.14 Carry out Topographic and longitudinal Joint survey by


licenced Surveyor & contractor Engineer LS 1.00
1.10. Services
Provision and maintenance of office equipment for the
1.10.1 engineer office inaccordance with the general LS 1.00
specification

#1 General Item 2 /130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Provision and maintenance of safety equipment for the


1.10.2 LS 1.00
engineer and first AID provision

Provision of drivers, fuel and maintanance for the


1.10.3 PS 1.00
engineers vehicles through out the project duration

Allow for provision and maintenance of surveying


equipment as specified for the sole use of the Resident
Engineer with surveying team( by licenced Surveyor)for
1.10.5 each site. The equipment to be used shall be appropriate LS 1.00
to the work and as per the instruction of the Engineer
Equipment to revert to the Contractor at the end of the
works

Provision of new (4x4) pickup 4 WD 2.5L disel ,model


1.10.6 2015 , 2 double cabin vehicle to be returned/given back PS 1.00
to the client up on completion of the project

Provision of comprehensive insurance for 2 vehicles for


1.10.7 LS 1.00
the project period

Provision and erection of of 4(2x1m size) sign Board


1.10.8 welded to 11/2" GI pipe at appropraite site as ordered by LS 1.00
the Engineer
1.11 Miscellaneous items
Trial pits including all soils investigations, testing and
1.11.1 No 90.00
reports

Allow for the preparation of As Built Drawings,the


submission of all contractor's drawings in accordance
1.11.2 LS 3.00
with the contract & preparation of Operation and
Maintenance manuals.

1.11.3 Works to existing services ps 2.00


1.12. Other Supplies

#1 General Item 3 /130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Allow for the submission of all Standard documents &


Manuals mentioned in the contract document like
BS,EBCS,ISO,ERA MANUAL etc which help the
Contractor for the timely execution of the works all as
described in the General condition of
contract,Specifications and/ as shown in tender &/or
BOQ as directed by the Engineer and as dictated by the
1.12.2 field condition. LS 1.00
1.13 Other obligations

The Tenderer shall describe below any separate charge


he/she wishes to include:The Contractor shall describe in
detail hereunder other works, obligations and things
which may be referred to in the Specifications or which
he may consider have been omitted from the Bills of
Quantities and for which he desires to enter a separate
1.13.1 LS 1.00
charge (the charge to be carried direct to the amount
column). FULL DESCRIPTION OF ITEM(S) OF WORK
OR ANY OTHER ISSUE SHOULD BE MADE. If no
separate charge is made hereunder, the rates in the Bills
of Quantities will be held as covering all expenses for all
such works

Total of Bill 1: General Items Carried to Summary

#1 General Item 4 /130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 2.1: CONSTRUCTION OF CONTROL PANEL ROOM @WELL FEILD


UNIT PRICE TOTAL
ITEM UNIT QTY
DESCRIPTION BIRR USD BIRR
2.1. CONSTRUCTION OF CONTROL PANEL ROOM

2.1.1 Earth work


2.1.1.1 Clearing of site to remove top soil to a depth of 200
m2 30.00
mm
2.1.1.2 Excavation for stone masonry foundation; 0.6m
m3 15.60
width and 0.7m depth
2.1.1.3 Excavation for floor slab 0.3 m depth m3 2.65
2.1.1.4 Cart away and deposit excavated surplus material
m3 26.30
to a distance not exceeding 1km.
2.1.1.5 Supply, fill and compact approved backfill material
m3 10.45

2.1.1.6 Excavate for foundation,in hard formation m3 6.00


2.1.1.7 Provide and fill hard core with hard basaltic or
equivalent stone, well compacted and blinded with
crushed stone to a finished thickness of 25cm m2 16.65

2.1.2 CONCRETE WORKS


2.1.2.1 Lean Concrete of Grade C-15, 50mm thick blinding
m2 15.70

2.1.2.2 Reinforced concrete grade C-25 with minimum


cement content 360 kg/m3 cast into formwork and
vibrated around reinforcement bars in:
2.1.2.2.1 Grade Beams m3 1.26
2.1.2.2.2 Columns m3 1.11
2.1.2.2.3 Top Tie Beams m3 0.45
2.1.2.2.4 Lintels m3 0.55
2.1.2.2.5 Floor Slab m3 3.53

#2.1 Control Rooms 5/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

2.1.2.2.6 Re-inforced concrete for pipe support m3 4.50


2.1.3 REINFORCEMENT BARS
Provide, cut, bend and fix in position reinforced
steel bar. All according to structural drawing.
Price shall include tying wires

2.1.3.1 Diameter 6 mm plain bar kg 52.00


2.1.3.2 Diameter 8 mm plain bar kg 22.52
2.1.3.4 Diameter 12 mm plain bar(180) kg 392.00
2.1.3.5 Diameter 14 mm plain bar kg 60.98
2.1.3.6 Diameter 16 mm plain bar kg 88.11
2.1.4 FORMWORKS
2.1.4.1 Provide, cut and fix formwork m2 19.20
2.1.5 BLOCK AND MASONRY WORKS
2.1.5.1 Supply and raise 400 mm thick and 1.9m high hard
trachytic or equivalent stone masonry foundation
wall bedded in cement mortar mix 1:3 below ground
level. m3 9.84
2.1.5.2 Ditto, but above ground level ,, 4.50
2.1.5.3 Supply and raise 200mm thick hollow concrete
block (class A of the ES CD3.301) wall laid in m2 44.38
cement mortar mix 1:3
2.1.6 CARPENTRY AND ROOFING
2.1.2.1.1 Supply, assemble and fix in position eucalyptus roof
truss of width 5.3 m price shall include the
application of three coats and external anti-termite No 7.00
treatment as per the drawing
2.1.2.1.2 Supply and fix purlin in zigba wood size 50 x 70 mm
nailed into eucalyptus truss including three coats of m 40.00
anti - termite external treatment

#2.1 Control Rooms 6/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

2.1.2.1.3 Supply and fix roof cover in G-30mm corrugated


galvanized iron sheet fixed into zigba wood purlin
with dome headed galvanized nails (purlin and m2 32.00
ridge cover measured separately)

2.1.2.1.4 Supply and fix edge gutter formed in G-28 flat


galvanized metal sheet including support brackets
1mm thick shaped steel plate spaced at a
maximum spacing of 1000 mm c/c and fixed to m 10.00
purlin - price includes metal primer and two coats of
synthetic enamel paint

2.1.2.1.5 Supply & fix diameter 100mm down pipe in G-28


including 1mm thick metal support brackets fixed at
a maximum interval of 1000 mm fixed to walls or m 12.00
columns
2.1.2.1.6 Supply and fix 25x 250 mm fascia board to purlin
pcs 16.00

2.1.2.1.7 Supply and fix metal windows size 1.2x1.0m price


No 1.00
includes 4mm thick glass
2.1.2.1.8 Supply and fix metal doors size 2.10x1.0 with
No 1.00
figured glass in upper half portion
2.1.7 FINISHING WORKS
Finishing work shall include all surface pre-
cleaning, polishing and cleaning at the end of
finishing
2.1.7.1 Floor screed in cement mortar 20 mm thick m2 17.63
2.1.7.2 Apply three coats of plaster in cement mortar to
m2 38.80
internal cement concrete block wall
2.1.7.3 Ditto, but to external face of wall m2 45.42
2.1.7.4 Apply 3 coats of plastic paint to internal walls and
synthetic paint to metal doors and windows m2 42.12

2.1.7.5 Ditto, but to external face of wall m2 45.42

#2.1 Control Rooms 7/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

2.1.7.6 Electricity wiring including conduits,sockets and


switches, fluorescent lighting system as per the LS 1.00
electrical design and to standard of EEPCo.
2.1.8 DRAINAGE AND STONE PAVEMENT WORKS
2.1.8.1 Stone pitched trapezoidal drainage ditch pointed
with mortar (1:3) (top width=40 cm, bottom
width=20 cm and depth=30cm) around the control m 30.00
panel room as per the drawing
2.1.8.2 Stone pavement around the building having 1m
m2
wide 19.20
Total of Bill 2.1 : For construction of Control
Panel Room
Total for 21 No.Control Room

#2.1 Control Rooms 8/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

L ROOM @WELL FEILD


TOTAL
USD

#2.1 Control Rooms 9/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

#2.1 Control Rooms 10/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

#2.1 Control Rooms 11/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

#2.1 Control Rooms 12/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 2.2: Generator Seat Plat Form @ the Wellfield


RATE TOTAL
ITEM DESCRIPTION UNIT QNTY
Birr Birr
2.2.1 EARTH WORK AND STONE MASONRY
2.2.1.1 Top soil stripping,clearing and cartaway up to 250 mm m2 148.20
depth
2.2.1.2 Normal Material excavation m3 126.00
2.2.1.3 Bulk excavation in normal material depth up to 1.0m m3 56.00
2.2.1.4 Ditto, but excavation of trenches depth exceeding 1.0m m3 29.00
2.2.1.5 Excavate for foundation,in softrock formation m 3
24.00
2.2.1.6 Excavate for foundation,in hard rock formation m3 25.00
2.2.1.7 Disposal of Surplus Excavated material as directed
m3 126.00
by the engineer
2.2.1.8 Provide, fill and compact selected granular material
at a minimum of 95% procter density in layers of not
greater than 300mm thick at the footing wall and m3 63.00
abutment wall.
2.2.1.9 Provide and fill hard core with hard basaltic or
equivalent stone, well compacted and blinded with
crushed stone to a finished thickness of 25 cm under m2 75.00
the platform and ramp floor slab.
2.2.1.10 Construction of Stone Masonry Wall out of Fresh
basaltic or equivalent stone, well dressed and joined m3 29.74
with cement mortar mix 1:3
Total For Earth Work
2.2.2 CONCRETE WORK
2.2.2.1 Provide and place 50mm thickness Class C-10
Concrete bedding below foundations. m2 75.00

2.2.2.2 Reinforced concrete type C-25 filled into form work


and vibrated around reinforced bar.
2.2.2.3 Grade Beam m3 2.4
2.2.2.4 150mm thick Floor Slab m3 11.25
#2.2 Generator Seat 13/130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

2.2.2.5 Provide, cut, bend and fix in position reinforced steel Kg 632.20
bar. All according to structural drawing. Price should
also include tying wires.

2.2.2.6 Provide and fix vertical or inclined formworks


according to the forms shown in the drawing. m2 24.00

Total For Concrete Work


2.2.3 FLOOR FINISH, PAVEMENT AND CONDUT
2.2.3.1. Supply and Construct Terazzo tile floor Finish with
cement sand mortar bedding. m2 35.00

2.2.3.2. Supply and Provide Conduit at the Floor Slab as per


the requirement of Electromechanical Cable Duct Lm 10.00
Provisions.
2.2.3.3. 100mm thick Class C-20 Mass Concrete Pavement
around the Platform including Half Circular Diameter Lm 30.00
300mm concrete Side ditch.
Total For Concrete Work for one generator seat
Total for tweenty one(21) Generator Seat

#2.2 Generator Seat 14/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 2.3: CONSTRUCTION OF GUARD HOUSE @WELL FIELD

UNIT PRICE TOTAL


ITEM UNIT QTY
DESCRIPTION BIRR USD BIRR USD
CONSTRUCTION OF GUARD HOUSE
2.3
@WELL FEILD
2.3.1 Earth work
Excavate 20 cm topsoil,clearing and
2.3.1.1
grubbing m2 36.00
Excavate for foundation,in common soil
2.3.1.2
depth not exceeding 2.0m. m3 30.00
Excavate for foundation,in softrock
2.3.1.3
formation
Excavate for foundation,in hard rock m3 2.00
2.3.1.4 formation m3 2.50

2.3.1.5
Cart away of surplus excavated materials m3 43.50
Supply and compact approved backfill
2.3.1.6
selected material m3 16.00
2.3.2 Stone masonary work
2.3.2.1 provide, place and build with broken stone
for 250mm hardcore with hard basaltic
stone or similar stone m2 11.80
2.3.2.2 Provide basaltic or equivalent masonry wall
below ground surface. m3 12.36
2.3.2.3 Ditto,but above ground level m3 0.95
2.3.3 Provide, cut, bend and fix in position
reinforced steel bar. All according to
structural drawing. Price shall include
tying wires

2.3.3.1 Diameter 6 mm plain bar kg 45.00

15/130
#2.3. Guard House WF
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

2.3.3.2 Diamter 8 mm deformed bar kg 55.00


2.3.3.3 Diamter 10 mm deformed bar kg 20.00
2.3.3.4 Diamter 12 mm deformed bar kg 200.00
2.3.3.5 Provide, cut and fix formwork m2 38.00
2.3.4 CONCRETE WORKS
Lean concrete of grade C-15, 50mm thick
2.3.4.1
blinding layer under foundation m2 13.30
Reinforced concrete type C-25 filled into
2.3.4.2 form work and vibrated around
reinforced bars
2.3.4.2.1 Grade Beam m3 1.00
2.3.4.2.2 Column m3 1.40
2.3.4.2.3 Top Tie Beam m3 0.65
2.3.4.2.4 Floor Slab m3 0.93
2.3.4.2.5 Lintels m3 0.13
2.3.5 Hollow block, carpentery & roofing
work, door & window.
Supply and construct hollow block
2.3.5.1
(200x200x400)mm m2 32.00
Ditto, but for parapet wall
2.3.5.2
(150x200x400)mm m2 11.50
Supply, assemble and fix in position
eucalyptus roof truss of length 3.6 m price
2.3.5.3 shall include the application of three coats
and external anti-termite treatment as per
the drawing
No. 6.00

16/130
#2.3. Guard House WF
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Supply and fix purlin in zigba wood size 50


x 70 mm nailed into eucalyptus truss
2.3.5.4 including three coats of anti - termite
external treatment m 21.00
Supply and fix roof cover in G-30mm
corrugated galvanized iron sheet fixed into
2.3.5.5 zigba wood purlin with dome headed
galvanized nails (purlin and ridge cover
measured separately)
m2 16.00
Supply and fix edge gutter formed in G-28
flat galvanized metal sheet including
support brackets 1mm thick shaped steel
plate spaced at a maximum spacing of
2.3.5.6
1000 mm c/c and fixed to purlin - price
includes metal primer and two coats of
synthetic enamel paint
m 3.50
Supply & fix diameter 100mm down pipe in
G-28 including 1mm thick metal support
2.3.5.7 brackets fixed at a maximum interval of
1000 mm fixed to walls or columns
m 11.60
Supply and fix 25x 250 mm fascia board to
2.3.5.8
purlin m2 3.50
Supply and fix metal windows size
2.3.5.9 (0.80x1.30)m price includes 4mm thick
clear glass No. 2.00
Supply and fix metal doors size
2.3.5.10 (0.80x2.20)m with figured glass in upper
half portion No. 1.00

17/130
#2.3. Guard House WF
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

2.3.6 Finishing; finishing work shall include


all surface pre-cleaning, polishing and
cleaning at the end of finishing

Floor screed in cement mortar 20 mm thick


2.2.3.1
m2 10.00
Apply three coats of plaster in cement
2.2.3.2 mortar to internal cement concrete block
wall m2 34.50
2.2.3.3 Ditto, but to external face of wall m2 54.00
Apply 3 coats of plastic paint to internal
2.2.3.4 walls and synthetic paint to metal doors
and windows m2 34.50
2.2.3.5 Ditto, but to external face of wall m2 53.50
2.3.6 Electrical Installation
2.3.6.1 Supply & install distribution board DB-R2
for flush mounting with lockable door
consisting
2.3.6.2 1pc of ACB of 10A, 1-ph No. 2.00
2.3.6.3 2pcs fo ACB of 16A, 1-ph No. 1.00
2.3.6.4 Light points with switches, fed through PVC
insulated wire 2x2.5mm2 cable No. 3.00
2.3.6.5 Flush mounted socket outlets of
16A,220V,50HZ,fed through PVC
3x2.5mm2 cable, laid on the roof and in
16mm conduit in the wall. No. 2.00
2.3.6.6 Light fittings type philips TMS 012/1.36 or
equivalent with 1x36W lamps No. 3.00
2.3.6.7 Power line of PVC conductor of 2 x 4 sq
mm from MDB m 50.00

18/130
#2.3. Guard House WF
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

2.3.6.8 Road lighting steel columns complete, with


70 watt HPS fittings and lamps, wiring
MCB's, glands and all items necessry for
the works. No. 8.00
2.3.6.9 Flood lighting steel columns complete, with
two 500 watt HPS fittings and lamps,
wiring, MCB'S, glands and all items
necessary for the works No. 8.00
2.3.6.10 photoelectrical cells, with all wirng, conduit
and fixings as necessary for the works.
No. 2.00
2.3.7 Miscellaneous
Stone pitched trapezoidal drainage ditch
pointed with mortar (1:3) (top width=40 cm,
2.3.7.1 bottom width=20 cm and depth=30cm)
around the control panel room as per the
drawing
m 26.00
Stone pavement around the building 1m
2.3.7.2
wide m 18.00
Total of Bill No.2.3
Total of for 21 Guard House

19/130
#2.3. Guard House WF
AAWSA:PROJECT OFFICE SOUTH AND OUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 2.4: CONSTRUCTION OF TOILET ROOM, SEPTIC TANK, SOAK AWAY PIT.

UNIT PRICE TOTAL


ITEM UNIT QTY
DESCRIPTION BIRR USD BIRR
CONSTRUCTION OF TOILET ROOM, SEPTIC
2.4 TANK, SOAK AWAY PIT (@WELL FEILD)
2.4. Construction of Toilet Room
2.4.1 Earth work
2.4.1.1
Excavate 20 cm topsoil,clearing and grubbing m2 15.20
2.4.1.2 Excavate for foundation,in common soil depth
not exceeding 2.0m. m3 5.60
2.4.1.3 Excavate for foundation,in soft rock m3 0.50
2.4.1.4 Excavate for foundation,in hard rock m3 1.50
2.4.1.5 Cart away of surplus excavated materials m3 13.50
2.4.1.6 Supply and compact approved backfill selected
material m3 2.50
2.4.2 Stone masonary work
2.4.2.1 provide ,place and build with broken stone for
250mm hardcore with hard basaltic stone or
similar stone m3 2.25
2.4.2.2 Provide basaltic or equivalent masonry wall
below and above ground surface m3 5.60
2.4.2.3 Ditto,but above ground level m3 0.90
2.4.3 Provide, cut, bend and fix in position
reinforced steel bar. All according to
structural drawing. Price shall include tying
wires

2.4.3.1 Diameter 6 mm plain bar kg 13.47


2.4.3.2 Diameter 10 mm deformed bar kg 45.00
2.4.3.3 Diameter 12 mm deformed bar kg 135.00
2.4.3.3 Provide, cut and fix formwork m2 20.59

#2.4. Toilet,Septic tank,fenc 20/130


AAWSA:PROJECT OFFICE SOUTH AND OUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

2.4.4 CONCRETE WORK


2.4.4.1 Lean concrete of grade C-15, 50mm thick
blinding layer under foundation m2 3.60
2.4.4.2 Reinforced concrete type C-25 filled into
form work and vibrated around reinforced
bar to
2.4.4.2.1 Grade Beam m3 0.81
2.4.4.2.2 Column m3 0.50
2.4.4.2.3 Top Tie Beam m3 0.48
2.4.4.2.4 Floor Slab m3 0.85
2.4.4.2.5 Lintels m3 0.38
2.4.5 Hollow block, carpentery & roofing work,
door, window.
2.4.5.1 Supply and construct hollow block 200 x 200 x
400mm m2 20.50
2.4.5.2 Ditto, but 150x200x400 mm for parapet wall m2 6.30
2.4.5.3 Supply, assemble and fix in position eucalyptus
roof truss of length 3.6 m price shall include the
application of three coats and external anti-
termite treatment as per the drawing
No. 3.00
2.4.5.4 Supply and fix purlin in zigba wood size 50 x 70
mm nailed into eucalyptus truss including three
coats of anti - termite external treatment m 12.00
2.4.5.5 Supply and fix roof cover in G-28mm
corrugated galvanized iron sheet fixed into
zigba wood purlin with dome headed galvanized
nails (purlin and ridge cover measured
separately)
m2 5.80

#2.4. Toilet,Septic tank,fenc 21/130


AAWSA:PROJECT OFFICE SOUTH AND OUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

2.4.5.6 Supply and fix edge gutter formed in G-28 flat


galvanized metal sheet including support
brackets 1mm thick shaped steel plate spaced
at a maximum spacing of 1000 mm c/c and
fixed to purlin - price includes metal primer and
two coats of synthetic enamel paint

m 2.00
2.4.5.7 Supply & fix diameter 100mm down pipe in G-
28 including 1mm thick metal support brackets
fixed at a maximum interval of 1000 mm fixed
to walls or columns m 8.00
2.4.5.8 Supply and fix 25x 250 mm fascia board to ,, 2.00
purlin
2.4.5.9 Supply and fix metal windows size
(0.50x0.50)m price includes 4mm thick clear
glass No. 2.00
2.4.5.10 Supply and fix metal doors size (1.9x0.80)m
with figured glass in upper half portion ,, 1.00
Finishing; finishing work shall include all
surface pre-cleaning, polishing and cleaning
at the end of finishing
2.4.6 Floor screed in cement mortar 20 mm thick m2 2.25
2.4.6.1 Apply three coats of plaster in cement mortar to
internal cement concrete block wall m2 17.98
2.4.6.2 Ditto, but to external face of wall m2 25.03
2.4.6.3 Apply 3 coats of plastic paint to internal walls
and synthetic paint to metal doors and windows
m2 16.99
2.4.6.4 Ditto, but to external face of wall m2 24.49
2.4.6.5 Supply and fix Turkish type WC with high flush
cystern complete with cold water connection
and waste pipe line DN 110mm up to septic
tank. LS 1.00

#2.4. Toilet,Septic tank,fenc 22/130


AAWSA:PROJECT OFFICE SOUTH AND OUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

2.4.7 Miscellaneous
2.4.7.1 Stone pitched trapezoidal drainage ditch
pointed with mortar (1:3) (top width=40 cm,
bottom width=20 cm and depth=30cm) around
the control panel room as per the drawing
m 12.00
2.4.7.2 Stone pavement around the building 1m wide m 11.60
2.4.7.3 Light points complete wiring and the necessary
accessories LS. 1.00
Total for Toilet Room

#2.4. Toilet,Septic tank,fenc 23/130


AAWSA:PROJECT OFFICE SOUTH AND OUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Unit Price
Item No. Description Unit Qty. (birr)

2.4.8 Construction of Septic Tank for Toilet Room


2.4.8.1 Site clearing to depth of 20cm m2 20.00
2.4.8.2 Excavation of soil to depth of 3mts. In ordinary
soil m3 36.00
2.4.8.3 Excavate for foundation,in soft rock m3 18.00
2.4.8.4 Ditto, but in hard formation exceeding 3mts. m3 7.26
2.4.8.5 Cart away of surplus excavated materials to a
distance of 1- 2kms m3 29.00
2.4.8.6 Basaltic or equivalent stone masonry wall
bedded in cement mortar 1:3 m3 14.10
2.4.8.7 Lean concrete of C-15 under foundation slab. m2 7.60
2.4.8.8
Reinforced concrete foundation slab (C-20)
including reinforcement bar as per the drawing m3 1.60
2.4.8.9
Reinforced concrete cover slab (C-25) including
reinforcement bar as per the drawing m3 1.30
2.4.8.10
Provide, cut and fix in position zigba formwork
including soffit and scaffolding for cover slab. m2 6.10
2.4.8.11 Plastering of internal wall and partation wall in
cement mortar 1:3 m2 22.20
2.4.8.12 Supply and construct H.C.B baffle partation wall m2 2.40
2.4.8.13 Supply and install PVC vent pipe with cover cap
as per the drawing LS 1.00
Total for Septic Tank

#2.4. Toilet,Septic tank,fenc 24/130


AAWSA:PROJECT OFFICE SOUTH AND OUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Unit Price
Item No. Description Unit Qty. (birr)
2.4.9 Construction of Soak Away Pit
2.4.9.1Site clearing to depth of 20cm m2 8.00
2.4.9.2Excavation of soil to depth of 3mts. In ordinary
soil m3 23.00
2.4.9.3 Excavate for foundation,in soft rock m3 12.00
2.4.9.4 Ditto, but in hard formation not exceeding 3mts. m3 6.00
2.4.9.5 Cart away of surplus excavated materials to a
distance of 1- 2kms m3 29.00
2.4.9.6
Basaltic or equivalent dry stone masonry wall. m3 14.00
2.4.9.7 Supply and fill course gravel m3 4.80
2.4.9.8 Ditto, but fine gravel m3 2.40
2.4.9.9 Ditto, but sand m3 2.40
2.4.9.10 Reinforced concrete cover slab (C-25) in 10 cm
thick including reinforcement bar as per the
drawing m3 0.70
Total for Soak Away Pit

#2.4. Toilet,Septic tank,fenc 25/130


AAWSA:PROJECT OFFICE SOUTH AND OUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

2.4.10. Dimolishing of existing (5mX5m) Pump &


generator house @ SANFTW-3
Note:- Demolition materials will remain the
property of the Contractor.
Items for work in this class shall include:-
Excavation, preparation of surfaces, shoring
sides of Excavation, backfilling and removal of
redundant services, disposal of excavated
material or debris, /cart away for adistance not
more than 5Km of redundant services.(Tips for
disposal of excavated material or debris to be
2.4.10.1 identified by the contractor in liaison with the Ls 2.00
local authority).Dismantling &
Removal/replacing of Some of Existing GS
100mm pipe with its accessories &
adjustement of electrical equipments of panel
board with pump house.

Total of Bill No.2.4. TOILET ROOM, SEPTIC


TANK, SOAK AWAY PIT
Total of Bill 21 TOILET ROOM, SEPTIC
TANK, SOAK AWAY PIT

#2.4. Toilet,Septic tank,fenc 26/130


AAWSA:PROJECT OFFICE SOUTH AND OUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

SEPTIC TANK, SOAK AWAY PIT.

TOTAL

USD

#2.4. Toilet,Septic tank,fenc 27/130


AAWSA:PROJECT OFFICE SOUTH AND OUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

#2.4. Toilet,Septic tank,fenc 28/130


AAWSA:PROJECT OFFICE SOUTH AND OUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

#2.4. Toilet,Septic tank,fenc 29/130


AAWSA:PROJECT OFFICE SOUTH AND OUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

#2.4. Toilet,Septic tank,fenc 30/130


AAWSA:PROJECT OFFICE SOUTH AND OUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Amount (birr)

#2.4. Toilet,Septic tank,fenc 31/130


AAWSA:PROJECT OFFICE SOUTH AND OUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Amount (birr)

#2.4. Toilet,Septic tank,fenc 32/130


AAWSA:PROJECT OFFICE SOUTH AND OUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

#2.4. Toilet,Septic tank,fenc 33/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 2.5: CONSTRUCTION OF ALL COLLECTOR PIPES


UNIT PRICE TOTAL
ITEM UNIT QTY
DESCRIPTION BIRR USD BIRR

2.5. CONSTRUCTION OF ALL COLLECTOR PIPES

Laying of PN16 DCI pipe and jointing all the


necessary fittings including cut pipes, specials
2.5. and valves complete for collector pipe line

2.5.1 Site Clearance


General clerance of Site along proposed collector
pipe line as specified in the specification for
2.5.1.1 pipelines to an average depth of 20cm removing all m 43,656.00
bushes and top soil and existing materials along
the route

Cut down trees, grub up roots , stumps cart away


2.5.1.2 to tips of girth 0.5 - 1 m (Note:- Girth shall be No 150.00
measured 1.0 m above the ground level)
2.5.1.3 Ditto, but girth 1 - 2 m No 10.00
2.5.2 Excavation and Backfilling
Supply,Transport to/from site store, lay and
joint pipes in trench, include for excavation,
preparation of surfaces, disposal of excavated
material, shoring sides of excavation and
backfilling.

# 2.5 ALL COLLECTORS pipe


34 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Laying of PN16 DCI pipe and jointing all the


necessary fittings including cut pipes, specials
2.5. and valves complete for collector pipe line

Note:- Trench width and minimum cover to pipes is


as per the Specification. The cost shall include for
strutting, shuttering, stabilizing the earth faces of
trenches and keeping the trenches free of water by
pumping or other means and cost of use of
selected soil from the excavated material for
compaction in bed and surround to backfilling of
trenches, etc. all as specified

Trench excavation in normal material from 200 -


2.5.2.1
500 mm nominal bore DCI pipe
2.5.2.2 Depth not exceeding 1.5 m m 92,054.34
2.5.2.3 Depth 1.5 - 3.0m m 59,907.17
2.5.2.4 Depth >3.0m m3 32,413.50
2.5.2.5 E.O. Items for excavation in soft rock m3 11,344.73
2.5.2.6 E.O. Items for excavation in hard rock m3 34,034.18
E.O. Items for supplying and placing of 100 mm
2.5.2.7 approved selected bedding/surround material, if so m3 5,186.16
directed by the Engineer
2.5.2.8 Ditto, but approved selected backfill material m3 37,333.33
2.5.2.9 Ditto, but with native excavated backfill material m3 192,420.58
Cart away all excavated material, deposit to
2.5.2.10 appropriate distance not exceeding 1 km m3 45,519.49

# 2.5 ALL COLLECTORS pipe


35 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Laying of PN16 DCI pipe and jointing all the


necessary fittings including cut pipes, specials
2.5. and valves complete for collector pipe line

Supply and Laying of DCI pipe all PN 16 rated


and join with rubber sealing gasket and jointing
2.5.3 all necessary pipes, specials and valves
complete.This rate includes transporting from
site store to laying place .

2.5.3.4 DN 500 m 3,606.00


2.5.3.5 DN 400 m 6,570.00
2.5.3.6 DN 350 m 1,596.00
2.5.3.7 DN 300 m 6,522.00
2.5.3.8 DN 250 m 24,546.00
2.5.3.9 DN 200 m 816.00
Supply & Insatllation of Valves & Fittings all
2.5.4 PN 16 rated, in accordance with Tender
Specification
2.5.4.1 All Flanged Tee ( 45º Y tee) PN 16
a DN '500/400 No 5
b DN '400/400 No 1
c DN '400/300 No 4
d DN '400/250 No 1
e DN '350/300 No 1
f DN '350/250 No 2
g DN '300/250 No 2
2.5.4.2 Flanged Adaptor for DCI PN16
a DN 500 No 3
b DN 400 No 4
c DN 350 No 3

# 2.5 ALL COLLECTORS pipe


36 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Laying of PN16 DCI pipe and jointing all the


necessary fittings including cut pipes, specials
2.5. and valves complete for collector pipe line

d DN 300 No 4
e DN 250 No 2
f DN 200 No 1
2.5.4.3 Flanged Anchoring Spigot piece PN16
a DN 500 No 8
b DN 400 No 9
c DN 350 No 6
d DN 300 No 6
d DN 250 No 2
e DN 200 No 1
2.5.4.4 Double flanged Butterfly Valve PN16
a DN 500 No 3
b DN 400 No 5
c DN 350 No 3
d DN 300 No 1
e DN 250 2
2.5.4.5 Double Flanged Reducer PN16
a DN '500/400 No 1
b DN '500/350 No 1
c DN '400/350 No 1
d DN '400/300 No 3
e DN '400/250 No 3
f DN '400/200 No 1
g DN '350/300 No 2
h DN '300/250 No 2
2.5.4.6 Double Flanged Gate Valve PN16
a DN 300 No 7

# 2.5 ALL COLLECTORS pipe


37 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Laying of PN16 DCI pipe and jointing all the


necessary fittings including cut pipes, specials
2.5. and valves complete for collector pipe line

b DN 250 No 10
c DN 200 No 1
2.5.4.7 Flanged Socket pipe PN16
a DN 500 No 3
b DN 400 No 4
c DN 350 No 3
d DN 300 No 10
e DN 250 No 10
f DN 200 No 1
2.5.4.7 Double Socket Bend PN16
90O Bend
a DN 400 No 2.00
b DN 300 No 6.00
c DN 250 No 5.00
45O Bend
a DN 500 No 3.00
b DN 300 No 8.00
c DN 250 No 2.00
22.5O Bends
a DN 500 No 8.00
b DN 400 No 3.00
c DN 300 No 39.00
d DN 250 No 11.00
11.25O Bends
a DN 400 No 44.00
b DN 300 No 260.00

# 2.5 ALL COLLECTORS pipe


38 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Laying of PN16 DCI pipe and jointing all the


necessary fittings including cut pipes, specials
2.5. and valves complete for collector pipe line

c DN 250 No 29.00
2.5.4.8 All Flanged Tee ( 90º Tee) PN16
DN 150 No 2.00
2.4.4.9 Wash Out Valve (WOV) with accesseries
a All Flanged Tee 90 degree
DN 200/200 No 2.00
DN 250/200 No 6.00
DN 300/200 No 13.00
DN 400/200 No 3.00
b Double Flanged Gate Valve
DN 200 No 24.00
c Flanged Spigot
DN 200 No 24.00
d Socket Spigot
DN 200 No 24.00
e Socket Flanged
DN 200 No 24.00
g Flap Valve (WOV)
DN 200 No 24.00
2.4.4.10 Air Releas Valve (ARV) with accesseries
a All Flanged Tee 90 degree
DN 250/200 No 7.00
DN 300/200 No 10.00
DN 400/200 No 5.00
DN 500/200 No 3.00
b Gate Valve

# 2.5 ALL COLLECTORS pipe


39 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Laying of PN16 DCI pipe and jointing all the


necessary fittings including cut pipes, specials
2.5. and valves complete for collector pipe line

DN 200 No 25.00
c Flanged Spigot
DN 200 No 50.00
d Dismantling Joint
DN 200 No 50.00
e Air Releas Valve (ARV)
DN 200 No 25.00
Construction of valve chamber with Cast iron
manhole on which the name "AAWSA" is
2.5.5 printed cover; price includes manhole covers,
concrete, reinforcement, formwork, etc.

Construction of Type 1, 2A & 2B Valve chambers


2.5.5.1
2.5.5.2 DN 150mm - 500mm Dia. No. 18.00
2.5.5.3 Construction of Type 5A & 5B Valve chambers
2.5.5.4 DN150mm - 600 Dia. No 4.00
Supply & Installation of complete set of CHECK
2.5.5.9 VALVE construction of chamber as per the drawing.
(Type I)

DN 150-600mm Dia. No 16.00


2.5.6 Thrust and anchor blocks
Construction of class C20 concrete thrust and
support blocks for 90 degree bends diameters DN
2.5.6.1 200 to DN 500 including reinforcement and No 13.00
formwork as per drawing

# 2.5 ALL COLLECTORS pipe


40 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Laying of PN16 DCI pipe and jointing all the


necessary fittings including cut pipes, specials
2.5. and valves complete for collector pipe line

2.5.6.2 Ditto, but for 45 degree bends No 13.00


2.5.6.3 Ditto but for 22 1/2 and No 61.00
2.5.6.4 Ditto but for 11 1/4 degree bends No 333.00
Construction of class C20 concrete anchor blocks
2.5.6.5 for reducer & Tees including reinforcement and
formwork as per drawing
2.5.6.6 For DN 200 -500 No 42.00
Construction of class C20 concrete support blocks
2.5.6.7 for straight pipes for DN 200-500 including N0 200.00
reinforcement and formwork
2.5.7 Crossings
Supply grade C20 concrete and construct road
crossing for pipe of DN 200-500mmmm DCI PN16
pipe ,asphalt surfaced road crossing . Price
2.5.7.1 includes excavation work,rienforcement bar m 36.00
,formwork ,back filling and reinstatement of the
surface to the existing asphaslt level

Supply grade C20 concrete and construct stream/


ditch crossing .Price includes excavation
2.5.7.2 ,backfilling rienforcement bar ,formwork and pipe m 190.00
support work as ordered by the Engineer and
indicated in the drawing
2.5.8 Miscellaneous
Precast concrete marker posts as detailed in the
2.5.8.1 drawing album and as directed by the engineer No 25.00

# 2.5 ALL COLLECTORS pipe


41 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Laying of PN16 DCI pipe and jointing all the


necessary fittings including cut pipes, specials
2.5. and valves complete for collector pipe line

Pipeline pressure testing for leaks and


commissioning for the whole work, including all
2.5.8.2 necessary works such as transportation and use of LS 1.00
water, pipe fittings, desposing of used water

Disinfection of pipe lines: flushing with clear water,


filling with water containing 0.15 g/l calcium
2.5.8.3 hypochloride, left for 24 hours. This includes LS 1.00
supply of all necessary equipment, chemical and
water, as well as required tests.

Reinstatement,Laying of COLLECTER PIPES


2.5.9 LINE with Accessories, Testing and
Commissioning

# 2.5 ALL COLLECTORS pipe


42 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Laying of PN16 DCI pipe and jointing all the


necessary fittings including cut pipes, specials
2.5. and valves complete for collector pipe line

Careful PipeTrench excavation in soil/rock by hand


(not by machine) for locating the pipe crossing
point with the existing line to a depth of
requirements,Reinstatement carefully Existing
old pipe to replace with new supply & laying of
Pipe including all pipeline fittings in case of any
damage ,excavation,Cart away all excavated
material,Placing/back filling , compactimg approved
bedding materials for rocky areas under the pipe ,
jointing of Ductile Iron Pipe DN 25mm-800mm
,ISOPVC,GS,HDPE , in trenches of various depths, LS 1.00
and testing of pipeline in sections, repair leaking or
displaced joints and repeat testing till acceptance
and, where applicable, jointing of test sections into
united and entire pipeline,all as described in the
Specifications and directed by the Engineer,

2.5.9.1
Total of Bill No 2.5.: Construction of Collector
Pipe Line

# 2.5 ALL COLLECTORS pipe


43 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

S
TOTAL
USD

# 2.5 ALL COLLECTORS pipe


44 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

# 2.5 ALL COLLECTORS pipe


45 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

# 2.5 ALL COLLECTORS pipe


46 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

# 2.5 ALL COLLECTORS pipe


47 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

# 2.5 ALL COLLECTORS pipe


48 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

# 2.5 ALL COLLECTORS pipe


49 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

# 2.5 ALL COLLECTORS pipe


50 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

# 2.5 ALL COLLECTORS pipe


51 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

# 2.5 ALL COLLECTORS pipe


52 of 130
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

# 2.5 ALL COLLECTORS pipe


53 of 130
AAWSA PROJECT OFFICE SOUTH SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.1: CONSTRUCTION OF 10,000m3 COLLECTION RESERVIOR.


UNIT PRICE TOTAL
ITEM UNIT QTY
DESCRIPTION BIRR USD BIRR USD
CONSTRUCTION OF 10,000m3
3.1 COLLECTION RESERVIOR (TULLU
GUDDO)
3.1.1 EARTH WORK
3.1.1.1 Site clearing to remove top soil to an average
m2 1,589.63
depth of 20 cm
3.1.1.2 Bulk excavation in normal soil to a depth of
m3 874.30
55cm
3.1.1.3.1 Ditto but depth to a depth from 0.55m to
m3 1,509.55
1.5m
3.1.1.4 Ditto but to a depth 1.5 - 3.5 m m3 2,715.91
3.1.1.5 Ditto but to a depth 3.5 - 4.83 m m3 785.81
3.1.1.6 Ditto but to above 4.83 m m4 1,589.63
3.1.1.7 Ditto but in soft rock formation m3 463.35
3.1.1.8 Ditto but in hard rock formation m3 1,328.40
3.1.1.9 Cart away all excavated material, deposit to
appropriate distance not exceeding 1 km m3 1,519.79

3.1.1.10 Provide and fill with selected granular


m3 179.61
material around the resevoir
3.1.1.11 Provide and fill with selected granular
material under the resevoir and commpact
well as indicated in the specification and as m2 1,589.63
direted by the engineer

#3.1. 10,000WR Tullu Guddo 130/130


AAWSA PROJECT OFFICE SOUTH SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.1: CONSTRUCTION OF 10,000m3 COLLECTION RESERVIOR.


UNIT PRICE TOTAL
ITEM UNIT QTY
3.1.1.12 Provide and fill DESCRIPTION
hard core with hard basaltic
or equivalent stone, well compacted and
blinded with crushed stone to a finished m2 1,519.76
thickness of 25 cm under the reservoir and
valve chamber

3.1.2 CONCRETE WORK


3.1.2.1 70mm thick lean concrete under the
m2 1,501.50
reservoir base slab and valve chamber
3.1.2.2 Reinforced concrete type C-30 filled into
form work and vibrated around reinforced
bar for the reservior
3.1.2.2.1 Base slab m3 580.00
3.1.2.2.2 Concrete wall m3 924.18
3.1.2.2.3 Concrete column m3 130.94
3.1.2.2.4 Roof slab m3 336.44
3.1.2.2.5 Parapet m3 10.50
3.1.2.3 Provide and fix formwork to the reservior

3.1.2.3.1 Base slab m2 54.00


3.1.2.3.2 Column m2 154.28
3.1.2.3.3 Wall m2 2,485.57
3.1.2.3.4 Roof slab m2 1,320.21
3.1.2.3.5 Parapet m2 104.60
3.1.2.4 Provide, cut, bend and fix in position
reinforced steel bar. All according to
structural drawing. Price should include
tying wires
3.1.2.4.1 Diameter 8 mm plain bar kg 1,986.00
3.1.2.4.2 Diameter 10 mm deformed bar kg 143.00
3.1.2.4.3 Diameter 12 mm deformed bar kg 76,054.52
3.1.2.4.4 Diameter 16 mm deformed bar kg 65,183.86

#3.1. 10,000WR Tullu Guddo 130/130


AAWSA PROJECT OFFICE SOUTH SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.1: CONSTRUCTION OF 10,000m3 COLLECTION RESERVIOR.


UNIT PRICE TOTAL
ITEM UNIT QTY
3.1.2.4.5 Diameter 18 mmDESCRIPTION
deformed bar kg 5,283.00
3.1.2.4.6 Diameter 20 mm deformed bar kg 57,836.62
3.1.2.5 Reinforced concrete type C-25 filled into
form work and vibrated around reinforced
bar for valve chamber
3.1.2.5.1 Base slab m3 19.53
3.1.2.5.2 Concrete wall m3 25.50
3.1.2.5.3 Roof slab m3 8.37
3.1.2.5.4 Enterance Stair m3 1.11
3.1.2.6 Provide and fix formwork for valve
3.1.2.6.1 chamber
Base slab to m2 7.49
3.1.2.6.2 Wall m2 176.80
3.1.2.6.3 Top slab m2 57.21
3.1.2.6.4 Enterance Stair m2 9.48
3.1.2.7 Provide, cut, bend and fix in position
reinforced steel bar. All according to
structural drawing. Price should include
tying wires for valve chamber

3.1.2.7.1 Diameter 8 mm deformed bar kg 630.00


3.1.2.7.2 Diameter 10 mm deformed bar kg 327.45
3.1.2.7.3 Diameter 12 mm deformed bar kg 4,360.63
3.1.3 ACCESSORIES AND FINISHING
3.1.3.1 Provide and apply 50mm cement screed to
the reservoir floor and roof slab and Valve m2 3,924.71
Chamber
3.1.3.2 Provide and apply 3 coats of plaster to
internal walls, columns and to embedded m2 1,454.36
part of external wall surface
3.1.3.3 Rendering external wall of Reservoir and
m2 1,353.42
Valve Chamber

#3.1. 10,000WR Tullu Guddo 130/130


AAWSA PROJECT OFFICE SOUTH SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.1: CONSTRUCTION OF 10,000m3 COLLECTION RESERVIOR.


UNIT PRICE TOTAL
ITEM UNIT QTY
DESCRIPTION
3.1.3.4 Provided and install access internal and
external ladder constructed out of 25 mm dia
GS pipe and hooked to the wall as per the No 6.00
drawing; including safety cages

3.1.3.5 Provide and install water stops made of


natural or synthetic rubber or elastometric m 757.94
plastic compound with basic risen polyvinyl
chloride (PVC)
3.1.3.6 Provide and fix standard thickness Cast Ironl
access cover with 60mmx60mm angle iron
frame with latch and safety lock for valve No 6.00
chamber and reservoir
3.1.3.7 Provide and apply two coats of bituminous
asphalt over the plastered surface of the m2 67.51
embedded part of the reservoir

3.1.3.8 Provide and place single brick layer cover to


protect the asphalt coat from the backfill m2 81.01
material
3.1.4 PIPES, VALVES AND FITTINGS
3.1.4.1
Supply and Install, K-9 DCI Inlet ,Out
let ,Over flow and drainage pipes and
fittings and valves of PN10 with all
requred accessories, rubber sealing flat
gaskets, bolts, nuts with washers all
complete
3.1.4.1.1 Double flanged anchoring pipe puddled at
the center, L = 1.0m
DN 800mm No 4.00
DN 500mm No 4.00
DN 400mm No 4.00

#3.1. 10,000WR Tullu Guddo 130/130


AAWSA PROJECT OFFICE SOUTH SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.1: CONSTRUCTION OF 10,000m3 COLLECTION RESERVIOR.


UNIT PRICE TOTAL
ITEM UNIT QTY
DN 300mm DESCRIPTION No 4.00
3.1.4.1.2 Double Flanged Short pipe L = 0.5m
DN800mm No 4.00
DN500mm No 3.00
DN400mm No 3.00
DN300mm No 3.00
3.1.4.1.3 Flanged spigot , L = 1.m
DN800mm No 2.00
DN500mm No 2.00
DN400mm No 2.00
DN300mm No 2.00
DN 200mm No 2.00
3.1.4.1.4 Double Flanged Short Pipe L=4.0m
DN800mm No 2.00
DN500mm No 2.00
DN400mm No 2.00
DN300mm No 4.00
Double Flanged Pipe ,L=6m
DN500mm No 2.00
DN400mm No 2.00
DN300mm No 2.00
3.1.4.1.5 Flanged Bell Mouth
DN500mm No 2.00
DN400mm No 2.00
3.1.4.1.6 Double Flanged Blank
DN800mm No 2.00
3.1.4.1.7 Dismantling piece
DN800mm No 3.00
DN500mm No 2.00
DN400mm No 2.00
DN300mm No 2.00

#3.1. 10,000WR Tullu Guddo 130/130


AAWSA PROJECT OFFICE SOUTH SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.1: CONSTRUCTION OF 10,000m3 COLLECTION RESERVIOR.


UNIT PRICE TOTAL
ITEM UNIT QTY
3.1.4.1.8 Double SocketDESCRIPTION
Bend
45 O

DN500mm No 2.00
DN400mm No 2.00
DN300 No 2.00
3.1.4.1.9 Double Flanged Bend
90O Bend
DN500mm No 2.00
DN400mm No 2.00
DN300mm No 2.00
90O Bend (Docked leg)
DN500mm No 2.00
DN400mm No 2.00
DN300mm No 2.00
3.1.4.1.10 Double Flanged Gate Valve
DN800mm No 3.00
DN200mm No 1.00
3.1.4.1.11 All Flanged Tee
DN300/200mm No 2.00
DN800/800 No 2.00
3.1.4.1.12 Float Valve
DN500mm No 1.00
DN400mm No 1.00
3.1.4.1.13 Suction Strainer
DN800mm No 2.00
3.1.4.1.14 Pipe support with pipe clamp, wall bracket,
LS 1.00
foot plate and anchor bolts
3.1.4.1.15 Supply and install water level
LS 1.00
indicator(marker)

#3.1. 10,000WR Tullu Guddo 130/130


AAWSA PROJECT OFFICE SOUTH SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.1: CONSTRUCTION OF 10,000m3 COLLECTION RESERVIOR.


