8 PROJECT 3
WEATHER PROOF LAMP PENAMBAHAN & MODIF LAMPU PRODUKSI CK
No. WARNA DESKRIPSI QTY UNIT OWNER

1 BIRU Warna Biru Posisi Lampu Menempel Atap Rencana Akan Diturunkan 68 Set
PT. EKABOGA INTI
2 MERAH Warna Merah Rencana Penambahan Lampu dan Diturunkan 35 Set Jl. Raya Poncol No.2 Ciracas
Jakarta 13740 Indonesia
DESIGN BY DATE CONTRACTOR

9 Firman
CHECKED BY
26.01.2019
DATE FiPER INDONESIA 2
Jl. Panduraya, No.27
Hendi/ LAPI ITB
APPROVED BY DATE Ruko Grande, Blok.B1
Bogor 16152, Indonesia
Hendi/ LAPI ITB DRAWING TITLE
ORDER NUMBER

- DRAWING NUMBER REV

JOB NUMBER - 0
10 - SCALE : NTS APPROXIMATE WEIGHT ( Kg ) -

This drawing is our property,


SIZE : A3 SHEET : 1 of 1
1
it can't be reproduced or comunicated without our written agreement

P O N M L K J I H G F E D C B A

Potrebbero piacerti anche