Sei sulla pagina 1di 6

MONTHLY EMP AUDIT REPORT

Date: Report No.


Activities:

Ref Aspects Item Assessment / Status Compliance / Action

There is an EAD approved EMP in place for the


Envirocon Construction Products EMP

Documentation A site specific EMP is in place for the plant

The weekly environmental inspection checklists


are available
1 General

Continous Fuel tips, Pollution prevention,


Toolbox Talk/Training Pollution Control, Energy and water Conservation
tool box talks

Non-Conformance None
Report

All machines are inspected before they are


allowed to enter and be used on site. This
Machinery ensures exhaust emissions are keep to a minimal
level

Dust Control &


2 Road Base or Aggregate for entrance road to
Air Emission Access Roads
enforce speed limit

Appropriate fire extinguishers are provided to


Monitoring prevent fires and the associated release of
dangerous fumes

All machines are inspected before they are


allowed to enter and be used on site. This
reduces the risk of oil spillage and ground
contamination

Soil and Ground Fuel/Chemical


3 Water Storage
Management

SUB/10773/Amana 1
Ref Aspects Item Assessment / Status Compliance / Action

drip trays are provided for all equipments to


prevent oil spill during operation
Soil and Ground Fuel/Chemical
3 Water Storage
Management
Envirocon machines are inspected and
maintained weekly. Envirocon machines are
subject to the same inspection.

All machines are repaired at a dedicated vehicle


and plant maintenance yard on site.

Noise survey carried out weekly to monitor the


accumulation of noise during construction
Noise &
4 Monitoring
Vibration
All machine are parked on site overnight to
reduce traffic movement

Proper waste segregation to all Waste


Management Area provided

All office wastes including food waste are


managed by a dedicated waste management
Waste company (AMGT)
5 Management Waste Segregation

All used steel, wood and other plant materials


are collected in the waste segregation area and
are removed to recyc. Facility out of site

SUB/10773/Amana 2
Ref Aspects Item Assessment / Status Compliance / Action

There is a dedicated area for all chemicals for


Chemical and storage and MSDS are provided.
Hazardous Hazardous Waste
6 Materials
Management
Provision of chemical stores and provide
adequate kits for dispensing chemicals.

All restricted materials should be removed from


the storage room
Storage
Materials
7 Chemicals & Non-Chemicals materials should be
Management
in different storage room

Materials Status Materials should be stored systematically

Practice water, energy conservation and waste


Offices segregation daily
Energy
8 Management
Current office employees car pool TO and FROM
Car Pooling the site.

Emergency An emergency plan is in place for environmental


9 Arrangement Emergency Plan emergencies.

SUB/10773/Amana 3
Pic
Ref

SUB/10773/Amana 4
Pic
Ref

SUB/10773/Amana 5
Pic
Ref

SUB/10773/Amana 6

Potrebbero piacerti anche