UNIT PRICE TOTAL
ITEM UNIT QTY
DESCRIPTION
3.1.4.1.16 Supply and install DN4" ventilation GI pipe
No 6.00
with dome, L=1.0m
3.1.4.1.17 DN 21/2" roof drain, L=0.5m as per the
drawing No 6.00

3.1.4.1.18 Supply and install,1000mmX 2100mm and


2mm thick metal door with framing, Latch No 2.00
and Lock
3.1.5 Miscellaneous
3.1.5.1 Reservoir testing for leaks and
commissioning for the whole work, including
all necessary works such pipe fittings, LS 1.00
desposing of used water
3.1.5.2 Disinfection of Reservoirs: flushing with clear
water, filling with water containing 0.15 g/l
calcium hypochloride, left for 24 hours. This
includes supply of all necessary equipment, Ls 1.00
chemical and water, as well as required tests

Total of BILL 3.1: Construction of 10,000


m3 Service Reservoir

#3.1. 10,000WR Tullu Guddo 130/130


AAWSA:PROJECT OFFICE SOUTH SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.2.: CONSTRUCTION OF 5,000m3 ERVICE RESERVIOR TULLU GUDDO


UNIT PRICE TOTAL
ITEM UNIT QTY
DESCRIPTION BIRR USD BIRR USD

3.2 CONSTRUCTION OF 5,000m3 ERVICE


RESERVIOR (TULLU GUDDO)
3.2.1 EARTH WORK
3.2.1.1 Site clearing to remove top soil to an
m2 989.30
average depth of 20 cm
3.2.1.2 Bulk excavation in normal soil to a depth
m3 593.58
of 0.55m
3.2.1.3 Ditto but to depth 0.55 m to 1.5 m m3 890.37
3.2.1.4 Ditto but to a depth 1.5-3.5 m m3 1,989.76
3.2.1.5 Ditto but to a depth 3.5 - 4m m3 497.44
3.2.1.6 Ditto but in soft rock formation m3 198.56
3.2.1.7 Ditto but in hard rock formation m3 595.67
3.2.1.8 Cart away all excavated material, deposit
to appropriate distance not exceeding 1 m3 4,963.23
km
3.2.1.9 Provide and fill with selected granular
m3 525.78
material under and around the resevoir
3.2.1.10 Provide and fill hard core with hard
basaltic or equivalent stone, well
compacted and blinded with crushed m2 994.88
stone to a finished thickness of 25 cm
under the reservoir and valve chamber

3.2.2 CONCRETE WORK


3.2.3.2.1 70mm thick lean concrete under the
m2
reservoir base slab and valve chamber 994.8776

#3.2. 5,000WR Tullu Guddo 61/130


AAWSA:PROJECT OFFICE SOUTH SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.2.: CONSTRUCTION OF 5,000m3 ERVICE RESERVIOR TULLU GUDDO


3.2.3.2.2 Reinforced concrete type C-30 filled into
form work and vibrated around reinforced
bar for the reservior
3.2.3.2.3.2.1 Base slab m3 247.30
3.2.3.2.3.2.2 Concrete wall m3 487.94187
3.2.3.2.3.2.3 Concrete column m3 50.40
3.2.3.2.3.2.4 Top slab m3 269.1698
3.2.3.2.3.2.5 Parapet m3 5.84
3.2.3 FORMWORKS
Provide and fix formwork to Reservoir
3.2.3.1 Base slab m2 39.71
3.2.3.2 Wall m2 1,533.77
3.2.3.3 Column m2 63.72
3.2.3.4 Top slab m2 828.66
3.2.3.5 Parapet m2 77.87
3.2.4 REINFORCEMENT BARS
Provide, cut, bend and fix in position
reinforced steel bar. All according to
structural drawing. Price should
include tying wires

3.2.4.1 Diameter 8 mm plain bar kg 618.75


3.2.4.2 Diameter 10 mm deformed bar kg 6,062.19
3.2.4.3 Diameter 12 mm deformed bar kg 43,437.99
3.2.4.4 Diameter 16 mm deformed bar kg 37,735.53
3.2.4.5 Diameter 20 mm deformed bar kg 666.16
3.2.5 FORMWORKS

#3.2. 5,000WR Tullu Guddo 62/130


AAWSA:PROJECT OFFICE SOUTH SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.2.: CONSTRUCTION OF 5,000m3 ERVICE RESERVIOR TULLU GUDDO


3.2.5.1 Reinforced concrete type C-25 filled into
form work and vibrated around reinforced m3 42.60
bar for valve chamber
3.2.6 Provide and fix formwork for valve
chamber
3.2.6.1 Base slab m2 6.75
3.2.6.2 Wall m2 216.00
3.2.6.3 Top slab m2 85.05
3.2.7 Provide, cut, bend and fix in position
reinforced steel bar. All according to
structural drawing. Price should
include tying wires for valve chamber

3.2.7.1 Diameter 10 mm deformed bar kg 1,165.88


3.2.7.2 Diameter 12 mm deformed bar kg 4,593.98
3.2.7.3 Diameter 14 mm deformed bar kg 2,140.00
3.2.8 ACCESSORIES AND FINISHING
3.2.8.1 Provide and apply 50mm cement screed
to the reservoir floor and roof slab m2 2,595.80

3.2.8.2 Provide and apply 3 coats of plaster to


internal walls, columns and to embedded m2 1,469.16
part of external wall surface
3.2.8.3 Rendering external wall m2 1,078.74
3.2.8.4 Provided and install access internal and
external hatches constructed out of 25
mm dia GS pipe and hooked to the wall LS 1.00
as per the drawing; including safety cages

#3.2. 5,000WR Tullu Guddo 63/130


AAWSA:PROJECT OFFICE SOUTH SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.2.: CONSTRUCTION OF 5,000m3 ERVICE RESERVIOR TULLU GUDDO


3.2.8.5
Provide and install water stops made of
natural or synthetic rubber or elastometric m 434.17
plastic compound with basic risen
polyvinyl chloride (PVC)
3.2.8.6 Provide and fix Standard thickness cast
iron man hole cover 60 mmx60mm angle
iron fram with latch and safety lock for No 4.00
valve chamber and reservoir as ordered
by the Engineer

3.2.8.7 Provide and apply two coats of bituminous


asphalt over the plastered surface of the
embedded part of the reservoir m2 67.51

3.2.8.8 Provide and place single brick layer cover


to protect the asphalt coat from the m2 81.01
backfill material
3.2.8.9 Pipe support with pipe clamp, wall
LS 1.00
bracket, foot plate and anchor bolts
3.2.8.10 Supply and install water level indicator LS 1.00
3.2.8.11 Supply and install DN4" ventilation GI pipe
No 6.00
with dome, L=1.0m
3.2.8.12 DN 21/2" roof drain, L=0.5m as per the No 6.00
drawing
3.2.8.13 Supply and install,1000mmX 2100mm
and 2mm thick metal door with framing, No 1.00
Latch and Lock
3.2.9 PIPES, VALVES AND FITTINGS

#3.2. 5,000WR Tullu Guddo 64/130


AAWSA:PROJECT OFFICE SOUTH SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.2.: CONSTRUCTION OF 5,000m3 ERVICE RESERVIOR TULLU GUDDO

Install K-9 DCI inlet ,outlet, drain and


over flowpipes with fittings and valves
of PN 10 with all requred accessories,
rubber sealing flat gaskets, bolts, nuts
with washers as required
3.2.9.1. Double flanged anchoring pipe
puddled at the center, L = 1.5m
a DN 800mm No 2.00
b DN500mm No 2.00
c DN300mm No 2.00
3.2.9.2 Double Flanged piece pipe , L = 1.5m

a DN 500mm No 2.00
b DN 300mm No 2.00
3.2.9.3 Flanged spigot , L = 1.m
a DN 800mm No 2.00
b DN 500mm No 3.00
c DN 300mm No 2.00
d Socket spigot pipe , L = 6m
e DN 800mm No 2.00
f DN 500mm No 2.00
3.2.9.4 Spigot Short Pipe L= 0.50m
DN500mm No 2.00
3.2.9.5 Double Socket 45O Bend
DN 500mm No 2.00
3.2.9.6 Double flanged Pipe, L= 6m
a DN 500mm No 2.00
b DN 300mm No 2.00

#3.2. 5,000WR Tullu Guddo 65/130


AAWSA:PROJECT OFFICE SOUTH SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.2.: CONSTRUCTION OF 5,000m3 ERVICE RESERVIOR TULLU GUDDO


3.2.9.7 Double flanged Pipe, L= 4m
a DN 800mm No 2.00
b DN 500mm No 2.00
3.2.9.8 Flanged Bell Mouth
DN 500mm No 2.00
3.2.9.9 Dismantling piece
a DN 800mm No 2.00
b DN 500mm No 2.00
c DN 300mm No 2.00
3.2.9.10 Double Flanged Bend
90O Bend
a DN500mm No 2.00
b DN300mm No 3.00
3.2.9.11 Duck Foot 90 Bend
O

DN500mm No 2.00
3.2.9.12 Double Flanged Gate Valve
a DN 800mm No 2.00
b DN 200mm No 2.00
3.2.9.13 Double Flanged Puddled Pipe , L=
1.50m
a DN 500mm No 3.00
b DN 300mm No 2.00
c DN 200mm No 2.00
3.2.9.14 All Flanged Tee
DN 300/200mm No 2.00
3.2.9.15 Suction Strainer
DN 800mm No 2.00
3.2.10 Miscellaneous

#3.2. 5,000WR Tullu Guddo 66/130


AAWSA:PROJECT OFFICE SOUTH SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.2.: CONSTRUCTION OF 5,000m3 ERVICE RESERVIOR TULLU GUDDO


3.2.10.1 Reservoir testing for leaks and
commissioning for the whole work,
including all necessary works such pipe LS 1.00
fittings, desposing of used water

3.2.10.2 Disinfection of Reservoirs: flushing with


clear water, filling with water containing
0.15 g/l calcium hypochloride, left for 24
hours. This includes supply of all Ls 1.00
necessary equipment, chemical and
water, as well as required tests

Total BILL 3.2: Construction of 5,000


m3 Service Reservoir Near Tullu
Guddo

#3.2. 5,000WR Tullu Guddo 67/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FORM SANF WELL FIELD

BILL 3.3: CONSTRUCTION OF OPERATOR'S DWELLING @TULU GUDO


UNIT PRICE TOTAL
ITEM UNIT QTY
DESCRIPTION BIRR USD BIRR USD

3.3 CONSTRUCTION OF OPERATOR'S


DWELLING AT TULU GUDO
3.3.1 Earth work
3.3.1.1 Site clearing including removing bushes and
top soil to the depth of 20cm m2 120.00

3.3.1.2 Bulk excavation in normal soil to a depth not


m3 90.00
exceeding 150cm
3.3.1.3 Cart away all excavated material, deposit to
appropriate distance not exceeding 2 km m3 114.00

3.3.1.4 Supply and backfill compacte in layers


200mm thick to standered proctor selected
granular material as directed by the engineer m3 65.00

3.3.1.5 Selected excavated fill material and


m3 42.40
compacted layer by layer
3.3.2 STONE MASONRY WORKS
Provide, place and build with broken stone
3.3.2.1 for 250mm hardcore with hard basaltic stone m2 106.20
or similar stone
Provide basaltic or equivalent stone masonry
wall with dressed, impermeable, non-
3.3.2.2 weathered and non-fractured stone external m3 30.00
surface left for pointingbelow ground level.

3.3.2.3 Ditto,but above ground level m3 5.30


3.3.3 HOLLOW CONCRETE BLOCKS

#3.3.Operator Dewelling TG 68/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FORM SANF WELL FIELD

3.3.3.1 Supply and construct hollow block 200 x 200


m2 91.97
x 400mm
3.3.3.2 Ditto, but 150 x 200 x 400 mm m2 40.84
3.3.4 REINFORCEMENT BARS
Provide, cut, bend and fix in position
reinforced steel bar. All according to
structural drawing. Price shall include
tying wires

3.3.4.1 Diameter 6 mm plain bar kg 172.70


3.3.4.2 Diameter 10 mm deformed bar kg 138.36
3.3.4.3 Diameter 12 mm deformed bar kg 142.34
3.3.4.4 Diameter 14 mm deformed bar kg 225.35
3.3.4.5 Diameter 16 mm deformed bar kg 1,225.35
3.3.5 FORM WORKS
Provide, cut and fix formwork
3.3.5.1 Grade Beam m2 45.80
3.3.5.2 Top Beam m2 26.98
3.3.5.3 Columns m2 17.00
3.3.5.4 Lintels m2 6.70
3.3.6 CONCRETE WORKS
Lean Concrete of Grade C-15 and 50mm
3.3.6.1 thick blinding under foundation and floor Slab m2 22.73

100mm thick mass concrete of grade C-25


3.3.6.2 m2 78.20
for floor slab
3.3.6.3 Reinforced Concrete
Reinforced concrete grade C-25 with
minimum cement content 360 kg/m3 cast
into formwork and vibrated around
reinforcement bars:

3.3.6.3.1 Grade Beam m3 4.33

#3.3.Operator Dewelling TG 69/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FORM SANF WELL FIELD

3.3.6.3.2 Top Beam m3 1.73


3.3.6.3.3 Columns m3 0.80
3.3.6.3.4 Lintels m3 0.38
B. SUPER-STRUCTURES
3.3.6.4 Concrete Work with C-25 concrete
3.3.6.4.1 In elevation columns m3 1.50
3.3.6.4.2 In suspended beams m3 2.82
3.3.6.4.3 In lintels m3 0.70
Form work
3.3.6.4.4 In elevation columns m2 28.30
3.3.6.4.5 In suspended beams m2 30.15
3.3.6.4.6 In lintels m2 4.89
Mild steel rod reinforcement, cutting,
bending, & placing in position
3.3.6.4.6 Dia.6mm deformed kg 94.05
3.3.6.4.7 Dia. 12mm deformed kg 248.93
3.3.6.4.8 Dia. 16mm deformed kg 320.00
3.3.7 CARPENTRY AND ROOFING WORKS
Supply, assemble and fix in position
eucalyptus roof truss length 3.6m, price shall
3.3.7.1 include the application of three coats and No. 12.00
external anti-termite treatment as per the
drawing

Supply and fix purlin in zigba wood size 50 x


70 mm nailed into eucalyptus truss including
3.3.7.2 three coats of anti - termite external m 102.00
treatment

#3.3.Operator Dewelling TG 70/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FORM SANF WELL FIELD

Supply and fix roof cover in G-30mm


corrugated galvanized iron sheet fixed into
3.3.7.3 zigba wood purlin with dome headed m2 60.00
galvanized nails (purlin and ridge cover
measured separately)

Supply and fix edge gutter formed in G-28


flat galvanized metal sheet including support
brackets 1mm thick shaped steel plate
3.3.7.4 spaced at a maximum spacing of 1000 mm m 16.00
c/c and fixed to purlin - price includes metal
primer and two coats of synthetic enamel
paint

Supply & fix diameter 100mm down pipe in


G-28 including 1mm thick metal support
3.3.7.5 brackets fixed at a maximum interval of 1000 m 12.00
mm fixed to walls or columns

Supply and fix 25x 250 mm fascia board to


3.5.5.8 pcs 36.00
purlin
3.3.8 DOOR AND WINDOW WORKS
3.3.8.1 Supply and fix metal doors
Type D1 size 0.90 x 2.20 m No. 2.00
type D2 size 0.80 x 2.20 m No. 1.00
Type D3 size 0.70 x 2.10 m No. 2.00
3.3.8.2 Supply and fix metal windows
Type W1 size 1.50 x 1.20 m No. 2.00
Type W2 size 1.00 x 0.50 m No. 1.00
Type W3 size 0.75 x 0.50 m No. 2.00
3.3.9 FINISHING WORKS

#3.3.Operator Dewelling TG 71/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FORM SANF WELL FIELD

finishing work shall include all surface


pre-cleaning, polishing and cleaning at
the end of finishing
Floor screed in cement mortar 20 mm thick
3.3.9.1 m2 48.00

Apply three coats of plaster in cement mortar


3.3.9.2 to internal cement concrete block wall m2 178.00

3.3.9.3 Ditto, but to external face of wall m2 130.00


Apply 3 coats of plastic paint to internal walls
3.3.9.4 and synthetic paint to metal doors and m2 186.00
windows
3.3.9.5 Ditto, but to external face of wall 130.00
3.3.9.6 Plastic tile flooring m2
23.40
3.3.9.7 Plastic skirting ml 48.00
3.3.9.8 ceramic tile flooring m2 50.00
3.3.9.9 ceramic tile skirting size 10/2 cm m2 23.00
3.3.9.10 Plastic emulsion paint
3.3.9.11 Plastered vertical wall surface m2 106.50
3.3.9.12 Chip wood ceiling m2 79.63
PLUMBERING AND SANITARY
3.3.10 INSTALLATION

