Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
industry
Dirk Basten
Refratechnik Cement Supervisor Training Course 2012
Refractory installation
of a complete plant
Scheme of the refractory installation of a complete plant
T [°C]
1400
1200
1100
850°C -1000°C
Inbetriebnahme
1000
900
800
3*
700
400
1*
0
0 12 24 36 48 60 72 84 96 108 120 132 144 156 168
t [h]
Typical dry out curve for complete new plant
Heating diagram of refractory concretes
1500
1400 Heating diagram of refractory
Aufheizdiagramm concretes
feuerfester (AR,
Massen (LCC, MCC,LCC, SC, JC, G,
SC, JC)
1300 MCG, Heating diagramm of refractory concretes (LCC, MCC, SC, JC)
LCG) Stationary areas wall thickness 50- 50- 300 mm
1200
1100
1000
Temperatur / °C
Temperature / °C
900
30 °C/h
800 bis zur Einsatztemperatur
up to temp. of application
700
600
500
10 h / 500 °C Heating Up
400
300
25 °C/h
Drying
200 20 h / 110 - 150 °C
min. 24 h Erhärtungsdauer 15 °C/h
100 min. 24 hrs setting time
0
0 10 20 30 40 50 60 70 80 90 100 110
Zeit nach Einbau / h
Time after installation / hrs
Time after installation / h
Behaviour of drying rate
Drying rate
as as a function
a function of time
of drying time
100
Phase 1 Phase 2
90
80
Low vapour pressurelow drying rate
70
Drying rate [quantity/h]
60
Drying rate
10
0
1 2 3 4 5
tkn
6 7 8 9 10 11 12 13
Dryiing time
Drying time [h]
Phase 1: Pmeniskus > Ppore opening
air
Inlet outlet
T [°C]
100°
100°C Ppore opening
/1 bar
∆P≈ 1 bar
Pmeniskus
20°
20°C
/0.02 bar Pcapillary
Low temperatur, continous airstream with high ventilation
Phase 2: PMeniskus < Ppore opening
100°
100°C Pcapillary
/1 bar
250
S a tu r a tio n v a p o u r p r e s s u r e (b a r)
200
150
100
50
0
0 50 100 150 200 250 300 350 400
Temperature (°C)
1500
1400 Aufheizdiagramm feuerfester Massen (LCC, MCC, SC, JC)
1300 Heating diagramm of refractory concretes (LCC, MCC, SC, JC)
1200
1100
1000
Temperatur / °C
Temperature / °C
900
30 °C/h
800 bis zur Einsatztemperatur
up to temp. of application
700
600
10 h / 500 °C
500
400
25 °C/h
300
200 20 h / 110 - 150 °C
min. 24 h Erhärtungsdauer 15 °C/h
100 min. 24 hrs setting time
0
0 10 20 30 40 50 60 70 80 90 100 110
Zeit nach Einbau / h
Time after installation / hrs
Explosive spalling of castable surface (satellite cooler)
Dry out - surface cracking
Contraction at tyre
Temperaturedistribution in brick and kiln shell during heating up
In 8h to 1000°C
Too slowly heating up, too early turning of kiln
Loose lining
migration, relativ
movement
Too fast heating up
Typical timing: