An engineering and project center renovation work order was placed with Mascharak & Sons on December 7, 2017 for Rs. 36.01 lakhs. There was a Rs. 10 lakh savings on the engineering center floors. It is proposed to extend the delivery deadline from December 31, 2018 to December 31, 2019 to use the remaining Rs. 10 lakhs to complete electrical work on additional project center floors, as the current vendor is familiar with the site conditions.
An engineering and project center renovation work order was placed with Mascharak & Sons on December 7, 2017 for Rs. 36.01 lakhs. There was a Rs. 10 lakh savings on the engineering center floors. It is proposed to extend the delivery deadline from December 31, 2018 to December 31, 2019 to use the remaining Rs. 10 lakhs to complete electrical work on additional project center floors, as the current vendor is familiar with the site conditions.
An engineering and project center renovation work order was placed with Mascharak & Sons on December 7, 2017 for Rs. 36.01 lakhs. There was a Rs. 10 lakh savings on the engineering center floors. It is proposed to extend the delivery deadline from December 31, 2018 to December 31, 2019 to use the remaining Rs. 10 lakhs to complete electrical work on additional project center floors, as the current vendor is familiar with the site conditions.
Engineering centre and Project centre renovation work
Vendor: - Mascharak & Sons
Work order: - 3800013928/109 dated 07.12.2017 Delivery date: - 31.12.2018 Justification note for Extending the delivery period of electrical order no 3800013928 1. An work order had been placed on Mascharak & Sons dated 07.12.2017 for renovation work of engineering centre for Rs. 36.01 Lakhs. After completion of renovation work in engineering centre 1st floor and 2nd floor area, there was saving of approx. Rs. 10 lakhs in the order value. 2. There is ongoing renovation work in project centre 3rd floor and also proposed renovation work in project centre 2nd floor, ground floor and basement area. It is proposed to utilise the balance value of Rs 10 lakhs for this renovation work. 3. Deployed vendor is already enganged in the renovation work and also well aware of the site condition for dismantling work which is key aspect from safety point of view. 4. Accordingly, it is proposed to extend the delivery period for this order from 31.12.2018 to 31.12.2019 to complete the electrical activity for these floors.