3.3.10.1 Supply & Install galvanized steel pipes for


cold water distribution to all sanitary fixtures

3.3.10.2 15 mm m 12.00
3.3.10.3 20 mm m 36.00
3.3.10.4 uPVC pipe for sewage drainage
3.3.10.5 Dia. 150 mm ml 30.00
3.3.10.6 Dia. 100 mm ml 6.00
3.3.10.7 Dia. 50 mm ml 12.00

#3.3.Operator Dewelling TG 72/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FORM SANF WELL FIELD

3.3.10.8 Gate valves made of bronze


3.3.10.9 Dia. 15 mm pcs 2.00
3.3.10.10 Dia. 20 mm pcs 4.00
3.3.10.11 White Vitreous china WC with low flush pcs 2.00
3.3.10.12 White Vitreous china hand wash basin for
pcs 2.00
cold water size 500x405
3.3.10.13
White plated metallic shower plate 0.8x0.8m pcs 2.00

3.3.10.14 Enameled steel grated floor drain Dia. 50


pcs 2.00
mm
3.3.10.15 Wash down water closet No. 1.00
3.3.10.16 Supply & fix toilet paper holder with roller 150
x 25 mm complet with fastening screws No. 1.00

3.3.10.17 Shower units No. 1.00


3.3.10.18 Supply & install soil waste and vent pipe
made of plastic pipes (PVC) with tight joints

3.3.10.19 50 mm m 6.40
3.3.10.20 80 mm m 6.40
3.3.10.21 100 mm m 5.90
3.3.10.23 Supply & install vent caps made of rigid 80
mm PVC to be connected to the roof terminal No. 1.00
of vent pipe
3.3.10.24 Supply & fix sanitor sink made of concrete 40
mm thick Size: 1000 x 500 x 400 mm No. 1.00

3.3.11 Electrical Installation


3.3.11.1 Sub-distribution board (SDB-GE) for flush
mounting with locable door and consisting of:

3.3.11.2 1 pcs. ACB of 63A, 3-ph No. 1.00

#3.3.Operator Dewelling TG 73/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FORM SANF WELL FIELD

1 pcs. ACB of 25A, 3-ph No. 1.00


1 pcs. ACB of 16A, 3-ph No. 1.00
1 pcs. ACB of 16A, 1-ph No. 1.00
1 pcs. ACB of 10A, 1-ph and with all the
No. 1.00
necessary accessories
3.3.11.1 Light points with switches, fed through PVC
insulated Cu 2x2.5mm2 cable laid along the No. 6.00
truss
3.3.11.3 Flush mounted socket outlets of
16A,220v,50HZ,fed through PVC Cu
3x2.5mm2 cable, laid along the truss (on the No. 2.00
roof) and in 16mm conduit in the wall.

3.3.11.4 Power line of PVC conductor of 2 x 4 sq mm


m 30.00
from MDB
3.3.12 Light Fittings with Lamps
3.3.12.1 Suspended type fluorescent luminaries, type
philips TMS 012/1.36 or equivalent with
1x36W lamps suspended by 2.5mm steel No. 6.00
rope.
3.3.12.2 Ditto, but PACIFIC 095/1.36 or equivalent No. 4.00
3.3.12.3 25A,380V,50HZ,surface mounted power
socket (3ph) type or equivalent with earthing
contact fed through Cu 4x6mm2 PVC
insulated cable laid along the truss (on the No. 1.00
roof) and along the wall surface (on the wall)

3.3.12.4 Ditto,but 16A and fed through Cu 4x2.5mm2


cable type. No. 1.00

3.3.12.5 5 kg extinguisher(powder for electrical fiers)


LS 1.00
3.3.13 Miscellaneous

#3.3.Operator Dewelling TG 74/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FORM SANF WELL FIELD

Stone pitched trapezoidal drainage ditch


pointed with mortar (1:3) (top width=40 cm,
3.3.13.1 bottom width=20 cm and depth=30cm) m 44.00
around the control panel room as per the
drawing

Cemented stone pitching Stone pavement


3.3.13.2 around the building 1m wide. m 54.00

Total for Construction of OPERATOR'S


DWELLING
CONSTRUCTION OF TOILET ROOM,
SEPTIC TANK, SOAK AWAY PIT (for
opereter dewelling)
3.3.14. Construction of Toilet Room
3.3.141 Earth work
3.3.14.1.1 Excavate 20 cm topsoil,clearing and
m2 15.20
grubbing
3.3.14.1.2 Excavate for foundation,in common soil
m3 5.60
depth not exceeding 2.0m.
3.3.14.1.3 Excavate for foundation,in soft rock m3 0.50
3.3.14.1.4 Excavate for foundation,in hard rock m3 1.50
3.3.14.1.5 Cart away of surplus excavated materials m3 13.50
3.3.14.1.6 Supply and compact approved backfill
m3 2.50
selected material
3.3.14.2 Stone masonary work
3.3.14.2.1 provide ,place and build with broken stone
for 250mm hardcore with hard basaltic stone m3 2.25
or similar stone
3.3.14.2.2 Provide basaltic or equivalent masonry wall
m3 5.60
below and above ground surface
3.3.13.2.3 Ditto,but above ground level m3 0.90

#3.3.Operator Dewelling TG 75/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FORM SANF WELL FIELD

3.3.14.3 Provide, cut, bend and fix in position


reinforced steel bar. All according to
structural drawing. Price shall include
tying wires

3.3.14.3.1 Diameter 6 mm plain bar kg 13.47


3.3.14.3.2 Diameter 10 mm deformed bar kg 45.00
3.3.14.3.3 Diameter 12 mm deformed bar kg 135.00
3.3.14.3.4 Provide, cut and fix formwork m2 20.59
3.3.14.4 CONCRETE WORK
3.3.14.4.1 Lean concrete of grade C-15, 50mm thick
m2 3.60
blinding layer under foundation
3.3.13.4.2 Reinforced concrete type C-25 filled into
form work and vibrated around reinforced
bar to
3.3.13.4.2.1 Grade Beam m3 0.81
3.3.13.4.2.2 Column m3 0.50
3.3.13.4.2.3 Top Tie Beam m3 0.48
3.3.13.4.2.4 Floor Slab m3 0.85
3.3.13.4.2.5 Lintels m3 0.38
3.3.14.5Hollow block, carpentery & roofing work,
door, window.
3.3.14.5.1 Supply and construct hollow block 200 x 200
m2 20.50
x 400mm
3.3.14.5.2
m2 6.30
Ditto, but 150x200x400 mm for parapet wall
3.3.14.5.3 Supply, assemble and fix in position
eucalyptus roof truss of length 3.6 m price
shall include the application of three coats No. 3.00
and external anti-termite treatment as per the
drawing

#3.3.Operator Dewelling TG 76/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FORM SANF WELL FIELD

3.3.14.5.4 Supply and fix purlin in zigba wood size 50 x


70 mm nailed into eucalyptus truss including
three coats of anti - termite external m 12.00
treatment
3.3.14.5.5 Supply and fix roof cover in G-28mm
corrugated galvanized iron sheet fixed into
zigba wood purlin with dome headed m2 5.80
galvanized nails (purlin and ridge cover
measured separately)

3.3.14.5.6 Supply and fix edge gutter formed in G-28


flat galvanized metal sheet including support
brackets 1mm thick shaped steel plate
spaced at a maximum spacing of 1000 mm m 2.00
c/c and fixed to purlin - price includes metal
primer and two coats of synthetic enamel
paint

3.3.14.5.7 Supply & fix diameter 100mm down pipe in


G-28 including 1mm thick metal support
brackets fixed at a maximum interval of 1000 m 8.00
mm fixed to walls or columns

3.3.14.5.8 Supply and fix 25x 250 mm fascia board to


,, 2.00
purlin
3.3.14.5.9 Supply and fix metal windows size
(0.50x0.50)m price includes 4mm thick clear No. 2.00
glass
3.3.14.5.10 Supply and fix metal doors size (1.9x0.80)m
with figured glass in upper half portion ,, 1.00

Finishing; finishing work shall include all


surface pre-cleaning, polishing and
cleaning at the end of finishing

#3.3.Operator Dewelling TG 77/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FORM SANF WELL FIELD

3.3.14.6 Floor screed in cement mortar 20 mm thick


m2 2.25

3.3.14.6.1 Apply three coats of plaster in cement mortar


to internal cement concrete block wall m2 17.98

3.3.14.6.2 Ditto, but to external face of wall m2 25.03


3.3.14.6.3 Apply 3 coats of plastic paint to internal walls
and synthetic paint to metal doors and m2 16.99
windows
3.3.14.6.4 Ditto, but to external face of wall m2 24.49
3.3.14.6.5 Supply and fix Turkish type WC with high
flush cystern complete with cold water
connection and waste pipe line DN 110mm LS 1.00
up to septic tank.
3.3.14.7 Miscellaneous
3.3.14.7.1 Stone pitched trapezoidal drainage ditch
pointed with mortar (1:3) (top width=40 cm,
bottom width=20 cm and depth=30cm) m 12.00
around the control panel room as per the
drawing

3.3.14.7.2 Stone pavement around the building 1m wide


m 11.60

3.3.14.7.3 Light points complete wiring and the


LS. 1.00
necessary accessories
Total for Toilet Room

Item No. Description Unit Qty.


Construction of Septic Tank for Toilet
3.3.14.8 Room
3.3.14.8.1 Site clearing to depth of 20cm m2 20.00
3.3.14.8.2 Excavation of soil to depth of 3mts. In
m3 36.00
ordinary soil

#3.3.Operator Dewelling TG 78/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FORM SANF WELL FIELD

3.3.14.8.3 Excavate for foundation,in soft rock m3 18.00


3.3.14.8.4
m3 7.26
Ditto, but in hard formation exceeding 3mts.
3.3.14.8.5 Cart away of surplus excavated materials to
m3 29.00
a distance of 1- 2kms
3.3.14.8.6 Basaltic or equivalent stone masonry wall
m3 14.10
bedded in cement mortar 1:3
3.3.14.8.7
m2 7.60
Lean concrete of C-15 under foundation slab.
3.3.14.8.8 Reinforced concrete foundation slab (C-20)
including reinforcement bar as per the m3 1.60
drawing
3.3.14.8.9 Reinforced concrete cover slab (C-25)
including reinforcement bar as per the m3 1.30
drawing
3.3.14.8.10 Provide, cut and fix in position zigba
formwork including soffit and scaffolding for m2 6.10
cover slab.
3.3.14.8.11 Plastering of internal wall and partation wall
m2 22.20
in cement mortar 1:3
3.3.14.8.12 Supply and construct H.C.B baffle partation
m2 2.40
wall
3.3.14.8.13 Supply and install PVC vent pipe with cover
LS 1.00
cap as per the drawing
Total for Septic Tank
Total BILL 3.3: Construction of
OPERATOR'S DWELLING with toilet &
septic tank Near Tullu Guddo

#3.3.Operator Dewelling TG 79/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.4.: CONSTRUCTION OF GUARD HOUSE @TULLU GUDDO


UNIT PRICE TOTAL
ITEM UNIT QTY
DESCRIPTION BIRR USD BIRR USD

3.4. CONSTRUCTION OF GUARD HOUSE @


TULU GUDO
3.4.1 Earth work
3.4.1.1
Excavate 20 cm topsoil,clearing and grubbing m2 36.00
Excavate for foundation,in common soil depth
3.4.1.2
not exceeding 2.0m. m3 30.00

3.4.1.3
Excavate for foundation,in softrock formation m3 2.00
3.4.1.4 Excavate for foundation,in hard rock formation m3 2.50
3.4.1.5 Cart away of surplus excavated materials m3 43.50
Supply and compact approved backfill
3.4.1.6
selected material m3 16.00
3.4.2 Stone masonary work
3.4.2.1 provide, place and build with broken stone for
250mm hardcore with hard basaltic stone or
similar stone m2 11.80
3.4.2.2 Provide basaltic or equivalent masonry wall
below ground surface. m3 12.36
3.4.2.3 Ditto,but above ground level m3 0.92
3.4.3 Provide, cut, bend and fix in position
reinforced steel bar. All according to
structural drawing. Price shall include
tying wires

3.4.3.1 Diameter 6 mm plain bar kg 45.00


3.4.3.2 Diamter 8mm deformed bar kg 55.00
3.4.3.3 Diamter 10 mm deformed bar kg 19.84
3.4.3.4 Diamter 12 mm deformed bar kg 200.00

#3.4. Guard House TG 80/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

3.4.3.5 Provide, cut and fix formwork m2 38.00


3.4.4 CONCRETE WORKS
Lean concrete of grade C-15, 50mm thick
3.4.4.1
blinding layer under foundation m2 13.30
Reinforced concrete type C-25 filled into
3.4.4.2 form work and vibrated around reinforced
bars
3.4.4.2.1 Grade Beam m3 0.52
3.4.4.2.2 Column m3 1.40
3.4.4.2.3 Top Tie Beam m3 0.65
3.4.4.2.4 Floor Slab m3 0.93
3.4.4.2.5 Lintels m3 0.13
3.4.5 Hollow block, carpentery & roofing work,
door & window.
Supply and construct hollow block
3.4.5.1
(200x200x400)mm m2 32.00

3.4.5.2
Ditto, but for parapet wall (150x200x400)mm m2 11.50
Supply, assemble and fix in position
eucalyptus roof truss of length 3.6 m price
3.4.5.3 shall include the application of three coats and
external anti-termite treatment as per the
drawing
No. 6.00
Supply and fix purlin in zigba wood size 50 x
70 mm nailed into eucalyptus truss including
3.4.5.4 three coats of anti - termite external treatment
m 21.00

#3.4. Guard House TG 81/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Supply and fix roof cover in G-30mm


corrugated galvanized iron sheet fixed into
3.4.5.5 zigba wood purlin with dome headed
galvanized nails (purlin and ridge cover
measured separately)
m2 16.00
Supply and fix edge gutter formed in G-28 flat
galvanized metal sheet including support
brackets 1mm thick shaped steel plate spaced
3.4.5.6 at a maximum spacing of 1000 mm c/c and
fixed to purlin - price includes metal primer
and two coats of synthetic enamel paint
m 3.50
Supply & fix diameter 100mm down pipe in G-
28 including 1mm thick metal support brackets
3.4.5.7 fixed at a maximum interval of 1000 mm fixed
to walls or columns m 11.60
Supply and fix 25x 250 mm fascia board to
3.4.5.8
purlin m2 3.50
Supply and fix metal windows size
3.4.5.9 (0.80x1.30)m price includes 4mm thick clear
glass No. 2.00
Supply and fix metal doors size (0.80x2.20)m
3.4.5.10 with figured glass in upper half portion
No. 1.00
3.4.6 Finishing; finishing work shall include all
surface pre-cleaning, polishing and
cleaning at the end of finishing
Floor screed in cement mortar 20 mm thick
2.3.4.1
m2 10.00
Apply three coats of plaster in cement mortar
2.3.4.2 to internal cement concrete block wall
m2 34.50
2.3.4.3 Ditto, but to external face of wall m2 54.00

#3.4. Guard House TG 82/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Apply 3 coats of plastic paint to internal walls


2.3.4.4 and synthetic paint to metal doors and
windows m2 34.50
2.3.4.5 Ditto, but to external face of wall m2 53.50
3.4.6 Electrical Installation
3.4.6.1 Supply & install distribution board DB-R2 for
flush mounting with lockable door consisting

3.4.6.2 1pc of ACB of 10A, 1-ph No. 2.00


3.4.6.3 2pcs fo ACB of 16A, 1-ph No. 1.00
3.4.6.4 Light points with switches, fed through PVC
insulated wire 2x2.5mm2 cable No. 3.00
3.4.6.5 Flush mounted socket outlets of
16A,220V,50HZ,fed through PVC 3x2.5mm2
cable, laid on the roof and in 16mm conduit in
the wall. No. 2.00
3.4.6.6 Light fittings type philips TMS 012/1.36 or No. 3.00
equivalent with 1x36W lamps
3.4.6.7 Power line of PVC conductor of 2 x 4 sq mm
from MDB m 50.00
3.4.6.8 Road lighting steel columns complete, with 70
watt HPS fittings and lamps, wiring MCB's,
glands and all items necessry for the works. No. 8.00
3.4.6.9 Flood lighting steel columns complete, with
two 500 watt HPS fittings and lamps, wiring,
MCB'S, glands and all items necessary for the
works No. 8.00
3.4.6.10 photoelectrical cells, with all wirng, conduit
and fixings as necessary for the works. No. 2.00
3.4.7 Miscellaneous

#3.4. Guard House TG 83/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Stone pitched trapezoidal drainage ditch


pointed with mortar (1:3) (top width=40 cm,
3.4.7.1 bottom width=20 cm and depth=30cm) around
the control panel room as per the drawing
m 26.00
Stone pavement around the building 1m wide
3.4.7.2
m 18.00
Total of Bill No.3.4.

#3.4. Guard House TG 84/130


SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD
AAWSA:PROJECT OFFICE

BILL 3.5: CONSTRUCTION OF CHILORINATION ROOM @TULLU GUDDO


ITEM UNIT PRICE TOTAL
ITEM DESCRIPTIONS UNIT QUANTITY
NO. BIRR USD BIRR USD
3.5 CONSTRUCTION OF CHILORINATION ROOM

3.5.1 Earth work


3.5.1.1 Clearing of site to remove top soil to a depth of
m2 44.00
200 mm
3.5.1.2 Excavation for stone masonry foundation; 0.6m
m3 15.60
width and 0.7m depth
3.5.1.3 Excavation for floor slab 0.3 m depth m3 7.42
3.5.1.4 Cart away and deposit excavated surplus
m3 26.30
material to a distance not exceeding 1km.
3.5.1.5 Supply, fill and compact approved backfill
m3 15.26
material
3.5.1.6 Provide and fill hard core with hard basaltic or
equivalent stone, well compacted and blinded
with crushed stone to a finished thickness of m2 193.29
25cm
3.5.2 Concrete Works
3.5.2.1 Lean concrete of grade C-15, 50mm thick
blinding layer under masonry works and floor m2 33.48
slab
3.5.3 Reinforced concrete type C-25 filled into
form work and vibrated around reinforced
bar to
3.5.3.1 Grade Beam m3 1.26
3.5.3.2 Column m3 1.11
3.5.3.3 Top Tie Beam m3 0.45

85/130
#3.5 Chilorination Room TG
SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD
AAWSA:PROJECT OFFICE

BILL 3.5: CONSTRUCTION OF CHILORINATION ROOM @TULLU GUDDO


ITEM UNIT PRICE TOTAL
ITEM DESCRIPTIONS UNIT QUANTITY
NO.
3.5.3.4 Floor Slab m3 0.10
3.5.3.5 Lintels m3 3.53
3.5.3.6 Others m3 7.31
3.5.4 Reinforcement Bars
Provide, cut, bend and fix in position
reinforced steel bar. All according to
structural drawing. Price shall include tying
wires

3.5.4.1 6mm diameter deformed bar kg 94.15


3.5.4.3 8mm diameter deformed bar kg 41.43
3.5.4.4 10mm diameter deformed bar kg 251.50
3.5.4.5 12mm diameter deformed bar kg 721.00
3.5.4.6 14mm diameter deformed bar kg 1,109.91
3.5.4.7 16mm diameter deformed bar kg 162.00
3.5.5 Form Works
3.5.5.1 Provide, cut and fix formwork m2 118.66
3.5.6 Masonry and Block Works
3.5.6.1 Supply and raise 400 mm thick and 1.9m high
hard trachytic or equivalent stone masonry
foundation wall bedded in cement mortar mix 1:3 m3 11.50
below ground level.
3.5.6.2 Ditto above ground level. m3 6.00
3.5.6.3 Supply and raise 200mm thick concrete block
(class A of the ES CD3.301) wall laid in cement m2 112.08
mortar mix 1:3
3.5.7 Carpentry and Roofing

86/130
#3.5 Chilorination Room TG
SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD
AAWSA:PROJECT OFFICE

BILL 3.5: CONSTRUCTION OF CHILORINATION ROOM @TULLU GUDDO


ITEM UNIT PRICE TOTAL
ITEM DESCRIPTIONS UNIT QUANTITY
NO.
3.5.7.1 Supply, assemble and fix in position eucalyptus
roof truss of length 3.6 m price shall include the
application of three coats and external anti- No 18.00
termite treatment as per the drawing

3.5.7.2 Supply and fix purlin in zigba wood size 50 x 70


mm nailed into eucalyptus truss including three
coats of anti - termite external treatment m 46.00

3.5.7.3 Supply and fix roof cover in G-30mm corrugated


galvanized iron sheet fixed into zigba wood
purlin with dome headed galvanized nails (purlin m2 46.00
and ridge cover measured separately)

3.5.7.4 Supply and fix edge gutter formed in G-28 flat


galvanized metal sheet including support
brackets 1mm thick shaped steel plate spaced
at a maximum spacing of 1000 mm c/c and fixed m 60.00
to purlin - price includes metal primer and two
coats of synthetic enamel paint

3.5.7.5 Supply & fix diameter 100mm down pipe in G-28


including 1mm thick metal support brackets fixed
at a maximum interval of 1000 mm fixed to walls m 16.00
or columns
3.5.7.6 Supply and fix 25x 250 mm fascia board to
m 24.00
purlin
3.5.7.7 Supply and fix metal windows size 1.2 x 1.0m
No 2.00
price includes 4mm thick glass

87/130
#3.5 Chilorination Room TG
SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD
AAWSA:PROJECT OFFICE

BILL 3.5: CONSTRUCTION OF CHILORINATION ROOM @TULLU GUDDO


ITEM UNIT PRICE TOTAL
ITEM DESCRIPTIONS UNIT QUANTITY
NO.
3.5.7.8 Supply and fix metal doors size 2.10 x 1.0 with
No 3.00
figured glass in upper half portion
3.5.7.9 Mesh Wire Wall m2 164.20
3.5.8 Finishing Works
Finishing works shall include all surface pre-
cleaning, polishing and cleaning at the end
of finishing
3.5.8.1 Floor screed in cement mortar 20 mm thick m2 17.63
3.5.8.2 Apply three coats of plaster in cement mortar to
m2 38.80
internal part concrete block wall
3.5.8.3 Ditto, but to external face of wall m2 45.42
3.5.8.4 Apply 3 coats of plastic paint to internal walls
and synthetic paint to metal doors and windows m2 42.12

3.5.8.5 Ditto, but to external face of wall m2 45.42


3.5.8.6 Terazzoo Tile Floor Finish with cenment sand
mortar bedding for the chlorine pump room m2 17.28

3.5.8.7 Ceramic Wall Finish for the chlorine pump room


and Pump Seat Blocks for wall height up to m2 27.76
800mm from floor finish level
3.5.8.8 Electricity wiring including conduits,sockets and
switches, fluorescent lighting system as per the
electrical design and to standard of EEPCo. LS 1.00

3.5.9 Miscellaneous

88/130
#3.5 Chilorination Room TG
SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD
AAWSA:PROJECT OFFICE

BILL 3.5: CONSTRUCTION OF CHILORINATION ROOM @TULLU GUDDO


ITEM UNIT PRICE TOTAL
ITEM DESCRIPTIONS UNIT QUANTITY
NO.
3.5.9.1 Stone pitched trapezoidal drainage ditch pointed
with mortar (1:3) (top width=40 cm, bottom
width=20 cm and depth=30cm) around the m 30.00
chlirination building as per the drawing

3.5.9.2 Stone pavement around the building 1m wide


m2
19.20
Total BILL 3.5: Construction of
CHILORINATION ROOM Near Tullu Guddo

89/130
#3.5 Chilorination Room TG
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.6: CONSTRUCTION OF SEPTIC TANK, SOAK AWAY PIT @TULLU GUDDO
ITEM UNIT PRICE TOTAL
ITEM DESCRIPTIONS UNIT QUANTITY
NO. BIRR USD BIRR USD
CONSTRUCTION OF TOILET ROOM, SEPTIC
3.6 TANK, SOAK AWAY PIT
3.6. Construction of Toilet Room
3.6.1 Earth work
3.6.1.1 Excavate 20 cm topsoil,clearing and grubbing m2 15.20
3.6.1.2 Excavate for foundation,in common soil depth not
exceeding 2.0m. m3 5.60
3.6.1.3 Excavate for foundation,in soft rock m3 0.50
3.6.1.4 Excavate for foundation,in hard rock m3 1.50
3.6.1.5 Cart away of surplus excavated materials m3 13.50
3.6.1.6 Supply and compact approved backfill selected
material m3 2.50
3.6.2 Stone masonary work
3.6.2.1 provide ,place and build with broken stone for
250mm hardcore with hard basaltic stone or
similar stone m3 2.25
3.6.2.2 Provide basaltic or equivalent masonry wall below
and above ground surface m3 5.60
3.6.2.3 Ditto,but above ground level m3 0.90
3.6.3 Provide, cut, bend and fix in position
reinforced steel bar. All according to structural
drawing. Price shall include tying wires

3.6.3.1 Diameter 6 mm plain bar kg 13.47


3.6.3.2 Diameter 10 mm deformed bar kg 45.00
3.6.3.3 Diameter 12 mm deformed bar kg 135.00
3.6.3.3 Provide, cut and fix formwork m2 20.59
3.6.4 CONCRETE WORK
3.6.4.1 Lean concrete of grade C-15, 50mm thick blinding
layer under foundation m2 3.60

#3.6. Toilet,Septic tank,fe TG 90/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

3.6.4.2 Reinforced concrete type C-25 filled into form


work and vibrated around reinforced bar to

3.6.4.2.1 Grade Beam m3 0.81


3.6.4.2.2 Column m3 0.50
3.6.4.2.3 Top Tie Beam m3 0.48
3.6.4.2.4 Floor Slab m3 0.85
3.6.4.2.5 Lintels m3 0.38
3.6.5 Hollow block, carpentery & roofing work, door,
window.
3.6.5.1 Supply and construct hollow block 200 x 200 x
400mm m2 20.50
3.6.5.2 Ditto, but 150x200x400 mm for parapet wall m2 6.30
3.6.5.3 Supply, assemble and fix in position eucalyptus
roof truss of length 3.6 m price shall include the
application of three coats and external anti-termite
treatment as per the drawing
No. 3.00
3.6.5.4 Supply and fix purlin in zigba wood size 50 x 70
mm nailed into eucalyptus truss including three
coats of anti - termite external treatment m 12.00
3.6.5.5 Supply and fix roof cover in G-28mm corrugated
galvanized iron sheet fixed into zigba wood purlin
with dome headed galvanized nails (purlin and
ridge cover measured separately)
m2 5.80
3.6.5.6 Supply and fix edge gutter formed in G-28 flat
galvanized metal sheet including support brackets
1mm thick shaped steel plate spaced at a
maximum spacing of 1000 mm c/c and fixed to
purlin - price includes metal primer and two coats
of synthetic enamel paint
m 2.00

#3.6. Toilet,Septic tank,fe TG 91/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

3.6.5.7 Supply & fix diameter 100mm down pipe in G-28


including 1mm thick metal support brackets fixed
at a maximum interval of 1000 mm fixed to walls or
columns m 8.00
3.6.5.8 Supply and fix 25x 250 mm fascia board to purlin
,, 2.00
3.6.5.9 Supply and fix metal windows size (0.50x0.50)m
price includes 4mm thick clear glass
No. 2.00
3.6.5.10 Supply and fix metal doors size (1.9x0.80)m with
figured glass in upper half portion ,, 1.00
Finishing; finishing work shall include all
surface pre-cleaning, polishing and cleaning at
the end of finishing
3.6.6 Floor screed in cement mortar 20 mm thick m2 2.25
3.6.6.1 Apply three coats of plaster in cement mortar to
internal cement concrete block wall m2 17.98
3.6.6.2 Ditto, but to external face of wall m2 25.03
3.6.6.3 Apply 3 coats of plastic paint to internal walls and
synthetic paint to metal doors and windows
m2 16.99
3.6.6.4 Ditto, but to external face of wall m2 24.49
3.6.6.5 Supply and fix Turkish type WC with high flush
cystern complete with cold water connection and
waste pipe line DN 110mm up to septic tank.
LS 1.00
3.6.7 Miscellaneous
3.6.7.1 Stone pitched trapezoidal drainage ditch pointed
with mortar (1:3) (top width=40 cm, bottom
width=20 cm and depth=30cm) around the control
panel room as per the drawing m 12.00
3.6.7.2 Stone pavement around the building 1m wide m 11.60
3.6.7.3 Light points complete wiring and the necessary
accessories LS. 1.00
Total for Toilet Room

#3.6. Toilet,Septic tank,fe TG 92/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Item No. Description Unit Qty.

3.6.8 Construction of Septic Tank for Toilet Room


3.6.8.1 Site clearing to depth of 20cm m2 20.00
3.6.8.2
Excavation of soil to depth of 3mts. In ordinary soil m3 36.00
3.6.8.3 Excavate for foundation,in soft rock m3 18.00
3.6.8.4 Ditto, but in hard formation exceeding 3mts. m3 7.26
3.6.8.5 Cart away of surplus excavated materials to a
distance of 1- 2kms m3 29.00
3.6.8.6 Basaltic or equivalent stone masonry wall bedded
in cement mortar 1:3 m3 14.10
3.6.8.7 Lean concrete of C-15 under foundation slab. m2 7.60
3.6.8.8 Reinforced concrete foundation slab (C-20)
including reinforcement bar as per the drawing m3 1.60
3.6.8.9 Reinforced concrete cover slab (C-25) including
reinforcement bar as per the drawing m3 1.30
3.6.8.10 Provide, cut and fix in position zigba formwork
including soffit and scaffolding for cover slab. m2 6.10
3.6.8.11 Plastering of internal wall and partation wall in
cement mortar 1:3 m2 22.20
3.6.8.12
Supply and construct H.C.B baffle partation wall m2 2.40
3.6.8.13 Supply and install PVC vent pipe with cover cap as
per the drawing LS 1.00
Total for Septic Tank
Item No. Description Unit Qty.
3.6.9 Construction of Soak Away Pit
3.6.9.1 Site clearing to depth of 20cm m2 8.00
3.6.9.2
Excavation of soil to depth of 3mts. In ordinary soil m3 23.00
3.6.9.3 Excavate for foundation,in soft rock m3 12.00

#3.6. Toilet,Septic tank,fe TG 93/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

3.6.9.4
Ditto, but in hard formation not exceeding 3mts. m3 6.00
3.6.9.5 Cart away of surplus excavated materials to a
distance of 1- 2kms m3 29.00
3.6.9.6 Basaltic or equivalent dry stone masonry wall. m3 14.00
3.6.9.7 Supply and fill course gravel m3 4.80
3.6.9.8 Ditto, but fine gravel m3 2.40
3.6.9.9 Ditto, but sand m3 2.40
3.6.9.10 Reinforced concrete cover slab (C-25) in 10 cm
thick including reinforcement bar as per the
drawing m3 0.70
Total for Soak Away Pit
Total of Bill No.3.6. TOILET ROOM, SEPTIC
TANK, SOAK AWAY PIT

#3.6. Toilet,Septic tank,fe TG 94/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.7: CONSTRUCTION OF COMPOUND & RETAINING WORK (TULU GUDO )


ITEM UNIT AMOUNT
ITEM DESCRIPTION UNIT QTY
NO BIRR USD BIRR
3.7 COMPOUND WORK WORK (TULU GUDO )
3.7.1 Earth work
3.7.1.1 Site clearing to remove top soil to an average depth of 20 cm m2 1,671.39
3.7.1.2 Bulk excavation in normal soil to a depth of 60cm m3 1,002.84
3.7.1.3 Ditto but depth to a depth from 0.6m to 1.5m m3 952.69
3.7.1.4 Ditto but to a depth 1.5 - 3.5 m m3 501.42
3.7.1.5 Ditto but to a depth 3.5 - 4.83 m m3 1,504.25
3.7.1.6 Ditto but to > 4.83 m m4 12.00
3.7.1.7 Ditto but in soft rock formation m 3
2,089.24
3.7.1.8 Ditto but in hard rock formation m 3
1,754.96
3.7.1.9 Provide and fill with selected 60cm granular material around
m3 1,002.84
inside compound work.
3.7.1.10 Cart away all excavated material, deposit to appropriate
m3 8,485.96
distance not exceeding 1 km
3.7.1.11 Supply and lay DN 300 mm concrete drainage pipe with
m 786.08
connecting manhole as shown on the drawing.
3.7.1.12
Grassing of sides and bottom of external drainage ditch & green m2 1,020.00
area in the compound with approved permanently growing
grass as shown in tender Drawing
3.7.1.13
Provide/Construction of road inside the compound. Price
includes,remove the top soil, Excavation, backfill, cartaway,
concreting & all other associated works & materials will be m 291.05
constructed all as described in the Specifications and/ as shown
in tender Drawing &/or as directed by the Engineer and as
dictated by the field condition.
3.7.2 Electrical Installation
3.7.2.1 Supply & install within guard house; distribution board for flush
mounting with lockable door consisting of
3.7.2.2 1pc of ACB of 10A, 1-ph No. 1.00
3.7.2.3 2pcs fo ACB of 16A, 1-ph No. 2.00

#3.7.TG Compound & Retaing Wall 95/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.7: CONSTRUCTION OF COMPOUND & RETAINING WORK (TULU GUDO )


ITEM UNIT AMOUNT
ITEM DESCRIPTION UNIT QTY
NO
3.7.2.4 Light points with switches, fed through PVC insulated wire No. 2.00
2x2.5mm2 cable
3.7.2.5
Flush mounted socket outlets of 16A,220V,50HZ,fed through No. 2.00
PVC 3x2.5mm2 cable, laid on the roof and in 16mm conduit in
the wall.
3.7.2.6 Light fittings type philips TMS 012/1.36 or equivalent with 1x36W
No. 2.00
lamps
3.7.2.7 Power line of PVC conductor of 2 x 4 sq mm from EEPCO meter
m 20.00

#3.7.TG Compound & Retaing Wall 96/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.7: CONSTRUCTION OF COMPOUND & RETAINING WORK (TULU GUDO )


ITEM UNIT AMOUNT
ITEM DESCRIPTION UNIT QTY
NO
3.7.2.8 Road lighting steel columns complete, with 70 watt HPS fittings
and lamps, wiring MCB's, glands and all items necessry for the No. 4.00
works.
3.7.2.9 Flood lighting steel columns complete, with two 500 watt HPS
fittings and lamps, wiring, MCB'S, glands and all items No. 1.00
necessary for the works

3.7.2.10 photoelectrical cells, with all wirng, conduit and fixings as


No. 2.00
necessary for the works.
3.7.2.11 compound lighting as per the drawing LS 1.00
3.7.2.12 Supply and construct gate type IV as per the drawing No. 1.00
3.7.3 Fencing
Provide concrete,HCB class B, masonry, reinforcement bar
and other material and labor required for a complete and
satisfactory installation of Tullu Guddo compound Type IV
fencing works,including required finishing work & concrete
3.7.3.1 hollow block wall constructed all as described in the 475.00
Specifications and/ as shown in tender Drawing &/or as directed
by the Engineer and as dictated by the field condition.

ml
3.7.4 Metal Work
provide & install RHS grilled & framed Metal works all according
3.7.4.1 to the tender drawing. Price includes one coat of primer & two
coates of oil paint.
3.7.4.2 Main Gate
3.7.4.3 Size:- (500 x 230)cm No 1.00
3.7.4.4 Pedestrian Gate
3.7.4.5 Size:- (100 x 230)cm No 2.00

3.7.4.6
5cm thick class C-20 Concrete copping on main gate columns No 4.00
15x15cm reinforced concrete post as per the detail drawing.
3.7.4.7 Price includes form work, reinforcement bar and 50cm deep dia
50cm concrete pad foundation. No 12.00
3.7.4.8 50x50cm dressed stone m3 6.20

#3.7.TG Compound & Retaing Wall 97/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.7: CONSTRUCTION OF COMPOUND & RETAINING WORK (TULU GUDO )


ITEM UNIT AMOUNT
ITEM DESCRIPTION UNIT QTY
NO
3.7.4 Retaining Wall
3.7.4.1 Earth work
3.7.4.2 Site clearing to remove top soil to an average depth of 20 cm m2 1,289.19
3.7.4.3 Bulk excavation in normal soil to a depth of 60cm m 3
773.51
3.7.4.4 Ditto but depth to a depth from 0.6m to 1.5m m 3
1,224.73
3.7.4.5 Ditto but to a depth 1.5 - 3.5 m m3 2,578.38
3.7.4.6 Ditto but to a depth 3.5 - 4.83 m m3 1,714.62
3.7.4.7 Ditto but to above 4.83 m m 4
12.00
3.7.4.8 Ditto but in soft rock formation m3 2,761.00
3.7.4.9 Ditto but in hard rock formation m 3
1,829.30
3.7.4.10 Cart away all excavated material, deposit to appropriate
m3 10,365.87
distance not exceeding 1 km
3.7.4.11 Provide and fill 60cm with selected granular material for
m3 773.51
retaining wall.
3.7.4.12 Provide and fill hard core with hard basaltic or equivalent stone,
well compacted and blinded with crushed stone to a finished
thickness of 25 cm under the reservoir and valve chamber m2 322.30

3.7.5 Concrete Work

#3.7.TG Compound & Retaing Wall 98/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.7: CONSTRUCTION OF COMPOUND & RETAINING WORK (TULU GUDO )


ITEM UNIT AMOUNT
ITEM DESCRIPTION UNIT QTY
NO
3.7.5.1 Placing 50mm thick Grade C-10 Lean Concrete with 200kg/m 3
on excavated ground to make smooth even surface to receive m2 572.00
foundation concrete
3.7.5.2 Construction of 60cm thick Grade C-20 mass concrete for
capping with cement content of 300kg/m3at the top of retaining m3 22.10
wall.
3.7.5.3 construction of 50cm thick Grade C-20 Concrete for foundation
with cement content of 300kg/m3 to support the Masonry m3 171.60
Retaining wall

3.7.5.4 Provide, cut and fix formwork m2 42.00


3.7.6 Reinforcement
3.7.6.1 Diameter 8 mm reinforcement for base slab of retainig wall kg 4,063.49
3.7.6.2 Diameter 12 mm reinforcement for capping of retainig wall kg 1,802.30
3.7.7 Masonry work
3.7.7.1 Construction of Masonry made Retaining wall of fresh basaltic
or equivalent jointed with cement and sand mortar in the mix
ratio 1:4. per location all along the perimeter of the reservoir m3 870.00
placed and rest on the mass concrete .

3.7.7.2 Pointing all expossed external surface of masonry Retaining


Wall with cement sand mortar mix of 1:3 m2 41.50

Total BILL 3.7: CONSTRUCTION OF COMPOUND &


RETAINING WORK

#3.7.TG Compound & Retaing Wall 99/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

AMOUNT
USD

#3.7.TG Compound & Retaing Wall 100/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

AMOUNT

#3.7.TG Compound & Retaing Wall 101/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

AMOUNT

#3.7.TG Compound & Retaing Wall 102/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

AMOUNT

#3.7.TG Compound & Retaing Wall 103/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

AMOUNT

#3.7.TG Compound & Retaing Wall 104/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.8: CONSTRUCTION OF CONTROL & MONITORING ROOM@TULLU GUDDO


UNIT PRICE TOTAL
ITEM NO. ITEM DESCRIPTIONS UNIT QUANTITY
BIRR USD BIRR USD

3.8. Construction of SCADA system


Monitoring room @ Tulu Gudo
3.8.1 Earth Work
Clearing of site to remove top soil to a
3.8.1.1 m2 42.47
depth of 200 mm

Excavation for stone masonry


3.8.1.2 m3 43.20
foundation; 0.6m width and 1.0 m depth

3.8.1.3 Ditto,but depth >1m m3 29.64


Excavate for foundation,in softrock
3.8.1.3 m3 10.80
formation
Excavate for foundation,in hard rock
3.8.1.4 m3 4.45
formation

3.8.1.5 Backfill to depth of not less than 600mm m3 12.01

Cart away and deposit excavated


3.8.1.6 surplus material to a distance m3 96.58
exceeding 1km

Provide and fill hard core with hard


basaltic or equivalent stone, well
3.8.1.7 m2 15.81
compacted and blinded with crushed
stone to a finished thickness of 25 cm
3.8.2 Concrete and Block Work
Grade C-15 blinding concrete 50mm
3.8.2.1 m2 15.81
thick under floor slab
Reinforced concrete grade C-30 with
minimum cement content 360 kg/m3
cast into formwork and vibrated around
reinforcement bars in
3.8.2.1 Grade Beam m3 1.87

105/130
#3.8. SCADA Control Room TG
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

UNIT PRICE TOTAL


ITEM NO. ITEM DESCRIPTIONS UNIT QUANTITY
BIRR USD BIRR USD
3.8.2.2 Column m 3
1.40
3.8.2.3 Top Tie Beam m 3
1.02
3.8.2.4 Floor Slab m3 1.45
3.8.2.5 Lintels m3 0.87
Provide, cut, bend and fix in position
reinforced steel bar. All according to
structural drawing. Price shall include
tying wires
3.8.2.6 Diameter 8 mm deformed bar kg 58.73
3.8.2.7 Diameter 12 mm deformed bar kg 277.90
3.8.2.8 Provide, cut and fix formwork m2 52.28
3.8.3 Block work
Supply and raise 500 mm thick and
1.0m high hard trachyte or equivalent
3.8.3.1 stone masonry foundation wall below m3 26.60
the ground level bedded in cement
mortar mix 1:3

Supply and raise 500 mm thick and


0.5m high hard trachyte or equivalent
3.8.3.2 dressed stone masonry foundation wall m3 7.80
above the ground level bedded in
cement mortar mix 1:3

Supply and raise 200mm thick concrete


3.8.3.3 block (class A of the ES CD3.301) wall m2 31.10
laid in cement mortar mix 1:3

Ditto,but 150mm HCB 150X200X400 for


3.8.3.4 m2 10.40
parapet wall
The top 50 cm masonry bedded with
3.8.3.5 m3 3.00
cement mortar(1:3)

106/130
#3.8. SCADA Control Room TG
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

UNIT PRICE TOTAL


ITEM NO. ITEM DESCRIPTIONS UNIT QUANTITY
BIRR USD BIRR USD
3.8.4 Carpentry and Roofing

Supply, assemble and fix in position


eucalyptus roof truss of length 30.5 m
3.8.4.1 price shall include the application of No 8.00
three coats and external anti-termite
treatment as per the drawing

107/130
#3.8. SCADA Control Room TG
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

UNIT PRICE TOTAL


ITEM NO. ITEM DESCRIPTIONS UNIT QUANTITY
BIRR USD BIRR USD
Supply and fix purlin in zigba wood size
50 x 70 mm nailed into eucalyptus truss
3.8.4.2 m 14.80
including three coats of anti - termite
external treatment

Supply and fix roof cover in G-30 mm


corrugated galvanized iron sheet fixed
3.8.4.3 into zigba wood purlin with dome m2 12.40
headed galvanized nails (purlin and
ridge cover measured separately)

Supply and fix edge gutter formed in G-


30 flat galvanized metal sheet including
support brackets 1mm thick shaped
3.8.4.4 steel plate spaced at a maximum m 6.80
spacing of 1000 mm c/c and fixed to
purlin - price includes metal primer and
two coats of synthetic enamel pa

Supply & fix diameter 100mm down


pipe in G-30 including 1mm thick metal
3.8.4.5 support brackets fixed at a maximum m 3.20
interval of 1000 mm fixed to walls or
columns
Supply and fix 25x 250 mm fascia board
3.8.4.6 m 4.20
to purlin
3.8.5 Metal Work

108/130
#3.8. SCADA Control Room TG
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

UNIT PRICE TOTAL


ITEM NO. ITEM DESCRIPTIONS UNIT QUANTITY
BIRR USD BIRR USD
All metal doors are manufactured from
locally produced LTZ seiko steel profile
frames. All works should be cut and
assembled to sizes and shapes of the
door schedule upon submitting
workshop drawing by the contractor.
Unit price includes cylinder lock or
similar, door stoppers and other
necessary accessories for completing
the work. All according to doors
schedule and as specified.

Supply and fix metal windows size


1.1x1.2m price includes 4mm thick
3.8.5.1 No 1.00
glass and three layers of synthetic paint
to the frames
Ditto, but (.8x1.0m )mm metal framed
3.8.5.2 window covered metal louvered. No. 1.00

Supply and fix metal windows size


1.1x1.2m price includes 4mm thick
3.8.5.3 No 1.00
glass and three layers of synthetic paint
to the frames
Supply and fix metal doors size
1x2.10m with figured glass in upper
3.8.5.4 No 1.00
half portion and three layers of synthetic
paint to the doors
Supply and fix metal doors size
3.8.5.5 0.8x2.10m with three layers of synthetic No 1.00
paint to the doors
3.8.5.7 Mesh wire m2 1.24

109/130
#3.8. SCADA Control Room TG
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

UNIT PRICE TOTAL


ITEM NO. ITEM DESCRIPTIONS UNIT QUANTITY
BIRR USD BIRR USD
Finishing: finishing work shall
include all surface pre-cleaning,
3.8.6 -
polishing and cleaning at the end of
finishing
Floor screed in cement mortar 20 mm
3.8.6.1 m2 15.00
thick
Apply three coats of plaster in cement
3.8.6.2 mortar to internal cement concrete m2 51.75
block wall
3.8.6.3 Ditto, but to external face of wall 81.00
Apply cement mortar pointing to all
3.8.6.4 m2 51.75
external cement concrete block wall
Apply 3 coats of plastic paint to internal
3.8.6.5 walls and synthetic paint to metal doors m2 80.25
and windows
3.8.6.6 Ditto, but to external face of wall m2 52.00
3.8.7 Electrical Installation
Supply and install the required electrical
3.8.7.1 LS 1.00
installation
3.8.8 Miscellaneous
Stone pitched trapezoidal drainage ditch
pointed with mortar (1:3) (top width=40
3.8.8.1 cm, bottom width=20 cm and m 28.00
depth=30cm) around the control panel
room as per the drawing

Stone pavement around the building 1m


3.8.8.2 m 18.00
wide
Total of BILL 3.8: Construction of
CONTROL & MONITORING ROOM
(@TULLU GUDDO)

110/130
#3.8. SCADA Control Room TG
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.9: CONSTRUCTION OF GENERATOR HOUSE @ TULLU GUDDO


ITEM UNIT PRICE TOTAL
ITEM DESCRIPTIONS UNIT QUANTITY
NO. BIRR USD BIRR

3.9. CONSTRUCTION OF GENERATOR HOUSE


@TULLU GUDDO
3.9.1 EARTH WORKS
3.9.1 Excavation and back fill for Structures
3.9.1.1 Top soil stripping,clearing and cartaway up to 250 m2 143.70
mm depth
3.9.1.2 Bulk excavation in normal material depth up to
m3 100.60
1.0m
3.9.1.3 Ditto, but excavation of trenches depth exceeding
m3 59.57
1.0m
3.9.1.4 Excavate for foundation,in softrock formation m3 24.00
3.9.1.5 Excavate for foundation,in hard rock formation m3 25.00
3.9.1.6 Disposal of surplus excavated material as
m3 104.86
directed by the engineer
3.9.1.7 Backfill and compact selected none- expansive
granular material and compact in layer as directed m3 44.00
by the engineer
3.9.2 Stone masonary work
3.9.2.1 provide, place and build with broken stone for
250mm hardcore with hard basaltic stone or m3 62.89
similar stone
3.9.2.2 Provide basaltic or equivalent masonry wall below m3 37.84
3.9.2.3 ground
Ditto,butsurface
above of generator
ground level house m 3
7.74
3.9.3 Provide and place in-situ concrete to
specification
3.9.3.1 Grade C-15 blinding concrete 50mm thick under
m2 80.08
floor slab.

#3.9.Generator Room @ TG 111/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

3.9.3.2 Grade C-25 concrete in 380 kg cement /m3 for


grade beam m3 6.05

3.9.3.3 Ditto, but for 150mm thick floor slab m3 12.01


3.9.3.4 Ditto, but for generator seat as per the detailed m3 3.30
3.9.3.5 drawing
Ditto, but for lintels (200x200)mm m 3
3.20
3.9.3.6 Ditto, but for elevation column m 3
3.30
3.9.3.7 Ditto, but for intermediate beam m3 2.30
3.9.3.8 Ditto, but for top tie beam and crane support m3 3.50
3.9.3.9 beam
Ditto, but for roof slab m 3
14.15
3.9.3.10 Ditto, but for parapet wall over the roof slab. m3 3.30
3.9.4 Supply and fix form work in
3.9.4.1 F1 finish plane vertical forms to beam and column
m2 45.00

3.9.4.2 F2 finish plane vertical forms to beam and column


m2 50.00

3.9.4.3 High yield reinforcement steel bars to


specification
3.9.4.3. 6mm dia.
kg. 200.00
1
3.9.4.3. 8mm dia.
kg. 1,830.00
2
3.9.4.3. 10mm dia.
kg. 564.00
3
3.9.4.3. 12mm dia.
kg. 510.00
4
3.9.4.3. 14mm dia.
kg. 1,865.00
5
3.9.4.3. 16mm dia.
kg. 598.00
6

#3.9.Generator Room @ TG 112/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

3.9.5 Block Work and finishing


3.9.5.1 Supply and Construct 200mm thick hollow block
m2 127.25
wall 200X200X400 cement mortar 1:3
3.9.5.2 Ditto,but 150mm HCB 150X200X400 for parapet
m2 52.00
wall
3.9.5.3 Ditto,but external wall spatter(Tyrolean) finish m3 46.00
3.9.5.4 Apply two coats of tyrolean rendering in 12mm
thick cement mortar 1:3 to external wall surfaces. m2 75.00

3.9.5.5 plastering of internal and external wall surfaces,


columns, beams with three coats in cement
mortar 1:3 maximum thickness of 25mm m2 86.00

3.9.5.6 Painting plastered wall surfaces in two coats of


m2 86.00
plastic emulsion paint.
3.9.6 Carpentry and Roofing
3.9.6.1 Supply, assemble and fix in position eucalyptus No. 8.00
roof truss of length 5.5 m price shall include the
3.9.6.2 Supply and fix purlin in zigba wood size 50 x 70 m 78.00
application of three coats and external anti-termite
mm nailed into eucalyptus truss including three
3.9.6.3 treatment
Supply as per thecover
drawing
coats ofand
antifix roof
- termite in G-30mm
external corrugated
treatment m2 54.24
galvanized iron sheet fixed into zigba wood purlin
3.9.6.4 Supply and fix edge gutter formed in G-28 flat m 11.00
with dome headed galvanized nails (purlin and
galvanized metal sheet including support brackets
3.9.6.5 Supply & fixmeasured
ridge cover diameter 100mm down pipe in G-28
separately)
1mm thick shaped steel plate spaced at a
including 1mm thick metal support brackets fixed
maximum spacing of 1000 mm c/c and fixed to
at a maximum interval of 1000 mm fixed to walls
purlin - price includes metal primer and two coats
or columns m 14.00
of synthetic enamel paint
3.9.6.6 Supply and fix 25x 250 mm fascia board to purlin m 9.00
3.9.6.7
Supply and prepare a fair face concrete flooring m2 38.00
3.9.6 Metal Work

#3.9.Generator Room @ TG 113/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

3.9.6.1 Supply and fix (3400 x 3600)m metal door with


louvered ventilation made of double steel sheet
profile cut and welded No. 1.00
along the entire line of contact and covered with
3mm thick metal sheet.

3.9.6.2 Ditto, but (2900x2950)mm metal framed window


No. 10.00
covered metal louvered.
3.9.6.3 Ditto, but (075x1100)mm louvered window No. 2.00
3.9.6.5 Ditto, but (1000x1100)mm louvered window No. 1.00
3.9.6.6 Ditto, but (090x075)mm louvered window No. 8.00
3.9.6.7 Ditto, but (065x1050)mm louvered window No. 8.00
3.9.7 Electrical Installation
3.9.7.1 Sub-distribution board (SDB-GE) for flush
mounting with locable door and consisting of:
3.9.7.2 1 pcs. ACB of 63A, 3-ph No. 1.00
1 pcs. ACB of 25A, 3-ph No. 1.00
1 pcs. ACB of 16A, 3-ph No. 1.00
1 pcs. ACB of 16A, 1-ph No. 1.00
1 pcs. ACB of 10A, 1-ph and with all the
No. 1.00
necessary accessories
3.9.7.3 Light points with switches, fed through PVC No. 6.00
3.9.7.4 insulated Cu 2x2.5mm
Flush mounted
2
cable laid
socket outlets of along the truss
16A,220v,50HZ,fed through PVC Cu 3x2.5mm2 No. 2.00
cable, laid along the truss (on the roof) and in
16mm conduit in the wall.
3.9.7.5 Power line of PVC conductor of 2 x 4 sq mm from
m 30.00
MDB
3.9.8 Light Fittings with Lamps

#3.9.Generator Room @ TG 114/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

3.9.8.1 Suspended type fluorescent luminaries, type


philips TMS 012/1.36 or equivalent with 1x36W
lamps suspended by 2.5mm steel rope. No. 6.00

3.9.8.2 Ditto, but PACIFIC 095/1.36 or equivalent No. 4.00


3.9.8.3 25A,380V,50HZ,surface mounted power socket
(3ph) type or equivalent with earthing contact fed
through Cu 4x6mm2 PVC insulated cable laid No. 1.00
along the truss (on the roof) and along the wall
surface (on the wall)

3.9.8.4 Ditto,but 16A and fed through Cu 4x2.5mm2 cable


type. No. 1.00

3.9.8.5 5 kg extinguisher(powder for electrical fiers) LS 1.00


3.9.9 Miscellaneous works
3.9.9.1 Supply and construct grade C-15, 10cm thick
concrete walkways as shown on the drawings. m2 18.00

3.9.9.2 Supply and construct down pipes as shown in the


m 27.00
drawings.
3.9.9.3 Supply and construct drainage ditch as shown in
m 50.00
the drawings.
3.9.9.4 Provide and cover roof with bitumen mastic and
m2 96.00
marglass.
Grand Total For Generators Room # 3.9.

#3.9.Generator Room @ TG 115/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

E @ TULLU GUDDO
TOTAL
USD

#3.9.Generator Room @ TG 116/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

#3.9.Generator Room @ TG 117/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

#3.9.Generator Room @ TG 118/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

#3.9.Generator Room @ TG 119/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

#3.9.Generator Room @ TG 120/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 3.10: CONSTRUCTION OF TRANSFORMER HOUSE @TULLU GUDDO


UNIT AMOUNT
ITEM NO ITEM DESCRIPTION UNIT QTY
BIRR USD BIRR USD
CONSTRUCTION OF TRANSFORMER
3.1
HOUSE @TULLU GUDDO
3.10.1 Excavation and back fill for Structures
3.10.1.1 Clearing and grubbing top soil stripping up to
m2 140.60
250 mm depth
3.10.1.2 Bulk excavation in normal material depth up to
m3 42.75
1.0mand dispose as directed
3.10.1.3 Bulk excavation in normal material depth up to
1.0m below stripped level depth not exceeding m3 36.75
1.5m for masonary foundation.
3.10.1.4 m3 9.19
Excavate for foundation,in softrock formation
3.10.1.5 Excavation in hard rock formation m3 15.00
3.10.1.6 Cart away all excavated material, deposit to
m3 99.00
appropriate distance not exceeding 5 km
3.10.1.7 Supply and backfill compacte in layers 200mm
thick to standered proctor selected granular m3 36.10
material as directed by the engineer
3.10.2 Stone masonary
3.10.2.1
broken basaltic or similar stone and construct
m2 51.60
250mm thick hard core under floor slab.

3.10.2.2
Supply and construct stone masonary with hard
m3 39.20
trachytic stone 50 cm thick below ground level.

3.10.2.3 Ditto, but above ground level m3 8.80


3.10.2.4 Ditto, but stone filled for oil pit m3 4.00
Provide and place in-situ concrete to
3.10.3 specification
3.10.3.1 Grade C-15 blinding concrete 50mm thick under
m2 51.60
floor slab

121/130
#3.10 Transformer House TG
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

3.10.3.2 Grade C-20 in 150mm thick R.C.floor slab m3 9.60


3.10.3.3 Ditto, but in duct wall m3 2.60
3.10.3.4 Grade C-25 reinforced concrete beam under
m3 2.50
masonary foundation
3.10.3.5 Ditto, but for grade beam above masonary
m3 2.50
foundation
3.10.3.6 Ditto, but elevation column m3 4.50
3.10.3.7 Ditto, but for lintels (200x200)mm m3 1.00
3.10.3.8 Ditto, but for intermediate beam m3 2.30
3.10.3.9 Ditto, but for top-tie beam m3 2.30
3.10.3.10 Ditto, but for roof slab 120mm thick m3 12.50
3.10.3.11 Ditto, but for oil pit,H.Y. cable inlet pit & ramp m3 2.10
3.10.4 Supply and fix form work in
3.10.4.1 F1 finish plane vertical forms to beam and
m2 90.00
column
3.10.4.2 F2 finish plane vertical forms to roof slab m2 80.00
3.10.4.3 Supply,cut,bend and tie in position high yield
reinforcement steel bars to specification
6mm dia. kg. 165.00
8mm dia. kg. 405.00
10mm dia. kg. 720.00
12mm dia. kg. 1,700.00
14mm dia. kg. 840.00
16mm dia. kg. 312.00
3.10.5 Block work and finishing
3.10.5.1
Supply and construct 200x200x400mm thick
m2 82.70
hollow concrete block work in cement mortar 1:3

3.10.5.2 Apply two coats of tyrolean rendering to


external wall in cement mortar fair facing to m2 240.00
block work

122/130
#3.10 Transformer House TG
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

3.10.5.3
plastering of internal wall and exposed face of
external beam & column in cement mortar 1:3 m2 210.00
maximum thickness of 25mm in three coats.

3.10.5.4 Ditto,but internal face of roof slab. m2 98.00


3.10.5.5 Floor screeding cement mortar mix 1:3 in 3.5mm
m2 64.00
thick
Total
3.10.6 Painting work
3.10.6.1 Painting of smooth concrete surfaces under coat
m2 174.00
with plastic emulsion paint in two coats.
3.10.6.2 Ditto, but internal face of roof slab with plastic
m2 98.00
emulsion paint.
3.10.6.3 Painting of metal doors and windows with
sum 1.00
synthetatic paint.
3.10.7 Electrical Installation
3.3.7.1
Sub-distribution board (SDB-GE) for flush
mounting with locable door and consisting of:

3.3.7.2 1 pcs. ACB of 63A, 3-ph No. 1.00


3.3.7.3 1 pcs. ACB of 25A, 3-ph No. 1.00
3.3.7.4 1 pcs. ACB of 16A, 3-ph No. 1.00
3.3.7.5 1 pcs. ACB of 16A, 1-ph No. 1.00
3.3.7.6 1 pcs. ACB of 10A, 1-ph and with all the necessa No. 1.00
3.3.7.7 Light points with switches, fed through PVC
No. 6.00
insulated wire 2x2.5mm2 cable
3.3.7.8 Flush mounted socket outlets of
16A,220V,50HZ,fed through PVC 3x2.5mm2
No. 2.00
cable, laid on the roof and in 16mm conduit in
the wall.
3.3.7.9 Power line of PVC conductor of 2 x 4 sq mm
m 30.00
from MDB
3.10.8 Light Fittiogs With Lamps

123/130
#3.10 Transformer House TG
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

3.10.8.1
Suspended type fluorescent luminaries, type
philips TMS 012/1.36 or equivalent with 1x36W No. 6.00
lamps suspended by 2.5 mm steel rope.

3.10.8.2 25A,380V,50HZ,surface mounted power socket


(3ph) with earthing contact fed through Cu
4x4mm2 PVC insulated cable laid along the No. 1.00
truss (on the roof) and along the wall surface (on
the wall)
3.10.8.2 Surface mounted power socket 3phase type or
equivalent with earthing contact laid on the roof No. 2.00
and along the wall surface.
3.10.8.3 Ditto, but 16A and fed through 4x2.5mm2cable
No. 2.00
type.
3.10.9 Miscellaneous works No.
3.10.9.1 Supply and fix metal louvered door with slopping
slots 0.8m2 ventillation area with frame and No. 2.00
SEIKO profile (3000x3700)mm
3.10.9.2 Supply and fix metal louvered window with
frame and slopping slots SEIKO profile No. 26.00
(1000x800)mm
3.10.9.3 Ditto,but (800x2000)mm 4.00
3.10.9.4 100mm thick and 1m wide pavement including
concrete ditch in semi concrete pipe as per the m 56.00
drawing.
3.10.9.5 Provide and cover roof with bitumen mastic and
m2 98.00
marglass.
Grand Total For Bill # 3.10.
Total of Bill No.3.10 for 2 TRANSFORMER
House @TULU GUDO

124/130
#3.10 Transformer House TG
AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

BILL 11: CONSTRUCTION OF ACCESS ROAD


RATE TOTAL
ITEM DESCRIPTION UNIT QNTY
Birr Birr
11.1 CONSTRUCTION OF ACCESS ROAD EARTH WORK

Remove 150mm of Expansive top soil and dispose evenly to


11.1.1 m2 312,000
the sourounding road side.

Bulk Excavation to an average depth of 450mm below top


strip level and desposal of surplus excavated material not
11.1.2 greater than one kilometer from excavation location. The m3 148,200
excavation shall also include excavation for side dithes and
guard dithces where thereof required.

11.1.3 Shape Road Bed and Compact to 90% AASHTO Modified m2 312,000

The excavation formed as directed in Item 1 & Item 2 above


should be backfilled with a plastic non-expansive soil of CBR
11.1.4 value 3 - 4 or better, and compacted to a density of 95% m3 140,400
modified AASHTO in each 150mm layer; the subgrade
material may be plastic but non-expansive.

#11. ROAD 125/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Supply, Place and compact Gravel Wearing Couse Material


for a depth of 300mm. Compaction shall be made in two
layers of each 150mm thick, Minimum Compaction shall be
not less than 95% of modified AASHTO and the CBR Should
11.1.5 m3 93,600
be in excess of 20 after 4 days of socking. Selected material
shall consist of hard durable angular particles of fragments of
stone or gravel. The material shall be free from vegetable
matter and lumps or balls of clay.

Total For Access Road Earth Work


CONSTRUCTION OF ACCESS ROAD STRUCTURES
11.2

11.2.1 EARTH WORK


11.2.1.1 Normal Material excavation for the structure seat up to the
design grade and desired dimentions. m3 566.72

11.2.1.2 Disposal of Surplus Excavated material as directed by the


m3 453.38
engineer
11.2.1.3 Provide, fill and compact selected granular material at a
minimum of 95% procter density in layers of not greater than m3 141.68
300mm thick.
Total For Acess Road Structures Earth Work
STONE MASONRY AND DOWNSTREAM STONE
11.2.2 PAVEMENT

Construction of stone masonry wall at inlet and outlet for


11.2.2.1 abutment and transistions walls out of fresh basaltic or m3 35.33
equivalent jointed with cement and sand mortar in the mix
ratio 1:4.

#11. ROAD 126/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Provide and Place 250mm thick Cemented Stone Pitching


11.2.2.2 m2 89.60
riprap for the upstream inlet and down stream outlet channel.

Total For Masonry and Rock Fill


11.2.3 CONCRETE WORK
Provide and place 70mm thickness Class C-10 Concrete
11.2.3.1 m2 152.56
bedding below culvert.

Provide and Place Class C-25 concrete in to the form work


11.2.3.2 m3 42.00
according to the design drawing for the box culvert.

Provide and fix vertical or inclined formworks according to the


11.2.3.3 forms shown in the drawing for the box culvert. m2 100.00

Provide, cut, bend and fix in position reinforced steel bar. All
11.2.3.4 according to structural drawing. Price should also include ton 3.50
tying wires.

Manufacture, Provide and Place in position concrete pipe as


11.2.3.5 per the standard specification of Ethiopian Road Authority
(ERA).

900 mm Internal Diameter lm 70.00


700 mm Internal Diameter lm 180.00
11.2.4 Miscellaneous works
Access road trafic signs & Sign Boards as shown in tender
11.2.4.1 Drawing &/or BoQ as directed by the Engineer and as No 27.00
dictated by the field condition.
Precast concrete marker posts as shown in tender Drawing
11.2.4.2 &/or BoQ as directed by the Engineer and as dictated by the No 13.00
field condition.
Total For Concrete Work

#11. ROAD 127/130


AAWSA:PROJECT OFFICE SOUTH AND SOUTH EAST ADDIS ABABA AREA WSP FROM SANF WELL FIELD

Total for Access Road

#11. ROAD 128/130